Historic Harrisville, Inc.; Notice of Application Accepted for Filing, Soliciting Comments, Motions To Intervene, Protests, 31584-31585 [2019-14083]

Download as PDF khammond on DSKBBV9HB2PROD with NOTICES 31584 Federal Register / Vol. 84, No. 127 / Tuesday, July 2, 2019 / Notices Description: Self-Certification of EWG Status of Stanton Energy Reliability Center, LLC. Filed Date: 6/26/19. Accession Number: 20190626–5039. Comments Due: 5 p.m. ET 7/17/19. Take notice that the Commission received the following electric rate filings: Docket Numbers: ER10–3145–012; ER19–1473–001; ER10–3116–012; ER19–1179–001;ER13–1544–009; ER10– 3120–012;ER19–1474–001; ER19–1597– 001;ER11–2036–012; ER16–930–006; ER10–3128–012;ER10–1800–013; ER10– 3136–012; ER11–2701–014; ER10–1728– 012; ER15–1582–015; ER15–1579–014; ER15–1914–016; ER16–1255–013; ER16–2201–009; ER16–1955–010; ER19–846–003; ER18–1667–003; ER17– 1864–008; ER17–1871–008; ER17–1909– 008; ER17–544–009; ER17–306–009; ER16–1738–010; ER16–474–011; ER16– 1901–010; ER16–468–010; ER18–2492– 004; ER16–1609–006; ER15–2679–012; ER16–2578–010; ER16–2541–009; ER18–2327–002; ER19–847–003; ER15– 2680–012; ER15–762–016; ER16–2224– 009; ER16–890–011; ER15–760–015; ER16–1973–010; ER16–1956–010. Applicants: AES Alamitos, LLC, AES Alamitos Energy, LLC, AES Energy Storage, LLC, AES ES Gilbert, LLC, AES ES Tait, LLC, AES Huntington Beach, L.L.C., AES Huntington Beach Energy, LLC, AES Integrated Energy, LLC, AES Laurel Mountain, LLC, AES Ohio Generation, LLC, AES Redondo Beach, L.L.C., Indianapolis Power & Light Company, Mountain View Power Partners, LLC, Mountain View Power Partners IV, LLC, The Dayton Power and Light Company, 65HK 8me LLC, 67RK 8me LLC, 87RL 8me LLC, Antelope Big Sky Ranch LLC, Antelope DSR 1, LLC, Antelope DSR 2, LLC, Antelope DSR 3, LLC, Antelope Expansion 2, LLC, Bayshore Solar A, LLC, Bayshore Solar B, LLC, Bayshore Solar C, LLC, Beacon Solar 1, LLC, Beacon Solar 3, LLC, Beacon Solar 4, LLC, Central Antelope Dry Ranch C LLC, FTS Master Tenant 1, LLC, FTS Master Tenant 2, LLC, ID Solar 1, LLC, Latigo Wind Park, LLC, North Lancaster Ranch LLC, Pioneer Wind Park I LLC, Riverhead Solar Farm, LLC, San Pablo Raceway, LLC, Sandstone Solar LLC, Sierra Solar Greenworks LLC, Solverde 1, LLC, Summer Solar LLC, Western Antelope Blue Sky Ranch A LLC, Western Antelope Blue Sky Ranch B LLC, Elevation Solar C LLC, Western Antelope Dry Ranch LLC. Description: Triennial Market Power Analysis of the AES MBR Affiliates for the Southwest Region. Filed Date: 6/25/19. VerDate Sep<11>2014 17:00 Jul 01, 2019 Jkt 247001 Accession Number: 20190625–5214. Comments Due: 5 p.m. ET 8/26/19. Docket Numbers: ER11–2211–010; ER11–2209–010; ER11–2210–010; ER11–2207–010; ER11–2206–010; ER13–1150–008; ER13–1151–008; ER11–2855–024; ER18–814–001; ER11– 3727–016; ER12–1711–016; ER19–672– 001; ER11–2856–024; ER19–1061–001; ER19–1062–001; ER19–843–001; ER19– 1063–001; ER19–844–001; ER11–2857– 024; ER10–2381–009. Applicants: Alta Wind I, LLC, Alta Wind II, LLC, Alta Wind III, LLC, Alta Wind IV, LLC, Alta Wind V, LLC, Alta Wind X, LLC, Alta Wind XI, LLC, Avenal Park LLC, Carlsbad Energy Center LLC, El Segundo Energy Center LLC, High Plains Ranch II, LLC, Marsh Landing LLC, Sand Drag LLC, Solar Alpine LLC, Solar Avra Valley LLC, Solar Blythe LLC, Solar Borrego I LLC, Solar Roadrunner LLC, Sun City Project LLC, Walnut Creek Energy, LLC. Description: Updated Market Power Analysis for the Southwest Region of the Clearway Group Sellers. Filed Date: 6/25/19. Accession Number: 20190625–5106. Comments Due: 5 p.m. ET 8/26/19. Docket Numbers: ER18–2085–002 Applicants: Cambria CoGen Company. Description: Compliance filing: Settlement Compliance Filing—Cambria CoGen Reactive Supply Service to be effective 9/1/2018. Filed Date: 6/25/19. Accession Number: 20190625–5097. Comments Due: 5 p.m. ET 7/16/19. Docket Numbers: ER19–2226–001. Applicants: Public Service Company of Colorado. Description: Tariff Amendment: PSC– CSU–A&R O&M-Jcksn Fllr-395-Amnd Filing to be effective 6/22/2019. Filed Date: 6/25/19. Accession Number: 20190625–5107. Comments Due: 5 p.m. ET 7/16/19. Docket Numbers: ER19–2251–000. Applicants: Tucson Electric Power Company. Description: § 205(d) Rate Filing: Rate Schedule No. 325, Line Extension Agreement to be effective 6/14/2019. Filed Date: 6/26/19. Accession Number: 20190626–5007. Comments Due: 5 p.m. ET 7/17/19. Docket Numbers: ER19–2252–000. Applicants: Stanton Energy Reliability Center, LLC. Description: Baseline eTariff Filing: MBR Tariff Authorization to be effective 8/25/2019. Filed Date: 6/26/19. Accession Number: 20190626–5013. Comments Due: 5 p.m. ET 7/17/19. The filings are accessible in the Commission’s eLibrary system by PO 00000 Frm 00024 Fmt 4703 Sfmt 4703 clicking on the links or querying the docket number. Any person desiring to intervene or protest in any of the above proceedings must file in accordance with Rules 211 and 214 of the Commission’s Regulations (18 CFR 385.211 and 385.214) on or before 5:00 p.m. Eastern time on the specified comment date. Protests may be considered, but intervention is necessary to become a party to the proceeding. eFiling is encouraged. More detailed information relating to filing requirements, interventions, protests, service, and qualifying facilities filings can be found at: https://www.ferc.gov/ docs-filing/efiling/filing-req.pdf. For other information, call (866) 208–3676 (toll free). For TTY, call (202) 502–8659. Dated: June 26, 2019. Nathaniel J. Davis, Sr., Deputy Secretary. [FR Doc. 2019–14091 Filed 7–1–19; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 14332–004] Historic Harrisville, Inc.; Notice of Application Accepted for Filing, Soliciting Comments, Motions To Intervene, Protests Take notice that the following hydroelectric application has been filed with the Commission and is available for public inspection: a. Application Type: Amendment of Exemption. b. Project No.: P–14332–004. c. Date Filed: May 7, 2018 and supplemented on September 21, 2018 and May 6, 2019. d. Applicant: Historic Harrisville, Inc. (exemptee). e. Name of Project: Cheshire Mills Hydroelectric Project. f. Location of Project: The project is located on Nubanusit Brook in the town of Harrisville, Cheshire County, New Hampshire. g. Filed Pursuant to: Federal Power Act, 16 U.S.C. 791a–825r. h. Applicant Contact: Erin Hammerstedt, Executive Director, Historic Harrisville, Inc., P.O. Box 79, Harrisville, NH 03450, (603) 827–3722. i. FERC Contact: Marybeth Gay; telephone: (202) 502–6125; email address: Marybeth.gay@ferc.gov. j. Deadline for filing comments, motions to interview, and protests is 30 days from the issuance date of this E:\FR\FM\02JYN1.SGM 02JYN1 khammond on DSKBBV9HB2PROD with NOTICES Federal Register / Vol. 84, No. 127 / Tuesday, July 2, 2019 / Notices notice by the Commission. The Commission strongly encourages electronic filing. Please file motions to intervene, protests, comments, and recommendations, using the Commission’s eFiling system at https:// www.ferc.gov/docs-filing/efiling.asp. Commenters can submit brief comments up to 6,000 characters, without prior registration, using the eComment system at https://www.ferc.gov/docs-filing/ ecomment.asp. You must include your name and contact information at the end of your comments. For assistance, please contact FERC Online Support at FERCOnlineSupport@ferc.gov, (866) 208–3676 (toll free), or (202) 502–8659 (TTY). In lieu of electronic filing, please send a paper copy to: Secretary, Federal Energy Regulatory Commission, 888 First Street NE, Washington, DC 20426. The first page of any filing should include docket number P–14332–004. k. Description of Request: The exemptee proposes to replace, rather than refurbish, the existing turbine with a horizontal Francis type turbine, and install an induction type generator. To accommodate the smaller turbine and generator, the exemptee would reduce the size of the penstock just outside of the building, and reduce the size of the opening in the floor. As the new, smaller turbine-generator would operate at a wider range of flows, the exemptee proposes to change the minimum and maximum hydraulic capacity of the project to 3 cubic feet per second (cfs) and 36 cfs, respectively. At flows less than 5.6 cfs (the minimum operating capacity of the project plus the minimum flow), the project would not operate and all flow would be released over the spillway. At flows higher than 5.6 cfs, the project would operate and 2.6 cfs would be released over the spillway. The new turbine and generator would have a total installed capacity of 35 kilowatts. Replacement, as proposed, would result in an average generation of between 140,000 and 180,000 kilowatthours. l. This notice is available for review and reproduction at the Commission in the Public Reference Room, Room 2A, 888 First Street NE, Washington, DC 20426. The filing may also be viewed on the Commission’s website at https:// www.ferc.gov/docs-filing/elibrary.asp. Enter the Docket number (P–14332–004) excluding the last three digits in the docket number field to access the notice. You may also register online at https://www.ferc.gov/docs-filing/ esubscription.asp to be notified via email of new filings and issuances related to this or other pending projects. For assistance, call toll-free 1–866–208– VerDate Sep<11>2014 17:00 Jul 01, 2019 Jkt 247001 3676 or email FERCOnlineSupport@ ferc.gov. For TTY, call (202) 502–8659. m. Individuals desiring to be included on the Commission’s mailing list should so indicate by writing to the Secretary of the Commission. n. Comments, Protests, or Motions to Intervene: Anyone may submit comments, a protest, or a motion to intervene in accordance with the requirements of Rules of Practice and Procedure, 18 CFR 385.210, .211, and .214. In determining the appropriate action to take, the Commission will consider all protests or other comments filed, but only those who file a motion to intervene in accordance with the Commission’s Rules may become a party to the proceeding. Any comments, protests, or motions to intervene must be received on or before the specified comment date for the particular application. o. Filing and Service of Responsive Documents: Any filing must (1) bear in all capital letters the title ‘‘COMMENTS’’, ‘‘PROTEST’’, or ‘‘MOTION TO INTERVENE’’ as applicable; (2) set forth in the heading the name of the applicant and the project number of the application to which the filing responds; (3) furnish the name, address, and telephone number of the person protesting or intervening; and (4) otherwise comply with the requirements of 18 CFR 385.2001 through 385.2005. All comments, motions to intervene, or protests must set forth their evidentiary basis and otherwise comply with the requirements of 18 CFR 4.34(b). All comments, motions to intervene, or protests should relate to the request to upgrade the turbine generator units. Agencies may obtain copies of the application directly from the applicant. A copy of any protest or motion to intervene must be served upon each representative of the applicant specified in the particular application. If an intervener files comments or documents with the Commission relating to the merits of an issue that may affect the responsibilities of a particular resource agency, they must also serve a copy of the document on that resource agency. A copy of all other filings in reference to this application must be accompanied by proof of service on all persons listed in the service list prepared by the Commission in this proceeding, in accordance with 18 CFR 4.34(b) and 385.2010. Dated: June 26, 2019. Kimberly D. Bose, Secretary. [FR Doc. 2019–14083 Filed 7–1–19; 8:45 am] BILLING CODE 6717–01–P PO 00000 Frm 00025 Fmt 4703 Sfmt 4703 31585 DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Combined Notice of Filings #2 Take notice that the Commission received the following electric rate filings: Docket Numbers: ER19–2253–000. Applicants: Midcontinent Independent System Operator, Inc. Description: § 205(d) Rate Filing: 2019–06–26_SA 3325 NSP–WMU T–T (Priam) to be effective 6/1/2019. Filed Date: 6/26/19. Accession Number: 20190626–5095. Comments Due: 5 p.m. ET 7/17/19. Docket Numbers: ER19–2254–000. Applicants: Southwest Power Pool, Inc. Description: § 205(d) Rate Filing: 2640R1 Sunflower Electric Power Corporation NITSA NOA to be effective 6/1/2019. Filed Date: 6/26/19. Accession Number: 20190626–5102. Comments Due: 5 p.m. ET 7/17/19. Docket Numbers: ER19–2255–000. Applicants: Brookfield Smoky Mountain Hydropower LP. Description: § 205(d) Rate Filing: Notice of Succession to be effective 6/ 1/2019. Filed Date: 6/26/19. Accession Number: 20190626–5104. Comments Due: 5 p.m. ET 7/17/19. Docket Numbers: ER19–2256–000. Applicants: Midcontinent Independent System Operator, Inc. Description: § 205(d) Rate Filing: 2019–06–26_SA 3324 Chandler Solar Project-ATC GIA (J849) to be effective 6/ 12/2019. Filed Date: 6/26/19. Accession Number: 20190626–5106. Comments Due: 5 p.m. ET 7/17/19. Docket Numbers: ER19–2257–000. Applicants: Southwest Power Pool, Inc. Description: § 205(d) Rate Filing: 2641R1 Sunflower Electric Power Corporation NITSA NOA to be effective 6/1/2019. Filed Date: 6/26/19. Accession Number: 20190626–5141. Comments Due: 5 p.m. ET 7/17/19. Docket Numbers: ER19–2258–000. Applicants: Duke Energy Carolinas, LLC. Description: § 205(d) Rate Filing: DEC NCEMC NITSA (SA No. 210) Amendment to be effective 7/1/2019. Filed Date: 6/26/19. Accession Number: 20190626–5159. Comments Due: 5 p.m. ET 7/17/19. Docket Numbers: ER19–2259–000. E:\FR\FM\02JYN1.SGM 02JYN1

Agencies

[Federal Register Volume 84, Number 127 (Tuesday, July 2, 2019)]
[Notices]
[Pages 31584-31585]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2019-14083]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Project No. 14332-004]


Historic Harrisville, Inc.; Notice of Application Accepted for 
Filing, Soliciting Comments, Motions To Intervene, Protests

    Take notice that the following hydroelectric application has been 
filed with the Commission and is available for public inspection:
    a. Application Type: Amendment of Exemption.
    b. Project No.: P-14332-004.
    c. Date Filed: May 7, 2018 and supplemented on September 21, 2018 
and May 6, 2019.
    d. Applicant: Historic Harrisville, Inc. (exemptee).
    e. Name of Project: Cheshire Mills Hydroelectric Project.
    f. Location of Project: The project is located on Nubanusit Brook 
in the town of Harrisville, Cheshire County, New Hampshire.
    g. Filed Pursuant to: Federal Power Act, 16 U.S.C. 791a-825r.
    h. Applicant Contact: Erin Hammerstedt, Executive Director, 
Historic Harrisville, Inc., P.O. Box 79, Harrisville, NH 03450, (603) 
827-3722.
    i. FERC Contact: Marybeth Gay; telephone: (202) 502-6125; email 
address: [email protected].
    j. Deadline for filing comments, motions to interview, and protests 
is 30 days from the issuance date of this

[[Page 31585]]

notice by the Commission. The Commission strongly encourages electronic 
filing. Please file motions to intervene, protests, comments, and 
recommendations, using the Commission's eFiling system at https://www.ferc.gov/docs-filing/efiling.asp. Commenters can submit brief 
comments up to 6,000 characters, without prior registration, using the 
eComment system at https://www.ferc.gov/docs-filing/ecomment.asp. You 
must include your name and contact information at the end of your 
comments. For assistance, please contact FERC Online Support at 
[email protected], (866) 208-3676 (toll free), or (202) 502-
8659 (TTY). In lieu of electronic filing, please send a paper copy to: 
Secretary, Federal Energy Regulatory Commission, 888 First Street NE, 
Washington, DC 20426. The first page of any filing should include 
docket number P-14332-004.
    k. Description of Request: The exemptee proposes to replace, rather 
than refurbish, the existing turbine with a horizontal Francis type 
turbine, and install an induction type generator. To accommodate the 
smaller turbine and generator, the exemptee would reduce the size of 
the penstock just outside of the building, and reduce the size of the 
opening in the floor. As the new, smaller turbine-generator would 
operate at a wider range of flows, the exemptee proposes to change the 
minimum and maximum hydraulic capacity of the project to 3 cubic feet 
per second (cfs) and 36 cfs, respectively. At flows less than 5.6 cfs 
(the minimum operating capacity of the project plus the minimum flow), 
the project would not operate and all flow would be released over the 
spillway. At flows higher than 5.6 cfs, the project would operate and 
2.6 cfs would be released over the spillway. The new turbine and 
generator would have a total installed capacity of 35 kilowatts. 
Replacement, as proposed, would result in an average generation of 
between 140,000 and 180,000 kilowatt-hours.
    l. This notice is available for review and reproduction at the 
Commission in the Public Reference Room, Room 2A, 888 First Street NE, 
Washington, DC 20426. The filing may also be viewed on the Commission's 
website at https://www.ferc.gov/docs-filing/elibrary.asp. Enter the 
Docket number (P-14332-004) excluding the last three digits in the 
docket number field to access the notice. You may also register online 
at https://www.ferc.gov/docs-filing/esubscription.asp to be notified via 
email of new filings and issuances related to this or other pending 
projects. For assistance, call toll-free 1-866-208-3676 or email 
[email protected]. For TTY, call (202) 502-8659.
    m. Individuals desiring to be included on the Commission's mailing 
list should so indicate by writing to the Secretary of the Commission.
    n. Comments, Protests, or Motions to Intervene: Anyone may submit 
comments, a protest, or a motion to intervene in accordance with the 
requirements of Rules of Practice and Procedure, 18 CFR 385.210, .211, 
and .214. In determining the appropriate action to take, the Commission 
will consider all protests or other comments filed, but only those who 
file a motion to intervene in accordance with the Commission's Rules 
may become a party to the proceeding. Any comments, protests, or 
motions to intervene must be received on or before the specified 
comment date for the particular application.
    o. Filing and Service of Responsive Documents: Any filing must (1) 
bear in all capital letters the title ``COMMENTS'', ``PROTEST'', or 
``MOTION TO INTERVENE'' as applicable; (2) set forth in the heading the 
name of the applicant and the project number of the application to 
which the filing responds; (3) furnish the name, address, and telephone 
number of the person protesting or intervening; and (4) otherwise 
comply with the requirements of 18 CFR 385.2001 through 385.2005. All 
comments, motions to intervene, or protests must set forth their 
evidentiary basis and otherwise comply with the requirements of 18 CFR 
4.34(b). All comments, motions to intervene, or protests should relate 
to the request to upgrade the turbine generator units. Agencies may 
obtain copies of the application directly from the applicant. A copy of 
any protest or motion to intervene must be served upon each 
representative of the applicant specified in the particular 
application. If an intervener files comments or documents with the 
Commission relating to the merits of an issue that may affect the 
responsibilities of a particular resource agency, they must also serve 
a copy of the document on that resource agency. A copy of all other 
filings in reference to this application must be accompanied by proof 
of service on all persons listed in the service list prepared by the 
Commission in this proceeding, in accordance with 18 CFR 4.34(b) and 
385.2010.

    Dated: June 26, 2019.
Kimberly D. Bose,
Secretary.
[FR Doc. 2019-14083 Filed 7-1-19; 8:45 am]
 BILLING CODE 6717-01-P


This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.