Eagle Creek Sartell Hydro, LLC; Notice of Application Accepted for Filing, Soliciting Comments, Motions To Intervene, and Protests, 33930-33931 [2019-15062]

Download as PDF jspears on DSK30JT082PROD with NOTICES 33930 Federal Register / Vol. 84, No. 136 / Tuesday, July 16, 2019 / Notices of intervention and pursuant to section 157.205 of the regulations under the NGA (18 CFR 157.205), a protest to the request. If no protest is filed within the time allowed therefore, the proposed activity shall be deemed to be authorized effective the day after the time allowed for filing a protest. If a protest is filed and not withdrawn within 30 days after the allowed time for filing a protest, the instant request shall be treated as an application for authorization pursuant to section 7 of the NGA. Pursuant to section 157.9 of the Commission’s rules, 18 CFR 157.9, within 90 days of this Notice the Commission staff will either: complete its environmental assessment (EA) and place it into the Commission’s public record (eLibrary) for this proceeding; or issue a Notice of Schedule for Environmental Review. If a Notice of Schedule for Environmental Review is issued, it will indicate, among other milestones, the anticipated date for the Commission staff’s issuance of the EA for this proposal. The filing of the EA in the Commission’s public record for this proceeding or the issuance of a Notice of Schedule for Environmental Review will serve to notify federal and state agencies of the timing for the completion of all necessary reviews, and the subsequent need to complete all federal authorizations within 90 days of the date of issuance of the Commission staff’s EA. Persons who wish to comment only on the environmental review of this project should submit an original and two copies of their comments to the Secretary of the Commission. Environmental commenters will be placed on the Commission’s environmental mailing list and will be notified of any meetings associated with the Commission’s environmental review process. Environmental commenters will not be required to serve copies of filed documents on all other parties. However, the non-party commenters will not receive copies of all documents filed by other parties or issued by the Commission and will not have the right to seek court review of the Commission’s final order. The Commission strongly encourages electronic filings of comments, protests, and interventions in lieu of paper using the ‘‘eFiling’’ link at https:// www.ferc.gov. Persons unable to file electronically should submit an original and 3 copies of the protest or intervention to the Federal Energy regulatory Commission, 888 First Street NE, Washington, DC 20426. VerDate Sep<11>2014 17:33 Jul 15, 2019 Jkt 247001 Dated: July 10, 2019. Nathaniel J. Davis, Sr., Deputy Secretary. [FR Doc. 2019–15068 Filed 7–15–19; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 8315–014] Eagle Creek Sartell Hydro, LLC; Notice of Application Accepted for Filing, Soliciting Comments, Motions To Intervene, and Protests July 10, 2019. Take notice that the following hydroelectric application has been filed with the Commission and is available for public inspection: a. Type of Application: Request for temporary variance of Article 34. b. Project No.: 8315–014. c. Date Filed: July 9, 2019. d. Applicant: Eagle Creek Sartell Hydro, LLC. e. Name of Project: Sartell Dam Hydro Project. f. Location: Mississippi River in Stearns and Benton counties, Minnesota. g. Filed Pursuant to: Federal Power Act, 16 U.S.C. 791a–825r. h. Applicant Contact: Ms. Melissa Rondou, Eagle Creek Sartell Hydro, LLC, 116 N State Street, P.O. Box 167, Neshkoro, WI 54960, (920) 293–4628 ext. 347, melissa.rondou@ eaglecreekre.com. i. FERC Contact: Mr. Jeremy Jessup, (202) 502–6779, Jeremy.Jessup@ferc.gov. j. Deadline for filing comments, motions to intervene, and protests, is 15 days from the issuance date of this notice by the Commission. The Commission strongly encourages electronic filing. Please file comments, motions to intervene, and protests using the Commission’s eFiling system at https://www.ferc.gov/docs-filing/ efiling.asp. Commenters can submit brief comments up to 6,000 characters, without prior registration, using the eComment system at https:// www.ferc.gov/doc-sfiling/ ecomment.asp. You must include your name and contact information at the end of your comments. For assistance, please contact FERC Online Support at FERCOnlineSupport@ferc.gov, (866) 208–3676 (toll free), or (202) 502–8659 (TTY). In lieu of electronic filing, please send a paper copy to: Secretary, Federal Energy Regulatory Commission, 888 First Street NE, Washington, DC 20426. PO 00000 Frm 00027 Fmt 4703 Sfmt 4703 The first page of any filing should include docket numbers P–8315–014. The Commission’s Rules of Practice and Procedure require all intervenors filing documents with the Commission to serve a copy of that document on each person on the official service list for the project. Further, if an intervenor files comments or documents with the Commission relating to the merits of an issue that may affect the responsibilities of a particular resource agency, they must also serve a copy of the document on that resource agency. k. Description of Request: The applicant requests a temporary variance from the run-of-river and reservoir elevation requirements of Article 34 of the license. The variance will allow the licensee to drawdown the reservoir approximately three feet beginning August 1, 2019, for a six-week period (from August 1 through approximately September 15, 2019). The drawdown is to assist the Minnesota Department of Natural Resources, the Little Rock Lake Association, and the Benton Soil and Water Conservation District to facilitate water quality, fish habitat, and restoration improvements in the reach of the Mississippi River upstream of the project, and at Little Rock Lake, located approximately six miles upstream of the project. l. Locations of the Application: A copy of the application is available for inspection and reproduction at the Commission’s Public Reference Room, located at 888 First Street NE, Room 2A, Washington, DC 20426, or by calling (202) 502–8371. This filing may also be viewed on the Commission’s website at https://www.ferc.gov/docs-filing/ elibrary.asp. Enter the docket number excluding the last three digits in the docket number field to access the document. You may also register online at https://www.ferc.gov/docs-filing/ esubscription.asp to be notified via email of new filings and issuances related to this or other pending projects. For assistance, call 1–866–208- 3676 or email FERCOnlineSupport@ferc.gov, for TTY, call (202) 502–8659. A copy is also available for inspection and reproduction at the address in item (h) above. m. Individuals desiring to be included on the Commission’s mailing list should so indicate by writing to the Secretary of the Commission. n. Comments, Motions to Intervene, or Protests: Anyone may submit comments, a motion to intervene, or a protest in accordance with the requirements of Rules of Practice and Procedure, 18 CFR 385.210, .211, .214. In determining the appropriate action to take, the Commission will consider all E:\FR\FM\16JYN1.SGM 16JYN1 Federal Register / Vol. 84, No. 136 / Tuesday, July 16, 2019 / Notices protests or other comments filed, but only those who file a motion to intervene in accordance with the Commission’s Rules may become a party to the proceeding. Any comments, motions to intervene, or protests must be received on or before the specified comment date for the particular application. o. Filing and Service of Responsive Documents: Any filing must (1) bear in all capital letters the title ‘‘COMMENTS’’, ‘‘MOTION TO INTERVENE’’, or ‘‘PROTEST’’ as applicable; (2) set forth in the heading the name of the applicant and the project number(s) of the application to which the filing responds; (3) furnish the name, address, and telephone number of the person intervening or protesting; and (4) otherwise comply with the requirements of 18 CFR 385.2001 through 385.2005. All comments, motions to intervene, or protests must set forth their evidentiary basis. A copy of all other filings in reference to this application must be accompanied by proof of service on all persons listed in the service list prepared by the Commission in this proceeding, in accordance with 385.2010. Dated: July 10, 2019. Nathaniel J. Davis, Sr., Deputy Secretary. intervention or motion to intervene, as appropriate. Such notices, motions, or protests must be filed on or before the comment date. On or before the comment date, it is not necessary to serve motions to intervene or protests on persons other than the Applicant. The Commission encourages electronic submission of protests and interventions in lieu of paper using the ‘‘eFiling’’ link at https://www.ferc.gov. Persons unable to file electronically should submit an original and 5 copies of the protest or intervention to the Federal Energy Regulatory Commission, 888 First Street NE, Washington, DC 20426. This filing is accessible on-line at https://www.ferc.gov, using the ‘‘eLibrary’’ link and is available for review in the Commission’s Public Reference Room in Washington, DC. There is an ‘‘eSubscription’’ link on the website that enables subscribers to receive email notification when a document is added to a subscribed docket(s). For assistance with any FERC Online service, please email FERCOnlineSupport@ferc.gov, or call (866) 208–3676 (toll free). For TTY, call (202) 502–8659. Comment Date: 5:00 p.m. Eastern Time on July 24, 2019. [FR Doc. 2019–15062 Filed 7–15–19; 8:45 am] Dated: July 10, 2019. Nathaniel J. Davis, Sr., Deputy Secretary. BILLING CODE 6717–01–P [FR Doc. 2019–15064 Filed 7–15–19; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Federal Energy Regulatory Commission [Docket No. EF19–4–000] jspears on DSK30JT082PROD with NOTICES Western Area Power Administration; Notice of Filing Take notice that on June 24, 2019, Western Area Power Administration submitted tariff filing per: Extension of Formula Rates for the Central Valley Project, California-Oregon Transmission Project, Pacific Alternating Current Intertie, and Third-Party Transmission Service—Rate Order No. WAPA–185 to be effective October 1, 2019. Any person desiring to intervene or to protest this filing must file in accordance with Rules 211 and 214 of the Commission’s Rules of Practice and Procedure (18 CFR 385.211, 385.214). Protests will be considered by the Commission in determining the appropriate action to be taken, but will not serve to make protestants parties to the proceeding. Any person wishing to become a party must file a notice of VerDate Sep<11>2014 17:33 Jul 15, 2019 Jkt 247001 Combined Notice of Filings #1 Take notice that the Commission received the following electric rate filings: Docket Numbers: ER18–734–001. Applicants: Frenchtown III Solar, LLC. Description: Report Filing: Frenchtown III Refund Report to be effective N/A. Filed Date: 7/10/19. Accession Number: 20190710–5050. Comments Due: 5 p.m. ET 7/31/19. Docket Numbers: ER18–1226–001. Applicants: PA Solar Park, LLC. Description: Report Filing: PA Solar Park Refund Report to be effective N/A. Filed Date: 7/10/19. Accession Number: 20190710–5049. Comments Due: 5 p.m. ET 7/31/19. Docket Numbers: ER18–2063–001. Applicants: Flemington Solar, LLC. PO 00000 Frm 00028 Fmt 4703 Sfmt 4703 33931 Description: Report Filing: Flemington Solar Refund Report to be effective N/A. Filed Date: 7/10/19. Accession Number: 20190710–5052. Comments Due: 5 p.m. ET 7/31/19. Docket Numbers: ER19–1916–001. Applicants: Louisville Gas and Electric Company. Description: Compliance filing: Order No. 845 Additional Information Compliance Filing to be effective 5/22/ 2019. Filed Date: 7/10/19. Accession Number: 20190710–5087. Comments Due: 5 p.m. ET 7/31/19. Docket Numbers: ER19–2165–001. Applicants: Western Interconnect LLC. Description: Compliance filing: Amendment to Order 845 Compliance Filing to be effective 5/22/2019. Filed Date: 7/10/19. Accession Number: 20190710–5063. Comments Due: 5 p.m. ET 7/31/19. Docket Numbers: ER19–2231–001. Applicants: Chief Conemaugh Power II, LLC. Description: Tariff Amendment: Supplement to Petition for MarketBased Rate Authorization to be effective 8/21/2019. Filed Date: 7/10/19. Accession Number: 20190710–5089. Comments Due: 5 p.m. ET 7/31/19. Docket Numbers: ER19–2232–001. Applicants: Chief Keystone Power II, LLC. Description: Tariff Amendment: Supplement to Petition for MarketBased Rate Authorization to be effective 8/21/2019. Filed Date: 7/10/19. Accession Number: 20190710–5092. Comments Due: 5 p.m. ET 7/31/19. Docket Numbers: ER19–2369–000. Applicants: Indigo Generation LLC. Description: § 205(d) Rate Filing: Revised Market Based Rate Tariff to be effective 7/11/2019. Filed Date: 7/10/19. Accession Number: 20190710–5028. Comments Due: 5 p.m. ET 7/31/19. Docket Numbers: ER19–2370–000. Applicants: Larkspur Energy LLC. Description: § 205(d) Rate Filing: Revised Market Based Rate Tariff to be effective 7/11/2019. Filed Date: 7/10/19. Accession Number: 20190710–5029. Comments Due: 5 p.m. ET 7/31/19. Docket Numbers: ER19–2371–000. Applicants: Mariposa Energy, LLC. Description: § 205(d) Rate Filing: Revised Market Based Rate Tariff to be effective 7/11/2019. Filed Date: 7/10/19. E:\FR\FM\16JYN1.SGM 16JYN1

Agencies

[Federal Register Volume 84, Number 136 (Tuesday, July 16, 2019)]
[Notices]
[Pages 33930-33931]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2019-15062]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Project No. 8315-014]


Eagle Creek Sartell Hydro, LLC; Notice of Application Accepted 
for Filing, Soliciting Comments, Motions To Intervene, and Protests

July 10, 2019.
    Take notice that the following hydroelectric application has been 
filed with the Commission and is available for public inspection:
    a. Type of Application: Request for temporary variance of Article 
34.
    b. Project No.: 8315-014.
    c. Date Filed: July 9, 2019.
    d. Applicant: Eagle Creek Sartell Hydro, LLC.
    e. Name of Project: Sartell Dam Hydro Project.
    f. Location: Mississippi River in Stearns and Benton counties, 
Minnesota.
    g. Filed Pursuant to: Federal Power Act, 16 U.S.C. 791a-825r.
    h. Applicant Contact: Ms. Melissa Rondou, Eagle Creek Sartell 
Hydro, LLC, 116 N State Street, P.O. Box 167, Neshkoro, WI 54960, (920) 
293-4628 ext. 347, [email protected].
    i. FERC Contact: Mr. Jeremy Jessup, (202) 502-6779, 
[email protected].
    j. Deadline for filing comments, motions to intervene, and 
protests, is 15 days from the issuance date of this notice by the 
Commission. The Commission strongly encourages electronic filing. 
Please file comments, motions to intervene, and protests using the 
Commission's eFiling system at https://www.ferc.gov/docs-filing/efiling.asp. Commenters can submit brief comments up to 6,000 
characters, without prior registration, using the eComment system at 
https://www.ferc.gov/doc-sfiling/ecomment.asp. You must include your 
name and contact information at the end of your comments. For 
assistance, please contact FERC Online Support at 
[email protected], (866) 208-3676 (toll free), or (202) 502-
8659 (TTY). In lieu of electronic filing, please send a paper copy to: 
Secretary, Federal Energy Regulatory Commission, 888 First Street NE, 
Washington, DC 20426. The first page of any filing should include 
docket numbers P-8315-014.
    The Commission's Rules of Practice and Procedure require all 
intervenors filing documents with the Commission to serve a copy of 
that document on each person on the official service list for the 
project. Further, if an intervenor files comments or documents with the 
Commission relating to the merits of an issue that may affect the 
responsibilities of a particular resource agency, they must also serve 
a copy of the document on that resource agency.
    k. Description of Request: The applicant requests a temporary 
variance from the run-of-river and reservoir elevation requirements of 
Article 34 of the license. The variance will allow the licensee to 
drawdown the reservoir approximately three feet beginning August 1, 
2019, for a six-week period (from August 1 through approximately 
September 15, 2019). The drawdown is to assist the Minnesota Department 
of Natural Resources, the Little Rock Lake Association, and the Benton 
Soil and Water Conservation District to facilitate water quality, fish 
habitat, and restoration improvements in the reach of the Mississippi 
River upstream of the project, and at Little Rock Lake, located 
approximately six miles upstream of the project.
    l. Locations of the Application: A copy of the application is 
available for inspection and reproduction at the Commission's Public 
Reference Room, located at 888 First Street NE, Room 2A, Washington, DC 
20426, or by calling (202) 502-8371. This filing may also be viewed on 
the Commission's website at https://www.ferc.gov/docs-filing/elibrary.asp. Enter the docket number excluding the last three digits 
in the docket number field to access the document. You may also 
register online at https://www.ferc.gov/docs-filing/esubscription.asp to 
be notified via email of new filings and issuances related to this or 
other pending projects. For assistance, call 1-866-208- 3676 or email 
[email protected], for TTY, call (202) 502-8659. A copy is 
also available for inspection and reproduction at the address in item 
(h) above.
    m. Individuals desiring to be included on the Commission's mailing 
list should so indicate by writing to the Secretary of the Commission.
    n. Comments, Motions to Intervene, or Protests: Anyone may submit 
comments, a motion to intervene, or a protest in accordance with the 
requirements of Rules of Practice and Procedure, 18 CFR 385.210, .211, 
.214. In determining the appropriate action to take, the Commission 
will consider all

[[Page 33931]]

protests or other comments filed, but only those who file a motion to 
intervene in accordance with the Commission's Rules may become a party 
to the proceeding. Any comments, motions to intervene, or protests must 
be received on or before the specified comment date for the particular 
application.
    o. Filing and Service of Responsive Documents: Any filing must (1) 
bear in all capital letters the title ``COMMENTS'', ``MOTION TO 
INTERVENE'', or ``PROTEST'' as applicable; (2) set forth in the heading 
the name of the applicant and the project number(s) of the application 
to which the filing responds; (3) furnish the name, address, and 
telephone number of the person intervening or protesting; and (4) 
otherwise comply with the requirements of 18 CFR 385.2001 through 
385.2005. All comments, motions to intervene, or protests must set 
forth their evidentiary basis. A copy of all other filings in reference 
to this application must be accompanied by proof of service on all 
persons listed in the service list prepared by the Commission in this 
proceeding, in accordance with 385.2010.

    Dated: July 10, 2019.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2019-15062 Filed 7-15-19; 8:45 am]
BILLING CODE 6717-01-P


This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.