Notice of Preliminary Permit Application Accepted for Filing and Soliciting Comments, Motions To Intervene, and Competing Applications, 33768-33769 [2019-14928]
Download as PDF
khammond on DSKBBV9HB2PROD with NOTICES
33768
Federal Register / Vol. 84, No. 135 / Monday, July 15, 2019 / Notices
County Line in Citrus County, Florida.
This interconnect will provide Duke
Energy Florida, Inc. (DEF), an existing
shipper on the Sabal Trail system, with
additional operational flexibility and
reliability (FGT Citrus County Meter
Station Project), all as more fully set
forth in the application, which is open
to the public for inspection. The filing
may also be viewed on the web at https://
www.ferc.gov using the ‘‘eLibrary’’ link.
Enter the docket number excluding the
last three digits in the docket number
field to access the document. For
assistance, contact FERC at
FERCOnlineSupport@ferc.gov or call
toll-free, (866) 208–3676 or TTY, (202)
502–8659.
Specifically, Sabal Trail proposes to
construct, own, and operate a new M&R
Facility at milepost (MP) 18.42 on its
Citrus County Line. The Project is
designed to connect Sabal Trail’s Citrus
County Line with FGT’s 30-inch and 36inch diameter pipelines located at FGT’s
MP 81.6 to provide DEF with an
additional source of natural gas.
Any questions regarding this
application should be directed to P.
Martin Teague, Associate General
Counsel, 2701 North Rocky Point Drive,
Suite 1050, Tampa, FL 33607, or call
(813) 282–6605, or by email:
marty.teague@enbridge.com.
Any person or the Commission’s staff
may, within 60 days after issuance of
the instant notice by the Commission,
file pursuant to Rule 214 of the
Commission’s Procedural Rules (18 CFR
385.214) a motion to intervene or notice
of intervention and pursuant to Section
157.205 of the regulations under the
NGA (18 CFR 157.205), a protest to the
request. If no protest is filed within the
time allowed therefore, the proposed
activity shall be deemed to be
authorized effective the day after the
time allowed for filing a protest. If a
protest is filed and not withdrawn
within 30 days after the allowed time
for filing a protest, the instant request
shall be treated as an application for
authorization pursuant to section 7 of
the NGA.
Pursuant to section 157.9 of the
Commission’s rules, 18 CFR 157.9,
within 90 days of this Notice the
Commission staff will either: Complete
its environmental assessment (EA) and
place it into the Commission’s public
record (eLibrary) for this proceeding, or
issue a Notice of Schedule for
Environmental Review. If a Notice of
Schedule for Environmental Review is
issued, it will indicate, among other
milestones, the anticipated date for the
Commission staff’s issuance of the final
environmental impact statement (FEIS)
or EA for this proposal. The filing of the
VerDate Sep<11>2014
16:08 Jul 12, 2019
Jkt 247001
EA in the Commission’s public record
for this proceeding or the issuance of a
Notice of Schedule for Environmental
Review will serve to notify federal and
state agencies of the timing for the
completion of all necessary reviews, and
the subsequent need to complete all
federal authorizations within 90 days of
the date of issuance of the Commission
staff’s FEIS or EA.
Persons who wish to comment only
on the environmental review of this
project should submit an original and
two copies of their comments to the
Secretary of the Commission.
Environmental commenters will be
placed on the Commission’s
environmental mailing list, and will be
notified of any meetings associated with
the Commission’s environmental review
process. Environmental commenters
will not be required to serve copies of
filed documents on all other parties.
However, the non-party commenter will
not receive copies of all documents filed
by other parties or issued by the
Commission and will not have the right
to seek court review of the
Commission’s final order.
The Commission strongly encourages
electronic filings of comments, protests
and interventions in lieu of paper using
the ‘‘eFiling’’ link at https://
www.ferc.gov. Persons unable to file
electronically should submit an original
and 3 copies of the protest or
intervention to the Federal Energy
Regulatory Commission, 888 First Street
NE, Washington, DC 20426.
Dated: July 9, 2019.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2019–14926 Filed 7–12–19; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[ECOsponsible, LLC, Project No. 14987–
000]
Notice of Preliminary Permit
Application Accepted for Filing and
Soliciting Comments, Motions To
Intervene, and Competing Applications
On April 18, 2019, ECOsponsible,
LLC, filed an application for a
preliminary permit, pursuant to section
4(f) of the Federal Power Act (FPA),
proposing to study the feasibility of
hydropower on the Oneida River in
Onondaga and Oswego Counties, New
York. The sole purpose of a preliminary
permit, if issued, is to grant the permit
holder priority to file a license
PO 00000
Frm 00036
Fmt 4703
Sfmt 4703
application during the permit term. A
preliminary permit does not authorize
the permit holder to perform any landdisturbing activities or otherwise enter
upon lands or waters owned by others
without the owners’ express permission.
The proposed Caughdenoy Lock
Hydro Project would consist of the
following: (1) An existing 15-foot-high,
550-foot-long flood control dam (i.e., the
Caughdenoy Dam) and an associated
impoundment; (2) three turbines for a
total installed capacity of 3,000
kilowatts to be installed on the Oneida
Canal; (3) a new 50-foot-long
transmission line from the powerhouse
to an existing grid interconnection
point; and (4) appurtenant facilities. The
proposed project would have an average
annual generation of 13,446 megawatthours.
Applicant Contact: Dennis Ryan,
ECOsponsible, LLC, PO Box 114, West
Falls, NY 14170; phone: (716) 222–2188.
FERC Contact: Monir Chowdhury;
phone: (202) 502–6736.
Deadline for filing comments, motions
to intervene, competing applications
(without notices of intent), or notices of
intent to file competing applications: 60
days from the issuance of this notice.
Competing applications and notices of
intent must meet the requirements of 18
CFR 4.36.
The Commission strongly encourages
electronic filing. Please file comments,
motions to intervene, notices of intent,
and competing applications using the
Commission’s eFiling system at https://
www.ferc.gov/docs-filing/efiling.asp.
Commenters can submit brief comments
up to 6,000 characters, without prior
registration, using the eComment system
at https://www.ferc.gov/docs-filing/
ecomment.asp. You must include your
name and contact information at the end
of your comments. For assistance,
please contact FERC Online Support at
FERCOnlineSupport@ferc.gov, (866)
208–3676 (toll free), or (202) 502–8659
(TTY). In lieu of electronic filing, please
send a paper copy to: Secretary, Federal
Energy Regulatory Commission, 888
First Street NE, Washington, DC 20426.
The first page of any filing should
include docket number P–14987–000.
More information about this project,
including a copy of the application, can
be viewed or printed on the ‘‘eLibrary’’
link of the Commission’s website at
https://www.ferc.gov/docs-filing/
elibrary.asp. Enter the docket number
(P–14987) in the docket number field to
access the document. For assistance,
contact FERC Online Support.
E:\FR\FM\15JYN1.SGM
15JYN1
Federal Register / Vol. 84, No. 135 / Monday, July 15, 2019 / Notices
Dated: July 9, 2019.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2019–14928 Filed 7–12–19; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Combined Notice of Filings
Take notice that the Commission has
received the following Natural Gas
Pipeline Rate and Refund Report filings:
khammond on DSKBBV9HB2PROD with NOTICES
Filings Instituting Proceedings
Docket Numbers: RP19–419–003.
Applicants: Tuscarora Gas
Transmission Company.
Description: Compliance filing
Compliance to RP19–419 Phase II Rates
to be effective 8/1/2019.
Filed Date: 6/28/19.
Accession Number: 20190628–5061.
Comments Due: 5 p.m. ET 7/11/19.
Docket Numbers: RP19–1045–001.
Applicants: Cheniere Creole Trail
Pipeline, L.P.
Description: Request for Temporary
Waiver and Extension of Time to
Implement NAESB 3.1 Standards Per
Order No. 587–Y of Cheniere Creole
Trail Pipeline, L.P. under RP19–1045.
Filed Date: 7/1/19.
Accession Number: 20190701–5418.
Comments Due: 5 p.m. ET 7/15/19.
Docket Numbers: RP19–206–005.
Applicants: Mississippi Canyon Gas
Pipeline, L.L.C.
Description: Compliance filing MCGP
RP19–206 Compliance Filing to be
effective 8/1/2019.
Filed Date: 7/2/19.
Accession Number: 20190702–5146.
Comments Due: 5 p.m. ET 7/15/19.
Docket Numbers: RP19–73–002.
Applicants: El Paso Natural Gas
Company, L.L.C.
Description: Compliance filing FERC
Form No. 501–G Settlement
Implementation Filing to be effective
1/1/2019.
Filed Date: 7/2/19.
Accession Number: 20190702–5116.
Comments Due: 5 p.m. ET 7/15/19.
Docket Numbers: RP19–1375–000.
Applicants: Texas Eastern
Transmission, LP.
Description: § 4(d) Rate Filing: July
2019 Name Change Cleanup Filing to be
effective 8/5/2019.
Filed Date: 7/5/19.
Accession Number: 20190705–5101.
Comments Due: 5 p.m. ET 7/17/19.
Docket Numbers: RP19–1376–000.
VerDate Sep<11>2014
16:08 Jul 12, 2019
Jkt 247001
Applicants: Texas Eastern
Transmission, LP.
Description: § 4(d) Rate Filing:
Negotiated Rates—July 2019 Cleanup
Filing to be effective 8/5/2019.
Filed Date: 7/5/19.
Accession Number: 20190705–5104.
Comments Due: 5 p.m. ET 7/17/19.
Docket Numbers: RP19–1377–000.
Applicants: Algonquin Gas
Transmission, LLC.
Description: § 4(d) Rate Filing:
Negotiated Rates—July 2019 Cleanup
Filing to be effective 8/5/2019.
Filed Date: 7/5/19.
Accession Number: 20190705–5106.
Comments Due: 5 p.m. ET 7/17/19.
The filings are accessible in the
Commission’s eLibrary system by
clicking on the links or querying the
docket number.
Any person desiring to intervene or
protest in any of the above proceedings
must file in accordance with Rules 211
and 214 of the Commission’s
Regulations (18 CFR 385.211 and
385.214) on or before 5:00 p.m. Eastern
time on the specified comment date.
Protests may be considered, but
intervention is necessary to become a
party to the proceeding.
eFiling is encouraged. More detailed
information relating to filing
requirements, interventions, protests,
service, and qualifying facilities filings
can be found at: https://www.ferc.gov/
docs-filing/efiling/filing-req.pdf. For
other information, call (866) 208–3676
(toll free). For TTY, call (202) 502–8659.
Dated: July 9, 2019.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2019–14925 Filed 7–12–19; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 2042–191]
Public Utility District No. 1 of Pend
Oreille County, Washington; Notice of
Application for Amendment of License,
and Soliciting Comments, Motions To
Intervene, and Protests
Take notice that the following
application has been filed with the
Commission and is available for public
inspection:
a. Application Type: Request for
Amendment of License.
b. Project No.: 2042–191.
c. Date Filed: June 10, 2019.
d. Applicant: Public Utility District
No. 1 of Pend Oreille County,
Washington.
PO 00000
Frm 00037
Fmt 4703
Sfmt 4703
33769
e. Name of Project: Box Canyon
Hydroelectric Project.
f. Location: The project is located on
the Pend Oreille River in northeastern
Washington and northwestern Idaho.
The project occupies federal lands,
including acreage within the Colville
National Forest and the Kalispel Indian
Reservation.
g. Filed Pursuant to: The application
for amendment of license was filed
pursuant to 18 CFR 385.602 and 4.201.
h. Applicant Contact: Tyler Whitney,
General Counsel and Director of
Regulatory & Government Affairs,
Public Utility District No. 1 of Pend
Oreille County, P.O. Box 190, 130 N
Washington, Newport, Washington
99156, (509) 447–9331, twhitney@
popud.org; Craig Gannett, Davis Wright
Tremaine LLP, 1201 Third Ave., Suite
2200, Seattle, WA 98101, (206) 757–
8048, craiggannett@dwt.com; and
Walker Stanovsky, Davis Wright
Tremaine LLP, 1201 Third Ave., Suite
2200, Seattle, WA 98101, (206) 757–
8259, walkerstanovsky@dwt.com.
i. FERC Contact: Holly Frank,
telephone: (202) 502–6833, and email
address: holly.frank@ferc.gov.
j. Deadline for filing comments,
motions to intervene, and protests is 30
days from the issuance date of this
notice by the Commission.
The Commission strongly encourages
electronic filing. Please file motions to
intervene, protests, comments, or
recommendations using the
Commission’s eFiling system at https://
www.ferc.gov/docs-filing/efiling.asp.
Commenters can submit brief comments
up to 6,000 characters, without prior
registration, using the eComment system
at https://www.ferc.gov/docs-filing/
ecomment.asp. You must include your
name and contact information at the end
of your comments. For assistance,
please contact FERC Online Support at
FERCOnlineSupport@ferc.gov, (866)
208–3676 (toll free), or (202) 502–8659
(TTY). In lieu of electronic filing, please
send a paper copy to: Secretary, Federal
Energy Regulatory Commission, 888
First Street NE, Washington, DC 20426.
The first page of any filing should
include docket number P–2042–191.
k. Description of Request: On
February 19, 2010, the Commission
approved a license amendment to
include revised conditions submitted by
the Department of the Interior (Interior)
and the U.S. Forest Service pursuant to
section 4(e) of the Federal Power Act
(FPA) and the fish passage measures
prescribed by Interior pursuant to FPA
section 18. Since then, the PUD has
been implementing the terms of the
amended license, with administrative
changes to the sequence and schedule of
E:\FR\FM\15JYN1.SGM
15JYN1
Agencies
[Federal Register Volume 84, Number 135 (Monday, July 15, 2019)]
[Notices]
[Pages 33768-33769]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2019-14928]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[ECOsponsible, LLC, Project No. 14987-000]
Notice of Preliminary Permit Application Accepted for Filing and
Soliciting Comments, Motions To Intervene, and Competing Applications
On April 18, 2019, ECOsponsible, LLC, filed an application for a
preliminary permit, pursuant to section 4(f) of the Federal Power Act
(FPA), proposing to study the feasibility of hydropower on the Oneida
River in Onondaga and Oswego Counties, New York. The sole purpose of a
preliminary permit, if issued, is to grant the permit holder priority
to file a license application during the permit term. A preliminary
permit does not authorize the permit holder to perform any land-
disturbing activities or otherwise enter upon lands or waters owned by
others without the owners' express permission.
The proposed Caughdenoy Lock Hydro Project would consist of the
following: (1) An existing 15-foot-high, 550-foot-long flood control
dam (i.e., the Caughdenoy Dam) and an associated impoundment; (2) three
turbines for a total installed capacity of 3,000 kilowatts to be
installed on the Oneida Canal; (3) a new 50-foot-long transmission line
from the powerhouse to an existing grid interconnection point; and (4)
appurtenant facilities. The proposed project would have an average
annual generation of 13,446 megawatt-hours.
Applicant Contact: Dennis Ryan, ECOsponsible, LLC, PO Box 114, West
Falls, NY 14170; phone: (716) 222-2188.
FERC Contact: Monir Chowdhury; phone: (202) 502-6736.
Deadline for filing comments, motions to intervene, competing
applications (without notices of intent), or notices of intent to file
competing applications: 60 days from the issuance of this notice.
Competing applications and notices of intent must meet the requirements
of 18 CFR 4.36.
The Commission strongly encourages electronic filing. Please file
comments, motions to intervene, notices of intent, and competing
applications using the Commission's eFiling system at https://www.ferc.gov/docs-filing/efiling.asp. Commenters can submit brief
comments up to 6,000 characters, without prior registration, using the
eComment system at https://www.ferc.gov/docs-filing/ecomment.asp. You
must include your name and contact information at the end of your
comments. For assistance, please contact FERC Online Support at
[email protected], (866) 208-3676 (toll free), or (202) 502-
8659 (TTY). In lieu of electronic filing, please send a paper copy to:
Secretary, Federal Energy Regulatory Commission, 888 First Street NE,
Washington, DC 20426. The first page of any filing should include
docket number P-14987-000.
More information about this project, including a copy of the
application, can be viewed or printed on the ``eLibrary'' link of the
Commission's website at https://www.ferc.gov/docs-filing/elibrary.asp.
Enter the docket number (P-14987) in the docket number field to access
the document. For assistance, contact FERC Online Support.
[[Page 33769]]
Dated: July 9, 2019.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2019-14928 Filed 7-12-19; 8:45 am]