Northern Indiana Public Service Company; Notice of Filing, 33065 [2019-14736]
Download as PDF
jspears on DSK30JT082PROD with NOTICES
Federal Register / Vol. 84, No. 133 / Thursday, July 11, 2019 / Notices
document should follow the
instructions for filing such requests
described in item l below. Cooperating
agencies should note the Commission’s
policy that agencies that cooperate in
the preparation of the environmental
document cannot also intervene. See, 94
FERC 61,076 (2001).
k. Pursuant to section 4.32(b)(7) of 18
CFR of the Commission’s regulations, if
any resource agency, Indian Tribe, or
person believes that an additional
scientific study should be conducted in
order to form an adequate factual basis
for a complete analysis of the
application on its merit, the resource
agency, Indian Tribe, or person must file
a request for a study with the
Commission not later than 60 days from
the date of filing of the application, and
serve a copy of the request on the
applicant.
l. Deadline for filing additional study
requests and requests for cooperating
agency status: August 27, 2019.
The Commission strongly encourages
electronic filing. Please file additional
study requests and requests for
cooperating agency status using the
Commission’s eFiling system at https://
www.ferc.gov/docs-filing/efiling.asp. For
assistance, please contact FERC Online
Support at FERCOnlineSupport@
ferc.gov, (866) 208–3676 (toll free), or
(202) 502–8659 (TTY). In lieu of
electronic filing, please send a paper
copy to: Secretary, Federal Energy
Regulatory Commission, 888 First Street
NE, Washington, DC 20426. The first
page of any filing should include docket
number P–3251–010.
m. This application is not ready for
environmental analysis at this time.
n. The project works consist of: (1) An
existing 28-foot-high, 260-foot-long
reinforced-concrete gravity overflowtype dam, known as Beebe Lake Dam,
with a crest elevation of 780.7 feet mean
sea level (msl); (2) an impoundment
(Beebe Lake) with a surface area of 16
acres and a storage capacity of 50 acrefeet at the normal pool elevation of
780.7 feet msl; (3) a concrete forebay
wall and reinforced-concrete intake
with a 6-foot-high, 6-foot-wide steel
vertical-slide gate along the right (north)
bank; (4) a 5-foot-diameter, 1,507-footlong reinforced-concrete underground
pipeline and a 5-foot-diameter, 200-footlong riveted-steel underground
penstock; (5) a 79-foot-long, 29-footwide, 24-foot-high powerhouse
containing two Ossberger turbines and
induction generators with a combined
authorized capacity of 1,718 kilowatts;
(6) a tailrace located on the river rightside of Fall Creek directly below the
powerhouse; (7) a 385-foot-long, 2.4kilovolt transmission line connecting to
VerDate Sep<11>2014
17:26 Jul 10, 2019
Jkt 247001
Cornell’s distribution system; and (8)
appurtenant facilities.
The Cornell Project is operated in a
run-of-river mode and bypasses a 1,800foot-long reach of Fall Creek that
extends from the toe of the dam to the
powerhouse tailrace. From 2013 through
2018, the average annual generation was
4,599 megawatt-hours.
o. A copy of the application is
available for review at the Commission
in the Public Reference Room or may be
viewed on the Commission’s website at
https://www.ferc.gov using the eLibrary
link. Enter the docket number excluding
the last three digits in the docket
number field to access the document.
For assistance, contact FERC Online
Support. A copy is also available for
inspection and reproduction at the
address in item h above.
You may also register online at https://
www.ferc.gov/docs-filing/
esubscription.asp to be notified via
email of new filings and issuances
related to this or other pending projects.
For assistance, contact FERC Online
Support.
p. Procedural schedule and final
amendments: The application will be
processed according to the following
preliminary schedule. Revisions to the
schedule will be made as appropriate.
Issue Deficiency Letter (if necessary)—
August 2019
Request Additional Information—
August 2019
Issue Acceptance Letter—November
2019
Issue Scoping Document 1 for
comments—December 2019
Request Additional Information (if
necessary)—February 2020
Issue Scoping Document 2—March 2020
Issue notice of ready for environmental
analysis—March 2020
Commission issues EA—September
2020
Comments on EA—October 2020
q. Final amendments to the
application must be filed with the
Commission no later than 30 days from
the issuance date of the notice of ready
for environmental analysis.
Dated: July 5, 2019.
Kimberly D. Bose,
Secretary.
[FR Doc. 2019–14735 Filed 7–10–19; 8:45 am]
BILLING CODE 6717–01–P
PO 00000
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. ES19–33–000]
Northern Indiana Public Service
Company; Notice of Filing
Take notice that on July 3, 2019,
Northern Indiana Public Service
Company filed an Errata to July 2, 2019
Supplement to its June 11, 2019
Application under section 204 of the
Federal Power Act for Authorization to
Issue Securities.
Any person desiring to intervene or to
protest this filing must file in
accordance with Rules 211 and 214 of
the Commission’s Rules of Practice and
Procedure (18 CFR 385.211, 385.214).
Protests will be considered by the
Commission in determining the
appropriate action to be taken, but will
not serve to make protestants parties to
the proceeding. Any person wishing to
become a party must file a notice of
intervention or motion to intervene, as
appropriate. Such notices, motions, or
protests must be filed on or before the
comment date. Anyone filing a motion
to intervene or protest must serve a copy
of that document on the Applicant.
The Commission encourages
electronic submission of protests and
interventions in lieu of paper using the
eFiling link at https://www.ferc.gov.
Persons unable to file electronically
should submit an original and 5 copies
of the protest or intervention to the
Federal Energy Regulatory Commission,
888 First Street NE, Washington, DC
20426.
This filing is accessible on-line at
https://www.ferc.gov, using the eLibrary
link and is available for review in the
Commission’s Public Reference Room in
Washington, DC. There is an
eSubscription link on the website that
enables subscribers to receive email
notification when a document is added
to a subscribed docket(s). For assistance
with any FERC Online service, please
email FERCOnlineSupport@ferc.gov, or
call (866) 208–3676 (toll free). For TTY,
call (202) 502–8659.
Comments: 5:00 p.m. Eastern Time on
July 10, 2019.
Dated: July 5, 2019.
Kimberly D. Bose,
Secretary.
[FR Doc. 2019–14736 Filed 7–10–19; 8:45 am]
BILLING CODE 6717–01–P
Frm 00015
Fmt 4703
33065
Sfmt 9990
E:\FR\FM\11JYN1.SGM
11JYN1
Agencies
[Federal Register Volume 84, Number 133 (Thursday, July 11, 2019)]
[Notices]
[Page 33065]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2019-14736]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Docket No. ES19-33-000]
Northern Indiana Public Service Company; Notice of Filing
Take notice that on July 3, 2019, Northern Indiana Public Service
Company filed an Errata to July 2, 2019 Supplement to its June 11, 2019
Application under section 204 of the Federal Power Act for
Authorization to Issue Securities.
Any person desiring to intervene or to protest this filing must
file in accordance with Rules 211 and 214 of the Commission's Rules of
Practice and Procedure (18 CFR 385.211, 385.214). Protests will be
considered by the Commission in determining the appropriate action to
be taken, but will not serve to make protestants parties to the
proceeding. Any person wishing to become a party must file a notice of
intervention or motion to intervene, as appropriate. Such notices,
motions, or protests must be filed on or before the comment date.
Anyone filing a motion to intervene or protest must serve a copy of
that document on the Applicant.
The Commission encourages electronic submission of protests and
interventions in lieu of paper using the eFiling link at https://www.ferc.gov. Persons unable to file electronically should submit an
original and 5 copies of the protest or intervention to the Federal
Energy Regulatory Commission, 888 First Street NE, Washington, DC
20426.
This filing is accessible on-line at https://www.ferc.gov, using the
eLibrary link and is available for review in the Commission's Public
Reference Room in Washington, DC. There is an eSubscription link on the
website that enables subscribers to receive email notification when a
document is added to a subscribed docket(s). For assistance with any
FERC Online service, please email [email protected], or call
(866) 208-3676 (toll free). For TTY, call (202) 502-8659.
Comments: 5:00 p.m. Eastern Time on July 10, 2019.
Dated: July 5, 2019.
Kimberly D. Bose,
Secretary.
[FR Doc. 2019-14736 Filed 7-10-19; 8:45 am]
BILLING CODE 6717-01-P