Combined Notice of Filings, 33252-33253 [2019-14829]

Download as PDF 33252 Federal Register / Vol. 84, No. 134 / Friday, July 12, 2019 / Notices For assistance, contact FERC Online Support. p. Procedural schedule and final amendments: The application will be processed according to the following preliminary Hydro Licensing Schedule. Revisions to the schedule will be made as appropriate. Issue Notice of Acceptance—September 2019 Request Additional Information (if necessary)—September 2019 Issue Acceptance Letter—December 2019 Issue Scoping Document 1 for comments—January 2020 Hold Scoping Meeting—February 2020 Request Additional Information (if necessary)—April 2020 Issue Scoping Document 2—April 2020 Issue notice of ready for environmental analysis—April 2020 Commission issues EA, draft EA, or draft EIS—October 2020 Comments on EA or draft EA or draft EIS—November 2020 Initiate 10(j) process (if necessary)— December 2020 Commission issues final EA of final EIS—April 2021 Final amendments to the application must be filed with the Commission no later than 30 days from the issuance date of the notice of ready for environmental analysis. Dated: July 8, 2019. Nathaniel J. Davis, Sr., Deputy Secretary. [FR Doc. 2019–14837 Filed 7–11–19; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Combined Notice of Filings Take notice that the Commission has received the following Natural Gas Pipeline Rate and Refund Report filings: jbell on DSK3GLQ082PROD with NOTICES Filings Instituting Proceedings Docket Numbers: CP16–22–003; CP16–23–002. Applicants: NEXUS Gas Transmission, LLC, et al. Description: Abbreviated Joint Application for Amendment to Certificate of Public Convenience and Necessity, and Authorization to Abandon by Lease of NEXUS Gas Transmission, LLC, et al. under CP16– 22, et al. Filed Date: 7/2/19. Accession Number: 20190702–5218. Comments Due: 5 p.m. ET 7/23/19. Docket Numbers: RP18–75–005. VerDate Sep<11>2014 16:55 Jul 11, 2019 Jkt 247001 Applicants: Algonquin Gas Transmission, LLC. Description: Compliance filing FRQ Settlement Compliance Filing 2 re Docket RP18–75 to be effective 8/1/ 2019. Filed Date: 7/1/19. Accession Number: 20190701–5116. Comments Due: 5 p.m. ET 7/15/19. Docket Numbers: RP19–1044–001. Applicants: Cheniere Corpus Christi Pipeline, L.P. Description: Request for Temporary Waiver and Extension of Time to Implement NAESB 3.1 Standards Per Order No. 587–Y of Cheniere Corpus Christi Pipeline, LP under RP19–1044. Filed Date: 7/1/19. Accession Number: 20190701–5419. Comments Due: 5 p.m. ET 7/15/19. Docket Numbers: RP19–1353–000. Applicants: Northern Natural Gas Company. Description: § 4(d) Rate Filing: 20190701 Section 4 Rate Case Part 1 of 3 to be effective 8/1/2019. Filed Date: 7/1/19. Accession Number: 20190701–5105. Comments Due: 5 p.m. ET 7/15/19. Docket Numbers: RP19–1354–000. Applicants: Enable Gas Transmission, LLC. Description: § 4(d) Rate Filing: Negotiated Rate Filing—July 1 2019 Encana 1011022 to be effective 7/1/ 2019. Filed Date: 7/1/19. Accession Number: 20190701–5106. Comments Due: 5 p.m. ET 7/15/19. Docket Numbers: RP19–1355–000. Applicants: Columbia Gulf Transmission, LLC. Description: § 4(d) Rate Filing: ELEOP Facilities Tariff References to be effective 8/1/2019. Filed Date: 7/1/19. Accession Number: 20190701–5107. Comments Due: 5 p.m. ET 7/15/19. Docket Numbers: RP19–1356–000. Applicants: Gulf South Pipeline Company, LP. Description: § 4(d) Rate Filing: Cap Rel Neg Rate Agmts (Atlanta Gas 8438 to various shippers eff 7–1–2019) to be effective 7/1/2019. Filed Date: 7/1/19. Accession Number: 20190701–5108. Comments Due: 5 p.m. ET 7/15/19. Docket Numbers: RP19–1357–000. Applicants: Gulf South Pipeline Company, LP. Description: § 4(d) Rate Filing: Cap Rel Neg Rate Agmts (Aethon 50488, 37657 to Scona 51294, 91297) to be effective 7/1/2019. Filed Date: 7/1/19. Accession Number: 20190701–5109. PO 00000 Frm 00035 Fmt 4703 Sfmt 4703 Comments Due: 5 p.m. ET 7/15/19. Docket Numbers: RP19–1358–000. Applicants: Texas Gas Transmission, LLC. Description: § 4(d) Rate Filing: Cap Rel Neg Rate Agmts (Gulfport 35445, 34939 to Eco-Energy 38093, 38094) to be effective 7/1/2019. Filed Date: 7/1/19. Accession Number: 20190701–5110. Comments Due: 5 p.m. ET 7/15/19. Docket Numbers: RP19–1359–000. Applicants: ETC Tiger Pipeline, LLC. Description: § 4(d) Rate Filing: Housekeeping Filing on 7–1–19 to be effective 8/1/2019. Filed Date: 7/1/19. Accession Number: 20190701–5147. Comments Due: 5 p.m. ET 7/15/19. Docket Numbers: RP19–1360–000. Applicants: Trailblazer Pipeline Company LLC. Description: § 4(d) Rate Filing: Neg Rate 2019–06–27–19 5 sharing Ks to be effective 7/1/2019. Filed Date: 7/1/19. Accession Number: 20190701–5175. Comments Due: 5 p.m. ET 7/15/19. Docket Numbers: RP19–1361–000. Applicants: Fayetteville Express Pipeline LLC. Description: § 4(d) Rate Filing: Housekeeping Filing on 7–1–19 to be effective 8/1/2019. Filed Date: 7/1/19. Accession Number: 20190701–5202. Comments Due: 5 p.m. ET 7/15/19. Docket Numbers: RP19–1362–000. Applicants: RH energytrans, LLC. Description: § 4(d) Rate Filing: RH energytrans, LLC—Filing of Baseline Tariff, Dkt. No. CP18–6–000 Compliance to be effective 9/1/2019. Filed Date: 7/1/19. Accession Number: 20190701–5219. Comments Due: 5 p.m. ET 7/15/19. Docket Numbers: RP19–1363–000. Applicants: NEXUS Gas Transmission, LLC. Description: § 4(d) Rate Filing: Negotiated Rate—Amended CNX Gas 860004 to be effective 7/1/2019. Filed Date: 7/1/19. Accession Number: 20190701–5223. Comments Due: 5 p.m. ET 7/15/19. Docket Numbers: RP19–1364–000. Applicants: Tennessee Gas Pipeline Company, L.L.C. Description: § 4(d) Rate Filing: Volume No. 2—Twin Eagle SP340846 & SP340847 to be effective 8/1/2019. Filed Date: 7/1/19. Accession Number: 20190701–5265. Comments Due: 5 p.m. ET 7/15/19. Docket Numbers: RP19–1365–000. Applicants: WTG Hugoton, LP. Description: § 4(d) Rate Filing: Annual Fuel Retention Percentage Filing 2019– 2020 to be effective 8/1/2019. E:\FR\FM\12JYN1.SGM 12JYN1 jbell on DSK3GLQ082PROD with NOTICES Federal Register / Vol. 84, No. 134 / Friday, July 12, 2019 / Notices Filed Date: 7/1/19. Accession Number: 20190701–5323. Comments Due: 5 p.m. ET 7/15/19. Docket Numbers: RP19–1366–000. Applicants: Rockies Express Pipeline LLC. Description: § 4(d) Rate Filing: Neg Rate 2019–07–01 Encana to be effective 7/1/2019. Filed Date: 7/1/19. Accession Number: 20190701–5325. Comments Due: 5 p.m. ET 7/15/19. Docket Numbers: RP19–1367–000. Applicants: Equitrans, L.P. Description: § 4(d) Rate Filing: Negotiated Capacity Release Agreements—7/1/2019 to be effective 7/1/2019. Filed Date: 7/1/19. Accession Number: 20190701–5331. Comments Due: 5 p.m. ET 7/15/19. Docket Numbers: RP19–1370–000. Applicants: MIGC LLC. Description: Annual Fuel Retention Percentage Tracker of MIGC LLC under RP19–1370. Filed Date: 7/1/19. Accession Number: 20190701–5392. Comments Due: 5 p.m. ET 7/15/19. Docket Numbers: RP19–1371–000. Applicants: West Texas Gas, Inc. Description: Annual Purchased Gas Cost Reconciliation Report of West Texas Gas, Inc. under RP19–1371. Filed Date: 7/1/19. Accession Number: 20190701–5393. Comments Due: 5 p.m. ET 7/15/19. Docket Numbers: RP19–206–005. Applicants: Mississippi Canyon Gas Pipeline, L.L.C. Description: Compliance filing MCGP RP19–206 Compliance Filing to be effective 8/1/2019. Filed Date: 7/2/19. Accession Number: 20190702–5146. Comments Due: 5 p.m. ET 7/15/19. Docket Numbers: RP19–73–002. Applicants: El Paso Natural Gas Company, L.L.C. Description: Compliance filing FERC Form No. 501–G Settlement Implementation Filing to be effective 1/1/2019. Filed Date: 7/2/19. Accession Number: 20190702–5116. Comments Due: 5 p.m. ET 7/15/19. The filings are accessible in the Commission’s eLibrary system by clicking on the links or querying the docket number. Any person desiring to intervene or protest in any of the above proceedings must file in accordance with Rules 211 and 214 of the Commission’s Regulations (18 CFR 385.211 and 385.214) on or before 5:00 p.m. Eastern time on the specified comment date. VerDate Sep<11>2014 16:55 Jul 11, 2019 Jkt 247001 Protests may be considered, but intervention is necessary to become a party to the proceeding. eFiling is encouraged. More detailed information relating to filing requirements, interventions, protests, service, and qualifying facilities filings can be found at: https://www.ferc.gov/ docs-filing/efiling/filing-req.pdf. For other information, call (866) 208–3676 (toll free). For TTY, call (202) 502–8659. Dated: July 8, 2019. Nathaniel J. Davis, Sr., Deputy Secretary. [FR Doc. 2019–14829 Filed 7–11–19; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 663–071] Puerto Rico Electric Power Authority; Notice of Application Accepted for Filing, Soliciting Comments, Protests and Motions To Intervene Take notice that the following hydroelectric application has been filed with the Commission and is available for public inspection: a. Type of Proceeding: Extension of License Term. b. Project No.: P–663–071. c. Date Filed: July 1, 2019. d. Licensee: Puerto Rico Electric Power Authority. e. Name and Location of Project: Rio Blanco Hydroelectric Project, located on the Rio Blanco, in the municipality of Naguabo, Puerto Rico. f. Filed Pursuant to: Federal Power Act, 16 U.S.C. 791a–825r. g. Licensee Contact Information: Ms. Indira Mohip Colon, Manager, Projects and Environmental Licensing Department, Ave. Ponce de Leo´n, Pda. 17.5, Edificio NEOS, Piso 707, Bo. Santurce, Municipio de San Juan, San Juan, PR 00936–4267, Phone: (787) 521– 4968, Email: INDIRA.MOHIP@ prepa.com. h. FERC Contact: Mr. Ashish Desai, (202) 502–8370, Ashish.Desai@ferc.gov. i. Deadline for filing comments, motions to intervene and protests, is 30 days from the issuance date of this notice by the Commission. The Commission strongly encourages electronic filing. Please file motions to intervene, protests, comments, and recommendations, using the Commission’s eFiling system at https:// www.ferc.gov/docs-filing/efiling.asp. Commenters can submit brief comments up to 6,000 characters, without prior PO 00000 Frm 00036 Fmt 4703 Sfmt 4703 33253 registration, using the eComment system at https://www.ferc.gov/docs-filing/ ecomment.asp. You must include your name and contact information at the end of your comments. For assistance, please contact FERC Online Support at FERCOnlineSupport@ferc.gov, (866) 208–3676 (toll free), or (202) 502–8659 (TTY). In lieu of electronic filing, please send a paper copy to: Secretary, Federal Energy Regulatory Commission, 888 First Street NE, Washington, DC 20426. The first page of any filing should include docket number P–663–071. j. Description of Proceeding: The Puerto Rico Electric Power Authority, licensee for the Rio Blanco Project requests to extend the current 30-year license term for the project by eight years, from August 19, 2021 to August 19, 2029. The licensee filed a Notice of Intent and Pre-application Document for a new license on August 16, 2016 and would be required to file a Final License Application (FLA) for a new license by August 19, 2019, two years prior to license expiration. The Rio Blanco Project was rendered inoperable in September 2017 after Hurricanes Irma and Maria caused extensive damage to project facilities, including the powerhouse structure, switchyard, access roads, and penstock. The licensee is currently working with the Federal Emergency Management Agency (FEMA) to obtain funds to rehabilitate the project. The licensee requests the eight-year extension to complete FEMA requirements to obtain funding, complete restoration of the project, and plan and complete relicensing studies to prepare a FLA to file with the Commission by August 19, 2027. k. This notice is available for review and reproduction at the Commission in the Public Reference Room, Room 2A, 888 First Street NE, Washington, DC 20426. The filing may also be viewed on the Commission’s website at https:// www.ferc.gov/docs-filing/elibrary.asp. Enter the Docket number (P–663–071) excluding the last three digits in the docket number field to access the notice. You may also register online at https://www.ferc.gov/docs-filing/ esubscription.asp to be notified via email of new filings and issuances related to this or other pending projects. For assistance, call toll-free 1–866–208– 3676 or email FERCOnlineSupport@ ferc.gov. For TTY, call (202) 502–8659. l. Individuals desiring to be included on the Commission’s mailing list should so indicate by writing to the Secretary of the Commission. m. Comments, Protests, or Motions to Intervene: Anyone may submit comments, a protest, or a motion to E:\FR\FM\12JYN1.SGM 12JYN1

Agencies

[Federal Register Volume 84, Number 134 (Friday, July 12, 2019)]
[Notices]
[Pages 33252-33253]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2019-14829]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission


Combined Notice of Filings

    Take notice that the Commission has received the following Natural 
Gas Pipeline Rate and Refund Report filings:

Filings Instituting Proceedings

    Docket Numbers: CP16-22-003; CP16-23-002.
    Applicants: NEXUS Gas Transmission, LLC, et al.
    Description: Abbreviated Joint Application for Amendment to 
Certificate of Public Convenience and Necessity, and Authorization to 
Abandon by Lease of NEXUS Gas Transmission, LLC, et al. under CP16-22, 
et al.
    Filed Date: 7/2/19.
    Accession Number: 20190702-5218.
    Comments Due: 5 p.m. ET 7/23/19.

    Docket Numbers: RP18-75-005.
    Applicants: Algonquin Gas Transmission, LLC.
    Description: Compliance filing FRQ Settlement Compliance Filing 2 
re Docket RP18-75 to be effective 8/1/2019.
    Filed Date: 7/1/19.
    Accession Number: 20190701-5116.
    Comments Due: 5 p.m. ET 7/15/19.

    Docket Numbers: RP19-1044-001.
    Applicants: Cheniere Corpus Christi Pipeline, L.P.
    Description: Request for Temporary Waiver and Extension of Time to 
Implement NAESB 3.1 Standards Per Order No. 587-Y of Cheniere Corpus 
Christi Pipeline, LP under RP19-1044.
    Filed Date: 7/1/19.
    Accession Number: 20190701-5419.
    Comments Due: 5 p.m. ET 7/15/19.

    Docket Numbers: RP19-1353-000.
    Applicants: Northern Natural Gas Company.
    Description: Sec.  4(d) Rate Filing: 20190701 Section 4 Rate Case 
Part 1 of 3 to be effective 8/1/2019.
    Filed Date: 7/1/19.
    Accession Number: 20190701-5105.
    Comments Due: 5 p.m. ET 7/15/19.

    Docket Numbers: RP19-1354-000.
    Applicants: Enable Gas Transmission, LLC.
    Description: Sec.  4(d) Rate Filing: Negotiated Rate Filing--July 1 
2019 Encana 1011022 to be effective 7/1/2019.
    Filed Date: 7/1/19.
    Accession Number: 20190701-5106.
    Comments Due: 5 p.m. ET 7/15/19.

    Docket Numbers: RP19-1355-000.
    Applicants: Columbia Gulf Transmission, LLC.
    Description: Sec.  4(d) Rate Filing: ELEOP Facilities Tariff 
References to be effective 8/1/2019.
    Filed Date: 7/1/19.
    Accession Number: 20190701-5107.
    Comments Due: 5 p.m. ET 7/15/19.

    Docket Numbers: RP19-1356-000.
    Applicants: Gulf South Pipeline Company, LP.
    Description: Sec.  4(d) Rate Filing: Cap Rel Neg Rate Agmts 
(Atlanta Gas 8438 to various shippers eff 7-1-2019) to be effective 7/
1/2019.
    Filed Date: 7/1/19.
    Accession Number: 20190701-5108.
    Comments Due: 5 p.m. ET 7/15/19.

    Docket Numbers: RP19-1357-000.
    Applicants: Gulf South Pipeline Company, LP.
    Description: Sec.  4(d) Rate Filing: Cap Rel Neg Rate Agmts (Aethon 
50488, 37657 to Scona 51294, 91297) to be effective 7/1/2019.
    Filed Date: 7/1/19.
    Accession Number: 20190701-5109.
    Comments Due: 5 p.m. ET 7/15/19.

    Docket Numbers: RP19-1358-000.
    Applicants: Texas Gas Transmission, LLC.
    Description: Sec.  4(d) Rate Filing: Cap Rel Neg Rate Agmts 
(Gulfport 35445, 34939 to Eco-Energy 38093, 38094) to be effective 7/1/
2019.
    Filed Date: 7/1/19.
    Accession Number: 20190701-5110.
    Comments Due: 5 p.m. ET 7/15/19.

    Docket Numbers: RP19-1359-000.
    Applicants: ETC Tiger Pipeline, LLC.
    Description: Sec.  4(d) Rate Filing: Housekeeping Filing on 7-1-19 
to be effective 8/1/2019.
    Filed Date: 7/1/19.
    Accession Number: 20190701-5147.
    Comments Due: 5 p.m. ET 7/15/19.

    Docket Numbers: RP19-1360-000.
    Applicants: Trailblazer Pipeline Company LLC.
    Description: Sec.  4(d) Rate Filing: Neg Rate 2019-06-27-19 5 
sharing Ks to be effective 7/1/2019.
    Filed Date: 7/1/19.
    Accession Number: 20190701-5175.
    Comments Due: 5 p.m. ET 7/15/19.

    Docket Numbers: RP19-1361-000.
    Applicants: Fayetteville Express Pipeline LLC.
    Description: Sec.  4(d) Rate Filing: Housekeeping Filing on 7-1-19 
to be effective 8/1/2019.
    Filed Date: 7/1/19.
    Accession Number: 20190701-5202.
    Comments Due: 5 p.m. ET 7/15/19.

    Docket Numbers: RP19-1362-000.
    Applicants: RH energytrans, LLC.
    Description: Sec.  4(d) Rate Filing: RH energytrans, LLC--Filing of 
Baseline Tariff, Dkt. No. CP18-6-000 Compliance to be effective 9/1/
2019.
    Filed Date: 7/1/19.
    Accession Number: 20190701-5219.
    Comments Due: 5 p.m. ET 7/15/19.

    Docket Numbers: RP19-1363-000.
    Applicants: NEXUS Gas Transmission, LLC.
    Description: Sec.  4(d) Rate Filing: Negotiated Rate--Amended CNX 
Gas 860004 to be effective 7/1/2019.
    Filed Date: 7/1/19.
    Accession Number: 20190701-5223.
    Comments Due: 5 p.m. ET 7/15/19.

    Docket Numbers: RP19-1364-000.
    Applicants: Tennessee Gas Pipeline Company, L.L.C.
    Description: Sec.  4(d) Rate Filing: Volume No. 2--Twin Eagle 
SP340846 & SP340847 to be effective 8/1/2019.
    Filed Date: 7/1/19.
    Accession Number: 20190701-5265.
    Comments Due: 5 p.m. ET 7/15/19.

    Docket Numbers: RP19-1365-000.
    Applicants: WTG Hugoton, LP.
    Description: Sec.  4(d) Rate Filing: Annual Fuel Retention 
Percentage Filing 2019-2020 to be effective 8/1/2019.

[[Page 33253]]

    Filed Date: 7/1/19.
    Accession Number: 20190701-5323.
    Comments Due: 5 p.m. ET 7/15/19.

    Docket Numbers: RP19-1366-000.
    Applicants: Rockies Express Pipeline LLC.
    Description: Sec.  4(d) Rate Filing: Neg Rate 2019-07-01 Encana to 
be effective 7/1/2019.
    Filed Date: 7/1/19.
    Accession Number: 20190701-5325.
    Comments Due: 5 p.m. ET 7/15/19.

    Docket Numbers: RP19-1367-000.
    Applicants: Equitrans, L.P.
    Description: Sec.  4(d) Rate Filing: Negotiated Capacity Release 
Agreements--7/1/2019 to be effective 7/1/2019.
    Filed Date: 7/1/19.
    Accession Number: 20190701-5331.
    Comments Due: 5 p.m. ET 7/15/19.

    Docket Numbers: RP19-1370-000.
    Applicants: MIGC LLC.
    Description: Annual Fuel Retention Percentage Tracker of MIGC LLC 
under RP19-1370.
    Filed Date: 7/1/19.
    Accession Number: 20190701-5392.
    Comments Due: 5 p.m. ET 7/15/19.

    Docket Numbers: RP19-1371-000.
    Applicants: West Texas Gas, Inc.
    Description: Annual Purchased Gas Cost Reconciliation Report of 
West Texas Gas, Inc. under RP19-1371.
    Filed Date: 7/1/19.
    Accession Number: 20190701-5393.
    Comments Due: 5 p.m. ET 7/15/19.

    Docket Numbers: RP19-206-005.
    Applicants: Mississippi Canyon Gas Pipeline, L.L.C.
    Description: Compliance filing MCGP RP19-206 Compliance Filing to 
be effective 8/1/2019.
    Filed Date: 7/2/19.
    Accession Number: 20190702-5146.
    Comments Due: 5 p.m. ET 7/15/19.

    Docket Numbers: RP19-73-002.
    Applicants: El Paso Natural Gas Company, L.L.C.
    Description: Compliance filing FERC Form No. 501-G Settlement 
Implementation Filing to be effective 1/1/2019.
    Filed Date: 7/2/19.
    Accession Number: 20190702-5116.
    Comments Due: 5 p.m. ET 7/15/19.

    The filings are accessible in the Commission's eLibrary system by 
clicking on the links or querying the docket number.
    Any person desiring to intervene or protest in any of the above 
proceedings must file in accordance with Rules 211 and 214 of the 
Commission's Regulations (18 CFR 385.211 and 385.214) on or before 5:00 
p.m. Eastern time on the specified comment date. Protests may be 
considered, but intervention is necessary to become a party to the 
proceeding.
    eFiling is encouraged. More detailed information relating to filing 
requirements, interventions, protests, service, and qualifying 
facilities filings can be found at: https://www.ferc.gov/docs-filing/efiling/filing-req.pdf. For other information, call (866) 208-3676 
(toll free). For TTY, call (202) 502-8659.

    Dated: July 8, 2019.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2019-14829 Filed 7-11-19; 8:45 am]
BILLING CODE 6717-01-P
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.