Combined Notice of Filings #1, 33250 [2019-14828]
Download as PDF
33250
Federal Register / Vol. 84, No. 134 / Friday, July 12, 2019 / Notices
when such information might lose its
confidential character due to the
passage of time, and (7) why disclosure
of the information would be contrary to
the public interest.
Signed in Washington, DC, on July 3, 2019.
Chris Fall,
Director, Office of Science.
[FR Doc. 2019–14869 Filed 7–11–19; 8:45 am]
BILLING CODE 6450–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
jbell on DSK3GLQ082PROD with NOTICES
Combined Notice of Filings #1
Take notice that the Commission
received the following electric rate
filings:
Docket Numbers: ER15–1882–004.
Applicants: PSEG Energy Resources &
Trade LLC.
Description: Compliance filing:
Informational filing of PSEG Energy
Resources & Trade to be effective
12/31/9998.
Filed Date: 7/8/19.
Accession Number: 20190708–5097.
Comments Due: 5 p.m. ET 7/29/19.
Docket Numbers: ER19–1672–001.
Applicants: Southwest Power Pool,
Inc.
Description: Tariff Amendment:
Amended Filing in ER19–1672—
1148R25 American Electric Power
NITSA and NOA to be effective 4/1/
2019.
Filed Date: 7/8/19.
Accession Number: 20190708–5098.
Comments Due: 5 p.m. ET 7/29/19.
Docket Numbers: ER19–1927–001.
Applicants: Portland General Electric
Company.
Description: Compliance filing: Order
845 Amended Surplus Interconnection
Language to be effective 5/22/2019.
Filed Date: 7/8/19.
Accession Number: 20190708–5006.
Comments Due: 5 p.m. ET 7/29/19.
Docket Numbers: ER19–2360–000.
Applicants: Montague Wind Power
Facility, LLC.
Description: Baseline eTariff Filing:
Application for Market-Based Rate
Authorization, Request for Related
Waivers to be effective 7/26/2019.
Filed Date: 7/8/19.
Accession Number: 20190708–5004.
Comments Due: 5 p.m. ET 7/29/19.
Docket Numbers: ER19–2361–000.
Applicants: Otter Creek Wind Farm
LLC.
Description: Baseline eTariff Filing:
Application for Market-Based Rate
Authorization, Request for Related
Waivers to be effective 9/7/2019.
VerDate Sep<11>2014
16:55 Jul 11, 2019
Jkt 247001
Filed Date: 7/8/19.
Accession Number: 20190708–5008.
Comments Due: 5 p.m. ET 7/29/19.
Docket Numbers: ER19–2362–000.
Applicants: Southwest Power Pool,
Inc.
Description: Reliability Penalty Cost
Recovery, et al. of Southwest Power
Pool, Inc.
Filed Date: 7/3/19.
Accession Number: 20190703–5219.
Comments Due: 5 p.m. ET 7/24/19.
Docket Numbers: ER19–2363–000.
Applicants: Pennsylvania Electric
Company, Mid-Atlantic Interstate
Transmission, LLC, PJM
Interconnection, L.L.C.
Description: § 205(d) Rate Filing:
Penelec submits Construction
Agreement, Service Agreement No. 5279
to be effective 9/6/2019.
Filed Date: 7/8/19.
Accession Number: 20190708–5075.
Comments Due: 5 p.m. ET 7/29/19.
Docket Numbers: ER19–2364–000.
Applicants: Midcontinent
Independent System Operator, Inc.,
ALLETE, Inc.
Description: § 205(d) Rate Filing:
2019–07–08_SA 3329 MP–GRPU T–L
(Tioga) to be effective 6/12/2019.
Filed Date: 7/8/19.
Accession Number: 20190708–5077.
Comments Due: 5 p.m. ET 7/29/19.
The filings are accessible in the
Commission’s eLibrary system by
clicking on the links or querying the
docket number.
Any person desiring to intervene or
protest in any of the above proceedings
must file in accordance with Rules 211
and 214 of the Commission’s
Regulations (18 CFR 385.211 and
385.214) on or before 5:00 p.m. Eastern
time on the specified comment date.
Protests may be considered, but
intervention is necessary to become a
party to the proceeding.
eFiling is encouraged. More detailed
information relating to filing
requirements, interventions, protests,
service, and qualifying facilities filings
can be found at: https://www.ferc.gov/
docs-filing/efiling/filing-req.pdf. For
other information, call (866) 208–3676
(toll free). For TTY, call (202) 502–8659.
Dated: July 8, 2019.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2019–14828 Filed 7–11–19; 8:45 am]
BILLING CODE 6717–01–P
PO 00000
Frm 00033
Fmt 4703
Sfmt 4703
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. ER19–2360–000]
Montague Wind Power Facility, LLC;
Supplemental Notice That Initial
Market-Based Rate Filing Includes
Request for Blanket Section 204
Authorization
This is a supplemental notice in the
above-referenced proceeding of
Montague Wind Power Facility, LLC’s
application for market-based rate
authority, with an accompanying rate
tariff, noting that such application
includes a request for blanket
authorization, under 18 CFR part 34, of
future issuances of securities and
assumptions of liability.
Any person desiring to intervene or to
protest should file with the Federal
Energy Regulatory Commission, 888
First Street NE, Washington, DC 20426,
in accordance with Rules 211 and 214
of the Commission’s Rules of Practice
and Procedure (18 CFR 385.211 and
385.214). Anyone filing a motion to
intervene or protest must serve a copy
of that document on the Applicant.
Notice is hereby given that the
deadline for filing protests with regard
to the applicant’s request for blanket
authorization, under 18 CFR part 34, of
future issuances of securities and
assumptions of liability, is July 29,
2019.
The Commission encourages
electronic submission of protests and
interventions in lieu of paper, using the
FERC Online links at https://
www.ferc.gov. To facilitate electronic
service, persons with internet access
who will eFile a document and/or be
listed as a contact for an intervenor
must create and validate an
eRegistration account using the
eRegistration link. Select the eFiling
link to log on and submit the
intervention or protests.
Persons unable to file electronically
should submit an original and 5 copies
of the intervention or protest to the
Federal Energy Regulatory Commission,
888 First Street NE, Washington, DC
20426.
The filings in the above-referenced
proceeding are accessible in the
Commission’s eLibrary system by
clicking on the appropriate link in the
above list. They are also available for
electronic review in the Commission’s
Public Reference Room in Washington,
DC. There is an eSubscription link on
the website that enables subscribers to
receive email notification when a
document is added to a subscribed
E:\FR\FM\12JYN1.SGM
12JYN1
Agencies
[Federal Register Volume 84, Number 134 (Friday, July 12, 2019)]
[Notices]
[Page 33250]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2019-14828]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
Combined Notice of Filings #1
Take notice that the Commission received the following electric
rate filings:
Docket Numbers: ER15-1882-004.
Applicants: PSEG Energy Resources & Trade LLC.
Description: Compliance filing: Informational filing of PSEG Energy
Resources & Trade to be effective 12/31/9998.
Filed Date: 7/8/19.
Accession Number: 20190708-5097.
Comments Due: 5 p.m. ET 7/29/19.
Docket Numbers: ER19-1672-001.
Applicants: Southwest Power Pool, Inc.
Description: Tariff Amendment: Amended Filing in ER19-1672--1148R25
American Electric Power NITSA and NOA to be effective 4/1/2019.
Filed Date: 7/8/19.
Accession Number: 20190708-5098.
Comments Due: 5 p.m. ET 7/29/19.
Docket Numbers: ER19-1927-001.
Applicants: Portland General Electric Company.
Description: Compliance filing: Order 845 Amended Surplus
Interconnection Language to be effective 5/22/2019.
Filed Date: 7/8/19.
Accession Number: 20190708-5006.
Comments Due: 5 p.m. ET 7/29/19.
Docket Numbers: ER19-2360-000.
Applicants: Montague Wind Power Facility, LLC.
Description: Baseline eTariff Filing: Application for Market-Based
Rate Authorization, Request for Related Waivers to be effective 7/26/
2019.
Filed Date: 7/8/19.
Accession Number: 20190708-5004.
Comments Due: 5 p.m. ET 7/29/19.
Docket Numbers: ER19-2361-000.
Applicants: Otter Creek Wind Farm LLC.
Description: Baseline eTariff Filing: Application for Market-Based
Rate Authorization, Request for Related Waivers to be effective 9/7/
2019.
Filed Date: 7/8/19.
Accession Number: 20190708-5008.
Comments Due: 5 p.m. ET 7/29/19.
Docket Numbers: ER19-2362-000.
Applicants: Southwest Power Pool, Inc.
Description: Reliability Penalty Cost Recovery, et al. of Southwest
Power Pool, Inc.
Filed Date: 7/3/19.
Accession Number: 20190703-5219.
Comments Due: 5 p.m. ET 7/24/19.
Docket Numbers: ER19-2363-000.
Applicants: Pennsylvania Electric Company, Mid-Atlantic Interstate
Transmission, LLC, PJM Interconnection, L.L.C.
Description: Sec. 205(d) Rate Filing: Penelec submits Construction
Agreement, Service Agreement No. 5279 to be effective 9/6/2019.
Filed Date: 7/8/19.
Accession Number: 20190708-5075.
Comments Due: 5 p.m. ET 7/29/19.
Docket Numbers: ER19-2364-000.
Applicants: Midcontinent Independent System Operator, Inc., ALLETE,
Inc.
Description: Sec. 205(d) Rate Filing: 2019-07-08_SA 3329 MP-GRPU
T-L (Tioga) to be effective 6/12/2019.
Filed Date: 7/8/19.
Accession Number: 20190708-5077.
Comments Due: 5 p.m. ET 7/29/19.
The filings are accessible in the Commission's eLibrary system by
clicking on the links or querying the docket number.
Any person desiring to intervene or protest in any of the above
proceedings must file in accordance with Rules 211 and 214 of the
Commission's Regulations (18 CFR 385.211 and 385.214) on or before 5:00
p.m. Eastern time on the specified comment date. Protests may be
considered, but intervention is necessary to become a party to the
proceeding.
eFiling is encouraged. More detailed information relating to filing
requirements, interventions, protests, service, and qualifying
facilities filings can be found at: https://www.ferc.gov/docs-filing/efiling/filing-req.pdf. For other information, call (866) 208-3676
(toll free). For TTY, call (202) 502-8659.
Dated: July 8, 2019.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2019-14828 Filed 7-11-19; 8:45 am]
BILLING CODE 6717-01-P