Union Falls Hydropower L.P.; Erie Boulevard Hydropower L.P.; Notice of Application for Amendment and Transfer of License and Soliciting Comments, Motions To Intervene, and Protests, 32902-32903 [2019-14677]
Download as PDF
32902
Federal Register / Vol. 84, No. 132 / Wednesday, July 10, 2019 / Notices
all as more fully explained in the
petition.
Any person desiring to intervene or to
protest this filing must file in
accordance with Rules 211 and 214 of
the Commission’s Rules of Practice and
Procedure (18 CFR 385.211, 385.214).
Protests will be considered by the
Commission in determining the
appropriate action to be taken, but will
not serve to make protestants parties to
the proceeding. Any person wishing to
become a party must file a notice of
intervention or motion to intervene, as
appropriate. Such notices, motions, or
protests must be filed on or before the
comment date. Anyone filing a motion
to intervene or protest must serve a copy
of that document on the Petitioner.
The Commission encourages
electronic submission of protests and
interventions in lieu of paper using the
‘‘eFiling’’ link at https://www.ferc.gov.
Persons unable to file electronically
should submit an original and 5 copies
of the protest or intervention to the
Federal Energy Regulatory Commission,
888 First Street NE, Washington, DC
20426.
This filing is accessible on-line at
https://www.ferc.gov, using the eLibrary
link and is available for review in the
Commission’s Public Reference Room in
Washington, DC. There is an
eSubscription link on the website that
enables subscribers to receive email
notification when a document is added
to a subscribed docket(s). For assistance
with any FERC Online service, please
email FERCOnlineSupport@ferc.gov, or
call (866) 208–3676 (toll free). For TTY,
call (202) 502–8659.
Comment Date: 5 p.m. Eastern time
on July 26, 2019.
Dated: July 2, 2019.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2019–14644 Filed 7–9–19; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
jspears on DSK30JT082PROD with NOTICES
[Project No. P–4472–028; Project No. P–
15000–000]
Union Falls Hydropower L.P.; Erie
Boulevard Hydropower L.P.; Notice of
Application for Amendment and
Transfer of License and Soliciting
Comments, Motions To Intervene, and
Protests
Take notice that the following
hydroelectric application has been filed
with the Commission and is available
for public inspection.
VerDate Sep<11>2014
18:32 Jul 09, 2019
Jkt 247001
a. Type of Application: Amendment
and Transfer of License. Licensees for
the Saranac Project No. 4472, Union
Falls Hydropower L.P. (Union Falls) and
Erie Boulevard Hydropower L.P. (Erie
Boulevard), request that the
Commission amend the existing Saranac
Project, which consists of two
developments, the Franklin Falls
Development and the Union Falls
Development. The amendment would
divide the two developments into
separately-licensed projects and
simultaneously approve a license
transfer so that there are no longer colicensees but rather Union Falls would
become the sole licensee for the Union
Falls Project, and Erie Boulevard would
become the sole licensee for the
Franklin Falls Project. If the amendment
application is approved, the license for
the Union Falls Development, would
continue to be referred to as the Saranac
Project No. 4472 and the license for the
Franklin Falls Development would
become a new project called the
Franklin Falls Project No. 15000.
b. Project Nos.: 4472–028 and 15000–
000.
c. Date filed: June 17, 2019.
d. Applicants: Union Falls
Hydropower L.P. and Erie Boulevard
Hydropower L.P.
e. Name of Project: Saranac Project
No. 4472.
f. Location: The project consists of
two developments, the Franklin Falls
Development and the Union Falls
Development. The 2.265- megawatt
(MW) upstream Franklin Falls
Development is located about 45 river
miles (RM) from the confluence of the
Saranac River with Lake Champlain.
The 2.6–MW Union Falls Development
is located about seven RM downstream
of the Franklin Falls Development at
RM 38. Both developments are located
on the Saranac River in the Towns of
Franklin, Blackbrook, and St. Armand,
in Franklin, Clinton, and Essex
Counties, New York.
g. Filed Pursuant to: Federal Power
Act 16 U.S.C. 791(a)–825(r).
h. Applicants Contact:
For the Franklin Falls Development:
Mr. Thomas Uncher, Erie Boulevard
Hydropower L.P., Vice President of
Operations, Brookfield Renewable, 399
Big Bay Road, Queensbury, NY 12804,
(518) 743–2018.
For the Union Falls Development: Mr.
Lewis Loon, Union Falls Hydropower
L.P., General Manager, Operations and
Maintenance-USA/QC 423 Brunswick
Avenue, Gardner, ME 04345, (207) 203–
3027.
i. FERC Contact: Kim Nguyen, (202)
502–6105 or kim.nguyen@ferc.gov.
PO 00000
Frm 00044
Fmt 4703
Sfmt 4703
j. Deadline for filing comments,
motions to intervene, and protests:
August 2, 2019 (30 days).
The Commission strongly encourages
electronic filing. Please file comments,
motions to intervene, and protests using
the Commission’s eFiling system at
https://www.ferc.gov/docs-filing/
efiling.asp. Commenters can submit
brief comments up to 6,000 characters,
without prior registration, using the
eComment system at https://
www.ferc.gov/docs-filing/
ecomment.asp. You must include your
name and contact information at the end
of your comments. For assistance,
please contact FERC Online Support at
FERCOnlineSupport@ferc.gov, (866)
208–3676 (toll free), or (202) 502–8659
(TTY). In lieu of electronic filing, please
send a paper copy to: Secretary, Federal
Energy Regulatory Commission, 888
First Street NE, Washington, DC 20426.
The first page of any filing should
include docket number P–4472–028 and
P–15000–000.
k. Locations of the Application: A
copy of the application is available for
inspection and reproduction at the
Commission’s Public Reference Room,
located at 888 First Street NE, Room 2A,
Washington, DC 20426, or by calling
(202) 502–8371. This filing may also be
viewed on the Commission’s website at
https://www.ferc.gov/docs-filing/
efiling.asp. Enter the docket number
excluding the last three digits in the
docket number field to access the
document. You may also register online
at https://www.ferc.gov/docs-filing/
esubscription.asp to be notified via
email of new filings and issuances
related to this or other pending projects.
For assistance, call 1–866–208–3676 or
email FERCOnlineSupport@ferc.gov, for
TTY, call (202) 502–8659. A copy is also
available for inspection and
reproduction at the addresses in item (h)
above.
l. Individuals desiring to be included
on the Commission’s mailing list should
so indicate by writing to the Secretary
of the Commission.
Register online at https://
www.ferc.gov/docs-filing/
esubscription.asp to be notified via
email of new filings and issuances
related to this or other pending projects.
For assistance, contact
FERCOnlineSupport@ferc.gov, (866)
208–3676 (toll free), or (202) 502–8659
(TTY).
m. Comments, Protests, or Motions to
Intervene: Anyone may submit
comments, a protest, or a motion to
intervene in accordance with the
requirements of Rules of Practice and
Procedure, 18 CFR 385.210, .211, and
.214. In determining the appropriate
E:\FR\FM\10JYN1.SGM
10JYN1
Federal Register / Vol. 84, No. 132 / Wednesday, July 10, 2019 / Notices
action to take, the Commission will
consider all protests or other comments
filed, but only those who file a motion
to intervene in accordance with the
Commission’s Rules may become a
party to the proceeding. Any comments,
protests, or motions to intervene must
be received on or before the specified
comment date for the particular
application.
n. Filing and Service of Documents:
Any filing must (1) bear in all capital
letters the title COMMENTS, PROTEST,
or MOTION TO INTERVENE as
applicable; (2) set forth in the heading
the name of the applicant and the
project number of the application to
which the filing responds; (3) furnish
the name, address, and telephone
number of the person protesting or
intervening; and (4) otherwise comply
with the requirements of 18 CFR
385.2001 through 385.2005. All
comments, motions to intervene, or
protests must set forth their evidentiary
basis. Any filing made by an intervenor
must be accompanied by prof of service
on all persons listed in the service list
prepared by the Commission in this
proceeding, in accordance with 18 CFR
385.2010.
Dated: July 3, 2019.
Kimberly D. Bose,
Secretary.
[FR Doc. 2019–14677 Filed 7–9–19; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Combined Notice of Filings
jspears on DSK30JT082PROD with NOTICES
Take notice that the Commission has
received the following Natural Gas
Pipeline Rate and Refund Report filings:
Filings Instituting Proceedings
Docket Numbers: RP19–1337–000.
Applicants: Texas Eastern
Transmission, LP.
Description: Submits tariff filing per
154.204: Negotiated Rates—MC Global
7–1–2019 Releases to be effective 7/1/
2019 under RP19–1337.
Filed Date: 6/27/19.
Accession Number: 20190627–5043.
Comments Due: 5 p.m. ET 7/12/19.
Docket Numbers: RP19–1338–000.
Applicants: Rockies Express Pipeline
LLC.
Description: Submits tariff filing per
154.204: Neg Rate 2019–06–27 CP
Castleton and Twin Eagle (E2W) to be
effective 07/1/2019.
Filed Date: 6/27/19.
Accession Number: 20190627–5096.
VerDate Sep<11>2014
18:32 Jul 09, 2019
Jkt 247001
Comments Due: 5 p.m. ET 7/12/19.
Docket Numbers: RP19–1368–000.
Applicants: Iroquois Gas
Transmission System, L.P.
Description: § 4(d) Rate Filing: 070219
Negotiated Rates—Spotlight Energy,
LLC R–77250–6 to be effective 9/1/2019.
Filed Date: 7/2/19.
Accession Number: 20190702–5070.
Comments Due: 5 p.m. ET 7/15/19.
Docket Numbers: RP19–1369–000.
Applicants: Iroquois Gas
Transmission System, L.P.
Description: § 4(d) Rate Filing: 070219
Negotiated Rates—Tenaska Marketing
Ventures R–2835–20 to be effective 9/1/
2019.
Filed Date: 7/2/19.
Accession Number: 20190702–5071.
Comments Due: 5 p.m. ET 7/15/19.
Docket Numbers: RP19–1372–000.
Applicants: Dominion Energy Cove
Point LNG, LP.
Description: Compliance filing
DECP—2019 Penalty Revenue
Distribution to be effective N/A.
Filed Date: 7/2/19.
Accession Number: 20190702–5096.
Comments Due: 5 p.m. ET 7/15/19.
Docket Numbers: RP19–1373–000.
Applicants: Dominion Energy
Transmission, Inc.
Description: Compliance filing DETI—
2019 Overrun and Penalty Revenue
Distribution to be effective N/A.
Filed Date: 7/2/19.
Accession Number: 20190702–5112.
Comments Due: 5 p.m. ET 7/15/19.
Docket Numbers: RP19–1374–000.
Applicants: Northern Natural Gas
Company.
Description: § 4(d) Rate Filing:
20170702 Negotiated Rate to be effective
7/3/2019.
Filed Date: 7/2/19.
Accession Number: 20190702–5202.
Comments Due: 5 p.m. ET 7/15/19.
The filings are accessible in the
Commission’s eLibrary system by
clicking on the links or querying the
docket number.
Any person desiring to intervene or
protest in any of the above proceedings
must file in accordance with Rules 211
and 214 of the Commission’s
Regulations (18 CFR 385.211 and
385.214) on or before 5:00 p.m. Eastern
time on the specified comment date.
Protests may be considered, but
intervention is necessary to become a
party to the proceeding.
eFiling is encouraged. More detailed
information relating to filing
requirements, interventions, protests,
service, and qualifying facilities filings
can be found at: https://www.ferc.gov/
docs-filing/efiling/filing-req.pdf. For
PO 00000
Frm 00045
Fmt 4703
Sfmt 4703
32903
other information, call (866) 208–3676
(toll free). For TTY, call (202) 502–8659.
Dated: July 3, 2019.
Kimberly D. Bose,
Secretary.
[FR Doc. 2019–14671 Filed 7–9–19; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket Nos. EL18–182–000, ER13–2266–
004, ER18–1509–000, ER18–1509–001,
ER18–2364–000, ER19–1428–000, ER18–
1639–000, ER18–1639–001, ER18–1639–002,
ER18–1639–003]
ISO New England Inc., Constellation
Mystic Power, LLC; Supplemental
Notice of Staff-Led Public Meeting
As announced in the Notice of StaffLed Public Meeting issued on May 21,
2019, Federal Energy Regulatory
Commission (Commission) staff will
convene a staff-led public meeting on
Monday, July 15, 2019, from 10:00 a.m.
to 5:00 p.m. (ET). The public meeting
will be held in the Commission Meeting
Room at Commission headquarters, 888
First Street NE, Washington, DC 20426.
Commissioners may attend and
participate.
On April 22, 2019, ISO New England
Inc. (ISO–NE), New England States
Committee on Electricity (NESCOE),
and New England Power Pool
(NEPOOL) Participants Committee
jointly requested a public meeting to
share with Commission staff, without
violating the Commission’s regulations
prohibiting ex parte communications,1
information about efforts to develop
proposed tariff revisions in response to
a Commission directive 2 to reflect
improvements to ISO–NE’s market
design to better address regional fuel
security concerns. This notice of public
meeting is in response to that request.
This staff-led public meeting will
consist of three presentations by
representatives from ISO–NE, NEPOOL,
and NESCOE with time for questions
and answers at the end of each
presentation. Questions will be
permitted from only Commission staff
and Commissioners. The Commission
will not solicit post-meeting comments.
Parties who wish to comment on ISO–
NE’s proposal may do so when ISO–NE
files its proposal.
Attached to this supplemental notice
is an agenda for this public meeting,
1 Commission Rules of Practice and Procedure,
Rule 2201, 18 CFR 385.2201 (2018).
2 See ISO New England Inc., 164 FERC 61,003, at
P 2 (2018).
E:\FR\FM\10JYN1.SGM
10JYN1
Agencies
[Federal Register Volume 84, Number 132 (Wednesday, July 10, 2019)]
[Notices]
[Pages 32902-32903]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2019-14677]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Project No. P-4472-028; Project No. P-15000-000]
Union Falls Hydropower L.P.; Erie Boulevard Hydropower L.P.;
Notice of Application for Amendment and Transfer of License and
Soliciting Comments, Motions To Intervene, and Protests
Take notice that the following hydroelectric application has been
filed with the Commission and is available for public inspection.
a. Type of Application: Amendment and Transfer of License.
Licensees for the Saranac Project No. 4472, Union Falls Hydropower L.P.
(Union Falls) and Erie Boulevard Hydropower L.P. (Erie Boulevard),
request that the Commission amend the existing Saranac Project, which
consists of two developments, the Franklin Falls Development and the
Union Falls Development. The amendment would divide the two
developments into separately-licensed projects and simultaneously
approve a license transfer so that there are no longer co-licensees but
rather Union Falls would become the sole licensee for the Union Falls
Project, and Erie Boulevard would become the sole licensee for the
Franklin Falls Project. If the amendment application is approved, the
license for the Union Falls Development, would continue to be referred
to as the Saranac Project No. 4472 and the license for the Franklin
Falls Development would become a new project called the Franklin Falls
Project No. 15000.
b. Project Nos.: 4472-028 and 15000-000.
c. Date filed: June 17, 2019.
d. Applicants: Union Falls Hydropower L.P. and Erie Boulevard
Hydropower L.P.
e. Name of Project: Saranac Project No. 4472.
f. Location: The project consists of two developments, the Franklin
Falls Development and the Union Falls Development. The 2.265- megawatt
(MW) upstream Franklin Falls Development is located about 45 river
miles (RM) from the confluence of the Saranac River with Lake
Champlain. The 2.6-MW Union Falls Development is located about seven RM
downstream of the Franklin Falls Development at RM 38. Both
developments are located on the Saranac River in the Towns of Franklin,
Blackbrook, and St. Armand, in Franklin, Clinton, and Essex Counties,
New York.
g. Filed Pursuant to: Federal Power Act 16 U.S.C. 791(a)-825(r).
h. Applicants Contact:
For the Franklin Falls Development: Mr. Thomas Uncher, Erie
Boulevard Hydropower L.P., Vice President of Operations, Brookfield
Renewable, 399 Big Bay Road, Queensbury, NY 12804, (518) 743-2018.
For the Union Falls Development: Mr. Lewis Loon, Union Falls
Hydropower L.P., General Manager, Operations and Maintenance-USA/QC 423
Brunswick Avenue, Gardner, ME 04345, (207) 203-3027.
i. FERC Contact: Kim Nguyen, (202) 502-6105 or [email protected].
j. Deadline for filing comments, motions to intervene, and
protests: August 2, 2019 (30 days).
The Commission strongly encourages electronic filing. Please file
comments, motions to intervene, and protests using the Commission's
eFiling system at https://www.ferc.gov/docs-filing/efiling.asp.
Commenters can submit brief comments up to 6,000 characters, without
prior registration, using the eComment system at https://www.ferc.gov/docs-filing/ecomment.asp. You must include your name and contact
information at the end of your comments. For assistance, please contact
FERC Online Support at [email protected], (866) 208-3676 (toll
free), or (202) 502-8659 (TTY). In lieu of electronic filing, please
send a paper copy to: Secretary, Federal Energy Regulatory Commission,
888 First Street NE, Washington, DC 20426. The first page of any filing
should include docket number P-4472-028 and P-15000-000.
k. Locations of the Application: A copy of the application is
available for inspection and reproduction at the Commission's Public
Reference Room, located at 888 First Street NE, Room 2A, Washington, DC
20426, or by calling (202) 502-8371. This filing may also be viewed on
the Commission's website at https://www.ferc.gov/docs-filing/efiling.asp. Enter the docket number excluding the last three digits in
the docket number field to access the document. You may also register
online at https://www.ferc.gov/docs-filing/esubscription.asp to be
notified via email of new filings and issuances related to this or
other pending projects. For assistance, call 1-866-208-3676 or email
[email protected], for TTY, call (202) 502-8659. A copy is
also available for inspection and reproduction at the addresses in item
(h) above.
l. Individuals desiring to be included on the Commission's mailing
list should so indicate by writing to the Secretary of the Commission.
Register online at https://www.ferc.gov/docs-filing/esubscription.asp to be notified via email of new filings and issuances
related to this or other pending projects. For assistance, contact
[email protected], (866) 208-3676 (toll free), or (202) 502-
8659 (TTY).
m. Comments, Protests, or Motions to Intervene: Anyone may submit
comments, a protest, or a motion to intervene in accordance with the
requirements of Rules of Practice and Procedure, 18 CFR 385.210, .211,
and .214. In determining the appropriate
[[Page 32903]]
action to take, the Commission will consider all protests or other
comments filed, but only those who file a motion to intervene in
accordance with the Commission's Rules may become a party to the
proceeding. Any comments, protests, or motions to intervene must be
received on or before the specified comment date for the particular
application.
n. Filing and Service of Documents: Any filing must (1) bear in all
capital letters the title COMMENTS, PROTEST, or MOTION TO INTERVENE as
applicable; (2) set forth in the heading the name of the applicant and
the project number of the application to which the filing responds; (3)
furnish the name, address, and telephone number of the person
protesting or intervening; and (4) otherwise comply with the
requirements of 18 CFR 385.2001 through 385.2005. All comments, motions
to intervene, or protests must set forth their evidentiary basis. Any
filing made by an intervenor must be accompanied by prof of service on
all persons listed in the service list prepared by the Commission in
this proceeding, in accordance with 18 CFR 385.2010.
Dated: July 3, 2019.
Kimberly D. Bose,
Secretary.
[FR Doc. 2019-14677 Filed 7-9-19; 8:45 am]
BILLING CODE 6717-01-P