Union Falls Hydropower L.P.; Erie Boulevard Hydropower L.P.; Notice of Application for Amendment and Transfer of License and Soliciting Comments, Motions To Intervene, and Protests, 32902-32903 [2019-14677]

Download as PDF 32902 Federal Register / Vol. 84, No. 132 / Wednesday, July 10, 2019 / Notices all as more fully explained in the petition. Any person desiring to intervene or to protest this filing must file in accordance with Rules 211 and 214 of the Commission’s Rules of Practice and Procedure (18 CFR 385.211, 385.214). Protests will be considered by the Commission in determining the appropriate action to be taken, but will not serve to make protestants parties to the proceeding. Any person wishing to become a party must file a notice of intervention or motion to intervene, as appropriate. Such notices, motions, or protests must be filed on or before the comment date. Anyone filing a motion to intervene or protest must serve a copy of that document on the Petitioner. The Commission encourages electronic submission of protests and interventions in lieu of paper using the ‘‘eFiling’’ link at https://www.ferc.gov. Persons unable to file electronically should submit an original and 5 copies of the protest or intervention to the Federal Energy Regulatory Commission, 888 First Street NE, Washington, DC 20426. This filing is accessible on-line at https://www.ferc.gov, using the eLibrary link and is available for review in the Commission’s Public Reference Room in Washington, DC. There is an eSubscription link on the website that enables subscribers to receive email notification when a document is added to a subscribed docket(s). For assistance with any FERC Online service, please email FERCOnlineSupport@ferc.gov, or call (866) 208–3676 (toll free). For TTY, call (202) 502–8659. Comment Date: 5 p.m. Eastern time on July 26, 2019. Dated: July 2, 2019. Nathaniel J. Davis, Sr., Deputy Secretary. [FR Doc. 2019–14644 Filed 7–9–19; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission jspears on DSK30JT082PROD with NOTICES [Project No. P–4472–028; Project No. P– 15000–000] Union Falls Hydropower L.P.; Erie Boulevard Hydropower L.P.; Notice of Application for Amendment and Transfer of License and Soliciting Comments, Motions To Intervene, and Protests Take notice that the following hydroelectric application has been filed with the Commission and is available for public inspection. VerDate Sep<11>2014 18:32 Jul 09, 2019 Jkt 247001 a. Type of Application: Amendment and Transfer of License. Licensees for the Saranac Project No. 4472, Union Falls Hydropower L.P. (Union Falls) and Erie Boulevard Hydropower L.P. (Erie Boulevard), request that the Commission amend the existing Saranac Project, which consists of two developments, the Franklin Falls Development and the Union Falls Development. The amendment would divide the two developments into separately-licensed projects and simultaneously approve a license transfer so that there are no longer colicensees but rather Union Falls would become the sole licensee for the Union Falls Project, and Erie Boulevard would become the sole licensee for the Franklin Falls Project. If the amendment application is approved, the license for the Union Falls Development, would continue to be referred to as the Saranac Project No. 4472 and the license for the Franklin Falls Development would become a new project called the Franklin Falls Project No. 15000. b. Project Nos.: 4472–028 and 15000– 000. c. Date filed: June 17, 2019. d. Applicants: Union Falls Hydropower L.P. and Erie Boulevard Hydropower L.P. e. Name of Project: Saranac Project No. 4472. f. Location: The project consists of two developments, the Franklin Falls Development and the Union Falls Development. The 2.265- megawatt (MW) upstream Franklin Falls Development is located about 45 river miles (RM) from the confluence of the Saranac River with Lake Champlain. The 2.6–MW Union Falls Development is located about seven RM downstream of the Franklin Falls Development at RM 38. Both developments are located on the Saranac River in the Towns of Franklin, Blackbrook, and St. Armand, in Franklin, Clinton, and Essex Counties, New York. g. Filed Pursuant to: Federal Power Act 16 U.S.C. 791(a)–825(r). h. Applicants Contact: For the Franklin Falls Development: Mr. Thomas Uncher, Erie Boulevard Hydropower L.P., Vice President of Operations, Brookfield Renewable, 399 Big Bay Road, Queensbury, NY 12804, (518) 743–2018. For the Union Falls Development: Mr. Lewis Loon, Union Falls Hydropower L.P., General Manager, Operations and Maintenance-USA/QC 423 Brunswick Avenue, Gardner, ME 04345, (207) 203– 3027. i. FERC Contact: Kim Nguyen, (202) 502–6105 or kim.nguyen@ferc.gov. PO 00000 Frm 00044 Fmt 4703 Sfmt 4703 j. Deadline for filing comments, motions to intervene, and protests: August 2, 2019 (30 days). The Commission strongly encourages electronic filing. Please file comments, motions to intervene, and protests using the Commission’s eFiling system at https://www.ferc.gov/docs-filing/ efiling.asp. Commenters can submit brief comments up to 6,000 characters, without prior registration, using the eComment system at https:// www.ferc.gov/docs-filing/ ecomment.asp. You must include your name and contact information at the end of your comments. For assistance, please contact FERC Online Support at FERCOnlineSupport@ferc.gov, (866) 208–3676 (toll free), or (202) 502–8659 (TTY). In lieu of electronic filing, please send a paper copy to: Secretary, Federal Energy Regulatory Commission, 888 First Street NE, Washington, DC 20426. The first page of any filing should include docket number P–4472–028 and P–15000–000. k. Locations of the Application: A copy of the application is available for inspection and reproduction at the Commission’s Public Reference Room, located at 888 First Street NE, Room 2A, Washington, DC 20426, or by calling (202) 502–8371. This filing may also be viewed on the Commission’s website at https://www.ferc.gov/docs-filing/ efiling.asp. Enter the docket number excluding the last three digits in the docket number field to access the document. You may also register online at https://www.ferc.gov/docs-filing/ esubscription.asp to be notified via email of new filings and issuances related to this or other pending projects. For assistance, call 1–866–208–3676 or email FERCOnlineSupport@ferc.gov, for TTY, call (202) 502–8659. A copy is also available for inspection and reproduction at the addresses in item (h) above. l. Individuals desiring to be included on the Commission’s mailing list should so indicate by writing to the Secretary of the Commission. Register online at https:// www.ferc.gov/docs-filing/ esubscription.asp to be notified via email of new filings and issuances related to this or other pending projects. For assistance, contact FERCOnlineSupport@ferc.gov, (866) 208–3676 (toll free), or (202) 502–8659 (TTY). m. Comments, Protests, or Motions to Intervene: Anyone may submit comments, a protest, or a motion to intervene in accordance with the requirements of Rules of Practice and Procedure, 18 CFR 385.210, .211, and .214. In determining the appropriate E:\FR\FM\10JYN1.SGM 10JYN1 Federal Register / Vol. 84, No. 132 / Wednesday, July 10, 2019 / Notices action to take, the Commission will consider all protests or other comments filed, but only those who file a motion to intervene in accordance with the Commission’s Rules may become a party to the proceeding. Any comments, protests, or motions to intervene must be received on or before the specified comment date for the particular application. n. Filing and Service of Documents: Any filing must (1) bear in all capital letters the title COMMENTS, PROTEST, or MOTION TO INTERVENE as applicable; (2) set forth in the heading the name of the applicant and the project number of the application to which the filing responds; (3) furnish the name, address, and telephone number of the person protesting or intervening; and (4) otherwise comply with the requirements of 18 CFR 385.2001 through 385.2005. All comments, motions to intervene, or protests must set forth their evidentiary basis. Any filing made by an intervenor must be accompanied by prof of service on all persons listed in the service list prepared by the Commission in this proceeding, in accordance with 18 CFR 385.2010. Dated: July 3, 2019. Kimberly D. Bose, Secretary. [FR Doc. 2019–14677 Filed 7–9–19; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Combined Notice of Filings jspears on DSK30JT082PROD with NOTICES Take notice that the Commission has received the following Natural Gas Pipeline Rate and Refund Report filings: Filings Instituting Proceedings Docket Numbers: RP19–1337–000. Applicants: Texas Eastern Transmission, LP. Description: Submits tariff filing per 154.204: Negotiated Rates—MC Global 7–1–2019 Releases to be effective 7/1/ 2019 under RP19–1337. Filed Date: 6/27/19. Accession Number: 20190627–5043. Comments Due: 5 p.m. ET 7/12/19. Docket Numbers: RP19–1338–000. Applicants: Rockies Express Pipeline LLC. Description: Submits tariff filing per 154.204: Neg Rate 2019–06–27 CP Castleton and Twin Eagle (E2W) to be effective 07/1/2019. Filed Date: 6/27/19. Accession Number: 20190627–5096. VerDate Sep<11>2014 18:32 Jul 09, 2019 Jkt 247001 Comments Due: 5 p.m. ET 7/12/19. Docket Numbers: RP19–1368–000. Applicants: Iroquois Gas Transmission System, L.P. Description: § 4(d) Rate Filing: 070219 Negotiated Rates—Spotlight Energy, LLC R–77250–6 to be effective 9/1/2019. Filed Date: 7/2/19. Accession Number: 20190702–5070. Comments Due: 5 p.m. ET 7/15/19. Docket Numbers: RP19–1369–000. Applicants: Iroquois Gas Transmission System, L.P. Description: § 4(d) Rate Filing: 070219 Negotiated Rates—Tenaska Marketing Ventures R–2835–20 to be effective 9/1/ 2019. Filed Date: 7/2/19. Accession Number: 20190702–5071. Comments Due: 5 p.m. ET 7/15/19. Docket Numbers: RP19–1372–000. Applicants: Dominion Energy Cove Point LNG, LP. Description: Compliance filing DECP—2019 Penalty Revenue Distribution to be effective N/A. Filed Date: 7/2/19. Accession Number: 20190702–5096. Comments Due: 5 p.m. ET 7/15/19. Docket Numbers: RP19–1373–000. Applicants: Dominion Energy Transmission, Inc. Description: Compliance filing DETI— 2019 Overrun and Penalty Revenue Distribution to be effective N/A. Filed Date: 7/2/19. Accession Number: 20190702–5112. Comments Due: 5 p.m. ET 7/15/19. Docket Numbers: RP19–1374–000. Applicants: Northern Natural Gas Company. Description: § 4(d) Rate Filing: 20170702 Negotiated Rate to be effective 7/3/2019. Filed Date: 7/2/19. Accession Number: 20190702–5202. Comments Due: 5 p.m. ET 7/15/19. The filings are accessible in the Commission’s eLibrary system by clicking on the links or querying the docket number. Any person desiring to intervene or protest in any of the above proceedings must file in accordance with Rules 211 and 214 of the Commission’s Regulations (18 CFR 385.211 and 385.214) on or before 5:00 p.m. Eastern time on the specified comment date. Protests may be considered, but intervention is necessary to become a party to the proceeding. eFiling is encouraged. More detailed information relating to filing requirements, interventions, protests, service, and qualifying facilities filings can be found at: https://www.ferc.gov/ docs-filing/efiling/filing-req.pdf. For PO 00000 Frm 00045 Fmt 4703 Sfmt 4703 32903 other information, call (866) 208–3676 (toll free). For TTY, call (202) 502–8659. Dated: July 3, 2019. Kimberly D. Bose, Secretary. [FR Doc. 2019–14671 Filed 7–9–19; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket Nos. EL18–182–000, ER13–2266– 004, ER18–1509–000, ER18–1509–001, ER18–2364–000, ER19–1428–000, ER18– 1639–000, ER18–1639–001, ER18–1639–002, ER18–1639–003] ISO New England Inc., Constellation Mystic Power, LLC; Supplemental Notice of Staff-Led Public Meeting As announced in the Notice of StaffLed Public Meeting issued on May 21, 2019, Federal Energy Regulatory Commission (Commission) staff will convene a staff-led public meeting on Monday, July 15, 2019, from 10:00 a.m. to 5:00 p.m. (ET). The public meeting will be held in the Commission Meeting Room at Commission headquarters, 888 First Street NE, Washington, DC 20426. Commissioners may attend and participate. On April 22, 2019, ISO New England Inc. (ISO–NE), New England States Committee on Electricity (NESCOE), and New England Power Pool (NEPOOL) Participants Committee jointly requested a public meeting to share with Commission staff, without violating the Commission’s regulations prohibiting ex parte communications,1 information about efforts to develop proposed tariff revisions in response to a Commission directive 2 to reflect improvements to ISO–NE’s market design to better address regional fuel security concerns. This notice of public meeting is in response to that request. This staff-led public meeting will consist of three presentations by representatives from ISO–NE, NEPOOL, and NESCOE with time for questions and answers at the end of each presentation. Questions will be permitted from only Commission staff and Commissioners. The Commission will not solicit post-meeting comments. Parties who wish to comment on ISO– NE’s proposal may do so when ISO–NE files its proposal. Attached to this supplemental notice is an agenda for this public meeting, 1 Commission Rules of Practice and Procedure, Rule 2201, 18 CFR 385.2201 (2018). 2 See ISO New England Inc., 164 FERC 61,003, at P 2 (2018). E:\FR\FM\10JYN1.SGM 10JYN1

Agencies

[Federal Register Volume 84, Number 132 (Wednesday, July 10, 2019)]
[Notices]
[Pages 32902-32903]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2019-14677]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Project No. P-4472-028; Project No. P-15000-000]


Union Falls Hydropower L.P.; Erie Boulevard Hydropower L.P.; 
Notice of Application for Amendment and Transfer of License and 
Soliciting Comments, Motions To Intervene, and Protests

    Take notice that the following hydroelectric application has been 
filed with the Commission and is available for public inspection.
    a. Type of Application: Amendment and Transfer of License. 
Licensees for the Saranac Project No. 4472, Union Falls Hydropower L.P. 
(Union Falls) and Erie Boulevard Hydropower L.P. (Erie Boulevard), 
request that the Commission amend the existing Saranac Project, which 
consists of two developments, the Franklin Falls Development and the 
Union Falls Development. The amendment would divide the two 
developments into separately-licensed projects and simultaneously 
approve a license transfer so that there are no longer co-licensees but 
rather Union Falls would become the sole licensee for the Union Falls 
Project, and Erie Boulevard would become the sole licensee for the 
Franklin Falls Project. If the amendment application is approved, the 
license for the Union Falls Development, would continue to be referred 
to as the Saranac Project No. 4472 and the license for the Franklin 
Falls Development would become a new project called the Franklin Falls 
Project No. 15000.
    b. Project Nos.: 4472-028 and 15000-000.
    c. Date filed: June 17, 2019.
    d. Applicants: Union Falls Hydropower L.P. and Erie Boulevard 
Hydropower L.P.
    e. Name of Project: Saranac Project No. 4472.
    f. Location: The project consists of two developments, the Franklin 
Falls Development and the Union Falls Development. The 2.265- megawatt 
(MW) upstream Franklin Falls Development is located about 45 river 
miles (RM) from the confluence of the Saranac River with Lake 
Champlain. The 2.6-MW Union Falls Development is located about seven RM 
downstream of the Franklin Falls Development at RM 38. Both 
developments are located on the Saranac River in the Towns of Franklin, 
Blackbrook, and St. Armand, in Franklin, Clinton, and Essex Counties, 
New York.
    g. Filed Pursuant to: Federal Power Act 16 U.S.C. 791(a)-825(r).
    h. Applicants Contact:
    For the Franklin Falls Development: Mr. Thomas Uncher, Erie 
Boulevard Hydropower L.P., Vice President of Operations, Brookfield 
Renewable, 399 Big Bay Road, Queensbury, NY 12804, (518) 743-2018.
    For the Union Falls Development: Mr. Lewis Loon, Union Falls 
Hydropower L.P., General Manager, Operations and Maintenance-USA/QC 423 
Brunswick Avenue, Gardner, ME 04345, (207) 203-3027.
    i. FERC Contact: Kim Nguyen, (202) 502-6105 or [email protected].
    j. Deadline for filing comments, motions to intervene, and 
protests: August 2, 2019 (30 days).
    The Commission strongly encourages electronic filing. Please file 
comments, motions to intervene, and protests using the Commission's 
eFiling system at https://www.ferc.gov/docs-filing/efiling.asp. 
Commenters can submit brief comments up to 6,000 characters, without 
prior registration, using the eComment system at https://www.ferc.gov/docs-filing/ecomment.asp. You must include your name and contact 
information at the end of your comments. For assistance, please contact 
FERC Online Support at [email protected], (866) 208-3676 (toll 
free), or (202) 502-8659 (TTY). In lieu of electronic filing, please 
send a paper copy to: Secretary, Federal Energy Regulatory Commission, 
888 First Street NE, Washington, DC 20426. The first page of any filing 
should include docket number P-4472-028 and P-15000-000.
    k. Locations of the Application: A copy of the application is 
available for inspection and reproduction at the Commission's Public 
Reference Room, located at 888 First Street NE, Room 2A, Washington, DC 
20426, or by calling (202) 502-8371. This filing may also be viewed on 
the Commission's website at https://www.ferc.gov/docs-filing/efiling.asp. Enter the docket number excluding the last three digits in 
the docket number field to access the document. You may also register 
online at https://www.ferc.gov/docs-filing/esubscription.asp to be 
notified via email of new filings and issuances related to this or 
other pending projects. For assistance, call 1-866-208-3676 or email 
[email protected], for TTY, call (202) 502-8659. A copy is 
also available for inspection and reproduction at the addresses in item 
(h) above.
    l. Individuals desiring to be included on the Commission's mailing 
list should so indicate by writing to the Secretary of the Commission.
    Register online at https://www.ferc.gov/docs-filing/esubscription.asp to be notified via email of new filings and issuances 
related to this or other pending projects. For assistance, contact 
[email protected], (866) 208-3676 (toll free), or (202) 502-
8659 (TTY).
    m. Comments, Protests, or Motions to Intervene: Anyone may submit 
comments, a protest, or a motion to intervene in accordance with the 
requirements of Rules of Practice and Procedure, 18 CFR 385.210, .211, 
and .214. In determining the appropriate

[[Page 32903]]

action to take, the Commission will consider all protests or other 
comments filed, but only those who file a motion to intervene in 
accordance with the Commission's Rules may become a party to the 
proceeding. Any comments, protests, or motions to intervene must be 
received on or before the specified comment date for the particular 
application.
    n. Filing and Service of Documents: Any filing must (1) bear in all 
capital letters the title COMMENTS, PROTEST, or MOTION TO INTERVENE as 
applicable; (2) set forth in the heading the name of the applicant and 
the project number of the application to which the filing responds; (3) 
furnish the name, address, and telephone number of the person 
protesting or intervening; and (4) otherwise comply with the 
requirements of 18 CFR 385.2001 through 385.2005. All comments, motions 
to intervene, or protests must set forth their evidentiary basis. Any 
filing made by an intervenor must be accompanied by prof of service on 
all persons listed in the service list prepared by the Commission in 
this proceeding, in accordance with 18 CFR 385.2010.

    Dated: July 3, 2019.
Kimberly D. Bose,
Secretary.
[FR Doc. 2019-14677 Filed 7-9-19; 8:45 am]
BILLING CODE 6717-01-P


This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.