Combined Notice of Filings #1, 32452-32454 [2019-14425]
Download as PDF
jbell on DSK3GLQ082PROD with NOTICES
32452
Federal Register / Vol. 84, No. 130 / Monday, July 8, 2019 / Notices
The draft EIS is also available in
electronic format. It may be viewed and
downloaded from the FERC’s website
(www.ferc.gov) on the Environmental
Documents page (https://www.ferc.gov/
industries/gas/enviro/eis.asp). In
addition, the draft EIS may be accessed
by using the eLibrary link on the FERC’s
website. Click on the eLibrary link
(https://www.ferc.gov/docs-filing/
elibrary.asp), then click on General
Search and enter the docket number in
the ‘‘Docket Number’’ field, excluding
the last three digits (i.e., CP17–178). Be
sure you have selected an appropriate
date range. For assistance, please
contact FERC Online Support at
FercOnlineSupport@ferc.gov or toll free
at (866) 208–3676, or for TTY, contact
(202) 502–8659.
Any person wishing to comment on
the draft EIS may do so. Your comments
should focus on the draft EIS’s
disclosure and discussion of potential
environmental effects, reasonable
alternatives, and measures to avoid or
lessen environmental impacts. To
ensure consideration of your comments
on the proposal in the final EIS, it is
important that the Commission receive
your comments on or before 5:00 p.m.
Eastern Time on October 3, 2019.
For your convenience, there are four
methods you can use to submit your
comments to the Commission. In all
instances, please reference the Project
docket number (CP17–178–000) with
your submission. The Commission
encourages electronic filing of
comments and has staff available to
assist you at (866) 208–3676 or
FercOnlineSupport@ferc.gov. Please
carefully follow these instructions so
that your comments are properly
recorded.
(1) You can file your comments
electronically using the eComment
feature on the Commission’s website
(www.ferc.gov) under the link to
Documents and Filings. This is an easy
method for submitting brief, text-only
comments on the Project.
(2) You can file your comments
electronically by using the eFiling
feature on the Commission’s website
(www.ferc.gov) under the link to
Documents and Filings. With eFiling,
you can provide comments in a variety
of formats by attaching them as a file
with your submission. New eFiling
users must first create an account by
clicking on ‘‘eRegister.’’ If you are filing
a comment on a particular project,
please select ‘‘Comment on a Filing’’ as
the filing type.
(3) You can file a paper copy of your
comments by mailing them to the
following address. Be sure to reference
the Project docket number (CP17–178–
VerDate Sep<11>2014
19:44 Jul 05, 2019
Jkt 247001
000) with your submission: Kimberly D.
Bose, Secretary, Federal Energy
Regulatory Commission, 888 First Street
NE, Room 1A, Washington, DC 20426.
(4) In lieu of sending written or
electronic comments, the Commission
invites you to attend one of the public
comment meetings held in the Project
area to receive comments on the draft
EIS. The dates, locations, and times of
these meetings, along with the BLM
public hearings, will be provided in a
supplemental notice.
Any person seeking to become a party
to the proceeding must file a motion to
intervene pursuant to Rule 214 of the
Commission’s Rules of Practice and
Procedure (18 Code of Federal
Regulations Part 385.214). Motions to
intervene are more fully described at
https://www.ferc.gov/resources/guides/
how-to/intervene.asp. Only intervenors
have the right to seek rehearing of the
Commission’s decision. The
Commission grants affected landowners
and others with environmental concerns
intervenor status upon showing good
cause by stating that they have a clear
and direct interest in this proceeding
that no other party can adequately
represent. Simply filing environmental
comments will not give you intervenor
status, but you do not need intervenor
status to have your comments
considered. Subsequent decisions,
determination, permits, and
authorization by the cooperating
agencies are subject to the
administrative procedures of each
respective agency.
Questions?
Additional information about the
Project is available from the
Commission’s Office of External Affairs,
at (866) 208–FERC, or on the FERC
website (www.ferc.gov) using the
eLibrary link. The eLibrary link also
provides access to the texts of formal
documents issued by the Commission,
such as orders, notices, and
rulemakings.
In addition, the Commission offers a
free service called eSubscription that
allows you to keep track of all formal
issuances and submittals in specific
dockets. This can reduce the amount of
time you spend researching proceedings
by automatically providing you with
notification of these filings, document
summaries, and direct links to the
documents. Go to www.ferc.gov/docsfiling/esubscription.asp.
Dated: June 28, 2019.
Kimberly D. Bose,
Secretary.
[FR Doc. 2019–14432 Filed 7–5–19; 8:45 am]
BILLING CODE 6717–01–P
PO 00000
Frm 00052
Fmt 4703
Sfmt 4703
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Combined Notice of Filings #1
Take notice that the Commission
received the following electric rate
filings:
Docket Numbers: ER10–1819–021;
ER10–1818–019; ER10–1817–019;
ER10–1820–024.
Applicants: Northern States Power
Company, a Minnesota corporation.
Description: Notice of Change in
Status of Northern States Power
Company, a Minnesota corporation, et
al.
Filed Date: 6/28/19.
Accession Number: 20190628–5206.
Comments Due: 5 p.m. ET 7/19/19.
Docket Numbers: ER10–3077–007;
ER10–3071–007; ER10–3074–007;
ER10–3075–007; ER10–3076–007;
ER14–1342–004; ER14–608–004; ER15–
876–004; ER16–1644–004; ER17–1214–
003; ER19–537–003.
Applicants: CalPeak Power LLC,
CalPeak Power—Border LLC, CalPeak
Power—Enterprise LLC, CalPeak
Power—Panoche LLC, CalPeak Power—
Vaca Dixon LLC, Midway Peaking, LLC,
Malaga Power, LLC, MRP San Joaquin
Energy, LLC, MRP Generation Holdings,
LLC, High Desert Power Project, LLC,
Coso Geothermal Power Holdings, LLC.
Description: Updated Market Power
Analysis for the Southwest Region of
CalPeak Power LLC, et al.
Filed Date: 6/28/19.
Accession Number: 20190628–5237.
Comments Due: 5 p.m. ET 8/27/19.
Docket Numbers: ER14–2939–007;
ER14–2465–010; ER14–2466–010;
ER15–2728–009; ER15–632–009; ER15–
634–009.
Applicants: Imperial Valley Solar
Company (IVSC) 2,LLC, CID Solar, LLC,
RE Camelot LLC, RE Columbia Two
LLC, Maricopa West Solar PV, LLC,
Cottonwood Solar LLC.
Description: Triennial Market Power
Analysis for the Southwest Region of
the Dominion Companies.
Filed Date: 6/28/19.
Accession Number: 20190628–5234.
Comments Due: 5 p.m. ET 8/27/19.
Docket Numbers: ER16–1255–014;
ER15–1579–015; ER15–1582–016;
ER15–1914–017; ER15–2679–013;
ER15–2680–013; ER15–760–016; ER15–
762–017; ER16–1609–007; ER16–1738–
011; ER16–1901–011; ER16–1955–011;
ER16–1956–011; ER16–1973–011;
ER16–2201–010; ER16–2224–010;
ER16–2541–010; ER16–2578–011;
ER16–468–011; ER16–474–012; ER16–
890–012; ER17–1864–009; ER17–1871–
E:\FR\FM\08JYN1.SGM
08JYN1
jbell on DSK3GLQ082PROD with NOTICES
Federal Register / Vol. 84, No. 130 / Monday, July 8, 2019 / Notices
009; ER17–1909–009; ER17–306–010;
ER17–544–010; ER18–1667–004; ER18–
2327–003; ER18–2492–005; ER19–846–
004; ER19–847–004.
Applicants: Antelope Big Sky Ranch
LLC, Antelope DSR 1, LLC, Antelope
DSR 2, LLC, Antelope DSR 3, LLC,
Antelope Expansion 2, LLC, Bayshore
Solar B, LLC, Bayshore Solar A, LLC,
Bayshore Solar C, LLC, Beacon Solar 1,
LLC, Beacon Solar 3, LLC, Beacon Solar
4, LLC, Central Antelope Dry Ranch C
LLC, Elevation Solar C LLC, FTS Master
Tenant 1, LLC, FTS Master Tenant 2,
LLC, ID Solar 1, LLC, Latigo Wind Park,
LLC, North Lancaster Ranch LLC,
Pioneer Wind Park I, LLC, Riverhead
Solar Farm, LLC, San Pablo Raceway,
LLC, Sandstone Solar LLC, Sierra Solar
Greenworks LLC, Solverde 1, LLC,
Summer Solar LLC, Western Antelope
Blue Sky Ranch A LLC, Western
Antelope Blue Sky Ranch B LLC,
Western Antelope Dry Ranch LLC,
65HK 8me LLC, 67RK 8me LLC, 87RL
8me LLC.
Description: Triennial Market Power
Update for the Northwest Region of
Antelope Big Sky Ranch LLC, et. al.
Filed Date: 6/28/19.
Accession Number: 20190628–5271.
Comments Due: 5 p.m. ET 8/27/19.
Docket Numbers: ER19–1166–000.
Applicants: ISO New England Inc.
Description: Response of ISO New
England Inc. to June 6, 2019 Request for
Additional Information Regarding
Results of FCA 13.
Filed Date: 6/28/19.
Accession Number: 20190628–5239.
Comments Due: 5 p.m. ET 7/19/19.
Docket Numbers: ER19–2290–000.
Applicants: Arizona Public Service
Company.
Description: § 205(d) Rate Filing: Rate
Schedule No. 293 Dry Lakes Pseudo-Tie
Agreement to be effective 8/28/2019.
Filed Date: 6/28/19.
Accession Number: 20190628–5198.
Comments Due: 5 p.m. ET 7/19/19.
Docket Numbers: ER19–2291–000.
Applicants: PJM Interconnection,
L.L.C.
Description: § 205(d) Rate Filing:
Amendment to WMPA, SA No. 5147;
Queue No. AD1–144 (amend) to be
effective 6/15/2018.
Filed Date: 6/28/19.
Accession Number: 20190628–5199.
Comments Due: 5 p.m. ET 7/19/19.
Docket Numbers: ER19–2292–000.
Applicants: New England Power Pool
Participants Committee.
Description: § 205(d) Rate Filing: Jul
2019 Membership Filing to be effective
6/1/2019.
Filed Date: 6/28/19.
Accession Number: 20190628–5200.
VerDate Sep<11>2014
19:44 Jul 05, 2019
Jkt 247001
Comments Due: 5 p.m. ET 7/19/19.
Docket Numbers: ER19–2293–000.
Applicants: Southwest Power Pool,
Inc.
Description: § 205(d) Rate Filing:
2041R9 Kansas City Board of Public
Utilities PTP Agreement to be effective
9/1/2019.
Filed Date: 6/28/19.
Accession Number: 20190628–5201.
Comments Due: 5 p.m. ET 7/19/19.
Docket Numbers: ER19–2294–000.
Applicants: Mesquite Power, LLC.
Description: Compliance filing:
Updated Market Power Analysis for the
SW Region & New eTariff Baseline to be
effective 6/29/2019.
Filed Date: 6/28/19.
Accession Number: 20190628–5202.
Comments Due: 5 p.m. ET 8/27/19.
Docket Numbers: ER19–2295–000.
Applicants: Midcontinent
Independent System Operator, Inc.,
Northern States Power Company, a
Minnesota corporation, Northern States
Power Company, a Wisconsin
corporation.
Description: § 205(d) Rate Filing:
2019–06–28_NSP Attachment O 30.9
East River Filing to be effective 7/1/
2019.
Filed Date: 6/28/19.
Accession Number: 20190628–5213.
Comments Due: 5 p.m. ET 7/19/19.
Docket Numbers: ER19–2296–000.
Applicants: Pio Pico Energy Center,
LLC.
Description: Market-Based Triennial
Review Filing: Updated Market Power
Analysis for the SW Region & Revised
MBR Tariff to be effective 6/29/2019.
Filed Date: 6/28/19.
Accession Number: 20190628–5215.
Comments Due: 5 p.m. ET 8/27/19.
Docket Numbers: ER19–2297–000.
Applicants: Sierra Pacific Power
Company.
Description: Tariff Cancellation:
Cancellation of Rate Schedule No. 66 to
be effective 8/28/2019.
Filed Date: 6/28/19.
Accession Number: 20190628–5228.
Comments Due: 5 p.m. ET 7/19/19.
Docket Numbers: ER19–2298–000.
Applicants: Sierra Pacific Power
Company.
Description: Tariff Cancellation:
Cancellation of Rate Schedule No. 71 to
be effective 8/28/2019.
Filed Date: 6/28/19.
Accession Number: 20190628–5230.
Comments Due: 5 p.m. ET 7/19/19.
Docket Numbers: ER19–2299–000.
Applicants: Southwest Power Pool,
Inc.
Description: § 205(d) Rate Filing:
Revisions to Reduce Number of
PO 00000
Frm 00053
Fmt 4703
Sfmt 4703
32453
Identical Transmission Service Requests
to be effective 8/28/2019.
Filed Date: 6/28/19.
Accession Number: 20190628–5232.
Comments Due: 5 p.m. ET 7/19/19.
Docket Numbers: ER19–2300–000.
Applicants: Georgia Power Company.
Description: § 205(d) Rate Filing: SR
Arlington II Affected System
Construction Agreement Filing to be
effective 5/28/2019.
Filed Date: 6/28/19.
Accession Number: 20190628–5233.
Comments Due: 5 p.m. ET 7/19/19.
Docket Numbers: ER19–2301–000.
Applicants: PJM Interconnection,
L.L.C.
Description: § 205(d) Rate Filing:
Revisions to the OA, Sch. 6, sec 1.5 re:
Market Efficiency Project Reevaluation
to be effective 8/28/2019.
Filed Date: 6/28/19.
Accession Number: 20190628–5236.
Comments Due: 5 p.m. ET 7/19/19.
Docket Numbers: ER19–2303–000.
Applicants: NSTAR Electric
Company.
Description: § 205(d) Rate Filing:
Second Supplement to Stony Brook—
Ludlow Agreement to be effective 7/1/
2019.
Filed Date: 6/28/19.
Accession Number: 20190628–5242.
Comments Due: 5 p.m. ET 7/19/19.
Docket Numbers: ER19–2304–000.
Applicants: Georgia Power Company.
Description: § 205(d) Rate Filing: SR
Terrell Affected System Construction
Agreement Filing to be effective 5/28/
2019.
Filed Date: 6/28/19.
Accession Number: 20190628–5243.
Comments Due: 5 p.m. ET 7/19/19.
Docket Numbers: ER19–2305–000.
Applicants: Valencia Power, LLC.
Description: Compliance filing:
Updated Market Power Analysis for the
SW Region & New eTariff Baseline to be
effective 6/29/2019.
Filed Date: 6/28/19.
Accession Number: 20190628–5246.
Comments Due: 5 p.m. ET 8/27/19.
Docket Numbers: ER19–2306–000.
Applicants: NorthWestern
Corporation.
Description: § 205(d) Rate Filing: SA
877—Firm Point-to-Point TSA with
Energy Keepers to be effective 9/1/2019.
Filed Date: 6/28/19.
Accession Number: 20190628–5261.
Comments Due: 5 p.m. ET 7/19/19.
Docket Numbers: ER19–2307–000.
Applicants: Macquarie Energy LLC.
Description: § 205(d) Rate Filing:
Request for Cat. 1 Seller Status in the
NW Region & Revised MBR Tariff to be
effective 6/29/2019.
E:\FR\FM\08JYN1.SGM
08JYN1
jbell on DSK3GLQ082PROD with NOTICES
32454
Federal Register / Vol. 84, No. 130 / Monday, July 8, 2019 / Notices
Filed Date: 6/28/19.
Accession Number: 20190628–5262.
Comments Due: 5 p.m. ET 7/19/19.
Docket Numbers: ER19–2308–000.
Applicants: Macquarie Energy
Trading LLC.
Description: § 205(d) Rate Filing:
Request for Cat. 1 Seller Status in the
NW Region & Revised MBR Tariff to be
effective 6/29/2019.
Filed Date: 6/28/19.
Accession Number: 20190628–5270.
Comments Due: 5 p.m. ET 7/19/19.
Docket Numbers: ER19–2309–000.
Applicants: Utah Red Hills Renewable
Park, LLC.
Description: § 205(d) Rate Filing:
Request for Cat. 1 Seller Status in the
NW Region & Revised MBR Tariff to be
effective 6/29/2019.
Filed Date: 6/28/19.
Accession Number: 20190628–5272.
Comments Due: 5 p.m. ET 7/19/19.
Docket Numbers: ER19–2310–000.
Applicants: Arizona Public Service
Company.
Description: § 205(d) Rate Filing:
Service Agreement No. 373, E&P
Agreement to be effective 5/31/2019.
Filed Date: 6/28/19.
Accession Number: 20190628–5284.
Comments Due: 5 p.m. ET 7/19/19.
Docket Numbers: ER19–2311–000.
Applicants: Consolidated Edison
Company of New York, Inc.
Description: § 205(d) Rate Filing:
PASNY Tariff Standby Revisions 6–
2019 to be effective 7/1/2019.
Filed Date: 7/1/19.
Accession Number: 20190701–5005.
Comments Due: 5 p.m. ET 7/22/19.
Docket Numbers: ER19–2312–000.
Applicants: ISO New England Inc.
Description: Filing of Permanent DeList Bids and Retirement De-List Bids
for 2023–24 Forward Capacity Auction
(FCA 14) of ISO New England, Inc.
Filed Date: 6/28/19.
Accession Number: 20190628–5287.
Comments Due: 5 p.m. ET 7/19/19.
Docket Numbers: ER19–2313–000.
Applicants: Pacific Gas and Electric
Company.
Description: Notice of Termination of
GSFA and GIA Service Agreement No.
58 of Pacific Gas and Electric Company.
Filed Date: 6/28/19.
Accession Number: 20190628–5292.
Comments Due: 5 p.m. ET 7/19/19.
Docket Numbers: ER19–2314–000.
Applicants: MidAmerican Central
California Transco, LLC.
Description: Application to Recover
Abandoned Plant Costs of MidAmerican
Central California Transco, LLC.
Filed Date: 6/28/19.
Accession Number: 20190628–5293.
VerDate Sep<11>2014
19:44 Jul 05, 2019
Jkt 247001
Comments Due: 5 p.m. ET 7/19/19.
The filings are accessible in the
Commission’s eLibrary system by
clicking on the links or querying the
docket number.
Any person desiring to intervene or
protest in any of the above proceedings
must file in accordance with Rules 211
and 214 of the Commission’s
Regulations (18 CFR 385.211 and
385.214) on or before 5:00 p.m. Eastern
time on the specified comment date.
Protests may be considered, but
intervention is necessary to become a
party to the proceeding.
eFiling is encouraged. More detailed
information relating to filing
requirements, interventions, protests,
service, and qualifying facilities filings
can be found at: https://www.ferc.gov/
docs-filing/efiling/filing-req.pdf. For
other information, call (866) 208–3676
(toll free). For TTY, call (202) 502–8659.
Dated: July 1, 2019.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2019–14425 Filed 7–5–19; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. CP19–481–000]
Notice of Request Under Blanket
Authorization; Transcontinental Gas
Pipe Line Company, LLC
Take notice that on June 21, 2019,
Transcontinental Gas Pipe Line
Company, LLC (Transco), Post Office
Box 1396, Houston, Texas 77251, filed
in Docket No. CP19–481–000 a prior
notice request pursuant to sections
157.205 and 157.216 of the
Commission’s regulations under the
Natural Gas Act (NGA) to abandon,
partially in place and partially by
removal, supply lateral pipelines
located in offshore federal waters near
Louisiana. Specifically, Transco
proposes to abandon an approximately
19.24-mile, 10-inch-diameter pipeline
extending subsea from Ship Shoal Block
169 to Ship Shoal Block 87, Platform B,
and an approximately 1.06-mile, 8-inchdiameter pipeline extending from Ship
Shoal Block 87, Platform B to Ship
Shoal Block 72 subsea tie-in (Supply
Laterals).
Transco states that the abandonment
of the Supply Laterals will have no
impact on the daily design capacity of,
or operating conditions on, Transco’s
pipeline system, nor will the
abandonment have any adverse impact
PO 00000
Frm 00054
Fmt 4703
Sfmt 4703
on Transco’s existing customers.
Additionally, Transco states that the
Supply Laterals have not provided
service to any customers during the
previous 12 months and are not covered
under a firm contract. Transco estimates
the total cost of the abandonment to be
approximately $2.4 million, all as more
fully set forth in the application which
is on file with the Commission and open
to public inspection. The filing may also
be viewed on the web at https://
www.ferc.gov using the ‘‘eLibrary’’ link.
Enter the docket number excluding the
last three digits in the docket number
field to access the document. For
assistance, please contact FERC Online
Support at FERCOnlineSupport@
ferc.gov or toll free at (866) 208–3676, or
TTY, contact (202) 502–8659.
Any questions concerning this
application may be directed to Charlotte
Hutson Director, Rates & Regulatory,
Transcontinental Gas Pipe Line
Company, LLC, Post Office Box 1396,
Houston, Texas 77251–1396, by
telephone at (713) 215–4060, or by
email at charlotte.a.hutson@
williams.com.
Any person or the Commission’s staff
may, within 60 days after issuance of
the instant notice by the Commission,
file pursuant to Rule 214 of the
Commission’s Procedural Rules (18 CFR
385.214) a motion to intervene or notice
of intervention and pursuant to section
157.205 of the regulations under the
NGA (18 CFR 157.205), a protest to the
request. If no protest is filed within the
time allowed therefore, the proposed
activity shall be deemed to be
authorized effective the day after the
time allowed for filing a protest. If a
protest is filed and not withdrawn
within 30 days after the allowed time
for filing a protest, the instant request
shall be treated as an application for
authorization pursuant to section 7 of
the NGA.
Pursuant to section 157.9 of the
Commission’s rules (18 CFR 157.9),
within 90 days of this Notice, the
Commission staff will either: Complete
its environmental assessment (EA) and
place it into the Commission’s public
record (eLibrary) for this proceeding; or
issue a Notice of Schedule for
Environmental Review. If a Notice of
Schedule for Environmental Review is
issued, it will indicate, among other
milestones, the anticipated date for the
Commission staff’s issuance of the EA
for this proposal. The filing of the EA
in the Commission’s public record for
this proceeding or the issuance of a
Notice of Schedule for Environmental
Review will serve to notify federal and
state agencies of the timing for the
completion of all necessary reviews, and
E:\FR\FM\08JYN1.SGM
08JYN1
Agencies
[Federal Register Volume 84, Number 130 (Monday, July 8, 2019)]
[Notices]
[Pages 32452-32454]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2019-14425]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
Combined Notice of Filings #1
Take notice that the Commission received the following electric
rate filings:
Docket Numbers: ER10-1819-021; ER10-1818-019; ER10-1817-019; ER10-
1820-024.
Applicants: Northern States Power Company, a Minnesota corporation.
Description: Notice of Change in Status of Northern States Power
Company, a Minnesota corporation, et al.
Filed Date: 6/28/19.
Accession Number: 20190628-5206.
Comments Due: 5 p.m. ET 7/19/19.
Docket Numbers: ER10-3077-007; ER10-3071-007; ER10-3074-007; ER10-
3075-007; ER10-3076-007; ER14-1342-004; ER14-608-004; ER15-876-004;
ER16-1644-004; ER17-1214-003; ER19-537-003.
Applicants: CalPeak Power LLC, CalPeak Power--Border LLC, CalPeak
Power--Enterprise LLC, CalPeak Power--Panoche LLC, CalPeak Power--Vaca
Dixon LLC, Midway Peaking, LLC, Malaga Power, LLC, MRP San Joaquin
Energy, LLC, MRP Generation Holdings, LLC, High Desert Power Project,
LLC, Coso Geothermal Power Holdings, LLC.
Description: Updated Market Power Analysis for the Southwest Region
of CalPeak Power LLC, et al.
Filed Date: 6/28/19.
Accession Number: 20190628-5237.
Comments Due: 5 p.m. ET 8/27/19.
Docket Numbers: ER14-2939-007; ER14-2465-010; ER14-2466-010; ER15-
2728-009; ER15-632-009; ER15-634-009.
Applicants: Imperial Valley Solar Company (IVSC) 2,LLC, CID Solar,
LLC, RE Camelot LLC, RE Columbia Two LLC, Maricopa West Solar PV, LLC,
Cottonwood Solar LLC.
Description: Triennial Market Power Analysis for the Southwest
Region of the Dominion Companies.
Filed Date: 6/28/19.
Accession Number: 20190628-5234.
Comments Due: 5 p.m. ET 8/27/19.
Docket Numbers: ER16-1255-014; ER15-1579-015; ER15-1582-016; ER15-
1914-017; ER15-2679-013; ER15-2680-013; ER15-760-016; ER15-762-017;
ER16-1609-007; ER16-1738-011; ER16-1901-011; ER16-1955-011; ER16-1956-
011; ER16-1973-011; ER16-2201-010; ER16-2224-010; ER16-2541-010; ER16-
2578-011; ER16-468-011; ER16-474-012; ER16-890-012; ER17-1864-009;
ER17-1871-
[[Page 32453]]
009; ER17-1909-009; ER17-306-010; ER17-544-010; ER18-1667-004; ER18-
2327-003; ER18-2492-005; ER19-846-004; ER19-847-004.
Applicants: Antelope Big Sky Ranch LLC, Antelope DSR 1, LLC,
Antelope DSR 2, LLC, Antelope DSR 3, LLC, Antelope Expansion 2, LLC,
Bayshore Solar B, LLC, Bayshore Solar A, LLC, Bayshore Solar C, LLC,
Beacon Solar 1, LLC, Beacon Solar 3, LLC, Beacon Solar 4, LLC, Central
Antelope Dry Ranch C LLC, Elevation Solar C LLC, FTS Master Tenant 1,
LLC, FTS Master Tenant 2, LLC, ID Solar 1, LLC, Latigo Wind Park, LLC,
North Lancaster Ranch LLC, Pioneer Wind Park I, LLC, Riverhead Solar
Farm, LLC, San Pablo Raceway, LLC, Sandstone Solar LLC, Sierra Solar
Greenworks LLC, Solverde 1, LLC, Summer Solar LLC, Western Antelope
Blue Sky Ranch A LLC, Western Antelope Blue Sky Ranch B LLC, Western
Antelope Dry Ranch LLC, 65HK 8me LLC, 67RK 8me LLC, 87RL 8me LLC.
Description: Triennial Market Power Update for the Northwest Region
of Antelope Big Sky Ranch LLC, et. al.
Filed Date: 6/28/19.
Accession Number: 20190628-5271.
Comments Due: 5 p.m. ET 8/27/19.
Docket Numbers: ER19-1166-000.
Applicants: ISO New England Inc.
Description: Response of ISO New England Inc. to June 6, 2019
Request for Additional Information Regarding Results of FCA 13.
Filed Date: 6/28/19.
Accession Number: 20190628-5239.
Comments Due: 5 p.m. ET 7/19/19.
Docket Numbers: ER19-2290-000.
Applicants: Arizona Public Service Company.
Description: Sec. 205(d) Rate Filing: Rate Schedule No. 293 Dry
Lakes Pseudo-Tie Agreement to be effective 8/28/2019.
Filed Date: 6/28/19.
Accession Number: 20190628-5198.
Comments Due: 5 p.m. ET 7/19/19.
Docket Numbers: ER19-2291-000.
Applicants: PJM Interconnection, L.L.C.
Description: Sec. 205(d) Rate Filing: Amendment to WMPA, SA No.
5147; Queue No. AD1-144 (amend) to be effective 6/15/2018.
Filed Date: 6/28/19.
Accession Number: 20190628-5199.
Comments Due: 5 p.m. ET 7/19/19.
Docket Numbers: ER19-2292-000.
Applicants: New England Power Pool Participants Committee.
Description: Sec. 205(d) Rate Filing: Jul 2019 Membership Filing
to be effective 6/1/2019.
Filed Date: 6/28/19.
Accession Number: 20190628-5200.
Comments Due: 5 p.m. ET 7/19/19.
Docket Numbers: ER19-2293-000.
Applicants: Southwest Power Pool, Inc.
Description: Sec. 205(d) Rate Filing: 2041R9 Kansas City Board of
Public Utilities PTP Agreement to be effective 9/1/2019.
Filed Date: 6/28/19.
Accession Number: 20190628-5201.
Comments Due: 5 p.m. ET 7/19/19.
Docket Numbers: ER19-2294-000.
Applicants: Mesquite Power, LLC.
Description: Compliance filing: Updated Market Power Analysis for
the SW Region & New eTariff Baseline to be effective 6/29/2019.
Filed Date: 6/28/19.
Accession Number: 20190628-5202.
Comments Due: 5 p.m. ET 8/27/19.
Docket Numbers: ER19-2295-000.
Applicants: Midcontinent Independent System Operator, Inc.,
Northern States Power Company, a Minnesota corporation, Northern States
Power Company, a Wisconsin corporation.
Description: Sec. 205(d) Rate Filing: 2019-06-28_NSP Attachment O
30.9 East River Filing to be effective 7/1/2019.
Filed Date: 6/28/19.
Accession Number: 20190628-5213.
Comments Due: 5 p.m. ET 7/19/19.
Docket Numbers: ER19-2296-000.
Applicants: Pio Pico Energy Center, LLC.
Description: Market-Based Triennial Review Filing: Updated Market
Power Analysis for the SW Region & Revised MBR Tariff to be effective
6/29/2019.
Filed Date: 6/28/19.
Accession Number: 20190628-5215.
Comments Due: 5 p.m. ET 8/27/19.
Docket Numbers: ER19-2297-000.
Applicants: Sierra Pacific Power Company.
Description: Tariff Cancellation: Cancellation of Rate Schedule No.
66 to be effective 8/28/2019.
Filed Date: 6/28/19.
Accession Number: 20190628-5228.
Comments Due: 5 p.m. ET 7/19/19.
Docket Numbers: ER19-2298-000.
Applicants: Sierra Pacific Power Company.
Description: Tariff Cancellation: Cancellation of Rate Schedule No.
71 to be effective 8/28/2019.
Filed Date: 6/28/19.
Accession Number: 20190628-5230.
Comments Due: 5 p.m. ET 7/19/19.
Docket Numbers: ER19-2299-000.
Applicants: Southwest Power Pool, Inc.
Description: Sec. 205(d) Rate Filing: Revisions to Reduce Number
of Identical Transmission Service Requests to be effective 8/28/2019.
Filed Date: 6/28/19.
Accession Number: 20190628-5232.
Comments Due: 5 p.m. ET 7/19/19.
Docket Numbers: ER19-2300-000.
Applicants: Georgia Power Company.
Description: Sec. 205(d) Rate Filing: SR Arlington II Affected
System Construction Agreement Filing to be effective 5/28/2019.
Filed Date: 6/28/19.
Accession Number: 20190628-5233.
Comments Due: 5 p.m. ET 7/19/19.
Docket Numbers: ER19-2301-000.
Applicants: PJM Interconnection, L.L.C.
Description: Sec. 205(d) Rate Filing: Revisions to the OA, Sch. 6,
sec 1.5 re: Market Efficiency Project Reevaluation to be effective 8/
28/2019.
Filed Date: 6/28/19.
Accession Number: 20190628-5236.
Comments Due: 5 p.m. ET 7/19/19.
Docket Numbers: ER19-2303-000.
Applicants: NSTAR Electric Company.
Description: Sec. 205(d) Rate Filing: Second Supplement to Stony
Brook--Ludlow Agreement to be effective 7/1/2019.
Filed Date: 6/28/19.
Accession Number: 20190628-5242.
Comments Due: 5 p.m. ET 7/19/19.
Docket Numbers: ER19-2304-000.
Applicants: Georgia Power Company.
Description: Sec. 205(d) Rate Filing: SR Terrell Affected System
Construction Agreement Filing to be effective 5/28/2019.
Filed Date: 6/28/19.
Accession Number: 20190628-5243.
Comments Due: 5 p.m. ET 7/19/19.
Docket Numbers: ER19-2305-000.
Applicants: Valencia Power, LLC.
Description: Compliance filing: Updated Market Power Analysis for
the SW Region & New eTariff Baseline to be effective 6/29/2019.
Filed Date: 6/28/19.
Accession Number: 20190628-5246.
Comments Due: 5 p.m. ET 8/27/19.
Docket Numbers: ER19-2306-000.
Applicants: NorthWestern Corporation.
Description: Sec. 205(d) Rate Filing: SA 877--Firm Point-to-Point
TSA with Energy Keepers to be effective 9/1/2019.
Filed Date: 6/28/19.
Accession Number: 20190628-5261.
Comments Due: 5 p.m. ET 7/19/19.
Docket Numbers: ER19-2307-000.
Applicants: Macquarie Energy LLC.
Description: Sec. 205(d) Rate Filing: Request for Cat. 1 Seller
Status in the NW Region & Revised MBR Tariff to be effective 6/29/2019.
[[Page 32454]]
Filed Date: 6/28/19.
Accession Number: 20190628-5262.
Comments Due: 5 p.m. ET 7/19/19.
Docket Numbers: ER19-2308-000.
Applicants: Macquarie Energy Trading LLC.
Description: Sec. 205(d) Rate Filing: Request for Cat. 1 Seller
Status in the NW Region & Revised MBR Tariff to be effective 6/29/2019.
Filed Date: 6/28/19.
Accession Number: 20190628-5270.
Comments Due: 5 p.m. ET 7/19/19.
Docket Numbers: ER19-2309-000.
Applicants: Utah Red Hills Renewable Park, LLC.
Description: Sec. 205(d) Rate Filing: Request for Cat. 1 Seller
Status in the NW Region & Revised MBR Tariff to be effective 6/29/2019.
Filed Date: 6/28/19.
Accession Number: 20190628-5272.
Comments Due: 5 p.m. ET 7/19/19.
Docket Numbers: ER19-2310-000.
Applicants: Arizona Public Service Company.
Description: Sec. 205(d) Rate Filing: Service Agreement No. 373,
E&P Agreement to be effective 5/31/2019.
Filed Date: 6/28/19.
Accession Number: 20190628-5284.
Comments Due: 5 p.m. ET 7/19/19.
Docket Numbers: ER19-2311-000.
Applicants: Consolidated Edison Company of New York, Inc.
Description: Sec. 205(d) Rate Filing: PASNY Tariff Standby
Revisions 6-2019 to be effective 7/1/2019.
Filed Date: 7/1/19.
Accession Number: 20190701-5005.
Comments Due: 5 p.m. ET 7/22/19.
Docket Numbers: ER19-2312-000.
Applicants: ISO New England Inc.
Description: Filing of Permanent De-List Bids and Retirement De-
List Bids for 2023-24 Forward Capacity Auction (FCA 14) of ISO New
England, Inc.
Filed Date: 6/28/19.
Accession Number: 20190628-5287.
Comments Due: 5 p.m. ET 7/19/19.
Docket Numbers: ER19-2313-000.
Applicants: Pacific Gas and Electric Company.
Description: Notice of Termination of GSFA and GIA Service
Agreement No. 58 of Pacific Gas and Electric Company.
Filed Date: 6/28/19.
Accession Number: 20190628-5292.
Comments Due: 5 p.m. ET 7/19/19.
Docket Numbers: ER19-2314-000.
Applicants: MidAmerican Central California Transco, LLC.
Description: Application to Recover Abandoned Plant Costs of
MidAmerican Central California Transco, LLC.
Filed Date: 6/28/19.
Accession Number: 20190628-5293.
Comments Due: 5 p.m. ET 7/19/19.
The filings are accessible in the Commission's eLibrary system by
clicking on the links or querying the docket number.
Any person desiring to intervene or protest in any of the above
proceedings must file in accordance with Rules 211 and 214 of the
Commission's Regulations (18 CFR 385.211 and 385.214) on or before 5:00
p.m. Eastern time on the specified comment date. Protests may be
considered, but intervention is necessary to become a party to the
proceeding.
eFiling is encouraged. More detailed information relating to filing
requirements, interventions, protests, service, and qualifying
facilities filings can be found at: https://www.ferc.gov/docs-filing/efiling/filing-req.pdf. For other information, call (866) 208-3676
(toll free). For TTY, call (202) 502-8659.
Dated: July 1, 2019.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2019-14425 Filed 7-5-19; 8:45 am]
BILLING CODE 6717-01-P