Pacific Gas & Electric Company; Notice of Application Tendered for Filing With the Commission and Soliciting Additional Study Requests and Establishing Procedural Schedule for Relicensing and a Deadline for Submission of Final Amendments, 32906-32907 [2019-14646]
Download as PDF
jspears on DSK30JT082PROD with NOTICES
32906
Federal Register / Vol. 84, No. 132 / Wednesday, July 10, 2019 / Notices
Comments Due: 5 p.m. ET 7/19/19.
Docket Numbers: ER19–1073–001;
ER11–3942–019; ER13–1139–018;
ER13–1346–010; ER14–2630–011;
ER19–1074–001; ER19–1075–001;
ER19–1076–001; ER19–529–001.
Applicants: Alta Wind VIII, LLC,
Brookfield Energy Marketing Inc.,
Brookfield Energy Marketing LP,
Brookfield Energy Marketing US LLC,
Brookfield Renewable Trading and
Marketing LP, Mesa Wind Power
Corporation, Windstar Energy LLC,
Imperial Valley Solar 1, LLC, Regulus
Solar, LLC.
Description: Updated Market Power
Analysis for the Southwest Region of
the Brookfield Companies and the
TerraForm Companies.
Filed Date: 6/28/19.
Accession Number: 20190628–5339.
Comments Due: 5 p.m. ET 8/27/19.
Docket Numbers: ER19–1575–001;
ER10–1992–020; ER10–3251–013;
ER13–1586–014; ER14–2382–013;
ER14–2871–013; ER15–110–012; ER15–
463–012; ER15–621–012; ER15–622–
012; ER16–1129–006; ER16–1130–006;
ER16–1131–006; ER16–1132–006;
ER16–182–008; ER16–72–008; ER16–
902–004; ER17–1574–003; ER17–1785–
003; ER17–47–005; ER17–48–005;
ER18–2013–002; ER18–2240–001;
ER18–2241–001; ER18–47–004; ER19–
1658–001; ER19–1660–001; ER19–1662–
001; ER19–1663–001; ER19–1664–001;
ER19–1665–001; ER19–1666–001;
ER19–1667–001; ER19–426–001; ER19–
427–001.
Applicants: Alta Oak Realty, LLC,
Dutch Wind, LLC, Cameron Ridge, LLC,
Cameron Ridge II, LLC, Coachella Wind,
LLC, DifWind Farms Limited I, DifWind
Farms Limited II, DifWind Farms
Limited V, DifWind Farms LTD VI, EUI
Affiliate LLC, Garnet Wind, LLC, Luz
Solar Partners IX, Ltd., Luz Solar
Partners VIII, Ltd., Mojave 3/4/5 LLC,
MOJAVE 16/17/18 LLC, Oak Creek
Wind Power, LLC, ON Wind Energy
LLC, Pacific Crest Power, LLC, PHWD
Affiliate, LLC, Refresh Wind, LLC,
Refresh Wind 2, LLC, Ridgetop Energy,
LLC, San Gorgonio Westwinds II—
Windustries, LLC, San Gorgonio
Westwinds II, LLC, Terra-Gen 251
Wind, LLC, Terra-Gen Dixie Valley,
LLC, Terra-Gen Energy Services, LLC,
Terra-Gen Mojave Windfarms, LLC,
Terra-Gen VG Wind, LLC, TGP Energy
Management, LLC, Victory Garden
Phase IV, LLC, Voyager Wind I, LLC,
Voyager Wind II, LLC, VPI Enterprises,
LLC, Yavi Energy, LLC.
Description: Updated Market Power
Analysis for the Southwest Region of
Alta Oak Realty, LLC, et. al.
Filed Date: 6/28/19.
VerDate Sep<11>2014
18:32 Jul 09, 2019
Jkt 247001
Accession Number: 20190628–5338.
Comments Due: 5 p.m. ET 8/27/19.
Docket Numbers: ER19–2326–000.
Applicants: NSTAR Electric
Company.
Description: Initial rate filing:
SEMASS Partnership—Design,
Engineering and Construction
Agreement to be effective 7/1/2019.
Filed Date: 7/1/19.
Accession Number: 20190701–5330.
Comments Due: 5 p.m. ET 7/22/19.
Docket Numbers: ER19–2327–000.
Applicants: ISO New England Inc.,
New England Power Pool Participants
Committee.
Description: § 205(d) Rate Filing:
Notice of Eff Date—Monthly ‘‘Balance of
Planning Period’’ and Chng to FTR
Rights to be effective 9/17/2019.
Filed Date: 7/1/19.
Accession Number: 20190701–5341.
Comments Due: 5 p.m. ET 7/22/19.
The filings are accessible in the
Commission’s eLibrary system by
clicking on the links or querying the
docket number.
Any person desiring to intervene or
protest in any of the above proceedings
must file in accordance with Rules 211
and 214 of the Commission’s
Regulations (18 CFR 385.211 and
385.214) on or before 5:00 p.m. Eastern
time on the specified comment date.
Protests may be considered, but
intervention is necessary to become a
party to the proceeding.
eFiling is encouraged. More detailed
information relating to filing
requirements, interventions, protests,
service, and qualifying facilities filings
can be found at: https://www.ferc.gov/
docs-filing/efiling/filing-req.pdf. For
other information, call (866) 208–3676
(toll free). For TTY, call (202) 502–8659.
Dated: July 2, 2019.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2019–14642 Filed 7–9–19; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 10821–005]
Pacific Gas & Electric Company;
Notice of Application Tendered for
Filing With the Commission and
Soliciting Additional Study Requests
and Establishing Procedural Schedule
for Relicensing and a Deadline for
Submission of Final Amendments
Take notice that the following
application has been filed with the
PO 00000
Frm 00048
Fmt 4703
Sfmt 4703
Commission and is available for public
inspection.
a. Type of Application: Subsequent
License—Transmission Line Only.
b. Project No.: P–10821–005.
c. Date Filed: June 27, 2019.
d. Applicant: Pacific Gas & Electric
Company (PG&E).
e. Name of Project: Camp Far West
Transmission Line Project.
f. Location: The existing transmission
line project, with the proposed
modification, would be located in Placer
and Yuba Counties, California. The
project would occupy a total of 52.3
acres and include tribal land (Auburn
Off-Reservation Land Trust) managed by
the U.S. Department of the Interior,
Bureau of Indian Affairs and federal
land (Beale Air Force Base) managed by
the U.S. Department of Defense.
g. Filed Pursuant to: Federal Power
Act 16 U.S.C. 791 (a)–825(r).
h. Applicant Contact: Mr. Robert
Donovan, Senior Transmission Planner,
Pacific Gas & Electric Company, 245
Market Street, Room 1053B, Mail Code
N10A, San Francisco, California 94105.
i. FERC Contact: Quinn Emmering,
(202) 502–6382, quinn.emmering@
ferc.gov.
j. Cooperating Agencies: Federal,
state, local, and tribal agencies with
jurisdiction and/or special expertise
with respect to environmental issues
that wish to cooperate in the
preparation of the environmental
document should follow the
instructions for filing such requests
described in item l below. Cooperating
agencies should note the Commission’s
policy that agencies that cooperate in
the preparation of the environmental
document cannot also intervene. See, 94
FERC 61,076 (2001).
k. Pursuant to section 4.32(b)(7) of 18
CFR of the Commission’s regulations, if
any resource agency, Indian Tribe, or
person believes that an additional
scientific study should be conducted in
order to form an adequate factual basis
for a complete analysis of the
application on its merit, the resource
agency, Indian Tribe, or person must file
a request for a study with the
Commission not later than 60 days from
the date of filing of the application, and
serve a copy of the request on the
applicant.
l. Deadline for filing additional study
requests and requests for cooperating
agency status: August 26, 2019.
The Commission strongly encourages
electronic filing. Please file additional
study requests and requests for
cooperating agency status using the
Commission’s eFiling system at https://
www.ferc.gov/docs-filing/efiling.asp. For
assistance, please contact FERC Online
E:\FR\FM\10JYN1.SGM
10JYN1
jspears on DSK30JT082PROD with NOTICES
Federal Register / Vol. 84, No. 132 / Wednesday, July 10, 2019 / Notices
Support at FERCOnlineSupport@
ferc.gov, (866) 208–3676 (toll free), or
(202) 502–8659 (TTY). In lieu of
electronic filing, please send a paper
copy to: Secretary, Federal Energy
Regulatory Commission, 888 First Street
NE, Washington, DC 20426. The first
page of any filing should include docket
number P–10821–005.
m. The application is not ready for
environmental analysis at this time.
n. The existing Camp Far West
Transmission Line Project (P–10821) is
a transmission line-only project and
does not generate power. The project
serves as the primary transmission line
for South Sutter Water District’s Camp
Far West Hydroelectric Project No.
2997. The currently licensed project
includes a 1.9-mile-long, three-phase,
60-kilovolt (kV) transmission line
extending from the powerhouse of the
Camp Far West Hydroelectric Project
(P–2997) in Placer County to an
interconnection with PG&E’s SmartvilleLincoln (formerly Smartville-Pleasant
Grove) 60-kV transmission line. PG&E
now proposes to connect the project’s
1.9-mile-long transmission line to an
existing 9-mile-long, northbound
segment of the Smartville-Lincoln
transmission line that connects to the
Smartville-Nicholas No. 1 transmission
line at Beale Air Force Base. Because the
9-mile-long northbound segment of the
Smartville-Lincoln transmission line
would only carrying electrons
transmitted by the project, PG&E
proposes to incorporate the 9-milesegment into any subsequent license
issued for the project.
o. A copy of the application is
available for review at the Commission
in the Public Reference Room or may be
viewed on the Commission’s website at
https://www.ferc.gov using the eLibrary
link. Enter the docket number excluding
the last three digits in the docket
number field to access the document.
For assistance, contact FERC Online
Support. A copy is also available for
inspection and reproduction at the
address in item h above.
You may also register online at https://
www.ferc.gov/docs-filing/
esubscription.asp to be notified via
email of new filings and issuances
related to this or other pending projects.
For assistance, contact FERC Online
Support.
q. Procedural schedule and final
amendments: The application will be
processed according to the following
preliminary Hydro Licensing Schedule.
Revisions to the schedule will be made
as appropriate.
Issue Notice of Acceptance or
Deficiency Letter—August 2019
VerDate Sep<11>2014
18:32 Jul 09, 2019
Jkt 247001
Request Additional Information (if
necessary)—August 2019
Issue Acceptance Letter—November
2019
Issue Scoping Document 1 for
comments—December 2019
Request Additional Information (if
necessary)—February 2020
Issue Scoping Document 2—March 2020
Issue notice of ready for environmental
analysis—March 2020
Commission issues EA, draft EA, or
draft EIS—October 2020
Comments on EA, draft EA or draft
EIS—November 2020
Commission issues final EA of final
EIS—February 2021
Final amendments to the application
must be filed with the Commission no
later than 30 days from the issuance
date of the notice of ready for
environmental analysis.
Dated: July 2, 2019.
Kimberly D. Bose,
Secretary.
[FR Doc. 2019–14646 Filed 7–9–19; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Combined Notice of Filings
Take notice that the Commission has
received the following Natural Gas
Pipeline Rate and Refund Report filings:
Filings Instituting Proceedings
Docket Numbers: RP10–837–000.
Applicants: Dominion Energy
Transmission, Inc.
Description: Submits tariff filing per:
DETI-Operational Gas Sales Report
effective N/A under RP10–837.
Filed Date: 06/28/2019.
Accession Number: 20190628–5136.
Comment Date: 5 p.m. ET 7/10/19.
Docket Numbers: RP10–900–000.
Applicants: Dominion Energy
Transmission, Inc.
Description: Submits tariff filing per:
DETI-Operational Gas Sales Report—
2019 to be effective N/A under RP10–
837.
Filed Date: 06/28/2019.
Accession Number: 20190628–5137.
Comment Date: 5 p.m. ET 7/10/19.
Docket Numbers: RP19–1341–000.
Applicants: Big Sandy Pipeline, LLC.
Description: § 4(d) Rate Filing: Big
Sandy EPC 2019 to be effective 8/1/
2019.
Filed Date: 6/28/19.
Accession Number: 20190628–5091.
Comments Due: 5 p.m. ET 7/10/19.
PO 00000
Frm 00049
Fmt 4703
Sfmt 4703
32907
Docket Numbers: RP19–1342–000.
Applicants: Texas Eastern
Transmission, LP.
Description: Compliance filing TETLP
OFO July 2019 Penalty Disbursement
Report to be effective N/A.
Filed Date: 6/28/19.
Accession Number: 20190628–5093.
Comments Due: 5 p.m. ET 7/10/19.
Docket Numbers: RP19–1343–000.
Applicants: El Paso Natural Gas
Company, L.L.C.
Description: § 4(d) Rate Filing:
Negotiated Rate Agreement Update
(Conoco July 19) to be effective 7/1/
2019.
Filed Date: 6/28/19.
Accession Number: 20190628–5133.
Comments Due: 5 p.m. ET 7/10/19.
Docket Numbers: RP19–1344–000.
Applicants: El Paso Natural Gas
Company, L.L.C.
Description: § 4(d) Rate Filing:
Negotiated Rate Agreement Update
(APS July 2019) to be effective 7/1/2019.
Filed Date: 6/28/19.
Accession Number: 20190628–5135.
Comments Due: 5 p.m. ET 7/10/19.
Docket Numbers: RP19–1345–000.
Applicants: Texas Eastern
Transmission, LP.
Description: § 4(d) Rate Filing:
Negotiated Rate—Gulfport to EcoEnergy 8958321 to be effective 7/1/2019.
Filed Date: 6/28/19.
Accession Number: 20190628–5139.
Comments Due: 5 p.m. ET 7/10/19.
Docket Numbers: RP19–1346–000.
Applicants: Delphi Energy Corp.,
Outlier Resources Ltd.
Description: Joint Petition for
Temporary Waiver of Capacity Release
Regulations and Policies, et al. of Delphi
Energy Corp., et al. under RP19–1346.
Filed Date: 6/28/19.
Accession Number: 20190628–5144.
Comments Due: 5 p.m. ET 7/8/19.
Docket Numbers: RP19–1347–000.
Applicants: Transcontinental Gas
Pipe Line Company,
Description: § 4(d) Rate Filing:
Negotiated Rates—Cherokee AGL—
Replacement Shippers—Jul 2019 to be
effective 7/1/2019.
Filed Date: 6/28/19.
Accession Number: 20190628–5204.
Comments Due: 5 p.m. ET 7/10/19.
Docket Numbers: RP19–1348–000.
Applicants: NEXUS Gas
Transmission, LLC.
Description: § 4(d) Rate Filing:
Negotiated Rates—Columbia Gas 860005
July 1 releases to be effective 7/1/2019.
Filed Date: 6/28/19.
Accession Number: 20190628–5220.
Comments Due: 5 p.m. ET 7/10/19.
Docket Numbers: RP19–1349–000.
E:\FR\FM\10JYN1.SGM
10JYN1
Agencies
[Federal Register Volume 84, Number 132 (Wednesday, July 10, 2019)]
[Notices]
[Pages 32906-32907]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2019-14646]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Project No. 10821-005]
Pacific Gas & Electric Company; Notice of Application Tendered
for Filing With the Commission and Soliciting Additional Study Requests
and Establishing Procedural Schedule for Relicensing and a Deadline for
Submission of Final Amendments
Take notice that the following application has been filed with the
Commission and is available for public inspection.
a. Type of Application: Subsequent License--Transmission Line Only.
b. Project No.: P-10821-005.
c. Date Filed: June 27, 2019.
d. Applicant: Pacific Gas & Electric Company (PG&E).
e. Name of Project: Camp Far West Transmission Line Project.
f. Location: The existing transmission line project, with the
proposed modification, would be located in Placer and Yuba Counties,
California. The project would occupy a total of 52.3 acres and include
tribal land (Auburn Off-Reservation Land Trust) managed by the U.S.
Department of the Interior, Bureau of Indian Affairs and federal land
(Beale Air Force Base) managed by the U.S. Department of Defense.
g. Filed Pursuant to: Federal Power Act 16 U.S.C. 791 (a)-825(r).
h. Applicant Contact: Mr. Robert Donovan, Senior Transmission
Planner, Pacific Gas & Electric Company, 245 Market Street, Room 1053B,
Mail Code N10A, San Francisco, California 94105.
i. FERC Contact: Quinn Emmering, (202) 502-6382,
[email protected].
j. Cooperating Agencies: Federal, state, local, and tribal agencies
with jurisdiction and/or special expertise with respect to
environmental issues that wish to cooperate in the preparation of the
environmental document should follow the instructions for filing such
requests described in item l below. Cooperating agencies should note
the Commission's policy that agencies that cooperate in the preparation
of the environmental document cannot also intervene. See, 94 FERC
61,076 (2001).
k. Pursuant to section 4.32(b)(7) of 18 CFR of the Commission's
regulations, if any resource agency, Indian Tribe, or person believes
that an additional scientific study should be conducted in order to
form an adequate factual basis for a complete analysis of the
application on its merit, the resource agency, Indian Tribe, or person
must file a request for a study with the Commission not later than 60
days from the date of filing of the application, and serve a copy of
the request on the applicant.
l. Deadline for filing additional study requests and requests for
cooperating agency status: August 26, 2019.
The Commission strongly encourages electronic filing. Please file
additional study requests and requests for cooperating agency status
using the Commission's eFiling system at https://www.ferc.gov/docs-filing/efiling.asp. For assistance, please contact FERC Online
[[Page 32907]]
Support at [email protected], (866) 208-3676 (toll free), or
(202) 502-8659 (TTY). In lieu of electronic filing, please send a paper
copy to: Secretary, Federal Energy Regulatory Commission, 888 First
Street NE, Washington, DC 20426. The first page of any filing should
include docket number P-10821-005.
m. The application is not ready for environmental analysis at this
time.
n. The existing Camp Far West Transmission Line Project (P-10821)
is a transmission line-only project and does not generate power. The
project serves as the primary transmission line for South Sutter Water
District's Camp Far West Hydroelectric Project No. 2997. The currently
licensed project includes a 1.9-mile-long, three-phase, 60-kilovolt
(kV) transmission line extending from the powerhouse of the Camp Far
West Hydroelectric Project (P-2997) in Placer County to an
interconnection with PG&E's Smartville-Lincoln (formerly Smartville-
Pleasant Grove) 60-kV transmission line. PG&E now proposes to connect
the project's 1.9-mile-long transmission line to an existing 9-mile-
long, northbound segment of the Smartville-Lincoln transmission line
that connects to the Smartville-Nicholas No. 1 transmission line at
Beale Air Force Base. Because the 9-mile-long northbound segment of the
Smartville-Lincoln transmission line would only carrying electrons
transmitted by the project, PG&E proposes to incorporate the 9-mile-
segment into any subsequent license issued for the project.
o. A copy of the application is available for review at the
Commission in the Public Reference Room or may be viewed on the
Commission's website at https://www.ferc.gov using the eLibrary link.
Enter the docket number excluding the last three digits in the docket
number field to access the document. For assistance, contact FERC
Online Support. A copy is also available for inspection and
reproduction at the address in item h above.
You may also register online at https://www.ferc.gov/docs-filing/esubscription.asp to be notified via email of new filings and issuances
related to this or other pending projects. For assistance, contact FERC
Online Support.
q. Procedural schedule and final amendments: The application will
be processed according to the following preliminary Hydro Licensing
Schedule. Revisions to the schedule will be made as appropriate.
Issue Notice of Acceptance or Deficiency Letter--August 2019
Request Additional Information (if necessary)--August 2019
Issue Acceptance Letter--November 2019
Issue Scoping Document 1 for comments--December 2019
Request Additional Information (if necessary)--February 2020
Issue Scoping Document 2--March 2020
Issue notice of ready for environmental analysis--March 2020
Commission issues EA, draft EA, or draft EIS--October 2020
Comments on EA, draft EA or draft EIS--November 2020
Commission issues final EA of final EIS--February 2021
Final amendments to the application must be filed with the
Commission no later than 30 days from the issuance date of the notice
of ready for environmental analysis.
Dated: July 2, 2019.
Kimberly D. Bose,
Secretary.