Notice of Request Under Blanket Authorization: Columbia Gas Transmission, LLC, 33929-33930 [2019-15068]
Download as PDF
Federal Register / Vol. 84, No. 136 / Tuesday, July 16, 2019 / Notices
Signed in Washington, DC, on July 10,
2019.
Christopher Lawrence,
Management and Program Analyst,
Transmission Permitting and Technical
Assistance, Office of Electricity.
[FR Doc. 2019–15054 Filed 7–15–19; 8:45 am]
BILLING CODE 6450–01–P
DEPARTMENT OF ENERGY
[OE Docket No. EA–312–B]
Application To Export Electric Energy;
Emera Energy U.S. Subsidiary No. 2,
Inc.
Office of Electricity,
Department of Energy (DOE).
ACTION: Notice of application.
AGENCY:
Emera Energy U.S. Subsidiary
No. 2, Inc. (Applicant or EE US No. 2)
has applied to renew its authorization to
transmit electric energy from the United
States to Canada pursuant to the Federal
Power Act.
DATES: Comments, protests, or motions
to intervene must be submitted on or
before August 15, 2019.
ADDRESSES: Comments, protests,
motions to intervene, or requests for
more information should be addressed
to: Office of Electricity, Mail Code: OE–
20, U.S. Department of Energy, 1000
Independence Avenue SW, Washington,
DC 20585–0350. Because of delays in
handling conventional mail, it is
recommended that documents be
transmitted by overnight mail, by
electronic mail to Electricity.Exports@
hq.doe.gov, or by facsimile to 202–586–
8008.
SUPPLEMENTARY INFORMATION: The
Department of Energy (DOE) regulates
exports of electricity from the United
States to a foreign country, pursuant to
sections 301(b) and 402(f) of the
Department of Energy Organization Act
(42 U.S.C. 7151(b) and 7172(f)). Such
exports require authorization under
section 202(e) of the Federal Power Act
(16 U.S.C. 824a(e)).
On November 18, 2014, DOE issued
Order No. EA–312–A, which authorized
EE US No. 2 to transmit electric energy
from the United States to Canada as a
power marketer for a five-year term
using existing international
transmission facilities. That
authorization expires on November 18,
2019. On July 3, 2019, EE US No. 2 filed
an application with DOE for renewal of
the export authorization contained in
Order No. EA–312–A for an additional
five-year term.
In its application, the Applicant states
that it ‘‘does not own or control any
jspears on DSK30JT082PROD with NOTICES
SUMMARY:
VerDate Sep<11>2014
17:33 Jul 15, 2019
Jkt 247001
electric power generation or
transmission facilities and does not
have a franchised electric power service
area.’’ The electric energy that the
Applicant proposes to export to Canada
would be surplus energy purchased
from third parties, such as electric
utilities and Federal power marketing
agencies, pursuant to voluntary
agreements. The existing international
transmission facilities to be utilized by
the Applicant have previously been
authorized by Presidential permits
issued pursuant to Executive Order
10485, as amended, and are appropriate
for open access transmission by third
parties.
Procedural Matters: Any person
desiring to be heard in this proceeding
should file a comment or protest to the
application at the address provided
above. Protests should be filed in
accordance with Rule 211 of the Federal
Energy Regulatory Commission’s (FERC)
Rules of Practice and Procedure (18 CFR
385.211). Any person desiring to
become a party to this proceeding
should file a motion to intervene at the
above address in accordance with FERC
Rule 214 (18 CFR 385.214). Five (5)
copies of such comments, protests, or
motions to intervene should be sent to
the address provided above on or before
the date listed above.
Comments and other filings
concerning EE US No. 2’s application to
export electric energy to Canada should
be clearly marked with OE Docket No.
EA–312–B. An additional copy is to be
provided directly to Will Szubielski,
Emera Energy, 5151 Terminal Road,
Halifax, Nova Scotia B3J 1A1, Canada;
A. Michael Burnell, Emera Energy U.S.
Subsidiary No. 2, Inc., Suite 101, #37
Route 236, Kittery, Maine 03904; and
Bonnie A. Suchman, Suchman Law
LLC, 8104 Paisley Place, Potomac,
Maryland 20854.
A final decision will be made on this
application after the environmental
impacts have been evaluated pursuant
to DOE’s National Environmental Policy
Act Implementing Procedures (10 CFR
part 1021) and after DOE determines
that the proposed action will not have
an adverse impact on the sufficiency of
supply or reliability of the U.S. electric
power supply system.
Copies of this application will be
made available, upon request, for public
inspection and copying at the address
provided above, by accessing the
program website at https://energy.gov/
node/11845, or by emailing Angela Troy
at Angela.Troy@hq.doe.gov.
PO 00000
Frm 00026
Fmt 4703
Sfmt 4703
33929
Signed in Washington, DC, on July 10,
2019.
Christopher Lawrence,
Management and Program Analyst,
Transmission Permitting and Technical
Assistance, Office of Electricity.
[FR Doc. 2019–15052 Filed 7–15–19; 8:45 am]
BILLING CODE 6450–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. CP19–485–000]
Notice of Request Under Blanket
Authorization: Columbia Gas
Transmission, LLC
Take notice that on July 2, 2019,
Columbia Gas Transmission, LLC
(Columbia), 700 Louisiana Street,
Houston, Texas 77002, filed in Docket
No. CP19–485–000, a Prior Notice
Request pursuant to sections 157.205
and 157.216 of the Commission’s
regulations under the Natural Gas Act
(NGA), and Columbia’s blanket
certificate issued in Docket No. CP83–
76–000, requesting authorization to
abandon six injection/withdrawal (I/W)
wells, and associated appurtenances,
and abandon in-place six associated
pipelines totaling approximately 1.7
miles at the Lucas and Weaver Storage
Fields located in Ashland County, Ohio.
Columbia states the I/W wells have
provided a de minimus contribution to
the total field deliverability and casing
replacement would not be cost effective
due to the age of the facilities, all as
more fully described in the application
which is on file with the Commission
and open to public inspection. The
filing may also be viewed on the web at
https://www.ferc.gov using the
‘‘eLibrary’’ link. Enter the docket
number excluding the last three digits in
the docket number field to access the
document. For assistance, contact FERC
at FERCOnlineSupport@ferc.gov or call
toll-free, (866) 208–3676 or TTY, (202)
502–8659.
Any questions regarding this prior
notice should be directed to Sorana
Linder, Director, Modernization &
Certificates, Columbia Gas
Transmission, LLC, 700 Louisiana
Street, Suite 700, Houston, Texas 77002,
by telephone at (832) 320–5209, or by
email at sorana_linder@
transcanada.com.
Any person or the Commission’s staff
may, within 60 days after issuance of
the instant notice by the Commission,
file pursuant to Rule 214 of the
Commission’s Procedural Rules (18 CFR
385.214) a motion to intervene or notice
E:\FR\FM\16JYN1.SGM
16JYN1
jspears on DSK30JT082PROD with NOTICES
33930
Federal Register / Vol. 84, No. 136 / Tuesday, July 16, 2019 / Notices
of intervention and pursuant to section
157.205 of the regulations under the
NGA (18 CFR 157.205), a protest to the
request. If no protest is filed within the
time allowed therefore, the proposed
activity shall be deemed to be
authorized effective the day after the
time allowed for filing a protest. If a
protest is filed and not withdrawn
within 30 days after the allowed time
for filing a protest, the instant request
shall be treated as an application for
authorization pursuant to section 7 of
the NGA.
Pursuant to section 157.9 of the
Commission’s rules, 18 CFR 157.9,
within 90 days of this Notice the
Commission staff will either: complete
its environmental assessment (EA) and
place it into the Commission’s public
record (eLibrary) for this proceeding; or
issue a Notice of Schedule for
Environmental Review. If a Notice of
Schedule for Environmental Review is
issued, it will indicate, among other
milestones, the anticipated date for the
Commission staff’s issuance of the EA
for this proposal. The filing of the EA
in the Commission’s public record for
this proceeding or the issuance of a
Notice of Schedule for Environmental
Review will serve to notify federal and
state agencies of the timing for the
completion of all necessary reviews, and
the subsequent need to complete all
federal authorizations within 90 days of
the date of issuance of the Commission
staff’s EA.
Persons who wish to comment only
on the environmental review of this
project should submit an original and
two copies of their comments to the
Secretary of the Commission.
Environmental commenters will be
placed on the Commission’s
environmental mailing list and will be
notified of any meetings associated with
the Commission’s environmental review
process. Environmental commenters
will not be required to serve copies of
filed documents on all other parties.
However, the non-party commenters
will not receive copies of all documents
filed by other parties or issued by the
Commission and will not have the right
to seek court review of the
Commission’s final order.
The Commission strongly encourages
electronic filings of comments, protests,
and interventions in lieu of paper using
the ‘‘eFiling’’ link at https://
www.ferc.gov. Persons unable to file
electronically should submit an original
and 3 copies of the protest or
intervention to the Federal Energy
regulatory Commission, 888 First Street
NE, Washington, DC 20426.
VerDate Sep<11>2014
17:33 Jul 15, 2019
Jkt 247001
Dated: July 10, 2019.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2019–15068 Filed 7–15–19; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 8315–014]
Eagle Creek Sartell Hydro, LLC; Notice
of Application Accepted for Filing,
Soliciting Comments, Motions To
Intervene, and Protests
July 10, 2019.
Take notice that the following
hydroelectric application has been filed
with the Commission and is available
for public inspection:
a. Type of Application: Request for
temporary variance of Article 34.
b. Project No.: 8315–014.
c. Date Filed: July 9, 2019.
d. Applicant: Eagle Creek Sartell
Hydro, LLC.
e. Name of Project: Sartell Dam Hydro
Project.
f. Location: Mississippi River in
Stearns and Benton counties,
Minnesota.
g. Filed Pursuant to: Federal Power
Act, 16 U.S.C. 791a–825r.
h. Applicant Contact: Ms. Melissa
Rondou, Eagle Creek Sartell Hydro, LLC,
116 N State Street, P.O. Box 167,
Neshkoro, WI 54960, (920) 293–4628
ext. 347, melissa.rondou@
eaglecreekre.com.
i. FERC Contact: Mr. Jeremy Jessup,
(202) 502–6779, Jeremy.Jessup@ferc.gov.
j. Deadline for filing comments,
motions to intervene, and protests, is 15
days from the issuance date of this
notice by the Commission. The
Commission strongly encourages
electronic filing. Please file comments,
motions to intervene, and protests using
the Commission’s eFiling system at
https://www.ferc.gov/docs-filing/
efiling.asp. Commenters can submit
brief comments up to 6,000 characters,
without prior registration, using the
eComment system at https://
www.ferc.gov/doc-sfiling/
ecomment.asp. You must include your
name and contact information at the end
of your comments. For assistance,
please contact FERC Online Support at
FERCOnlineSupport@ferc.gov, (866)
208–3676 (toll free), or (202) 502–8659
(TTY). In lieu of electronic filing, please
send a paper copy to: Secretary, Federal
Energy Regulatory Commission, 888
First Street NE, Washington, DC 20426.
PO 00000
Frm 00027
Fmt 4703
Sfmt 4703
The first page of any filing should
include docket numbers P–8315–014.
The Commission’s Rules of Practice
and Procedure require all intervenors
filing documents with the Commission
to serve a copy of that document on
each person on the official service list
for the project. Further, if an intervenor
files comments or documents with the
Commission relating to the merits of an
issue that may affect the responsibilities
of a particular resource agency, they
must also serve a copy of the document
on that resource agency.
k. Description of Request: The
applicant requests a temporary variance
from the run-of-river and reservoir
elevation requirements of Article 34 of
the license. The variance will allow the
licensee to drawdown the reservoir
approximately three feet beginning
August 1, 2019, for a six-week period
(from August 1 through approximately
September 15, 2019). The drawdown is
to assist the Minnesota Department of
Natural Resources, the Little Rock Lake
Association, and the Benton Soil and
Water Conservation District to facilitate
water quality, fish habitat, and
restoration improvements in the reach
of the Mississippi River upstream of the
project, and at Little Rock Lake, located
approximately six miles upstream of the
project.
l. Locations of the Application: A
copy of the application is available for
inspection and reproduction at the
Commission’s Public Reference Room,
located at 888 First Street NE, Room 2A,
Washington, DC 20426, or by calling
(202) 502–8371. This filing may also be
viewed on the Commission’s website at
https://www.ferc.gov/docs-filing/
elibrary.asp. Enter the docket number
excluding the last three digits in the
docket number field to access the
document. You may also register online
at https://www.ferc.gov/docs-filing/
esubscription.asp to be notified via
email of new filings and issuances
related to this or other pending projects.
For assistance, call 1–866–208- 3676 or
email FERCOnlineSupport@ferc.gov, for
TTY, call (202) 502–8659. A copy is also
available for inspection and
reproduction at the address in item (h)
above.
m. Individuals desiring to be included
on the Commission’s mailing list should
so indicate by writing to the Secretary
of the Commission.
n. Comments, Motions to Intervene, or
Protests: Anyone may submit
comments, a motion to intervene, or a
protest in accordance with the
requirements of Rules of Practice and
Procedure, 18 CFR 385.210, .211, .214.
In determining the appropriate action to
take, the Commission will consider all
E:\FR\FM\16JYN1.SGM
16JYN1
Agencies
[Federal Register Volume 84, Number 136 (Tuesday, July 16, 2019)]
[Notices]
[Pages 33929-33930]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2019-15068]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Docket No. CP19-485-000]
Notice of Request Under Blanket Authorization: Columbia Gas
Transmission, LLC
Take notice that on July 2, 2019, Columbia Gas Transmission, LLC
(Columbia), 700 Louisiana Street, Houston, Texas 77002, filed in Docket
No. CP19-485-000, a Prior Notice Request pursuant to sections 157.205
and 157.216 of the Commission's regulations under the Natural Gas Act
(NGA), and Columbia's blanket certificate issued in Docket No. CP83-76-
000, requesting authorization to abandon six injection/withdrawal (I/W)
wells, and associated appurtenances, and abandon in-place six
associated pipelines totaling approximately 1.7 miles at the Lucas and
Weaver Storage Fields located in Ashland County, Ohio. Columbia states
the I/W wells have provided a de minimus contribution to the total
field deliverability and casing replacement would not be cost effective
due to the age of the facilities, all as more fully described in the
application which is on file with the Commission and open to public
inspection. The filing may also be viewed on the web at https://www.ferc.gov using the ``eLibrary'' link. Enter the docket number
excluding the last three digits in the docket number field to access
the document. For assistance, contact FERC at
[email protected] or call toll-free, (866) 208-3676 or TTY,
(202) 502-8659.
Any questions regarding this prior notice should be directed to
Sorana Linder, Director, Modernization & Certificates, Columbia Gas
Transmission, LLC, 700 Louisiana Street, Suite 700, Houston, Texas
77002, by telephone at (832) 320-5209, or by email at
[email protected].
Any person or the Commission's staff may, within 60 days after
issuance of the instant notice by the Commission, file pursuant to Rule
214 of the Commission's Procedural Rules (18 CFR 385.214) a motion to
intervene or notice
[[Page 33930]]
of intervention and pursuant to section 157.205 of the regulations
under the NGA (18 CFR 157.205), a protest to the request. If no protest
is filed within the time allowed therefore, the proposed activity shall
be deemed to be authorized effective the day after the time allowed for
filing a protest. If a protest is filed and not withdrawn within 30
days after the allowed time for filing a protest, the instant request
shall be treated as an application for authorization pursuant to
section 7 of the NGA.
Pursuant to section 157.9 of the Commission's rules, 18 CFR 157.9,
within 90 days of this Notice the Commission staff will either:
complete its environmental assessment (EA) and place it into the
Commission's public record (eLibrary) for this proceeding; or issue a
Notice of Schedule for Environmental Review. If a Notice of Schedule
for Environmental Review is issued, it will indicate, among other
milestones, the anticipated date for the Commission staff's issuance of
the EA for this proposal. The filing of the EA in the Commission's
public record for this proceeding or the issuance of a Notice of
Schedule for Environmental Review will serve to notify federal and
state agencies of the timing for the completion of all necessary
reviews, and the subsequent need to complete all federal authorizations
within 90 days of the date of issuance of the Commission staff's EA.
Persons who wish to comment only on the environmental review of
this project should submit an original and two copies of their comments
to the Secretary of the Commission. Environmental commenters will be
placed on the Commission's environmental mailing list and will be
notified of any meetings associated with the Commission's environmental
review process. Environmental commenters will not be required to serve
copies of filed documents on all other parties. However, the non-party
commenters will not receive copies of all documents filed by other
parties or issued by the Commission and will not have the right to seek
court review of the Commission's final order.
The Commission strongly encourages electronic filings of comments,
protests, and interventions in lieu of paper using the ``eFiling'' link
at https://www.ferc.gov. Persons unable to file electronically should
submit an original and 3 copies of the protest or intervention to the
Federal Energy regulatory Commission, 888 First Street NE, Washington,
DC 20426.
Dated: July 10, 2019.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2019-15068 Filed 7-15-19; 8:45 am]
BILLING CODE 6717-01-P