Southern California Edison Company; Notice of Petition for Declaratory Order, 33254 [2019-14835]
Download as PDF
33254
Federal Register / Vol. 84, No. 134 / Friday, July 12, 2019 / Notices
intervene in accordance with the
requirements of Rules of Practice and
Procedure, 18 CFR 385.210, .211, and
.214. In determining the appropriate
action to take, the Commission will
consider all protests or other comments
filed, but only those who file a motion
to intervene in accordance with the
Commission’s Rules may become a
party to the proceeding. Any comments,
protests, or motions to intervene must
be received on or before the specified
comment date for the particular
application.
n. Filing and Service of Responsive
Documents: Any filing must (1) bear in
all capital letters the title
‘‘COMMENTS’’, ‘‘PROTEST’’, or
‘‘MOTION TO INTERVENE’’ as
applicable; (2) set forth in the heading
the name of the applicant and the
project number of the application to
which the filing responds; (3) furnish
the name, address, and telephone
number of the person protesting or
intervening; and (4) otherwise comply
with the requirements of 18 CFR
385.2001 through 385.2005. All
comments, motions to intervene, or
protests must set forth their evidentiary
basis and otherwise comply with the
requirements of 18 CFR 4.34(b). All
comments, motions to intervene, or
protests should relate to the request to
extend the license term. Agencies may
obtain copies of the application directly
from the applicant. A copy of any
protest or motion to intervene must be
served upon each representative of the
applicant specified in the particular
application. If an intervener files
comments or documents with the
Commission relating to the merits of an
issue that may affect the responsibilities
of a particular resource agency, they
must also serve a copy of the document
on that resource agency. A copy of all
other filings in reference to this
application must be accompanied by
proof of service on all persons listed in
the service list prepared by the
Commission in this proceeding, in
accordance with 18 CFR 4.34(b) and
385.2010.
Dated: July 8, 2019.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
jbell on DSK3GLQ082PROD with NOTICES
[FR Doc. 2019–14836 Filed 7–11–19; 8:45 am]
BILLING CODE 6717–01–P
VerDate Sep<11>2014
16:55 Jul 11, 2019
Jkt 247001
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project Nos. P–67–133, P–120–028, P–
2085–020, P–2086–039, P–2174–017, P–
2175–021]
Southern California Edison Company;
Notice of Petition for Declaratory Order
Take notice that on June 17, 2019,
Southern California Edison Company
(SCE or Petitioner), applicant for six
projects within the Big Creek
Hydroelectric System, designated
Project No. 67 (Big Creek Nos. 2A, 8,
and Eastwood), Project No. 120 (Big
Creek No. 3), Project No. 2085
(Mammoth Pool), Project No. 2086
(Vermilion Valley), Project No. 2174
(Portal), and Project No. 2175 (Big Creek
Nos. 1 and 2) (collectively referred to as
the Big Creek Projects), filed a petition
for declaratory order (petition) pursuant
to Rule 207(a)(2) of the Federal Energy
Regulatory Commission’s Rules of
Practice and Procedure, 18 CFR
385.207(a)(2). SCE requests that the
Commission declare that the California
State Water Resources Control Board
has waived its authority to issue a
certification for the Big Creek Projects
under Section 401 of the Clean Water
Act, 33 U.S.C. 1341(a)(1), as more fully
explained in the petition.
Any person desiring to intervene or to
protest this filing must file in
accordance with Rules 211 and 214 of
the Commission’s Rules of Practice and
Procedure, 18 CFR 385.211, 385.214.
Protests will be considered by the
Commission in determining the
appropriate action to be taken, but will
not serve to make protestants parties to
the proceeding. Any person wishing to
become a party must file a notice of
intervention or motion to intervene, as
appropriate. Such notices, motions, or
protests must be filed on or before the
comment date. Anyone filing a motion
to intervene or protest must serve a copy
of that document on the Petitioner.
The Commission encourages
electronic submission of protests and
interventions in lieu of paper using the
‘‘eFiling’’ link at https://www.ferc.gov.
Persons unable to file electronically
should submit an original and 5 copies
of the protest or intervention to the
Federal Energy Regulatory Commission,
888 First Street NE, Washington, DC
20426.
This filing is accessible on-line at
https://www.ferc.gov, using the
‘‘eLibrary’’ link and is available for
review in the Commission’s Public
Reference Room in Washington, DC.
There is an ‘‘eSubscription’’ link on the
PO 00000
Frm 00037
Fmt 4703
Sfmt 4703
website that enables subscribers to
receive email notification when a
document is added to a subscribed
docket(s). For assistance with any FERC
Online service, please email
FERCOnlineSupport@ferc.gov, or call
(866) 208–3676 (toll free). For TTY, call
(202) 502–8659.
Comment Date: 5:00 p.m. Eastern
Time on July 23, 2019.
Dated: July 8, 2019.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2019–14835 Filed 7–11–19; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. ER19–2361–000]
Otter Creek Wind Farm LLC;
Supplemental Notice That Initial
Market-Based Rate Filing Includes
Request for Blanket Section 204
Authorization
This is a supplemental notice in the
above-referenced proceeding of Otter
Creek Wind Farm LLC’s application for
market-based rate authority, with an
accompanying rate tariff, noting that
such application includes a request for
blanket authorization, under 18 CFR
part 34, of future issuances of securities
and assumptions of liability.
Any person desiring to intervene or to
protest should file with the Federal
Energy Regulatory Commission, 888
First Street NE, Washington, DC 20426,
in accordance with Rules 211 and 214
of the Commission’s Rules of Practice
and Procedure (18 CFR 385.211 and
385.214). Anyone filing a motion to
intervene or protest must serve a copy
of that document on the Applicant.
Notice is hereby given that the
deadline for filing protests with regard
to the applicant’s request for blanket
authorization, under 18 CFR part 34, of
future issuances of securities and
assumptions of liability, is July 29,
2019.
The Commission encourages
electronic submission of protests and
interventions in lieu of paper, using the
FERC Online links at https://
www.ferc.gov. To facilitate electronic
service, persons with internet access
who will eFile a document and/or be
listed as a contact for an intervenor
must create and validate an
eRegistration account using the
eRegistration link. Select the eFiling
link to log on and submit the
intervention or protests.
E:\FR\FM\12JYN1.SGM
12JYN1
Agencies
[Federal Register Volume 84, Number 134 (Friday, July 12, 2019)]
[Notices]
[Page 33254]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2019-14835]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Project Nos. P-67-133, P-120-028, P-2085-020, P-2086-039, P-2174-017,
P-2175-021]
Southern California Edison Company; Notice of Petition for
Declaratory Order
Take notice that on June 17, 2019, Southern California Edison
Company (SCE or Petitioner), applicant for six projects within the Big
Creek Hydroelectric System, designated Project No. 67 (Big Creek Nos.
2A, 8, and Eastwood), Project No. 120 (Big Creek No. 3), Project No.
2085 (Mammoth Pool), Project No. 2086 (Vermilion Valley), Project No.
2174 (Portal), and Project No. 2175 (Big Creek Nos. 1 and 2)
(collectively referred to as the Big Creek Projects), filed a petition
for declaratory order (petition) pursuant to Rule 207(a)(2) of the
Federal Energy Regulatory Commission's Rules of Practice and Procedure,
18 CFR 385.207(a)(2). SCE requests that the Commission declare that the
California State Water Resources Control Board has waived its authority
to issue a certification for the Big Creek Projects under Section 401
of the Clean Water Act, 33 U.S.C. 1341(a)(1), as more fully explained
in the petition.
Any person desiring to intervene or to protest this filing must
file in accordance with Rules 211 and 214 of the Commission's Rules of
Practice and Procedure, 18 CFR 385.211, 385.214. Protests will be
considered by the Commission in determining the appropriate action to
be taken, but will not serve to make protestants parties to the
proceeding. Any person wishing to become a party must file a notice of
intervention or motion to intervene, as appropriate. Such notices,
motions, or protests must be filed on or before the comment date.
Anyone filing a motion to intervene or protest must serve a copy of
that document on the Petitioner.
The Commission encourages electronic submission of protests and
interventions in lieu of paper using the ``eFiling'' link at https://www.ferc.gov. Persons unable to file electronically should submit an
original and 5 copies of the protest or intervention to the Federal
Energy Regulatory Commission, 888 First Street NE, Washington, DC
20426.
This filing is accessible on-line at https://www.ferc.gov, using the
``eLibrary'' link and is available for review in the Commission's
Public Reference Room in Washington, DC. There is an ``eSubscription''
link on the website that enables subscribers to receive email
notification when a document is added to a subscribed docket(s). For
assistance with any FERC Online service, please email
[email protected], or call (866) 208-3676 (toll free). For
TTY, call (202) 502-8659.
Comment Date: 5:00 p.m. Eastern Time on July 23, 2019.
Dated: July 8, 2019.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2019-14835 Filed 7-11-19; 8:45 am]
BILLING CODE 6717-01-P