Combined Notice of Filings #1, 32900-32901 [2019-14676]
Download as PDF
32900
Federal Register / Vol. 84, No. 132 / Wednesday, July 10, 2019 / Notices
The Commission encourages
electronic submission of protests and
interventions in lieu of paper, using the
FERC Online links at https://
www.ferc.gov. To facilitate electronic
service, persons with internet access
who will eFile a document and/or be
listed as a contact for an intervenor
must create and validate an
eRegistration account using the
eRegistration link. Select the eFiling
link to log on and submit the
intervention or protests.
Persons unable to file electronically
should submit an original and 5 copies
of the intervention or protest to the
Federal Energy Regulatory Commission,
888 First Street NE, Washington, DC
20426.
The filings in the above-referenced
proceeding are accessible in the
Commission’s eLibrary system by
clicking on the appropriate link in the
above list. They are also available for
electronic review in the Commission’s
Public Reference Room in Washington,
DC. There is an eSubscription link on
the website that enables subscribers to
receive email notification when a
document is added to a subscribed
docket(s). For assistance with any FERC
Online service, please email
FERCOnlineSupport@ferc.gov. or call
(866) 208–3676 (toll free). For TTY, call
(202) 502–8659.
Dated: July 2, 2019.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2019–14648 Filed 7–9–19; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
jspears on DSK30JT082PROD with NOTICES
Combined Notice of Filings #1
Take notice that the Commission
received the following electric corporate
filings:
Docket Numbers: EC19–109–000.
Applicants: Paulding Wind Farm IV
LLC.
Description: Application for
Authorization Under Section 203 of the
Federal Power Act, et al. of Paulding
Wind Farm IV LLC.
Filed Date: 7/2/19.
Accession Number: 20190702–5223.
Comments Due: 5 p.m. ET 7/23/19.
Docket Numbers: EC19–110–000.
Applicants: Zephyr Wind, LLC.
Description: Application for
Authorization Under Section 203 of the
Federal Power Act, et al. of Zephyr
Wind, LLC.
Filed Date: 7/2/19.
VerDate Sep<11>2014
18:32 Jul 09, 2019
Jkt 247001
Accession Number: 20190702–5225.
Comments Due: 5 p.m. ET 7/23/19.
Take notice that the Commission
received the following exempt
wholesale generator filings:
Docket Numbers: EG19–145–000.
Applicants: Wilton Wind Energy II,
LLC.
Description: Notice of SelfCertification of Exempt Wholesale
Generator Status of Wilton Wind Energy
II, LLC.
Filed Date: 7/2/19.
Accession Number: 20190702–5184.
Comments Due: 5 p.m. ET 7/23/19.
Docket Numbers: EG19–146–000.
Applicants: Roadrunner Solar Project,
LLC.
Description: Self-Certification of EWG
Status of Roadrunner Solar Project, LLC.
Filed Date: 7/2/19.
Accession Number: 20190702–5228.
Comments Due: 5 p.m. ET 7/23/19.
Docket Numbers: EG19–147–000.
Applicants: High Lonesome Wind
Power, LLC.
Description: Self-Certification of EWG
Status of High Lonesome Wind Power,
LLC.
Filed Date: 7/2/19.
Accession Number: 20190702–5230.
Comments Due: 5 p.m. ET 7/23/19.
Take notice that the Commission
received the following electric rate
filings:
Docket Numbers: ER06–1128–002.
Applicants: Mankato Energy Center,
LLC.
Description: Notification of nonmaterial change in status of Mankato
Energy Center, LLC.
Filed Date: 5/24/19.
Accession Number: 20190524–5273.
Comments Due: 5 p.m. ET 7/17/19.
Docket Numbers: ER10–2042–031;
ER10–1862–025; ER10–1865–011;
ER10–1873–011; ER10–1875–011;
ER10–1876–011; ER10–1878–011;
ER10–1883–011; ER10–1884–011;
ER10–1885–011; ER10–1888–011;
ER10–1893–025; ER10–1938–026;
ER10–1947–011; ER10–2985–029;
ER10–3049–030; ER10–3051–030;
ER11–4369–010; ER12–1987–009;
ER12–2261–010; ER12–2645–004;
ER13–1407–008; ER16–2218–010;
ER19–1127–001; ER19–1934–001;
ER19–1941–001; ER19–1942–001;
ER19–696–001.
Applicants: Calpine Energy Services,
L.P., Calpine Construction Finance
Company, L.P., Calpine Energy
Solutions, LLC, Calpine Gilroy Cogen,
L.P., Calpine King City Cogen, LLC,
Calpine PowerAmerica—CA, LLC, CCFC
Sutter Energy, LLC, CES Marketing IX,
LLC, CES Marketing X, LLC, Champion
PO 00000
Frm 00042
Fmt 4703
Sfmt 4703
Energy, LLC, Champion Energy
Marketing LLC, Champion Energy
Services, LLC, Creed Energy Center,
LLC, Delta Energy Center, LLC, Geysers
Power Company, LLC, Gilroy Energy
Center, LLC, Goose Haven Energy
Center, LLC, Los Esteros Critical Energy
Facility LLC, Los Medanos Energy
Center, LLC, Metcalf Energy Center,
LLC, North American Power and Gas,
LLC, North American Power Business,
LLC, O.L.S. Energy-Agnews, Inc., Otay
Mesa Energy Center, LLC, Pastoria
Energy Facility L.L.C., Power Contract
Financing, L.L.C., Russell City Energy
Company, LLC, South Point Energy
Center, LLC.
Description: Updated Market Power
Analysis of the Calpine Southwest MBR
Sellers.
Filed Date: 7/1/19.
Accession Number: 20190702–5248.
Comments Due: 5 p.m. ET 8/30/19.
Docket Numbers: ER19–1932–002.
Applicants: Duke Energy Progress,
LLC.
Description: Tariff Amendment:
Amendment to DEP–PJM Amended JOA
Concurrence to be effective 7/22/2019.
Filed Date: 7/2/19.
Accession Number: 20190702–5138.
Comments Due: 5 p.m. ET 7/23/19.
Docket Numbers: ER19–2342–000.
Applicants: AEP Texas Inc.
Description: § 205(d) Rate Filing:
AEPTX–231RC 8ME (Norton Solar)
Interconnection Agreement to be
effective 6/20/2019.
Filed Date: 7/2/19.
Accession Number: 20190702–5171.
Comments Due: 5 p.m. ET 7/23/19.
Docket Numbers: ER19–2343–000.
Applicants: 2018 ESA Project
Company, LLC.
Description: Baseline eTariff Filing:
MBR Application and Tariff to be
effective 9/1/2019.
Filed Date: 7/2/19.
Accession Number: 20190702–5172.
Comments Due: 5 p.m. ET 7/23/19.
Docket Numbers: ER19–2344–000.
Applicants: Cheyenne Light, Fuel and
Power Company.
Description: § 205(d) Rate Filing:
Subentity Reserve Sharing Agreement
Concurrence (CLFP) to be effective 9/3/
2019.
Filed Date: 7/2/19.
Accession Number: 20190702–5196.
Comments Due: 5 p.m. ET 7/23/19.
Docket Numbers: ER19–2345–000.
Applicants: PJM Interconnection,
L.L.C.
Description: § 205(d) Rate Filing:
Original WMPA, SA No. 5418; Queue
No. AD2–049 to be effective 6/9/2019.
Filed Date: 7/2/19.
Accession Number: 20190702–5198.
E:\FR\FM\10JYN1.SGM
10JYN1
jspears on DSK30JT082PROD with NOTICES
Federal Register / Vol. 84, No. 132 / Wednesday, July 10, 2019 / Notices
Comments Due: 5 p.m. ET 7/23/19.
Docket Numbers: ER19–2346–000.
Applicants: Black Hills Colorado
Electric, LLC.
Description: § 205(d) Rate Filing:
Subentity Reserve Sharing Agreement
Concurrence (BHCE) to be effective 9/3/
2019.
Filed Date: 7/2/19.
Accession Number: 20190702–5200.
Comments Due: 5 p.m. ET 7/23/19.
Docket Numbers: ER19–2347–000.
Applicants: California Independent
System Operator Corporation.
Description: § 205(d) Rate Filing: TBD
Local Market Power Mitigation
Enhancements to be effective 10/14/
2019.
Filed Date: 7/2/19.
Accession Number: 20190702–5204.
Comments Due: 5 p.m. ET 7/23/19.
Docket Numbers: ER19–2348–000.
Applicants: Black Hills Colorado
Electric, LLC.
Description: § 205(d) Rate Filing:
Tariff Revisions for Subentity Reserve
Sharing Agreement (BHCE) to be
effective 9/3/2019.
Filed Date: 7/2/19.
Accession Number: 20190702–5206.
Comments Due: 5 p.m. ET 7/23/19.
Docket Numbers: ER19–2349–000.
Applicants: Cheyenne Light, Fuel and
Power Company.
Description: § 205(d) Rate Filing:
Tariff Revisions for Subentity Reserve
Sharing Agreement (CLFP) to be
effective 9/3/2019.
Filed Date: 7/2/19.
Accession Number: 20190702–5208.
Comments Due: 5 p.m. ET 7/23/19.
Docket Numbers: ER19–2350–000.
Applicants: Black Hills Power, Inc.
Description: § 205(d) Rate Filing:
Tariff Revisions for Subentity Reserve
Sharing Agreement (BHP) to be effective
9/3/2019.
Filed Date: 7/2/19.
Accession Number: 20190702–5210.
Comments Due: 5 p.m. ET 7/23/19.
Take notice that the Commission
received the following electric securities
filings:
Docket Numbers: ES19–33–000.
Applicants: Northern Indiana Public
Service Company.
Description: Supplement to June 11,
2019 Application under Section 204 of
the Federal Power Act for Authorization
to Issue Securities of Northern Indiana
Public Service Company LLC.
Filed Date: 7/2/19.
Accession Number: 20190702–5213.
Comments Due: 5 p.m. ET 7/9/19.
The filings are accessible in the
Commission’s eLibrary system by
clicking on the links or querying the
docket number.
VerDate Sep<11>2014
18:32 Jul 09, 2019
Jkt 247001
Any person desiring to intervene or
protest in any of the above proceedings
must file in accordance with Rules 211
and 214 of the Commission’s
Regulations (18 CFR 385.211 and
385.214) on or before 5:00 p.m. Eastern
time on the specified comment date.
Protests may be considered, but
intervention is necessary to become a
party to the proceeding.
eFiling is encouraged. More detailed
information relating to filing
requirements, interventions, protests,
service, and qualifying facilities filings
can be found at: https://www.ferc.gov/
docs-filing/efiling/filing-req.pdf. For
other information, call (866) 208–3676
(toll free). For TTY, call (202) 502–8659.
Dated: July 3, 2019.
Kimberly D. Bose,
Secretary.
[FR Doc. 2019–14676 Filed 7–9–19; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. EL19–83–000]
City of Lubbock, Acting by and
Through Its Municipally Owned
Electric Utility Lubbock Power & Light
v. Public Service Company of Colorado
Southwestern Public Service
Company; Notice of Complaint
Take notice that on July 2, 2019,
pursuant to sections 206 and 306 of the
Federal Power Act (FPA), 16 U.S.C.
824e, 825e, and Rules 206 and 212, of
the Federal Energy Regulatory
Commission’s (Commission) Rules of
Practice and Procedure, 18 CFR 385.206
and 385.212, City of Lubbock
(Complainant), acting by and through its
municipally owned electric utility,
Lubbock Power & Light (LP&L), filed a
formal complaint against Public Service
Company of Colorado and Southwestern
Public Service Company (SPS)
(collectively Respondents) alleging that
SPS’s Wholesale Distribution Service
rate as applied to LP&L is unjust,
unreasonable and unduly
discriminatory, all as more fully
explained in the Complaint.
LP&L certifies that copies of the
complaint were served on the contacts
for Public Service Company of Colorado
and SPS as listed on the Commission’s
list of Corporate Officials.
Any person desiring to intervene or to
protest this filing must file in
accordance with Rules 211 and 214 of
the Commission’s Rules of Practice and
Procedure (18 CFR 385.211 and
PO 00000
Frm 00043
Fmt 4703
Sfmt 4703
32901
385.214). Protests will be considered by
the Commission in determining the
appropriate action to be taken, but will
not serve to make protestants parties to
the proceeding. Any person wishing to
become a party must file a notice of
intervention or motion to intervene, as
appropriate. The Respondent’s answer
and all interventions, or protests must
be filed on or before the comment date.
The Respondent’s answer, motions to
intervene, and protests must be served
on the Complainants.
The Commission encourages
electronic submission of protests and
interventions in lieu of paper using the
eFiling link at https://www.ferc.gov.
Persons unable to file electronically
should submit an original and 5 copies
of the protest or intervention to the
Federal Energy Regulatory Commission,
888 First Street NE, Washington, DC
20426.
This filing is accessible on-line at
https://www.ferc.gov, using the eLibrary
link and is available for review in the
Commission’s Public Reference Room in
Washington, DC. There is an
eSubscription link on the website that
enables subscribers to receive email
notification when a document is added
to a subscribed docket(s). For assistance
with any FERC Online service, please
email FERCOnlineSupport@ferc.gov, or
call (866) 208–3676 (toll free). For TTY,
call (202) 502–8659.
Comment Date: 5:00 p.m. Eastern
Time on July 22, 2019.
Dated: July 3, 2019.
Kimberly D. Bose,
Secretary.
[FR Doc. 2019–14672 Filed 7–9–19; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. OR19–29–000]
SFPP, LP; Notice of Petition for
Declaratory Order
Take notice that on June 27, 2019,
pursuant to Rule 207(a)(2) of the Federal
Energy Regulatory Commission’s
(Commission) Rules of Practice and
Procedure, 18 CFR 385.207(a)(2) (2018),
SFPP, LP filed a petition for Declaratory
Order seeking approval of the overall
tariff rate structure, as well as terms of
service including prorationing, and
open season procedures, for a proposed
expansion service on SFPP’s East line,
in order to serve the Mexican market
with Mexican grade gasoline and diesel,
E:\FR\FM\10JYN1.SGM
10JYN1
Agencies
[Federal Register Volume 84, Number 132 (Wednesday, July 10, 2019)]
[Notices]
[Pages 32900-32901]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2019-14676]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
Combined Notice of Filings #1
Take notice that the Commission received the following electric
corporate filings:
Docket Numbers: EC19-109-000.
Applicants: Paulding Wind Farm IV LLC.
Description: Application for Authorization Under Section 203 of the
Federal Power Act, et al. of Paulding Wind Farm IV LLC.
Filed Date: 7/2/19.
Accession Number: 20190702-5223.
Comments Due: 5 p.m. ET 7/23/19.
Docket Numbers: EC19-110-000.
Applicants: Zephyr Wind, LLC.
Description: Application for Authorization Under Section 203 of the
Federal Power Act, et al. of Zephyr Wind, LLC.
Filed Date: 7/2/19.
Accession Number: 20190702-5225.
Comments Due: 5 p.m. ET 7/23/19.
Take notice that the Commission received the following exempt
wholesale generator filings:
Docket Numbers: EG19-145-000.
Applicants: Wilton Wind Energy II, LLC.
Description: Notice of Self-Certification of Exempt Wholesale
Generator Status of Wilton Wind Energy II, LLC.
Filed Date: 7/2/19.
Accession Number: 20190702-5184.
Comments Due: 5 p.m. ET 7/23/19.
Docket Numbers: EG19-146-000.
Applicants: Roadrunner Solar Project, LLC.
Description: Self-Certification of EWG Status of Roadrunner Solar
Project, LLC.
Filed Date: 7/2/19.
Accession Number: 20190702-5228.
Comments Due: 5 p.m. ET 7/23/19.
Docket Numbers: EG19-147-000.
Applicants: High Lonesome Wind Power, LLC.
Description: Self-Certification of EWG Status of High Lonesome Wind
Power, LLC.
Filed Date: 7/2/19.
Accession Number: 20190702-5230.
Comments Due: 5 p.m. ET 7/23/19.
Take notice that the Commission received the following electric
rate filings:
Docket Numbers: ER06-1128-002.
Applicants: Mankato Energy Center, LLC.
Description: Notification of non-material change in status of
Mankato Energy Center, LLC.
Filed Date: 5/24/19.
Accession Number: 20190524-5273.
Comments Due: 5 p.m. ET 7/17/19.
Docket Numbers: ER10-2042-031; ER10-1862-025; ER10-1865-011; ER10-
1873-011; ER10-1875-011; ER10-1876-011; ER10-1878-011; ER10-1883-011;
ER10-1884-011; ER10-1885-011; ER10-1888-011; ER10-1893-025; ER10-1938-
026; ER10-1947-011; ER10-2985-029; ER10-3049-030; ER10-3051-030; ER11-
4369-010; ER12-1987-009; ER12-2261-010; ER12-2645-004; ER13-1407-008;
ER16-2218-010; ER19-1127-001; ER19-1934-001; ER19-1941-001; ER19-1942-
001; ER19-696-001.
Applicants: Calpine Energy Services, L.P., Calpine Construction
Finance Company, L.P., Calpine Energy Solutions, LLC, Calpine Gilroy
Cogen, L.P., Calpine King City Cogen, LLC, Calpine PowerAmerica--CA,
LLC, CCFC Sutter Energy, LLC, CES Marketing IX, LLC, CES Marketing X,
LLC, Champion Energy, LLC, Champion Energy Marketing LLC, Champion
Energy Services, LLC, Creed Energy Center, LLC, Delta Energy Center,
LLC, Geysers Power Company, LLC, Gilroy Energy Center, LLC, Goose Haven
Energy Center, LLC, Los Esteros Critical Energy Facility LLC, Los
Medanos Energy Center, LLC, Metcalf Energy Center, LLC, North American
Power and Gas, LLC, North American Power Business, LLC, O.L.S. Energy-
Agnews, Inc., Otay Mesa Energy Center, LLC, Pastoria Energy Facility
L.L.C., Power Contract Financing, L.L.C., Russell City Energy Company,
LLC, South Point Energy Center, LLC.
Description: Updated Market Power Analysis of the Calpine Southwest
MBR Sellers.
Filed Date: 7/1/19.
Accession Number: 20190702-5248.
Comments Due: 5 p.m. ET 8/30/19.
Docket Numbers: ER19-1932-002.
Applicants: Duke Energy Progress, LLC.
Description: Tariff Amendment: Amendment to DEP-PJM Amended JOA
Concurrence to be effective 7/22/2019.
Filed Date: 7/2/19.
Accession Number: 20190702-5138.
Comments Due: 5 p.m. ET 7/23/19.
Docket Numbers: ER19-2342-000.
Applicants: AEP Texas Inc.
Description: Sec. 205(d) Rate Filing: AEPTX-231RC 8ME (Norton
Solar) Interconnection Agreement to be effective 6/20/2019.
Filed Date: 7/2/19.
Accession Number: 20190702-5171.
Comments Due: 5 p.m. ET 7/23/19.
Docket Numbers: ER19-2343-000.
Applicants: 2018 ESA Project Company, LLC.
Description: Baseline eTariff Filing: MBR Application and Tariff to
be effective 9/1/2019.
Filed Date: 7/2/19.
Accession Number: 20190702-5172.
Comments Due: 5 p.m. ET 7/23/19.
Docket Numbers: ER19-2344-000.
Applicants: Cheyenne Light, Fuel and Power Company.
Description: Sec. 205(d) Rate Filing: Subentity Reserve Sharing
Agreement Concurrence (CLFP) to be effective 9/3/2019.
Filed Date: 7/2/19.
Accession Number: 20190702-5196.
Comments Due: 5 p.m. ET 7/23/19.
Docket Numbers: ER19-2345-000.
Applicants: PJM Interconnection, L.L.C.
Description: Sec. 205(d) Rate Filing: Original WMPA, SA No. 5418;
Queue No. AD2-049 to be effective 6/9/2019.
Filed Date: 7/2/19.
Accession Number: 20190702-5198.
[[Page 32901]]
Comments Due: 5 p.m. ET 7/23/19.
Docket Numbers: ER19-2346-000.
Applicants: Black Hills Colorado Electric, LLC.
Description: Sec. 205(d) Rate Filing: Subentity Reserve Sharing
Agreement Concurrence (BHCE) to be effective 9/3/2019.
Filed Date: 7/2/19.
Accession Number: 20190702-5200.
Comments Due: 5 p.m. ET 7/23/19.
Docket Numbers: ER19-2347-000.
Applicants: California Independent System Operator Corporation.
Description: Sec. 205(d) Rate Filing: TBD Local Market Power
Mitigation Enhancements to be effective 10/14/2019.
Filed Date: 7/2/19.
Accession Number: 20190702-5204.
Comments Due: 5 p.m. ET 7/23/19.
Docket Numbers: ER19-2348-000.
Applicants: Black Hills Colorado Electric, LLC.
Description: Sec. 205(d) Rate Filing: Tariff Revisions for
Subentity Reserve Sharing Agreement (BHCE) to be effective 9/3/2019.
Filed Date: 7/2/19.
Accession Number: 20190702-5206.
Comments Due: 5 p.m. ET 7/23/19.
Docket Numbers: ER19-2349-000.
Applicants: Cheyenne Light, Fuel and Power Company.
Description: Sec. 205(d) Rate Filing: Tariff Revisions for
Subentity Reserve Sharing Agreement (CLFP) to be effective 9/3/2019.
Filed Date: 7/2/19.
Accession Number: 20190702-5208.
Comments Due: 5 p.m. ET 7/23/19.
Docket Numbers: ER19-2350-000.
Applicants: Black Hills Power, Inc.
Description: Sec. 205(d) Rate Filing: Tariff Revisions for
Subentity Reserve Sharing Agreement (BHP) to be effective 9/3/2019.
Filed Date: 7/2/19.
Accession Number: 20190702-5210.
Comments Due: 5 p.m. ET 7/23/19.
Take notice that the Commission received the following electric
securities filings:
Docket Numbers: ES19-33-000.
Applicants: Northern Indiana Public Service Company.
Description: Supplement to June 11, 2019 Application under Section
204 of the Federal Power Act for Authorization to Issue Securities of
Northern Indiana Public Service Company LLC.
Filed Date: 7/2/19.
Accession Number: 20190702-5213.
Comments Due: 5 p.m. ET 7/9/19.
The filings are accessible in the Commission's eLibrary system by
clicking on the links or querying the docket number.
Any person desiring to intervene or protest in any of the above
proceedings must file in accordance with Rules 211 and 214 of the
Commission's Regulations (18 CFR 385.211 and 385.214) on or before 5:00
p.m. Eastern time on the specified comment date. Protests may be
considered, but intervention is necessary to become a party to the
proceeding.
eFiling is encouraged. More detailed information relating to filing
requirements, interventions, protests, service, and qualifying
facilities filings can be found at: https://www.ferc.gov/docs-filing/efiling/filing-req.pdf. For other information, call (866) 208-3676
(toll free). For TTY, call (202) 502-8659.
Dated: July 3, 2019.
Kimberly D. Bose,
Secretary.
[FR Doc. 2019-14676 Filed 7-9-19; 8:45 am]
BILLING CODE 6717-01-P