Consolidated Hydro New York, LLC; Notice of Intent To File License Application, Filing of Pre-Application Document, and Approving Use of the Traditional Licensing Process, 31586-31587 [2019-14082]

Download as PDF khammond on DSKBBV9HB2PROD with NOTICES 31586 Federal Register / Vol. 84, No. 127 / Tuesday, July 2, 2019 / Notices Applicants: Turquoise Nevada LLC. Description: Baseline eTariff Filing: Turquoise Nevada FERC MBR Application to be effective 6/27/2019. Filed Date: 6/26/19. Accession Number: 20190626–5164. Comments Due: 5 p.m. ET 7/17/19. Docket Numbers: ER19–2260–000. Applicants: Valentine Solar, LLC. Description: Market-Based Triennial Review Filing: 2019 Triennial Market Power Update for the Southwest Region—Valentine Solar to be effective 8/26/2019. Filed Date: 6/26/19. Accession Number: 20190626–5166. Comments Due: 5 p.m. ET 8/26/19. Docket Numbers: ER19–2261–000. Applicants: RE Mustang LLC. Description: § 205(d) Rate Filing: Request for Cat. 1 Seller Status in the SW Region & Revised MBR Tariff to be effective 6/27/2019. Filed Date: 6/26/19. Accession Number: 20190626–5172. Comments Due: 5 p.m. ET 7/17/19. Docket Numbers: ER19–2262–000. Applicants: RE Mustang 3 LLC. Description: § 205(d) Rate Filing: Request for Cat. 1 Seller Status in the SW Region & Revised MBR Tariff to be effective 6/27/2019. Filed Date: 6/26/19. Accession Number: 20190626–5174. Comments Due: 5 p.m. ET 7/17/19. Docket Numbers: ER19–2263–000. Applicants: RE Mustang 4 LLC. Description: § 205(d) Rate Filing: Request for Cat. 1 Seller Status in the SW Region & Revised MBR Tariff to be effective 6/27/2019. Filed Date: 6/26/19. Accession Number: 20190626–5178. Comments Due: 5 p.m. ET 7/17/19. Docket Numbers: ER19–2264–000. Applicants: Northern Indiana Public Service Company. Description: § 205(d) Rate Filing: Filing of an Amended CIAC Agreement to be effective 6/27/2019. Filed Date: 6/26/19. Accession Number: 20190626–5179. Comments Due: 5 p.m. ET 7/17/19. Docket Numbers: ER19–2265–000. Applicants: TransCanada Energy Sales Ltd. Description: § 205(d) Rate Filing: TransCanada Energy Sales—Revised Electric MBR Tariff to be effective 6/27/ 2019. Filed Date: 6/26/19. Accession Number: 20190626–5185. Comments Due: 5 p.m. ET 7/17/19. Docket Numbers: ER19–2266–000. Applicants: Quitman Solar, LLC. Description: Baseline eTariff Filing: Quitman Solar, LLC Application for VerDate Sep<11>2014 17:00 Jul 01, 2019 Jkt 247001 Market-Based Rate Authority to be effective 8/26/2019. Filed Date: 6/26/19. Accession Number: 20190626–5186. Comments Due: 5 p.m. ET 7/17/19. Docket Numbers: ER19–2267–000. Applicants: TransCanada Power Marketing Ltd. Description: § 205(d) Rate Filing: TransCanada Power Marketing Revised Electric Tariff to be effective 6/27/2019. Filed Date: 6/26/19. Accession Number: 20190626–5187. Comments Due: 5 p.m. ET 7/17/19. The filings are accessible in the Commission’s eLibrary system by clicking on the links or querying the docket number. Any person desiring to intervene or protest in any of the above proceedings must file in accordance with Rules 211 and 214 of the Commission’s Regulations (18 CFR 385.211 and 385.214) on or before 5:00 p.m. Eastern time on the specified comment date. Protests may be considered, but intervention is necessary to become a party to the proceeding. eFiling is encouraged. More detailed information relating to filing requirements, interventions, protests, service, and qualifying facilities filings can be found at: https://www.ferc.gov/ docs-filing/efiling/filing-req.pdf. For other information, call (866) 208–3676 (toll free). For TTY, call (202) 502–8659. Dated: June 26, 2019. Nathaniel J. Davis, Sr., Deputy Secretary. [FR Doc. 2019–14092 Filed 7–1–19; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 7153–017] Consolidated Hydro New York, LLC; Notice of Intent To File License Application, Filing of Pre-Application Document, and Approving Use of the Traditional Licensing Process a. Type of Application: Notice of Intent to File License Application and Request to Use the Traditional Licensing Process. b. Project No.: 7153–017. c. Date filed: April 30, 2019. d. Submitted by: Consolidated Hydro New York, LLC (Consolidated Hydro). e. Name of Project: Victory Mills Hydroelectric Project. f. Location: Located on Fish Creek in the Village of Victory, Town of Saratoga, Saratoga County, New York. The project does not occupy any federal lands. PO 00000 Frm 00026 Fmt 4703 Sfmt 4703 g. Filed Pursuant to: 18 CFR 5.3 of the Commission’s regulations. h. Potential Applicant Contact: Mr. Kevin Webb, Hydro Licensing Manager, Enel Green Power North America, Inc., 100 Brickstone Square, Suite 300, Andover, MA 01810, Phone: (978) 935– 6039, Email: Kevin.Webb@enel.com. i. FERC Contact: Laurie Bauer, Phone: (202) 502–6519, Email: laurie.bauer@ ferc.gov. j. Consolidated Hydro filed its request to use the Traditional Licensing Process on April 30, 2019. Consolidated Hydro provided public notice of its request on April 25, 2019. In a letter dated June 26, 2019, the Director of the Division of Hydropower Licensing approved Consolidated Hydro’s request to use the Traditional Licensing Process. k. With this notice, we are initiating informal consultation with the U.S. Fish and Wildlife Service and/or NOAA Fisheries under section 7 of the Endangered Species Act and the joint agency regulations thereunder at 50 CFR, Part 402; and NOAA Fisheries under section 305(b) of the MagnusonStevens Fishery Conservation and Management Act and implementing regulations at 50 CFR 600.920. We are also initiating consultation with the New York State Historic Preservation Officer, as required by section 106, National Historic Preservation Act, and the implementing regulations of the Advisory Council on Historic Preservation at 36 CFR 800.2. l. With this notice, we are designating Consolidated Hydro as the Commission’s non-federal representative for carrying out informal consultation pursuant to section 7 of the Endangered Species Act; and consultation pursuant to section 106 of the National Historic Preservation Act. m. Consolidated Hydro filed a PreApplication Document (PAD; including a proposed process plan and schedule) with the Commission, pursuant to 18 CFR 5.6 of the Commission’s regulations. n. A copy of the PAD is available for review at the Commission in the Public Reference Room or may be viewed on the Commission’s website (https:// www.ferc.gov), using the ‘‘eLibrary’’ link. Enter the docket number, excluding the last three digits in the docket number field to access the document. For assistance, contact FERC Online Support at FERCONlineSupport@ferc.gov, (866) 208–3676 (toll free), or (202) 502–8659 (TTY). A copy is also available for inspection and reproduction at the address in paragraph h. o. The licensee states its unequivocal intent to submit an application for a E:\FR\FM\02JYN1.SGM 02JYN1 Federal Register / Vol. 84, No. 127 / Tuesday, July 2, 2019 / Notices new license for Project No. 7153. Pursuant to 18 CFR 16.8, 16.9, and 16.10 each application for a new license and any competing license applications must be filed with the Commission at least 24 months prior to the expiration of the existing license. All applications for license for this project must be filed by April 30, 2022. p. Register online at https:// www.ferc.gov/docs-filing/ esubscription.asp to be notified via email of new filing and issuances related to this or other pending projects. For assistance, contact FERC Online Support. Dated: June 26, 2019. Kimberly D. Bose, Secretary. [FR Doc. 2019–14082 Filed 7–1–19; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. CP19–19–000] khammond on DSKBBV9HB2PROD with NOTICES Magnolia LNG, LLC; Notice of Schedule for Environmental Review of the Magnolia LNG Production Capacity Amendment On November 19, 2018, Magnolia LNG, LLC (Magnolia LNG), filed an application in Docket No. CP19–19–000 requesting an authorization pursuant to Section 3(a) of the Natural Gas Act to amend the authorization granted by the Federal Energy Regulatory Commission (FERC or Commission) on April 15, 2016, in Docket No. CP14–347–000. The proposed project is known as the Magnolia LNG Production Capacity Amendment, and would increase the total production capacity of Magnolia LNG’s liquefaction project from the currently authorized 8 million tons per annum (MTPA) to 8.8 MTPA, or 1.4 billion cubic feet per day. Magnolia LNG states that the increased LNG production capacity would be realized through the optimization of its final design and would not require any increase in the authorized feed gas rates. Magnolia LNG’s approved terminal site is in Lake Charles, Calcasieu Parish, Louisiana, and no new facilities are proposed. On December 6, 2018, the Commission issued its Notice of Application for the project. Among other things, that notice alerted agencies issuing federal authorizations of the requirement to complete all necessary reviews and to reach a final decision on a request for a federal authorization VerDate Sep<11>2014 17:00 Jul 01, 2019 Jkt 247001 within 90 days of the date of issuance of the Commission staff’s final environmental document for the project. Subsequent to the issuance of the Notice of Application, staff determined that a supplemental environmental impact statement (EIS) would be necessary for the amended project. This instant notice identifies the FERC staff’s planned schedule for completion of the supplemental final EIS, which is based on issuance of the supplemental draft EIS in September 2019. 31587 or at FERCOnlineSupport@ferc.gov. The eLibrary link on the FERC website also provides access to the texts of formal documents issued by the Commission, such as orders, notices, and rule makings. Kimberly D. Bose, Secretary. [FR Doc. 2019–14080 Filed 7–1–19; 8:45 am] BILLING CODE 6717–01–P Schedule for Environmental Review Notice of Availability of the supplemental final—EIS January 24, 2020 90-day Federal Authorization Decision Deadline—April 23, 2020 If a schedule change becomes necessary for the final supplemental EIS, additional notice will be provided so that the relevant agencies are kept informed of the project’s progress. ENVIRONMENTAL PROTECTION AGENCY Background On June 7, 2019, the Commission issued a Notice of Intent to Prepare a Supplemental Environmental Impact Statement for the Proposed Magnolia LNG Production Capacity Amendment and Request for Comments on Environmental Issues (NOI). The NOI was sent to affected landowners; federal, state, and local government agencies; elected officials; environmental and public interest groups; Native American tribes; other interested parties; and local libraries and newspapers. All substantive comments received will be addressed in the supplemental EIS. AGENCY: Additional Information In order to receive notification of the issuance of the supplemental EIS and to keep track of all formal issuances and submittals in specific dockets, the Commission offers a free service called eSubscription. This can reduce the amount of time you spend researching proceedings by automatically providing you with notification of these filings, document summaries, and direct links to the documents. Go to www.ferc.gov/ docs-filing/esubscription.asp. Additional information about the project is available from the Commission’s Office of External Affairs at (866) 208–FERC or on the FERC website (www.ferc.gov). Using the ‘‘eLibrary’’ link, select ‘‘General Search’’ from the eLibrary menu, enter the selected date range and ‘‘Docket Number’’ excluding the last three digits (i.e., CP19–19), and follow the instructions. For assistance with access to eLibrary, the helpline can be reached at (866) 208–3676, TTY (202) 502–8659, PO 00000 Frm 00027 Fmt 4703 Sfmt 4703 [EPA–HQ–OAR–2004–0060; FRL–9995–65– OAR] Proposed Information Collection Request; Comment Request; Certification and Compliance Requirements for Nonroad SparkIgnition Engines (Renewal), ICR 1695.11, OMB 2060–0338 Environmental Protection Agency. ACTION: Notice. The Environmental Protection Agency (EPA) is planning to submit an information collection request (ICR), ‘‘Certification and Compliance Requirements for Nonroad SparkIgnition Engines (Renewal)’’, ICR 1695.11, OMB 2060–0338 to the Office of Management and Budget (OMB) for review and approval in accordance with the Paperwork Reduction Act. Before doing so, EPA is soliciting public comments on specific aspects of the proposed information collection request as described below. This notice is a proposed extension of the Nonroad Spark-Ignition Engines ICR, which is currently approved through October 31, 2019. An Agency may not conduct or sponsor and a person is not required to respond to a collection of information unless it displays a currently valid OMB control number. DATES: Comments must be submitted on or before September 3, 2019. ADDRESSES: Submit your comments, referencing the Docket ID No. EPA–HQ– OAR–2004–0060, to the EPA: Online using www.regulations.gov (our preferred method), or by mail to: EPA Docket Center, Environmental Protection Agency, Mail Code 28221T, 1200 Pennsylvania Ave. NW, Washington, DC 20460. EPA’s policy is that all comments received will be included in the public docket without change including any personal information provided, unless the comment includes profanity, threats, information claimed to be Confidential SUMMARY: E:\FR\FM\02JYN1.SGM 02JYN1

Agencies

[Federal Register Volume 84, Number 127 (Tuesday, July 2, 2019)]
[Notices]
[Pages 31586-31587]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2019-14082]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Project No. 7153-017]


Consolidated Hydro New York, LLC; Notice of Intent To File 
License Application, Filing of Pre-Application Document, and Approving 
Use of the Traditional Licensing Process

    a. Type of Application: Notice of Intent to File License 
Application and Request to Use the Traditional Licensing Process.
    b. Project No.: 7153-017.
    c. Date filed: April 30, 2019.
    d. Submitted by: Consolidated Hydro New York, LLC (Consolidated 
Hydro).
    e. Name of Project: Victory Mills Hydroelectric Project.
    f. Location: Located on Fish Creek in the Village of Victory, Town 
of Saratoga, Saratoga County, New York. The project does not occupy any 
federal lands.
    g. Filed Pursuant to: 18 CFR 5.3 of the Commission's regulations.
    h. Potential Applicant Contact: Mr. Kevin Webb, Hydro Licensing 
Manager, Enel Green Power North America, Inc., 100 Brickstone Square, 
Suite 300, Andover, MA 01810, Phone: (978) 935-6039, Email: 
[email protected].
    i. FERC Contact: Laurie Bauer, Phone: (202) 502-6519, Email: 
[email protected].
    j. Consolidated Hydro filed its request to use the Traditional 
Licensing Process on April 30, 2019. Consolidated Hydro provided public 
notice of its request on April 25, 2019. In a letter dated June 26, 
2019, the Director of the Division of Hydropower Licensing approved 
Consolidated Hydro's request to use the Traditional Licensing Process.
    k. With this notice, we are initiating informal consultation with 
the U.S. Fish and Wildlife Service and/or NOAA Fisheries under section 
7 of the Endangered Species Act and the joint agency regulations 
thereunder at 50 CFR, Part 402; and NOAA Fisheries under section 305(b) 
of the Magnuson-Stevens Fishery Conservation and Management Act and 
implementing regulations at 50 CFR 600.920. We are also initiating 
consultation with the New York State Historic Preservation Officer, as 
required by section 106, National Historic Preservation Act, and the 
implementing regulations of the Advisory Council on Historic 
Preservation at 36 CFR 800.2.
    l. With this notice, we are designating Consolidated Hydro as the 
Commission's non-federal representative for carrying out informal 
consultation pursuant to section 7 of the Endangered Species Act; and 
consultation pursuant to section 106 of the National Historic 
Preservation Act.
    m. Consolidated Hydro filed a Pre-Application Document (PAD; 
including a proposed process plan and schedule) with the Commission, 
pursuant to 18 CFR 5.6 of the Commission's regulations.
    n. A copy of the PAD is available for review at the Commission in 
the Public Reference Room or may be viewed on the Commission's website 
(https://www.ferc.gov), using the ``eLibrary'' link. Enter the docket 
number, excluding the last three digits in the docket number field to 
access the document. For assistance, contact FERC Online Support at 
[email protected], (866) 208-3676 (toll free), or (202) 502-
8659 (TTY). A copy is also available for inspection and reproduction at 
the address in paragraph h.
    o. The licensee states its unequivocal intent to submit an 
application for a

[[Page 31587]]

new license for Project No. 7153. Pursuant to 18 CFR 16.8, 16.9, and 
16.10 each application for a new license and any competing license 
applications must be filed with the Commission at least 24 months prior 
to the expiration of the existing license. All applications for license 
for this project must be filed by April 30, 2022.
    p. Register online at https://www.ferc.gov/docs-filing/esubscription.asp to be notified via email of new filing and issuances 
related to this or other pending projects. For assistance, contact FERC 
Online Support.

    Dated: June 26, 2019.
Kimberly D. Bose,
Secretary.
[FR Doc. 2019-14082 Filed 7-1-19; 8:45 am]