ISO New England Inc., Constellation Mystic Power, LLC; Supplemental Notice of Staff-Led Public Meeting, 32903-32904 [2019-14707]
Download as PDF
Federal Register / Vol. 84, No. 132 / Wednesday, July 10, 2019 / Notices
action to take, the Commission will
consider all protests or other comments
filed, but only those who file a motion
to intervene in accordance with the
Commission’s Rules may become a
party to the proceeding. Any comments,
protests, or motions to intervene must
be received on or before the specified
comment date for the particular
application.
n. Filing and Service of Documents:
Any filing must (1) bear in all capital
letters the title COMMENTS, PROTEST,
or MOTION TO INTERVENE as
applicable; (2) set forth in the heading
the name of the applicant and the
project number of the application to
which the filing responds; (3) furnish
the name, address, and telephone
number of the person protesting or
intervening; and (4) otherwise comply
with the requirements of 18 CFR
385.2001 through 385.2005. All
comments, motions to intervene, or
protests must set forth their evidentiary
basis. Any filing made by an intervenor
must be accompanied by prof of service
on all persons listed in the service list
prepared by the Commission in this
proceeding, in accordance with 18 CFR
385.2010.
Dated: July 3, 2019.
Kimberly D. Bose,
Secretary.
[FR Doc. 2019–14677 Filed 7–9–19; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Combined Notice of Filings
jspears on DSK30JT082PROD with NOTICES
Take notice that the Commission has
received the following Natural Gas
Pipeline Rate and Refund Report filings:
Filings Instituting Proceedings
Docket Numbers: RP19–1337–000.
Applicants: Texas Eastern
Transmission, LP.
Description: Submits tariff filing per
154.204: Negotiated Rates—MC Global
7–1–2019 Releases to be effective 7/1/
2019 under RP19–1337.
Filed Date: 6/27/19.
Accession Number: 20190627–5043.
Comments Due: 5 p.m. ET 7/12/19.
Docket Numbers: RP19–1338–000.
Applicants: Rockies Express Pipeline
LLC.
Description: Submits tariff filing per
154.204: Neg Rate 2019–06–27 CP
Castleton and Twin Eagle (E2W) to be
effective 07/1/2019.
Filed Date: 6/27/19.
Accession Number: 20190627–5096.
VerDate Sep<11>2014
18:32 Jul 09, 2019
Jkt 247001
Comments Due: 5 p.m. ET 7/12/19.
Docket Numbers: RP19–1368–000.
Applicants: Iroquois Gas
Transmission System, L.P.
Description: § 4(d) Rate Filing: 070219
Negotiated Rates—Spotlight Energy,
LLC R–77250–6 to be effective 9/1/2019.
Filed Date: 7/2/19.
Accession Number: 20190702–5070.
Comments Due: 5 p.m. ET 7/15/19.
Docket Numbers: RP19–1369–000.
Applicants: Iroquois Gas
Transmission System, L.P.
Description: § 4(d) Rate Filing: 070219
Negotiated Rates—Tenaska Marketing
Ventures R–2835–20 to be effective 9/1/
2019.
Filed Date: 7/2/19.
Accession Number: 20190702–5071.
Comments Due: 5 p.m. ET 7/15/19.
Docket Numbers: RP19–1372–000.
Applicants: Dominion Energy Cove
Point LNG, LP.
Description: Compliance filing
DECP—2019 Penalty Revenue
Distribution to be effective N/A.
Filed Date: 7/2/19.
Accession Number: 20190702–5096.
Comments Due: 5 p.m. ET 7/15/19.
Docket Numbers: RP19–1373–000.
Applicants: Dominion Energy
Transmission, Inc.
Description: Compliance filing DETI—
2019 Overrun and Penalty Revenue
Distribution to be effective N/A.
Filed Date: 7/2/19.
Accession Number: 20190702–5112.
Comments Due: 5 p.m. ET 7/15/19.
Docket Numbers: RP19–1374–000.
Applicants: Northern Natural Gas
Company.
Description: § 4(d) Rate Filing:
20170702 Negotiated Rate to be effective
7/3/2019.
Filed Date: 7/2/19.
Accession Number: 20190702–5202.
Comments Due: 5 p.m. ET 7/15/19.
The filings are accessible in the
Commission’s eLibrary system by
clicking on the links or querying the
docket number.
Any person desiring to intervene or
protest in any of the above proceedings
must file in accordance with Rules 211
and 214 of the Commission’s
Regulations (18 CFR 385.211 and
385.214) on or before 5:00 p.m. Eastern
time on the specified comment date.
Protests may be considered, but
intervention is necessary to become a
party to the proceeding.
eFiling is encouraged. More detailed
information relating to filing
requirements, interventions, protests,
service, and qualifying facilities filings
can be found at: https://www.ferc.gov/
docs-filing/efiling/filing-req.pdf. For
PO 00000
Frm 00045
Fmt 4703
Sfmt 4703
32903
other information, call (866) 208–3676
(toll free). For TTY, call (202) 502–8659.
Dated: July 3, 2019.
Kimberly D. Bose,
Secretary.
[FR Doc. 2019–14671 Filed 7–9–19; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket Nos. EL18–182–000, ER13–2266–
004, ER18–1509–000, ER18–1509–001,
ER18–2364–000, ER19–1428–000, ER18–
1639–000, ER18–1639–001, ER18–1639–002,
ER18–1639–003]
ISO New England Inc., Constellation
Mystic Power, LLC; Supplemental
Notice of Staff-Led Public Meeting
As announced in the Notice of StaffLed Public Meeting issued on May 21,
2019, Federal Energy Regulatory
Commission (Commission) staff will
convene a staff-led public meeting on
Monday, July 15, 2019, from 10:00 a.m.
to 5:00 p.m. (ET). The public meeting
will be held in the Commission Meeting
Room at Commission headquarters, 888
First Street NE, Washington, DC 20426.
Commissioners may attend and
participate.
On April 22, 2019, ISO New England
Inc. (ISO–NE), New England States
Committee on Electricity (NESCOE),
and New England Power Pool
(NEPOOL) Participants Committee
jointly requested a public meeting to
share with Commission staff, without
violating the Commission’s regulations
prohibiting ex parte communications,1
information about efforts to develop
proposed tariff revisions in response to
a Commission directive 2 to reflect
improvements to ISO–NE’s market
design to better address regional fuel
security concerns. This notice of public
meeting is in response to that request.
This staff-led public meeting will
consist of three presentations by
representatives from ISO–NE, NEPOOL,
and NESCOE with time for questions
and answers at the end of each
presentation. Questions will be
permitted from only Commission staff
and Commissioners. The Commission
will not solicit post-meeting comments.
Parties who wish to comment on ISO–
NE’s proposal may do so when ISO–NE
files its proposal.
Attached to this supplemental notice
is an agenda for this public meeting,
1 Commission Rules of Practice and Procedure,
Rule 2201, 18 CFR 385.2201 (2018).
2 See ISO New England Inc., 164 FERC 61,003, at
P 2 (2018).
E:\FR\FM\10JYN1.SGM
10JYN1
32904
Federal Register / Vol. 84, No. 132 / Wednesday, July 10, 2019 / Notices
including the list of speakers for each
presentation.
All interested persons may attend the
public meeting. Registration is not
required. However, in-person attendees
are encouraged to pre-register on-line at:
https://www.ferc.gov/whats-new/
registration/07-15-19-form.asp. Inperson attendees should allow time to
pass through building security
procedures before the 10:00 a.m. start
time of the public meeting.
The public meeting will be webcast.
A link to the webcast of this event will
be available in the Commission
Calendar of Events at www.ferc.gov. The
Capitol Connection provides technical
support for webcasts and offers the
option of listening to the meeting via
phone-bridge for a fee. If you have any
questions, visit https://
www.CapitolConnection.org or call (703)
993–3100.
The public meeting will not be
transcribed. PowerPoint slides or
printed documents used in the public
meeting will be entered into the record
in Docket No. EL18–182–000.
Commission public meetings are
accessible under section 508 of the
Rehabilitation Act of 1973. For
accessibility accommodations, please
send an email to accessibility@ferc.gov
or call toll free 1–866–208–3372 (voice)
or 202–208–8659 (TTY), or send a fax to
202–208–2106 with the required
accommodations.
For more information about this
public meeting, please contact Frank
Swigonski by phone at (202) 502–8089
or by email at frank.swigonski@ferc.gov.
For information related to logistics,
please contact Sarah McKinley at (202)
502–8368 or by email at
sarah.mckinley@ferc.gov.
Dated: July 3, 2019.
Kimberly D. Bose,
Secretary.
[FR Doc. 2019–14707 Filed 7–9–19; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
jspears on DSK30JT082PROD with NOTICES
Combined Notice of Filings #2
Take notice that the Commission
received the following electric corporate
filings:
Docket Numbers: EC19–111–000.
Applicants: DTE Electric Company,
Heritage Stoney Corners Wind Farm I,
LLC.
Description: Application for
Authorization Under Section 203 of the
VerDate Sep<11>2014
18:32 Jul 09, 2019
Jkt 247001
Federal Power Act, et al. of DTE Electric
Company, et al.
Filed Date: 7/3/19.
Accession Number: 20190703–5103.
Comments Due: 5 p.m. ET 7/24/19.
Take notice that the Commission
received the following electric rate
filings:
Docket Numbers: ER15–1883–005;
ER10–1852–027; ER10–1890–011;
ER10–1951–013; ER10–1962–011;
ER10–1989–011; ER11–2160–011;
ER11–2192–013; ER11–3635–011;
ER11–4462–034; ER11–4677–012;
ER11–4678–012; ER12–2444–011;
ER12–631–013; ER12–676–010; ER13–
1991–010; ER13–1992–010; ER13–2112–
007; ER15–1016–005; ER15–1375–005;
ER15–1418–005; ER15–2243–003;
ER15–2477–005; ER16–2443–002;
ER16–632–003; ER16–90–005; ER16–
91–005; ER17–196–002; ER17–2340–
002; ER17–582–003; ER17–583–003;
ER17–822–003; ER17–823–003; ER17–
838–009; ER18–1978–002; ER18–241–
002; ER18–772–002; ER18–807–002;
ER19–1392–002.
Applicants: Adelanto Solar, LLC,
Adelanto Solar II, LLC, Blythe Solar II,
LLC, Blythe Solar 110, LLC, Casa Mesa
Wind, LLC, Desert Sunlight 250, LLC,
Desert Sunlight 300, LLC, Florida Power
& Light Company, FPL Energy Green
Power Wind, LLC, FPL Energy
Montezuma Wind, LLC, Genesis Solar,
LLC, Golden Hills Interconnection, LLC,
Golden Hills North Wind, LLC, Golden
Hills Wind, LLC, Hatch Solar Energy
Center I, LLC, High Lonesome Mesa
Wind, LLC, High Winds, LLC, Luz Solar
Partners Ltd., III, Luz Solar Partners
Ltd., IV, Luz Solar Partners Ltd., V,
McCoy Solar, LLC, New Mexico Wind,
LLC, NextEra Blythe Solar Energy
Center, LLC, NextEra Energy
Montezuma II Wind, LLC, NextEra
Energy Marketing, LLC, NEPM II, LLC,
NextEra Energy Services Massachusetts,
LLC, North Sky River Energy, LLC,
Perrin Ranch Wind, LLC, Pima Energy
Storage System, LLC, Pinal Central
Energy Center, LLC, Red Mesa Wind,
LLC, Shafter Solar, LLC, Silver State
Solar Power South, LLC, Sky River LLC,
Vasco Winds, LLC, Westside Solar, LLC,
Whitney Point Solar, LLC, Windpower
Partners 1993, LLC.
Description: Triennial Market Power
Update for the Southwest Region of
NextEra Companies.
Filed Date: 7/1/19
Accession Number: 20190701–5421.
Comments Due: 5 p.m. ET 8/30/19.
Docket Numbers: ER19–1427–001.
Applicants: Alabama Power
Company.
Description: Compliance filing:
Southern Companies’ ROE Settlement
PO 00000
Frm 00046
Fmt 4703
Sfmt 4703
Compliance Filing to be effective 1/1/
2019.
Filed Date: 7/3/19.
Accession Number: 20190703–5135.
Comments Due: 5 p.m. ET 7/24/19.
Docket Numbers: ER19–1803–001.
Applicants: North Rosamond Solar,
LLC.
Description: Tariff Amendment:
Amendment Filing to May 8, 2019 MBR
Filing to be effective 5/9/2019.
Filed Date: 7/3/19.
Accession Number: 20190703–5011.
Comments Due: 5 p.m. ET 7/24/19.
Docket Numbers: ER19–2351–000.
Applicants: American Transmission
Systems, Incorporated, PJM
Interconnection, L.L.C.
Description: § 205(d) Rate Filing:
ATSI submits two ECSAs, Service
Agreement Nos. 5322 and 5323 to be
effective 9/6/2019.
Filed Date: 7/3/19.
Accession Number: 20190703–5045.
Comments Due: 5 p.m. ET 7/24/19.
Docket Numbers: ER19–2352–000.
Applicants: Massachusetts Electric
Company.
Description: § 205(d) Rate Filing:
Filing of Small Generator
Interconnection Agmt with Gas
Recovery Systems, LLC to be effective 7/
1/2019.
Filed Date: 7/3/19.
Accession Number: 20190703–5058.
Comments Due: 5 p.m. ET 7/24/19.
Docket Numbers: ER19–2353–000.
Applicants: Midcontinent
Independent System Operator, Inc.
Description: § 205(d) Rate Filing:
2019–07–03_SA 3327 ATC–WPSC PCA
(Packaging) to be effective 9/2/2019.
Filed Date: 7/3/19.
Accession Number: 20190703–5064.
Comments Due: 5 p.m. ET 7/24/19.
Docket Numbers: ER19–2354–000.
Applicants: Southern California
Edison Company.
Description: § 205(d) Rate Filing:
Letter Agreement with Silverstrand
Grid, LLC to be effective 7/5/2019.
Filed Date: 7/3/19.
Accession Number: 20190703–5095.
Comments Due: 5 p.m. ET 7/24/19.
Docket Numbers: ER19–2355–000.
Applicants: Southwestern Public
Service Company.
Description: § 205(d) Rate Filing:
SPS–GSEC–NPEC IA Pringle NDP–712–
SPS 0.0.0 to be effective 7/4/2019.
Filed Date: 7/3/19.
Accession Number: 20190703–5096.
Comments Due: 5 p.m. ET 7/24/19.
Docket Numbers: ER19–2356–000.
Applicants: PSEG Energy Resources &
Trade LLC.
Description: Tariff Cancellation:
Cancelation of Keystone and
E:\FR\FM\10JYN1.SGM
10JYN1
Agencies
[Federal Register Volume 84, Number 132 (Wednesday, July 10, 2019)]
[Notices]
[Pages 32903-32904]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2019-14707]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Docket Nos. EL18-182-000, ER13-2266-004, ER18-1509-000, ER18-1509-001,
ER18-2364-000, ER19-1428-000, ER18-1639-000, ER18-1639-001, ER18-1639-
002, ER18-1639-003]
ISO New England Inc., Constellation Mystic Power, LLC;
Supplemental Notice of Staff-Led Public Meeting
As announced in the Notice of Staff-Led Public Meeting issued on
May 21, 2019, Federal Energy Regulatory Commission (Commission) staff
will convene a staff-led public meeting on Monday, July 15, 2019, from
10:00 a.m. to 5:00 p.m. (ET). The public meeting will be held in the
Commission Meeting Room at Commission headquarters, 888 First Street
NE, Washington, DC 20426. Commissioners may attend and participate.
On April 22, 2019, ISO New England Inc. (ISO-NE), New England
States Committee on Electricity (NESCOE), and New England Power Pool
(NEPOOL) Participants Committee jointly requested a public meeting to
share with Commission staff, without violating the Commission's
regulations prohibiting ex parte communications,\1\ information about
efforts to develop proposed tariff revisions in response to a
Commission directive \2\ to reflect improvements to ISO-NE's market
design to better address regional fuel security concerns. This notice
of public meeting is in response to that request.
---------------------------------------------------------------------------
\1\ Commission Rules of Practice and Procedure, Rule 2201, 18
CFR 385.2201 (2018).
\2\ See ISO New England Inc., 164 FERC 61,003, at P 2 (2018).
---------------------------------------------------------------------------
This staff-led public meeting will consist of three presentations
by representatives from ISO-NE, NEPOOL, and NESCOE with time for
questions and answers at the end of each presentation. Questions will
be permitted from only Commission staff and Commissioners. The
Commission will not solicit post-meeting comments. Parties who wish to
comment on ISO-NE's proposal may do so when ISO-NE files its proposal.
Attached to this supplemental notice is an agenda for this public
meeting,
[[Page 32904]]
including the list of speakers for each presentation.
All interested persons may attend the public meeting. Registration
is not required. However, in-person attendees are encouraged to pre-
register on-line at: https://www.ferc.gov/whats-new/registration/07-15-19-form.asp. In-person attendees should allow time to pass through
building security procedures before the 10:00 a.m. start time of the
public meeting.
The public meeting will be webcast. A link to the webcast of this
event will be available in the Commission Calendar of Events at
www.ferc.gov. The Capitol Connection provides technical support for
webcasts and offers the option of listening to the meeting via phone-
bridge for a fee. If you have any questions, visit https://www.CapitolConnection.org or call (703) 993-3100.
The public meeting will not be transcribed. PowerPoint slides or
printed documents used in the public meeting will be entered into the
record in Docket No. EL18-182-000.
Commission public meetings are accessible under section 508 of the
Rehabilitation Act of 1973. For accessibility accommodations, please
send an email to [email protected] or call toll free 1-866-208-
3372 (voice) or 202-208-8659 (TTY), or send a fax to 202-208-2106 with
the required accommodations.
For more information about this public meeting, please contact
Frank Swigonski by phone at (202) 502-8089 or by email at
[email protected]. For information related to logistics, please
contact Sarah McKinley at (202) 502-8368 or by email at
[email protected].
Dated: July 3, 2019.
Kimberly D. Bose,
Secretary.
[FR Doc. 2019-14707 Filed 7-9-19; 8:45 am]
BILLING CODE 6717-01-P