Combined Notice of Filings, 34884 [2019-15378]
Download as PDF
34884
Federal Register / Vol. 84, No. 139 / Friday, July 19, 2019 / Notices
requirements, interventions, protests,
service, and qualifying facilities filings
can be found at: https://www.ferc.gov/
docs-filing/efiling/filing-req.pdf. For
other information, call (866) 208–3676
(toll free). For TTY, call (202) 502–8659.
Dated: July 12, 2019.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2019–15377 Filed 7–18–19; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Combined Notice of Filings
jbell on DSK3GLQ082PROD with NOTICES
Take notice that the Commission has
received the following Natural Gas
Pipeline Rate and Refund Report filings:
Filings Instituting Proceedings
Docket Number: PR19–67–000.
Applicants: Columbia Gas of Ohio,
Inc.
Description: Tariff filing per
284.123(b),(e)/: COH Rates effective July
1, 2019 to be effective 7/1/2019 under
PR19–67.
Filed Date: 7/11/19.
Accession Number: 201907115046.
Comments/Protests Due: 5 p.m. ET 8/
1/19.
Docket Numbers: RP19–1382–000.
Applicants: Northern Natural Gas
Company.
Description: § 4(d) Rate Filing:
20190711 Negotiated Rate to be effective
7/12/2019.
Filed Date: 7/11/19.
Accession Number: 20190711–5109.
Comments Due: 5 p.m. ET 7/23/19.
Docket Numbers: RP19–1383–000.
Applicants: Dominion Energy
Transmission, Inc.
Description: § 4(d) Rate Filing: DETI—
July 11, 2019 Negotiated Rate
Agreements to be effective 7/12/2019.
Filed Date: 7/11/19.
Accession Number: 20190711–5133.
Comments Due: 5 p.m. ET 7/23/19.
Docket Numbers: RP19–1384–000.
Applicants: Southwest Energy, L.P.
Description: Joint Petition for
Temporary Waiver of Commission
Policies, Capacity Release Regulations
and Policies of Southwest Energy, L.P.,
et al. under RP19–1384.
Filed Date: 7/11/19.
Accession Number: 20190711–5151.
Comments Due: 5 p.m. ET 7/23/19.
Docket Numbers: RP19–846–001.
Applicants: Black Hills Shoshone
Pipeline, LLC.
Description: Request for Extension of
Time to Implement NAESB 3.1
VerDate Sep<11>2014
18:36 Jul 18, 2019
Jkt 247001
Standards Per Order No. 587–Y of Black
Hills Shoshone Pipeline LLC under
RP19–846.
Filed Date: 7/11/19.
Accession Number: 20190711–5158.
Comments Due: 5 p.m. ET 7/19/19.
Docket Numbers: RP19–1291–002.
Applicants: Paiute Pipeline Company.
Description: Compliance filing
Compliance Filing—RP19–1291 to be
effective 7/1/2019.
Filed Date: 7/12/19.
Accession Number: 20190712–5146.
Comments Due: 5 p.m. ET 7/24/19.
The filings are accessible in the
Commission’s eLibrary system by
clicking on the links or querying the
docket number.
Any person desiring to intervene or
protest in any of the above proceedings
must file in accordance with Rules 211
and 214 of the Commission’s
Regulations (18 CFR 385.211 and
385.214) on or before 5:00 p.m. Eastern
time on the specified comment date.
Protests may be considered, but
intervention is necessary to become a
party to the proceeding.
eFiling is encouraged. More detailed
information relating to filing
requirements, interventions, protests,
service, and qualifying facilities filings
can be found at: https://www.ferc.gov/
docs-filing/efiling/filing-req.pdf. For
other information, call (866) 208–3676
(toll free). For TTY, call (202) 502–8659.
Dated: July 15, 2019.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2019–15378 Filed 7–18–19; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. CP19–484–000]
Kinder Morgan Louisiana Pipeline LLC;
Notice of Application
Take notice that on June 28, 2019,
Kinder Morgan Louisiana Pipeline LLC
(Kinder Morgan), at 1001 Louisiana
Street, Houston, Texas 77002, filed an
application in the above reference
docket an application pursuant to
section 7(c) of the Natural Gas Act
(NGA) to construct certain facilities.
Kinder Morgan proposes to construct,
and operate the Acadiana Project
(Project). The Project involves the: (1)
Installation of three (3) new gas fired
compressor units totaling 95,700
International Organization for
Standardization (ISO) horsepower at
Kinder Morgan’s existing Compressor
PO 00000
Frm 00036
Fmt 4703
Sfmt 4703
Station No. 760 in Acadia Parish,
Louisiana, (2) modifications to meter
piping at Kinder Morgan’s existing
Columbia Gulf Transmission Meter
Station in Evangeline Parish, Louisiana,
and (3) the installation of auxiliary
facilities at both locations, all as more
fully set forth in the application which
is on file with the Commission and open
to public inspection. The filing is
available for review at the Commission
in the Public Reference Room or may be
viewed on the Commission’s website
web at https://www.ferc.gov using the
‘‘eLibrary’’ link. Enter the docket
number excluding the last three digits in
the docket number field to access the
document. For assistance, contact FERC
at FERCOnlineSupport@ferc.gov or call
toll-free, (866) 208–3676 or TYY, (202)
502–8659.
Any questions concerning this
application may be directed to Bruce H.
Newsome, Vice President, Kinder
Morgan Louisiana Pipeline LLC, 3250
Lacey Road, 7th Floor, Downers Grove,
Illinois 60515–7918, by telephone at
(630) 725–3070 or by email at bruce_
newsome@kindermorgan.com.
Specifically, the Project will allow
Kinder Morgan to increase firm northto-south transportation capacity on its
system by 894,000 dekatherms per day
(Dth/d) from existing pipeline that
interconnects to an existing delivery
point with Sabine Pass Liquefaction,
LLC (SPL) at SPL’s liquefied natural gas
export terminal at Sabine Pass in
Cameron Parish, Louisiana. The
expansion capacity (894,000 Dth/d) will
be combined with 145,000 Dth/d of
existing system capacity that has been
reserved for the Project to enable Kinder
Morgan to meet the request of SPL,
which has executed a binding precedent
agreement with Kinder Morgan for
945,000 Dth/d of transportation capacity
for delivery of feedstock gas to the SPL
Export Terminal. The estimated cost of
the Project is $143,048,567.
Pursuant to section 157.9 of the
Commission’s rules (18 CFR 157.9),
within 90 days of this Notice, the
Commission staff will either: Complete
its environmental assessment (EA) and
place it into the Commission’s public
record (eLibrary) for this proceeding; or
issue a Notice of Schedule for
Environmental Review. If a Notice of
Schedule for Environmental Review is
issued, it will indicate, among other
milestones, the anticipated date for the
Commission staff’s issuance of the final
environmental impact statement (FEIS)
or EA for this proposal. The filing of the
EA in the Commission’s public record
for this proceeding or the issuance of a
Notice of Schedule for Environmental
Review will serve to notify federal and
E:\FR\FM\19JYN1.SGM
19JYN1
Agencies
[Federal Register Volume 84, Number 139 (Friday, July 19, 2019)]
[Notices]
[Page 34884]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2019-15378]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
Combined Notice of Filings
Take notice that the Commission has received the following Natural
Gas Pipeline Rate and Refund Report filings:
Filings Instituting Proceedings
Docket Number: PR19-67-000.
Applicants: Columbia Gas of Ohio, Inc.
Description: Tariff filing per 284.123(b),(e)/: COH Rates effective
July 1, 2019 to be effective 7/1/2019 under PR19-67.
Filed Date: 7/11/19.
Accession Number: 201907115046.
Comments/Protests Due: 5 p.m. ET 8/1/19.
Docket Numbers: RP19-1382-000.
Applicants: Northern Natural Gas Company.
Description: Sec. 4(d) Rate Filing: 20190711 Negotiated Rate to be
effective 7/12/2019.
Filed Date: 7/11/19.
Accession Number: 20190711-5109.
Comments Due: 5 p.m. ET 7/23/19.
Docket Numbers: RP19-1383-000.
Applicants: Dominion Energy Transmission, Inc.
Description: Sec. 4(d) Rate Filing: DETI--July 11, 2019 Negotiated
Rate Agreements to be effective 7/12/2019.
Filed Date: 7/11/19.
Accession Number: 20190711-5133.
Comments Due: 5 p.m. ET 7/23/19.
Docket Numbers: RP19-1384-000.
Applicants: Southwest Energy, L.P.
Description: Joint Petition for Temporary Waiver of Commission
Policies, Capacity Release Regulations and Policies of Southwest
Energy, L.P., et al. under RP19-1384.
Filed Date: 7/11/19.
Accession Number: 20190711-5151.
Comments Due: 5 p.m. ET 7/23/19.
Docket Numbers: RP19-846-001.
Applicants: Black Hills Shoshone Pipeline, LLC.
Description: Request for Extension of Time to Implement NAESB 3.1
Standards Per Order No. 587-Y of Black Hills Shoshone Pipeline LLC
under RP19-846.
Filed Date: 7/11/19.
Accession Number: 20190711-5158.
Comments Due: 5 p.m. ET 7/19/19.
Docket Numbers: RP19-1291-002.
Applicants: Paiute Pipeline Company.
Description: Compliance filing Compliance Filing--RP19-1291 to be
effective 7/1/2019.
Filed Date: 7/12/19.
Accession Number: 20190712-5146.
Comments Due: 5 p.m. ET 7/24/19.
The filings are accessible in the Commission's eLibrary system by
clicking on the links or querying the docket number.
Any person desiring to intervene or protest in any of the above
proceedings must file in accordance with Rules 211 and 214 of the
Commission's Regulations (18 CFR 385.211 and 385.214) on or before 5:00
p.m. Eastern time on the specified comment date. Protests may be
considered, but intervention is necessary to become a party to the
proceeding.
eFiling is encouraged. More detailed information relating to filing
requirements, interventions, protests, service, and qualifying
facilities filings can be found at: https://www.ferc.gov/docs-filing/efiling/filing-req.pdf. For other information, call (866) 208-3676
(toll free). For TTY, call (202) 502-8659.
Dated: July 15, 2019.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2019-15378 Filed 7-18-19; 8:45 am]
BILLING CODE 6717-01-P