Southern California Edison Company; Notice of Petition for Declaratory Order, 33254 [2019-14835]

Download as PDF 33254 Federal Register / Vol. 84, No. 134 / Friday, July 12, 2019 / Notices intervene in accordance with the requirements of Rules of Practice and Procedure, 18 CFR 385.210, .211, and .214. In determining the appropriate action to take, the Commission will consider all protests or other comments filed, but only those who file a motion to intervene in accordance with the Commission’s Rules may become a party to the proceeding. Any comments, protests, or motions to intervene must be received on or before the specified comment date for the particular application. n. Filing and Service of Responsive Documents: Any filing must (1) bear in all capital letters the title ‘‘COMMENTS’’, ‘‘PROTEST’’, or ‘‘MOTION TO INTERVENE’’ as applicable; (2) set forth in the heading the name of the applicant and the project number of the application to which the filing responds; (3) furnish the name, address, and telephone number of the person protesting or intervening; and (4) otherwise comply with the requirements of 18 CFR 385.2001 through 385.2005. All comments, motions to intervene, or protests must set forth their evidentiary basis and otherwise comply with the requirements of 18 CFR 4.34(b). All comments, motions to intervene, or protests should relate to the request to extend the license term. Agencies may obtain copies of the application directly from the applicant. A copy of any protest or motion to intervene must be served upon each representative of the applicant specified in the particular application. If an intervener files comments or documents with the Commission relating to the merits of an issue that may affect the responsibilities of a particular resource agency, they must also serve a copy of the document on that resource agency. A copy of all other filings in reference to this application must be accompanied by proof of service on all persons listed in the service list prepared by the Commission in this proceeding, in accordance with 18 CFR 4.34(b) and 385.2010. Dated: July 8, 2019. Nathaniel J. Davis, Sr., Deputy Secretary. jbell on DSK3GLQ082PROD with NOTICES [FR Doc. 2019–14836 Filed 7–11–19; 8:45 am] BILLING CODE 6717–01–P VerDate Sep<11>2014 16:55 Jul 11, 2019 Jkt 247001 DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project Nos. P–67–133, P–120–028, P– 2085–020, P–2086–039, P–2174–017, P– 2175–021] Southern California Edison Company; Notice of Petition for Declaratory Order Take notice that on June 17, 2019, Southern California Edison Company (SCE or Petitioner), applicant for six projects within the Big Creek Hydroelectric System, designated Project No. 67 (Big Creek Nos. 2A, 8, and Eastwood), Project No. 120 (Big Creek No. 3), Project No. 2085 (Mammoth Pool), Project No. 2086 (Vermilion Valley), Project No. 2174 (Portal), and Project No. 2175 (Big Creek Nos. 1 and 2) (collectively referred to as the Big Creek Projects), filed a petition for declaratory order (petition) pursuant to Rule 207(a)(2) of the Federal Energy Regulatory Commission’s Rules of Practice and Procedure, 18 CFR 385.207(a)(2). SCE requests that the Commission declare that the California State Water Resources Control Board has waived its authority to issue a certification for the Big Creek Projects under Section 401 of the Clean Water Act, 33 U.S.C. 1341(a)(1), as more fully explained in the petition. Any person desiring to intervene or to protest this filing must file in accordance with Rules 211 and 214 of the Commission’s Rules of Practice and Procedure, 18 CFR 385.211, 385.214. Protests will be considered by the Commission in determining the appropriate action to be taken, but will not serve to make protestants parties to the proceeding. Any person wishing to become a party must file a notice of intervention or motion to intervene, as appropriate. Such notices, motions, or protests must be filed on or before the comment date. Anyone filing a motion to intervene or protest must serve a copy of that document on the Petitioner. The Commission encourages electronic submission of protests and interventions in lieu of paper using the ‘‘eFiling’’ link at https://www.ferc.gov. Persons unable to file electronically should submit an original and 5 copies of the protest or intervention to the Federal Energy Regulatory Commission, 888 First Street NE, Washington, DC 20426. This filing is accessible on-line at https://www.ferc.gov, using the ‘‘eLibrary’’ link and is available for review in the Commission’s Public Reference Room in Washington, DC. There is an ‘‘eSubscription’’ link on the PO 00000 Frm 00037 Fmt 4703 Sfmt 4703 website that enables subscribers to receive email notification when a document is added to a subscribed docket(s). For assistance with any FERC Online service, please email FERCOnlineSupport@ferc.gov, or call (866) 208–3676 (toll free). For TTY, call (202) 502–8659. Comment Date: 5:00 p.m. Eastern Time on July 23, 2019. Dated: July 8, 2019. Nathaniel J. Davis, Sr., Deputy Secretary. [FR Doc. 2019–14835 Filed 7–11–19; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. ER19–2361–000] Otter Creek Wind Farm LLC; Supplemental Notice That Initial Market-Based Rate Filing Includes Request for Blanket Section 204 Authorization This is a supplemental notice in the above-referenced proceeding of Otter Creek Wind Farm LLC’s application for market-based rate authority, with an accompanying rate tariff, noting that such application includes a request for blanket authorization, under 18 CFR part 34, of future issuances of securities and assumptions of liability. Any person desiring to intervene or to protest should file with the Federal Energy Regulatory Commission, 888 First Street NE, Washington, DC 20426, in accordance with Rules 211 and 214 of the Commission’s Rules of Practice and Procedure (18 CFR 385.211 and 385.214). Anyone filing a motion to intervene or protest must serve a copy of that document on the Applicant. Notice is hereby given that the deadline for filing protests with regard to the applicant’s request for blanket authorization, under 18 CFR part 34, of future issuances of securities and assumptions of liability, is July 29, 2019. The Commission encourages electronic submission of protests and interventions in lieu of paper, using the FERC Online links at https:// www.ferc.gov. To facilitate electronic service, persons with internet access who will eFile a document and/or be listed as a contact for an intervenor must create and validate an eRegistration account using the eRegistration link. Select the eFiling link to log on and submit the intervention or protests. E:\FR\FM\12JYN1.SGM 12JYN1

Agencies

[Federal Register Volume 84, Number 134 (Friday, July 12, 2019)]
[Notices]
[Page 33254]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2019-14835]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Project Nos. P-67-133, P-120-028, P-2085-020, P-2086-039, P-2174-017, 
P-2175-021]


Southern California Edison Company; Notice of Petition for 
Declaratory Order

    Take notice that on June 17, 2019, Southern California Edison 
Company (SCE or Petitioner), applicant for six projects within the Big 
Creek Hydroelectric System, designated Project No. 67 (Big Creek Nos. 
2A, 8, and Eastwood), Project No. 120 (Big Creek No. 3), Project No. 
2085 (Mammoth Pool), Project No. 2086 (Vermilion Valley), Project No. 
2174 (Portal), and Project No. 2175 (Big Creek Nos. 1 and 2) 
(collectively referred to as the Big Creek Projects), filed a petition 
for declaratory order (petition) pursuant to Rule 207(a)(2) of the 
Federal Energy Regulatory Commission's Rules of Practice and Procedure, 
18 CFR 385.207(a)(2). SCE requests that the Commission declare that the 
California State Water Resources Control Board has waived its authority 
to issue a certification for the Big Creek Projects under Section 401 
of the Clean Water Act, 33 U.S.C. 1341(a)(1), as more fully explained 
in the petition.
    Any person desiring to intervene or to protest this filing must 
file in accordance with Rules 211 and 214 of the Commission's Rules of 
Practice and Procedure, 18 CFR 385.211, 385.214. Protests will be 
considered by the Commission in determining the appropriate action to 
be taken, but will not serve to make protestants parties to the 
proceeding. Any person wishing to become a party must file a notice of 
intervention or motion to intervene, as appropriate. Such notices, 
motions, or protests must be filed on or before the comment date. 
Anyone filing a motion to intervene or protest must serve a copy of 
that document on the Petitioner.
    The Commission encourages electronic submission of protests and 
interventions in lieu of paper using the ``eFiling'' link at https://www.ferc.gov. Persons unable to file electronically should submit an 
original and 5 copies of the protest or intervention to the Federal 
Energy Regulatory Commission, 888 First Street NE, Washington, DC 
20426.
    This filing is accessible on-line at https://www.ferc.gov, using the 
``eLibrary'' link and is available for review in the Commission's 
Public Reference Room in Washington, DC. There is an ``eSubscription'' 
link on the website that enables subscribers to receive email 
notification when a document is added to a subscribed docket(s). For 
assistance with any FERC Online service, please email 
[email protected], or call (866) 208-3676 (toll free). For 
TTY, call (202) 502-8659.
    Comment Date: 5:00 p.m. Eastern Time on July 23, 2019.

    Dated: July 8, 2019.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2019-14835 Filed 7-11-19; 8:45 am]
 BILLING CODE 6717-01-P


This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.