Historic Harrisville, Inc.; Notice of Application Accepted for Filing, Soliciting Comments, Motions To Intervene, Protests, 31584-31585 [2019-14083]
Download as PDF
khammond on DSKBBV9HB2PROD with NOTICES
31584
Federal Register / Vol. 84, No. 127 / Tuesday, July 2, 2019 / Notices
Description: Self-Certification of EWG
Status of Stanton Energy Reliability
Center, LLC.
Filed Date: 6/26/19.
Accession Number: 20190626–5039.
Comments Due: 5 p.m. ET 7/17/19.
Take notice that the Commission
received the following electric rate
filings:
Docket Numbers: ER10–3145–012;
ER19–1473–001; ER10–3116–012;
ER19–1179–001;ER13–1544–009; ER10–
3120–012;ER19–1474–001; ER19–1597–
001;ER11–2036–012; ER16–930–006;
ER10–3128–012;ER10–1800–013; ER10–
3136–012; ER11–2701–014; ER10–1728–
012; ER15–1582–015; ER15–1579–014;
ER15–1914–016; ER16–1255–013;
ER16–2201–009; ER16–1955–010;
ER19–846–003; ER18–1667–003; ER17–
1864–008; ER17–1871–008; ER17–1909–
008; ER17–544–009; ER17–306–009;
ER16–1738–010; ER16–474–011; ER16–
1901–010; ER16–468–010; ER18–2492–
004; ER16–1609–006; ER15–2679–012;
ER16–2578–010; ER16–2541–009;
ER18–2327–002; ER19–847–003; ER15–
2680–012; ER15–762–016; ER16–2224–
009; ER16–890–011; ER15–760–015;
ER16–1973–010; ER16–1956–010.
Applicants: AES Alamitos, LLC, AES
Alamitos Energy, LLC, AES Energy
Storage, LLC, AES ES Gilbert, LLC, AES
ES Tait, LLC, AES Huntington Beach,
L.L.C., AES Huntington Beach Energy,
LLC, AES Integrated Energy, LLC, AES
Laurel Mountain, LLC, AES Ohio
Generation, LLC, AES Redondo Beach,
L.L.C., Indianapolis Power & Light
Company, Mountain View Power
Partners, LLC, Mountain View Power
Partners IV, LLC, The Dayton Power and
Light Company, 65HK 8me LLC, 67RK
8me LLC, 87RL 8me LLC, Antelope Big
Sky Ranch LLC, Antelope DSR 1, LLC,
Antelope DSR 2, LLC, Antelope DSR 3,
LLC, Antelope Expansion 2, LLC,
Bayshore Solar A, LLC, Bayshore Solar
B, LLC, Bayshore Solar C, LLC, Beacon
Solar 1, LLC, Beacon Solar 3, LLC,
Beacon Solar 4, LLC, Central Antelope
Dry Ranch C LLC, FTS Master Tenant 1,
LLC, FTS Master Tenant 2, LLC, ID
Solar 1, LLC, Latigo Wind Park, LLC,
North Lancaster Ranch LLC, Pioneer
Wind Park I LLC, Riverhead Solar Farm,
LLC, San Pablo Raceway, LLC,
Sandstone Solar LLC, Sierra Solar
Greenworks LLC, Solverde 1, LLC,
Summer Solar LLC, Western Antelope
Blue Sky Ranch A LLC, Western
Antelope Blue Sky Ranch B LLC,
Elevation Solar C LLC, Western
Antelope Dry Ranch LLC.
Description: Triennial Market Power
Analysis of the AES MBR Affiliates for
the Southwest Region.
Filed Date: 6/25/19.
VerDate Sep<11>2014
17:00 Jul 01, 2019
Jkt 247001
Accession Number: 20190625–5214.
Comments Due: 5 p.m. ET 8/26/19.
Docket Numbers: ER11–2211–010;
ER11–2209–010; ER11–2210–010;
ER11–2207–010; ER11–2206–010;
ER13–1150–008; ER13–1151–008;
ER11–2855–024; ER18–814–001; ER11–
3727–016; ER12–1711–016; ER19–672–
001; ER11–2856–024; ER19–1061–001;
ER19–1062–001; ER19–843–001; ER19–
1063–001; ER19–844–001; ER11–2857–
024; ER10–2381–009.
Applicants: Alta Wind I, LLC, Alta
Wind II, LLC, Alta Wind III, LLC, Alta
Wind IV, LLC, Alta Wind V, LLC, Alta
Wind X, LLC, Alta Wind XI, LLC,
Avenal Park LLC, Carlsbad Energy
Center LLC, El Segundo Energy Center
LLC, High Plains Ranch II, LLC, Marsh
Landing LLC, Sand Drag LLC, Solar
Alpine LLC, Solar Avra Valley LLC,
Solar Blythe LLC, Solar Borrego I LLC,
Solar Roadrunner LLC, Sun City Project
LLC, Walnut Creek Energy, LLC.
Description: Updated Market Power
Analysis for the Southwest Region of
the Clearway Group Sellers.
Filed Date: 6/25/19.
Accession Number: 20190625–5106.
Comments Due: 5 p.m. ET 8/26/19.
Docket Numbers: ER18–2085–002
Applicants: Cambria CoGen
Company.
Description: Compliance filing:
Settlement Compliance Filing—Cambria
CoGen Reactive Supply Service to be
effective 9/1/2018.
Filed Date: 6/25/19.
Accession Number: 20190625–5097.
Comments Due: 5 p.m. ET 7/16/19.
Docket Numbers: ER19–2226–001.
Applicants: Public Service Company
of Colorado.
Description: Tariff Amendment: PSC–
CSU–A&R O&M-Jcksn Fllr-395-Amnd
Filing to be effective 6/22/2019.
Filed Date: 6/25/19.
Accession Number: 20190625–5107.
Comments Due: 5 p.m. ET 7/16/19.
Docket Numbers: ER19–2251–000.
Applicants: Tucson Electric Power
Company.
Description: § 205(d) Rate Filing: Rate
Schedule No. 325, Line Extension
Agreement to be effective 6/14/2019.
Filed Date: 6/26/19.
Accession Number: 20190626–5007.
Comments Due: 5 p.m. ET 7/17/19.
Docket Numbers: ER19–2252–000.
Applicants: Stanton Energy Reliability
Center, LLC.
Description: Baseline eTariff Filing:
MBR Tariff Authorization to be effective
8/25/2019.
Filed Date: 6/26/19.
Accession Number: 20190626–5013.
Comments Due: 5 p.m. ET 7/17/19.
The filings are accessible in the
Commission’s eLibrary system by
PO 00000
Frm 00024
Fmt 4703
Sfmt 4703
clicking on the links or querying the
docket number.
Any person desiring to intervene or
protest in any of the above proceedings
must file in accordance with Rules 211
and 214 of the Commission’s
Regulations (18 CFR 385.211 and
385.214) on or before 5:00 p.m. Eastern
time on the specified comment date.
Protests may be considered, but
intervention is necessary to become a
party to the proceeding.
eFiling is encouraged. More detailed
information relating to filing
requirements, interventions, protests,
service, and qualifying facilities filings
can be found at: https://www.ferc.gov/
docs-filing/efiling/filing-req.pdf. For
other information, call (866) 208–3676
(toll free). For TTY, call (202) 502–8659.
Dated: June 26, 2019.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2019–14091 Filed 7–1–19; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 14332–004]
Historic Harrisville, Inc.; Notice of
Application Accepted for Filing,
Soliciting Comments, Motions To
Intervene, Protests
Take notice that the following
hydroelectric application has been filed
with the Commission and is available
for public inspection:
a. Application Type: Amendment of
Exemption.
b. Project No.: P–14332–004.
c. Date Filed: May 7, 2018 and
supplemented on September 21, 2018
and May 6, 2019.
d. Applicant: Historic Harrisville, Inc.
(exemptee).
e. Name of Project: Cheshire Mills
Hydroelectric Project.
f. Location of Project: The project is
located on Nubanusit Brook in the town
of Harrisville, Cheshire County, New
Hampshire.
g. Filed Pursuant to: Federal Power
Act, 16 U.S.C. 791a–825r.
h. Applicant Contact: Erin
Hammerstedt, Executive Director,
Historic Harrisville, Inc., P.O. Box 79,
Harrisville, NH 03450, (603) 827–3722.
i. FERC Contact: Marybeth Gay;
telephone: (202) 502–6125; email
address: Marybeth.gay@ferc.gov.
j. Deadline for filing comments,
motions to interview, and protests is 30
days from the issuance date of this
E:\FR\FM\02JYN1.SGM
02JYN1
khammond on DSKBBV9HB2PROD with NOTICES
Federal Register / Vol. 84, No. 127 / Tuesday, July 2, 2019 / Notices
notice by the Commission. The
Commission strongly encourages
electronic filing. Please file motions to
intervene, protests, comments, and
recommendations, using the
Commission’s eFiling system at https://
www.ferc.gov/docs-filing/efiling.asp.
Commenters can submit brief comments
up to 6,000 characters, without prior
registration, using the eComment system
at https://www.ferc.gov/docs-filing/
ecomment.asp. You must include your
name and contact information at the end
of your comments. For assistance,
please contact FERC Online Support at
FERCOnlineSupport@ferc.gov, (866)
208–3676 (toll free), or (202) 502–8659
(TTY). In lieu of electronic filing, please
send a paper copy to: Secretary, Federal
Energy Regulatory Commission, 888
First Street NE, Washington, DC 20426.
The first page of any filing should
include docket number P–14332–004.
k. Description of Request: The
exemptee proposes to replace, rather
than refurbish, the existing turbine with
a horizontal Francis type turbine, and
install an induction type generator. To
accommodate the smaller turbine and
generator, the exemptee would reduce
the size of the penstock just outside of
the building, and reduce the size of the
opening in the floor. As the new,
smaller turbine-generator would operate
at a wider range of flows, the exemptee
proposes to change the minimum and
maximum hydraulic capacity of the
project to 3 cubic feet per second (cfs)
and 36 cfs, respectively. At flows less
than 5.6 cfs (the minimum operating
capacity of the project plus the
minimum flow), the project would not
operate and all flow would be released
over the spillway. At flows higher than
5.6 cfs, the project would operate and
2.6 cfs would be released over the
spillway. The new turbine and generator
would have a total installed capacity of
35 kilowatts. Replacement, as proposed,
would result in an average generation of
between 140,000 and 180,000 kilowatthours.
l. This notice is available for review
and reproduction at the Commission in
the Public Reference Room, Room 2A,
888 First Street NE, Washington, DC
20426. The filing may also be viewed on
the Commission’s website at https://
www.ferc.gov/docs-filing/elibrary.asp.
Enter the Docket number (P–14332–004)
excluding the last three digits in the
docket number field to access the
notice. You may also register online at
https://www.ferc.gov/docs-filing/
esubscription.asp to be notified via
email of new filings and issuances
related to this or other pending projects.
For assistance, call toll-free 1–866–208–
VerDate Sep<11>2014
17:00 Jul 01, 2019
Jkt 247001
3676 or email FERCOnlineSupport@
ferc.gov. For TTY, call (202) 502–8659.
m. Individuals desiring to be included
on the Commission’s mailing list should
so indicate by writing to the Secretary
of the Commission.
n. Comments, Protests, or Motions to
Intervene: Anyone may submit
comments, a protest, or a motion to
intervene in accordance with the
requirements of Rules of Practice and
Procedure, 18 CFR 385.210, .211, and
.214. In determining the appropriate
action to take, the Commission will
consider all protests or other comments
filed, but only those who file a motion
to intervene in accordance with the
Commission’s Rules may become a
party to the proceeding. Any comments,
protests, or motions to intervene must
be received on or before the specified
comment date for the particular
application.
o. Filing and Service of Responsive
Documents: Any filing must (1) bear in
all capital letters the title
‘‘COMMENTS’’, ‘‘PROTEST’’, or
‘‘MOTION TO INTERVENE’’ as
applicable; (2) set forth in the heading
the name of the applicant and the
project number of the application to
which the filing responds; (3) furnish
the name, address, and telephone
number of the person protesting or
intervening; and (4) otherwise comply
with the requirements of 18 CFR
385.2001 through 385.2005. All
comments, motions to intervene, or
protests must set forth their evidentiary
basis and otherwise comply with the
requirements of 18 CFR 4.34(b). All
comments, motions to intervene, or
protests should relate to the request to
upgrade the turbine generator units.
Agencies may obtain copies of the
application directly from the applicant.
A copy of any protest or motion to
intervene must be served upon each
representative of the applicant specified
in the particular application. If an
intervener files comments or documents
with the Commission relating to the
merits of an issue that may affect the
responsibilities of a particular resource
agency, they must also serve a copy of
the document on that resource agency.
A copy of all other filings in reference
to this application must be accompanied
by proof of service on all persons listed
in the service list prepared by the
Commission in this proceeding, in
accordance with 18 CFR 4.34(b) and
385.2010.
Dated: June 26, 2019.
Kimberly D. Bose,
Secretary.
[FR Doc. 2019–14083 Filed 7–1–19; 8:45 am]
BILLING CODE 6717–01–P
PO 00000
Frm 00025
Fmt 4703
Sfmt 4703
31585
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Combined Notice of Filings #2
Take notice that the Commission
received the following electric rate
filings:
Docket Numbers: ER19–2253–000.
Applicants: Midcontinent
Independent System Operator, Inc.
Description: § 205(d) Rate Filing:
2019–06–26_SA 3325 NSP–WMU T–T
(Priam) to be effective 6/1/2019.
Filed Date: 6/26/19.
Accession Number: 20190626–5095.
Comments Due: 5 p.m. ET 7/17/19.
Docket Numbers: ER19–2254–000.
Applicants: Southwest Power Pool,
Inc.
Description: § 205(d) Rate Filing:
2640R1 Sunflower Electric Power
Corporation NITSA NOA to be effective
6/1/2019.
Filed Date: 6/26/19.
Accession Number: 20190626–5102.
Comments Due: 5 p.m. ET 7/17/19.
Docket Numbers: ER19–2255–000.
Applicants: Brookfield Smoky
Mountain Hydropower LP.
Description: § 205(d) Rate Filing:
Notice of Succession to be effective 6/
1/2019.
Filed Date: 6/26/19.
Accession Number: 20190626–5104.
Comments Due: 5 p.m. ET 7/17/19.
Docket Numbers: ER19–2256–000.
Applicants: Midcontinent
Independent System Operator, Inc.
Description: § 205(d) Rate Filing:
2019–06–26_SA 3324 Chandler Solar
Project-ATC GIA (J849) to be effective 6/
12/2019.
Filed Date: 6/26/19.
Accession Number: 20190626–5106.
Comments Due: 5 p.m. ET 7/17/19.
Docket Numbers: ER19–2257–000.
Applicants: Southwest Power Pool,
Inc.
Description: § 205(d) Rate Filing:
2641R1 Sunflower Electric Power
Corporation NITSA NOA to be effective
6/1/2019.
Filed Date: 6/26/19.
Accession Number: 20190626–5141.
Comments Due: 5 p.m. ET 7/17/19.
Docket Numbers: ER19–2258–000.
Applicants: Duke Energy Carolinas,
LLC.
Description: § 205(d) Rate Filing: DEC
NCEMC NITSA (SA No. 210)
Amendment to be effective 7/1/2019.
Filed Date: 6/26/19.
Accession Number: 20190626–5159.
Comments Due: 5 p.m. ET 7/17/19.
Docket Numbers: ER19–2259–000.
E:\FR\FM\02JYN1.SGM
02JYN1
Agencies
[Federal Register Volume 84, Number 127 (Tuesday, July 2, 2019)]
[Notices]
[Pages 31584-31585]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2019-14083]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Project No. 14332-004]
Historic Harrisville, Inc.; Notice of Application Accepted for
Filing, Soliciting Comments, Motions To Intervene, Protests
Take notice that the following hydroelectric application has been
filed with the Commission and is available for public inspection:
a. Application Type: Amendment of Exemption.
b. Project No.: P-14332-004.
c. Date Filed: May 7, 2018 and supplemented on September 21, 2018
and May 6, 2019.
d. Applicant: Historic Harrisville, Inc. (exemptee).
e. Name of Project: Cheshire Mills Hydroelectric Project.
f. Location of Project: The project is located on Nubanusit Brook
in the town of Harrisville, Cheshire County, New Hampshire.
g. Filed Pursuant to: Federal Power Act, 16 U.S.C. 791a-825r.
h. Applicant Contact: Erin Hammerstedt, Executive Director,
Historic Harrisville, Inc., P.O. Box 79, Harrisville, NH 03450, (603)
827-3722.
i. FERC Contact: Marybeth Gay; telephone: (202) 502-6125; email
address: [email protected].
j. Deadline for filing comments, motions to interview, and protests
is 30 days from the issuance date of this
[[Page 31585]]
notice by the Commission. The Commission strongly encourages electronic
filing. Please file motions to intervene, protests, comments, and
recommendations, using the Commission's eFiling system at https://www.ferc.gov/docs-filing/efiling.asp. Commenters can submit brief
comments up to 6,000 characters, without prior registration, using the
eComment system at https://www.ferc.gov/docs-filing/ecomment.asp. You
must include your name and contact information at the end of your
comments. For assistance, please contact FERC Online Support at
[email protected], (866) 208-3676 (toll free), or (202) 502-
8659 (TTY). In lieu of electronic filing, please send a paper copy to:
Secretary, Federal Energy Regulatory Commission, 888 First Street NE,
Washington, DC 20426. The first page of any filing should include
docket number P-14332-004.
k. Description of Request: The exemptee proposes to replace, rather
than refurbish, the existing turbine with a horizontal Francis type
turbine, and install an induction type generator. To accommodate the
smaller turbine and generator, the exemptee would reduce the size of
the penstock just outside of the building, and reduce the size of the
opening in the floor. As the new, smaller turbine-generator would
operate at a wider range of flows, the exemptee proposes to change the
minimum and maximum hydraulic capacity of the project to 3 cubic feet
per second (cfs) and 36 cfs, respectively. At flows less than 5.6 cfs
(the minimum operating capacity of the project plus the minimum flow),
the project would not operate and all flow would be released over the
spillway. At flows higher than 5.6 cfs, the project would operate and
2.6 cfs would be released over the spillway. The new turbine and
generator would have a total installed capacity of 35 kilowatts.
Replacement, as proposed, would result in an average generation of
between 140,000 and 180,000 kilowatt-hours.
l. This notice is available for review and reproduction at the
Commission in the Public Reference Room, Room 2A, 888 First Street NE,
Washington, DC 20426. The filing may also be viewed on the Commission's
website at https://www.ferc.gov/docs-filing/elibrary.asp. Enter the
Docket number (P-14332-004) excluding the last three digits in the
docket number field to access the notice. You may also register online
at https://www.ferc.gov/docs-filing/esubscription.asp to be notified via
email of new filings and issuances related to this or other pending
projects. For assistance, call toll-free 1-866-208-3676 or email
[email protected]. For TTY, call (202) 502-8659.
m. Individuals desiring to be included on the Commission's mailing
list should so indicate by writing to the Secretary of the Commission.
n. Comments, Protests, or Motions to Intervene: Anyone may submit
comments, a protest, or a motion to intervene in accordance with the
requirements of Rules of Practice and Procedure, 18 CFR 385.210, .211,
and .214. In determining the appropriate action to take, the Commission
will consider all protests or other comments filed, but only those who
file a motion to intervene in accordance with the Commission's Rules
may become a party to the proceeding. Any comments, protests, or
motions to intervene must be received on or before the specified
comment date for the particular application.
o. Filing and Service of Responsive Documents: Any filing must (1)
bear in all capital letters the title ``COMMENTS'', ``PROTEST'', or
``MOTION TO INTERVENE'' as applicable; (2) set forth in the heading the
name of the applicant and the project number of the application to
which the filing responds; (3) furnish the name, address, and telephone
number of the person protesting or intervening; and (4) otherwise
comply with the requirements of 18 CFR 385.2001 through 385.2005. All
comments, motions to intervene, or protests must set forth their
evidentiary basis and otherwise comply with the requirements of 18 CFR
4.34(b). All comments, motions to intervene, or protests should relate
to the request to upgrade the turbine generator units. Agencies may
obtain copies of the application directly from the applicant. A copy of
any protest or motion to intervene must be served upon each
representative of the applicant specified in the particular
application. If an intervener files comments or documents with the
Commission relating to the merits of an issue that may affect the
responsibilities of a particular resource agency, they must also serve
a copy of the document on that resource agency. A copy of all other
filings in reference to this application must be accompanied by proof
of service on all persons listed in the service list prepared by the
Commission in this proceeding, in accordance with 18 CFR 4.34(b) and
385.2010.
Dated: June 26, 2019.
Kimberly D. Bose,
Secretary.
[FR Doc. 2019-14083 Filed 7-1-19; 8:45 am]
BILLING CODE 6717-01-P