Combined Notice of Filings #2, 32911-32913 [2019-14643]
Download as PDF
Federal Register / Vol. 84, No. 132 / Wednesday, July 10, 2019 / Notices
jspears on DSK30JT082PROD with NOTICES
each reporting category has been
adjusted in this collection, as compared
to the previous FERC–922 collection
burden estimate, to reflect less emphasis
on the writing category, as Commission
staff has developed a structured data
collection tool which will decrease the
amount of written text that respondents
will provide in the information
collection.9
The Estimated Cost per Response (6)
is the product of the three variables: The
Estimated Burden Hours per Response
(5) for a category, multiplied by the
labor rate (for wages plus benefits) for
each category (which is not shown in
the table), multiplied by the proportion
of total hours attributable to this Group,
to report on a category, e.g., the number
of metrics in that Group divided by the
total number of metrics (also not shown
in table). An example in the first row is
that for Group 1, Metrics Data Collection
category, the $7,039 is the product of
271 hours in column (5) multiplied by
the weighted average labor rate for that
category ($107.61) multiplied by 0.242
(the ratio of metrics in the first Group,
seven, to the total number of metrics, 29
or 7 ÷ 29). This fraction is not displayed
in the table.10
The Estimated Total Annual Burden
Hours (7) is the product of the Total
Number of Annual Responses (4) times
the Estimated Burden Hours per
Response (5). For the first row of the
first group this value is 2,905 hours =
10.72 × 271 hours.
Finally, the Estimated Total Annual
Cost (8) reflects the total burden to the
industry and is calculated by
multiplying the Total Number of
Annual Responses (4) times the
Estimated Cost per Response (6) for each
category for all groups and produces an
estimated total cost in the last row of the
table. The wage rates utilized in this
burden estimate have been updated to
recent Bureau of Labor Statistics
estimates for the same categories as used
in the prior burden estimates for the
FERC–922 information collection (i.e.,
Computer Systems Analysts, Lawyers,
Electrical Engineers, Economists, and
the category Chief Executive). Wage
estimates use the 90th percentile wage
from the recent Bureau of Labor
Employees Benefit Survey, adjusted
9 The estimated hours per response has increased
for: (a) Metrics Data Collection component to 271
hours (from 229 hours), and (b) Management
Review component to 60 hours (from 33 hours). The
estimated hours per response for Write Performance
Analysis has decreased to 70 hours (from 139
hours).
10 The fraction for Group 1 and the Potential New
Respondents is 0.242 (the seven metrics in the first
Group divided by the total number of metrics, 29);
for Group 2 the fraction is 0.414 (12 divided by 29);
for Group 3 the fraction is 0.345 (10 divided by 29).
VerDate Sep<11>2014
18:32 Jul 09, 2019
Jkt 247001
upward for the private industry benefits
of 30.3 percent, and are a weighted
average of those categories.
Comments: Comments are invited on:
(1) Whether the collection of
information is necessary for the proper
performance of the functions of the
Commission, including whether the
information will have practical utility;
(2) the accuracy of the agency’s estimate
of the burden and cost of the collection
of information, including the validity of
the methodology and assumptions used;
(3) ways to enhance the quality, utility
and clarity of the information collection;
and (4) ways to minimize the burden of
the collection of information on those
who are to respond, including the use
of automated collection techniques or
other forms of information technology.
Further, Commission staff requests
comments on whether the proposed
metrics (attached) will effectively track
the performance of the RTO/ISO energy
and capacity markets and the
administrative and market functions
that are common to the RTOs/ISOs and
the individual utilities in non-RTO/ISO
regions.
Dated: July 3, 2019.
Kimberly D. Bose,
Secretary.
[FR Doc. 2019–14669 Filed 7–9–19; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Combined Notice of Filings #2
Take notice that the Commission
received the following electric corporate
filings:
Docket Numbers: EC19–108–000.
Applicants: Valentine Solar, LLC,
Glaciers Edge Wind Project, LLC.
Description: Application for
Authorization Under Section 203 of the
Federal Power Act, et al. of Valentine
Solar, LLC, et al.
Filed Date: 7/1/19.
Accession Number: 20190701–5401.
Comments Due: 5 p.m. ET 7/22/19.
Take notice that the Commission
received the following electric rate
filings:
Docket Numbers: ER10–2290–007.
Applicants: Avista Corporation.
Description: Triennial Market Power
Update for the Northwest Region of
Avista Corporation.
Filed Date: 7/1/19.
Accession Number: 20190701–5387.
Comments Due: 5 p.m. ET 8/30/19.
Docket Numbers: ER10–2475–019;
ER10–2474–019; ER10–3246–013;
PO 00000
Frm 00053
Fmt 4703
Sfmt 4703
32911
ER12–21–021; ER13–1266–022; ER15–
2211–019.
Applicants: Nevada Power Company,
Sierra Pacific Power Company,
PacifiCorp, Agua Caliente Solar, LLC,
CalEnergy, LLC, MidAmerican Energy
Service LLC.
Description: Updated Market Power
Analysis for the Northwest Region of the
BHE Northwest Entities.
Filed Date: 6/28/19.
Accession Number: 20190628–5333.
Comments Due: 5 p.m. ET 8/27/19.
Docket Numbers: ER10–2739–025;
ER10–1892–012; ER13–1430–006;
ER13–1561–006; ER16–1652–013;
ER17–1490–001; ER19–170–001.
Applicants: LS Power Marketing, LLC,
Arlington Valley Solar Energy II, LLC,
Centinela Solar Energy, LLC, Columbia
Energy LLC, Gateway Energy Storage,
LLC, LifeEnergy, LLC, Vista Energy
Storage, LLC.
Description: Updated Market Power
Analysis for the Southwest Region of LS
Power Marketing, LLC, et al.
Filed Date: 7/1/19.
Accession Number: 20190701–5414.
Comments Due: 5 p.m. ET 8/30/19.
Docket Numbers: ER10–2822–014;
ER10–3158–008; ER10–3161–008;
ER10–3162–008; ER12–308–008; ER16–
1238–002; ER16–1250–006; ER17–1242–
001; ER17–1392–002.
Applicants: Atlantic Renewable
Projects II LLC, Avangrid Arizona
Renewables, LLC, Avangrid
Renewables, LLC, El Cabo Wind LLC,
Dillon Wind LLC, Manzana Wind LLC,
Mountain View Power Partners III, LLC,
Shiloh I Wind Project, LLC, Tule Wind
LLC.
Description: Updated Market Power
Analysis of the Avangrid Southwest
MBR Sellers.
Filed Date: 7/1/19.
Accession Number: 20190701–5415.
Comments Due: 5 p.m. ET 8/30/19.
Docket Numbers: ER15–1596–008;
ER10–2590–006; ER10–2593–006;
ER10–2616–015; ER11–4400–012;
ER15–1599–008; ER15–1958–007;
ER19–102–001.
Applicants: Dynegy Commercial Asset
Management, LLC, Dynegy Energy
Services (East), LLC, Dynegy Marketing
and Trade, LLC, Dynegy Moss Landing,
LLC, Dynegy Oakland, LLC, Dynegy
Power Marketing, LLC, Dynegy
Resources Management, LLC, Luminant
Energy Company LLC.
Description: Updated Triennial
Market Power Analysis for the
Southwest Region by the Vistra
Southwest MBR Sellers.
Filed Date: 7/1/19.
Accession Number: 20190701–5416.
Comments Due: 5 p.m. ET 8/30/19.
E:\FR\FM\10JYN1.SGM
10JYN1
jspears on DSK30JT082PROD with NOTICES
32912
Federal Register / Vol. 84, No. 132 / Wednesday, July 10, 2019 / Notices
Docket Numbers: ER16–748–003.
Applicants: Sentinel Energy Center,
LLC.
Description: Market Power Update of
Sentinel Energy Center, LLC.
Filed Date: 7/1/19.
Accession Number: 20190701–5406.
Comments Due: 5 p.m. ET 8/30/19.
Docket Numbers: ER17–2059–004;
ER10–3097–009.
Applicants: Puget Sound Energy, Inc.,
Bruce Power Inc.
Description: Updated Market Power
Analysis in the Northwest Region for
Puget Sound Energy, Inc., et al.
Filed Date: 7/1/19.
Accession Number: 20190701–5395.
Comments Due: 5 p.m. ET 8/30/19.
Docket Numbers: ER18–2033–001.
Applicants: Saavi Energy Solutions,
LLC.
Description: Updated Market Power
Analysis for Southwest Region of Saavi
Energy Solutions, LLC.
Filed Date: 7/1/19.
Accession Number: 20190701–5407.
Comments Due: 5 p.m. ET 8/30/19.
Docket Numbers: ER19–1415–001;
ER11–2508–024; ER19–2140–001;
ER19–2141–001; ER19–2142–001;
ER19–2143–001; ER19–2144–001;
ER19–2145–001; ER19–2146–001;
ER19–2147–001; ER19–2148–001.
Applicants: GenOn California South,
LP, GenOn Energy Management, LLC,
Brunot Island Power, LLC, Gilbert
Power, LLC, Heritage Power Marketing,
LLC, Mountain Power, LLC, New Castle
Power, LLC, Portland Power, LLC,
Sayreville Power, LLC, Shawville
Power, LLC, Warren Generation, LLC.
Description: Updated Market Power
Analysis for the Southwest Region of
the GenOn Holdings, Inc. subsidiaries.
Filed Date: 7/1/19.
Accession Number: 20190701–5412.
Comments Due: 5 p.m. ET 8/30/19.
Docket Numbers: ER19–1704–001.
Applicants: Midcontinent
Independent System Operator, Inc.
Description: Tariff Amendment:
2019–06–28_SA 2010 Ameren-SIPC
Substitute WDS Agreement to be
effective 12/31/9998.
Filed Date: 6/28/19.
Accession Number: 20190628–5241.
Comments Due: 5 p.m. ET 7/19/19.
Docket Numbers: ER19–1932–002.
Applicants: Duke Energy Progress,
LLC.
Description: Tariff Amendment:
Amendment to DEP–PJM Amended JOA
Concurrence to be effective 7/22/2019.
Filed Date: 7/2/19.
Accession Number: 20190702–5138.
Comments Due: 5 p.m. ET 7/23/19.
Docket Numbers: ER19–2050–001.
VerDate Sep<11>2014
18:32 Jul 09, 2019
Jkt 247001
Applicants: GridLiance Heartland
LLC, Midcontinent Independent System
Operator, Inc.
Description: Tariff Amendment:
2019–07–02_Errata to GridLiance
Heartland Revisions to Incorporate
Formula to be effective 9/1/2019.
Filed Date: 7/2/19.
Accession Number: 20190702–5141.
Comments Due: 5 p.m. ET 7/23/19.
Docket Numbers: ER19–2328–000.
Applicants: AEP Texas Inc.
Description: § 205(d) Rate Filing:
AEPTX-Pedernales Electric Cooperative
Interconnection Agr. 1st Amend/
Restated to be effective 3/13/2019.
Filed Date: 7/2/19.
Accession Number: 20190702–5000.
Comments Due: 5 p.m. ET 7/23/19.
Docket Numbers: ER19–2329–000.
Applicants: Midcontinent
Independent System Operator, Inc.,
Ameren Illinois Company.
Description: § 205(d) Rate Filing:
2019–07–02_SA 2880 Att A-Project
Specifications No. 4 WVPA-EnerStarWest Union to be effective 6/3/2019.
Filed Date: 7/2/19.
Accession Number: 20190702–5044.
Comments Due: 5 p.m. ET 7/23/19.
Docket Numbers: ER19–2330–000.
Applicants: Arizona Public Service
Company.
Description: Notice of Cancellation of
Rate Schedule No. 218 of Arizona
Public Service Company.
Filed Date: 7/1/19.
Accession Number: 20190701–5386.
Comments Due: 5 p.m. ET 7/22/19.
Docket Numbers: ER19–2331–000.
Applicants: Entergy Nuclear
Generation Company.
Description: Tariff Cancellation:
Entergy Nuclear Generation Company to
be effective 6/10/2019.
Filed Date: 7/2/19.
Accession Number: 20190702–5097.
Comments Due: 5 p.m. ET 7/23/19.
Docket Numbers: ER19–2332–000.
Applicants: Southern California
Edison Company.
Description: § 205(d) Rate Filing:
Letter Agreement with EC&R Solar
Development, LLC, Painter BESS to be
effective 7/3/2019.
Filed Date: 7/2/19.
Accession Number: 20190702–5100.
Comments Due: 5 p.m. ET 7/23/19.
Docket Numbers: ER19–2333–000.
Applicants: Public Service Company
of Colorado.
Description: § 205(d) Rate Filing:
PSCo Reserve Energy Tariff_Eff. 9.3.19
to be effective 9/3/2019.
Filed Date: 7/2/19.
Accession Number: 20190702–5101.
Comments Due: 5 p.m. ET 7/23/19.
PO 00000
Frm 00054
Fmt 4703
Sfmt 4703
Docket Numbers: ER19–2334–000.
Applicants: Public Service Company
of Colorado.
Description: § 205(d) Rate Filing:
OATT–PSCO Transition From RMRG to
NWPP to be effective 9/3/2019.
Filed Date: 7/2/19.
Accession Number: 20190702–5102.
Comments Due: 5 p.m. ET 7/23/19.
Docket Numbers: ER19–2335–000.
Applicants: Public Service Company
of Colorado.
Description: § 205(d) Rate Filing:
PSC–TSGT–BkCoU–CSU–BAA–
SubentitiyRSA–538–0.0.0 to be effective
9/3/2019.
Filed Date: 7/2/19.
Accession Number: 20190702–5103.
Comments Due: 5 p.m. ET 7/23/19.
Docket Numbers: ER19–2336–000.
Applicants: Public Service Company
of Colorado.
Description: § 205(d) Rate Filing:
PSC–WAPA–WACM–Subentity–
RsrvShrngSvcAgrmt–547–0.0.0 to be
effective 9/3/2019.
Filed Date: 7/2/19.
Accession Number: 20190702–5104.
Comments Due: 5 p.m. ET 7/23/19.
Docket Numbers: ER19–2337–000.
Applicants: Public Service Company
of Colorado.
Description: § 205(d) Rate Filing:
PSC–MEAN–NITS–246–0.0.0–Filing to
be effective 9/3/2019.
Filed Date: 7/2/19.
Accession Number: 20190702–5105.
Comments Due: 5 p.m. ET 7/23/19.
Docket Numbers: ER19–2338–000.
Applicants: PJM Interconnection,
L.L.C.
Description: § 205(d) Rate Filing:
Original ISA, SA No. 5416; Queue No.
AC2–067/AC2–068 to be effective 6/4/
2019.
Filed Date: 7/2/19.
Accession Number: 20190702–5144.
Comments Due: 5 p.m. ET 7/23/19.
Docket Numbers: ER19–2339–000.
Applicants: PacifiCorp.
Description: § 205(d) Rate Filing:
Cedar Springs Wind LGIA to be effective
9/1/2019.
Filed Date: 7/2/19.
Accession Number: 20190702–5145.
Comments Due: 5 p.m. ET 7/23/19.
Docket Numbers: ER19–2340–000.
Applicants: Black Hills Power, Inc.
Description: § 205(d) Rate Filing:
Subentity Reserve Sharing Agreement
(BHP) to be effective 9/3/2019.
Filed Date: 7/2/19.
Accession Number: 20190702–5166.
Comments Due: 5 p.m. ET 7/23/19.
Docket Numbers: ER19–2341–000.
Applicants: AEP Texas Inc.
Description: § 205(d) Rate Filing:
AEPTX-Las Majadas Wind Farm
E:\FR\FM\10JYN1.SGM
10JYN1
Federal Register / Vol. 84, No. 132 / Wednesday, July 10, 2019 / Notices
Interconnection Agreement First Amend
& Restated to be effective 6/14/2019.
Filed Date: 7/2/19.
Accession Number: 20190702–5168.
Comments Due: 5 p.m. ET 7/23/19.
The filings are accessible in the
Commission’s eLibrary system by
clicking on the links or querying the
docket number.
Any person desiring to intervene or
protest in any of the above proceedings
must file in accordance with Rules 211
and 214 of the Commission’s
Regulations (18 CFR 385.211 and
385.214) on or before 5:00 p.m. Eastern
time on the specified comment date.
Protests may be considered, but
intervention is necessary to become a
party to the proceeding.
eFiling is encouraged. More detailed
information relating to filing
requirements, interventions, protests,
service, and qualifying facilities filings
can be found at: https://www.ferc.gov/
docs-filing/efiling/filing-req.pdf. For
other information, call (866) 208–3676
(toll free). For TTY, call (202) 502–8659.
Dated: July 2, 2019.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2019–14643 Filed 7–9–19; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. IC19–20–000]
Commission Information Collection
Activities (FERC Form Nos. 6 and 6–
Q); Comment Request; Extension
Federal Energy Regulatory
Commission.
ACTION: Notice of information
collections and request for comments.
AGENCY:
In compliance with the
requirements of the Paperwork
Reduction Act of 1995 (PRA), the
Federal Energy Regulatory Commission
(Commission or FERC) is soliciting
public comment on the currently
approved information collections FERC
Form Nos. 6 (Annual Report of Oil
Pipeline Companies) and 6–Q
(Quarterly Report of Oil Pipeline
Companies) and submitting the
information collections to the Office of
Management and Budget (OMB) for
review. Any interested person may file
comments directly with OMB and
should address a copy of those
comments to the Commission as
explained below. On April 15, 2019, the
Commission published a Notice in the
jspears on DSK30JT082PROD with NOTICES
SUMMARY:
VerDate Sep<11>2014
18:32 Jul 09, 2019
Jkt 247001
Federal Register in Docket No. IC19–
20–000 requesting public comments.
The Commission received two public
comments and will indicate that in its
submittals to OMB.
DATES: Comments on the collections of
information are due August 9, 2019.
ADDRESSES: Comments filed with OMB,
identified by OMB Control Nos.: 1902–
0022 (FERC Form No. 6) and 1902–0206
(FERC Form No. 6–Q), should be sent
via email to the Office of Information
and Regulatory Affairs: oira_
submission@omb.gov. Attention:
Federal Energy Regulatory Commission
Desk Officer.
A copy of the comments should also
be sent to the Commission, in Docket
No. IC19–20–000, by either of the
following methods:
• eFiling at Commission’s Website:
https://www.ferc.gov/docs-filing/
efiling.asp.
• Mail/Hand Delivery/Courier:
Federal Energy Regulatory Commission,
Secretary of the Commission, 888 First
Street NE, Washington, DC 20426.
Instructions: All submissions must be
formatted and filed in accordance with
submission guidelines at: https://
www.ferc.gov/help/submissionguide.asp. For user assistance, contact
FERC Online Support by email at
ferconlinesupport@ferc.gov, or by phone
at: (866) 208–3676 (toll-free), or (202)
502–8659 for TTY.
Docket: Users interested in receiving
automatic notification of activity in this
docket or in viewing/downloading
comments and issuances in this docket
may do so at https://www.ferc.gov/docsfiling/docs-filing.asp.
FOR FURTHER INFORMATION CONTACT:
Ellen Brown by email at
DataClearance@FERC.gov, telephone at
(202) 502–8663, and fax at (202) 273–
0873.
SUPPLEMENTARY INFORMATION:
Titles: FERC Form Nos. 6 (Annual
Report of Oil Pipeline Companies) and
6–Q (Quarterly Report of Oil Pipeline
Companies).
OMB Control Nos.: 1902–0022 (FERC
Form No. 6) and 1902–0206 (FERC Form
No.6–Q).
Type of Respondent: Oil pipeline.
Type of Request: Three-year extension
of FERC Form Nos. 6 and 6–Q
information collections with no changes
to the current reporting and
recordkeeping requirements.1
1 FERC Form Nos. 6 and 6–Q are part of the
‘‘Forms Refresh’’ effort, which is a separate activity
and not addressed here. See Revisions to the Filing
Process for Commission Forms, 166 FERC ¶ 61,027
(2019) (started in Docket No. AD15–11 and ongoing
in Docket No. RM19–12). (OMB issued its decisions
on the proposed changes in the Forms Refresh
PO 00000
Frm 00055
Fmt 4703
Sfmt 4703
32913
Abstract: Under the Interstate
Commerce Act (ICA),2 the Commission
is authorized and empowered to make
investigations and to collect and record
data to the extent the Commission may
consider to be necessary or useful for
the purpose of carrying out the
provisions of the ICA. The Commission
must ensure just and reasonable rates
for transportation of crude oil and
petroleum products by pipelines in
interstate commerce.
FERC Form No. 6, Annual Report of Oil
Pipeline Companies
In 1977, the Department of Energy
Organization Act transferred to the
Commission from the Interstate
Commerce Commission (ICC) the
responsibility to regulate oil pipeline
companies. In accordance with the
transfer of authority, the Commission
was delegated the responsibility to
require oil pipelines to file annual
reports of information necessary for the
Commission to exercise its statutory
responsibilities.3 The transfer included
the ICC Form P, the predecessor to
FERC Form No. 6.4
To reduce burden on industry, FERC
Form No. 6 has three tiers of reporting
requirements:
1. Each oil pipeline carrier whose
annual jurisdictional operating revenues
has been $500,000 or more for each of
the three previous calendar years must
file FERC Form No. 6 (18 CFR 357.2 (a)).
Oil pipeline companies subject to the
provisions of section 20 of the ICA must
submit FERC Form No. 6–Q. 18 CFR
357.4(b)). Newly established entities
must use projected data to determine
whether FERC Form No. 6 must be filed.
2. Oil pipeline carriers exempt from
filing FERC Form No. 6 whose annual
Notice of Proposed Rulemaking in Docket No.
RM19–12 on March 14, 2019.) In addition, this
submittal does not reflect Docket No. RM15–19
(Petition for a Rulemaking of the Liquids Shippers
Group, et al., (2015)) and Docket No. RM17–1
(Revisions to Indexing Policies and Page 700 of
FERC Form No. 6 (2016)).
2 49 U.S.C. part 1, Section 20, 54 Stat. 916.
3 Section 402(b) of the Department of Energy
Organization Act (DOE Act), 42 U.S.C. 7172
provides that; ‘‘[t]here are hereby transferred to, and
vested in, the Commission all functions and
authority of the Interstate Commerce Commission
or any officer or component of such Commission
where the regulatory function establishes rates or
charges for the transportation of oil by pipeline or
established the valuation of any such pipeline.’’
4 The ICC developed the Form P to collect
information on an annual basis to enable it to carry
out its regulation of oil pipeline companies under
the Interstate Commerce Act. A comprehensive
review of the reporting requirements for oil pipeline
companies was performed on September 21, 1982,
when the Commission issued Order No. 260
revising the former ICC Form P, ‘‘Annual Report of
Carriers by Pipeline’’ and redesignating it as FERC
Form No. 6, ‘‘Annual Report of Oil Pipeline
Companies’’.
E:\FR\FM\10JYN1.SGM
10JYN1
Agencies
[Federal Register Volume 84, Number 132 (Wednesday, July 10, 2019)]
[Notices]
[Pages 32911-32913]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2019-14643]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
Combined Notice of Filings #2
Take notice that the Commission received the following electric
corporate filings:
Docket Numbers: EC19-108-000.
Applicants: Valentine Solar, LLC, Glaciers Edge Wind Project, LLC.
Description: Application for Authorization Under Section 203 of the
Federal Power Act, et al. of Valentine Solar, LLC, et al.
Filed Date: 7/1/19.
Accession Number: 20190701-5401.
Comments Due: 5 p.m. ET 7/22/19.
Take notice that the Commission received the following electric
rate filings:
Docket Numbers: ER10-2290-007.
Applicants: Avista Corporation.
Description: Triennial Market Power Update for the Northwest Region
of Avista Corporation.
Filed Date: 7/1/19.
Accession Number: 20190701-5387.
Comments Due: 5 p.m. ET 8/30/19.
Docket Numbers: ER10-2475-019; ER10-2474-019; ER10-3246-013; ER12-
21-021; ER13-1266-022; ER15-2211-019.
Applicants: Nevada Power Company, Sierra Pacific Power Company,
PacifiCorp, Agua Caliente Solar, LLC, CalEnergy, LLC, MidAmerican
Energy Service LLC.
Description: Updated Market Power Analysis for the Northwest Region
of the BHE Northwest Entities.
Filed Date: 6/28/19.
Accession Number: 20190628-5333.
Comments Due: 5 p.m. ET 8/27/19.
Docket Numbers: ER10-2739-025; ER10-1892-012; ER13-1430-006; ER13-
1561-006; ER16-1652-013; ER17-1490-001; ER19-170-001.
Applicants: LS Power Marketing, LLC, Arlington Valley Solar Energy
II, LLC, Centinela Solar Energy, LLC, Columbia Energy LLC, Gateway
Energy Storage, LLC, LifeEnergy, LLC, Vista Energy Storage, LLC.
Description: Updated Market Power Analysis for the Southwest Region
of LS Power Marketing, LLC, et al.
Filed Date: 7/1/19.
Accession Number: 20190701-5414.
Comments Due: 5 p.m. ET 8/30/19.
Docket Numbers: ER10-2822-014; ER10-3158-008; ER10-3161-008; ER10-
3162-008; ER12-308-008; ER16-1238-002; ER16-1250-006; ER17-1242-001;
ER17-1392-002.
Applicants: Atlantic Renewable Projects II LLC, Avangrid Arizona
Renewables, LLC, Avangrid Renewables, LLC, El Cabo Wind LLC, Dillon
Wind LLC, Manzana Wind LLC, Mountain View Power Partners III, LLC,
Shiloh I Wind Project, LLC, Tule Wind LLC.
Description: Updated Market Power Analysis of the Avangrid
Southwest MBR Sellers.
Filed Date: 7/1/19.
Accession Number: 20190701-5415.
Comments Due: 5 p.m. ET 8/30/19.
Docket Numbers: ER15-1596-008; ER10-2590-006; ER10-2593-006; ER10-
2616-015; ER11-4400-012; ER15-1599-008; ER15-1958-007; ER19-102-001.
Applicants: Dynegy Commercial Asset Management, LLC, Dynegy Energy
Services (East), LLC, Dynegy Marketing and Trade, LLC, Dynegy Moss
Landing, LLC, Dynegy Oakland, LLC, Dynegy Power Marketing, LLC, Dynegy
Resources Management, LLC, Luminant Energy Company LLC.
Description: Updated Triennial Market Power Analysis for the
Southwest Region by the Vistra Southwest MBR Sellers.
Filed Date: 7/1/19.
Accession Number: 20190701-5416.
Comments Due: 5 p.m. ET 8/30/19.
[[Page 32912]]
Docket Numbers: ER16-748-003.
Applicants: Sentinel Energy Center, LLC.
Description: Market Power Update of Sentinel Energy Center, LLC.
Filed Date: 7/1/19.
Accession Number: 20190701-5406.
Comments Due: 5 p.m. ET 8/30/19.
Docket Numbers: ER17-2059-004; ER10-3097-009.
Applicants: Puget Sound Energy, Inc., Bruce Power Inc.
Description: Updated Market Power Analysis in the Northwest Region
for Puget Sound Energy, Inc., et al.
Filed Date: 7/1/19.
Accession Number: 20190701-5395.
Comments Due: 5 p.m. ET 8/30/19.
Docket Numbers: ER18-2033-001.
Applicants: Saavi Energy Solutions, LLC.
Description: Updated Market Power Analysis for Southwest Region of
Saavi Energy Solutions, LLC.
Filed Date: 7/1/19.
Accession Number: 20190701-5407.
Comments Due: 5 p.m. ET 8/30/19.
Docket Numbers: ER19-1415-001; ER11-2508-024; ER19-2140-001; ER19-
2141-001; ER19-2142-001; ER19-2143-001; ER19-2144-001; ER19-2145-001;
ER19-2146-001; ER19-2147-001; ER19-2148-001.
Applicants: GenOn California South, LP, GenOn Energy Management,
LLC, Brunot Island Power, LLC, Gilbert Power, LLC, Heritage Power
Marketing, LLC, Mountain Power, LLC, New Castle Power, LLC, Portland
Power, LLC, Sayreville Power, LLC, Shawville Power, LLC, Warren
Generation, LLC.
Description: Updated Market Power Analysis for the Southwest Region
of the GenOn Holdings, Inc. subsidiaries.
Filed Date: 7/1/19.
Accession Number: 20190701-5412.
Comments Due: 5 p.m. ET 8/30/19.
Docket Numbers: ER19-1704-001.
Applicants: Midcontinent Independent System Operator, Inc.
Description: Tariff Amendment: 2019-06-28_SA 2010 Ameren-SIPC
Substitute WDS Agreement to be effective 12/31/9998.
Filed Date: 6/28/19.
Accession Number: 20190628-5241.
Comments Due: 5 p.m. ET 7/19/19.
Docket Numbers: ER19-1932-002.
Applicants: Duke Energy Progress, LLC.
Description: Tariff Amendment: Amendment to DEP-PJM Amended JOA
Concurrence to be effective 7/22/2019.
Filed Date: 7/2/19.
Accession Number: 20190702-5138.
Comments Due: 5 p.m. ET 7/23/19.
Docket Numbers: ER19-2050-001.
Applicants: GridLiance Heartland LLC, Midcontinent Independent
System Operator, Inc.
Description: Tariff Amendment: 2019-07-02_Errata to GridLiance
Heartland Revisions to Incorporate Formula to be effective 9/1/2019.
Filed Date: 7/2/19.
Accession Number: 20190702-5141.
Comments Due: 5 p.m. ET 7/23/19.
Docket Numbers: ER19-2328-000.
Applicants: AEP Texas Inc.
Description: Sec. 205(d) Rate Filing: AEPTX-Pedernales Electric
Cooperative Interconnection Agr. 1st Amend/Restated to be effective 3/
13/2019.
Filed Date: 7/2/19.
Accession Number: 20190702-5000.
Comments Due: 5 p.m. ET 7/23/19.
Docket Numbers: ER19-2329-000.
Applicants: Midcontinent Independent System Operator, Inc., Ameren
Illinois Company.
Description: Sec. 205(d) Rate Filing: 2019-07-02_SA 2880 Att A-
Project Specifications No. 4 WVPA-EnerStar-West Union to be effective
6/3/2019.
Filed Date: 7/2/19.
Accession Number: 20190702-5044.
Comments Due: 5 p.m. ET 7/23/19.
Docket Numbers: ER19-2330-000.
Applicants: Arizona Public Service Company.
Description: Notice of Cancellation of Rate Schedule No. 218 of
Arizona Public Service Company.
Filed Date: 7/1/19.
Accession Number: 20190701-5386.
Comments Due: 5 p.m. ET 7/22/19.
Docket Numbers: ER19-2331-000.
Applicants: Entergy Nuclear Generation Company.
Description: Tariff Cancellation: Entergy Nuclear Generation
Company to be effective 6/10/2019.
Filed Date: 7/2/19.
Accession Number: 20190702-5097.
Comments Due: 5 p.m. ET 7/23/19.
Docket Numbers: ER19-2332-000.
Applicants: Southern California Edison Company.
Description: Sec. 205(d) Rate Filing: Letter Agreement with EC&R
Solar Development, LLC, Painter BESS to be effective 7/3/2019.
Filed Date: 7/2/19.
Accession Number: 20190702-5100.
Comments Due: 5 p.m. ET 7/23/19.
Docket Numbers: ER19-2333-000.
Applicants: Public Service Company of Colorado.
Description: Sec. 205(d) Rate Filing: PSCo Reserve Energy
Tariff_Eff. 9.3.19 to be effective 9/3/2019.
Filed Date: 7/2/19.
Accession Number: 20190702-5101.
Comments Due: 5 p.m. ET 7/23/19.
Docket Numbers: ER19-2334-000.
Applicants: Public Service Company of Colorado.
Description: Sec. 205(d) Rate Filing: OATT-PSCO Transition From
RMRG to NWPP to be effective 9/3/2019.
Filed Date: 7/2/19.
Accession Number: 20190702-5102.
Comments Due: 5 p.m. ET 7/23/19.
Docket Numbers: ER19-2335-000.
Applicants: Public Service Company of Colorado.
Description: Sec. 205(d) Rate Filing: PSC-TSGT-BkCoU-CSU-BAA-
SubentitiyRSA-538-0.0.0 to be effective 9/3/2019.
Filed Date: 7/2/19.
Accession Number: 20190702-5103.
Comments Due: 5 p.m. ET 7/23/19.
Docket Numbers: ER19-2336-000.
Applicants: Public Service Company of Colorado.
Description: Sec. 205(d) Rate Filing: PSC-WAPA-WACM-Subentity-
RsrvShrngSvcAgrmt-547-0.0.0 to be effective 9/3/2019.
Filed Date: 7/2/19.
Accession Number: 20190702-5104.
Comments Due: 5 p.m. ET 7/23/19.
Docket Numbers: ER19-2337-000.
Applicants: Public Service Company of Colorado.
Description: Sec. 205(d) Rate Filing: PSC-MEAN-NITS-246-0.0.0-
Filing to be effective 9/3/2019.
Filed Date: 7/2/19.
Accession Number: 20190702-5105.
Comments Due: 5 p.m. ET 7/23/19.
Docket Numbers: ER19-2338-000.
Applicants: PJM Interconnection, L.L.C.
Description: Sec. 205(d) Rate Filing: Original ISA, SA No. 5416;
Queue No. AC2-067/AC2-068 to be effective 6/4/2019.
Filed Date: 7/2/19.
Accession Number: 20190702-5144.
Comments Due: 5 p.m. ET 7/23/19.
Docket Numbers: ER19-2339-000.
Applicants: PacifiCorp.
Description: Sec. 205(d) Rate Filing: Cedar Springs Wind LGIA to
be effective 9/1/2019.
Filed Date: 7/2/19.
Accession Number: 20190702-5145.
Comments Due: 5 p.m. ET 7/23/19.
Docket Numbers: ER19-2340-000.
Applicants: Black Hills Power, Inc.
Description: Sec. 205(d) Rate Filing: Subentity Reserve Sharing
Agreement (BHP) to be effective 9/3/2019.
Filed Date: 7/2/19.
Accession Number: 20190702-5166.
Comments Due: 5 p.m. ET 7/23/19.
Docket Numbers: ER19-2341-000.
Applicants: AEP Texas Inc.
Description: Sec. 205(d) Rate Filing: AEPTX-Las Majadas Wind Farm
[[Page 32913]]
Interconnection Agreement First Amend & Restated to be effective 6/14/
2019.
Filed Date: 7/2/19.
Accession Number: 20190702-5168.
Comments Due: 5 p.m. ET 7/23/19.
The filings are accessible in the Commission's eLibrary system by
clicking on the links or querying the docket number.
Any person desiring to intervene or protest in any of the above
proceedings must file in accordance with Rules 211 and 214 of the
Commission's Regulations (18 CFR 385.211 and 385.214) on or before 5:00
p.m. Eastern time on the specified comment date. Protests may be
considered, but intervention is necessary to become a party to the
proceeding.
eFiling is encouraged. More detailed information relating to filing
requirements, interventions, protests, service, and qualifying
facilities filings can be found at: https://www.ferc.gov/docs-filing/efiling/filing-req.pdf. For other information, call (866) 208-3676
(toll free). For TTY, call (202) 502-8659.
Dated: July 2, 2019.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2019-14643 Filed 7-9-19; 8:45 am]
BILLING CODE 6717-01-P