Consolidated Hydro New York, LLC; Notice of Intent To File License Application, Filing of Pre-Application Document, and Approving Use of the Traditional Licensing Process, 31586-31587 [2019-14082]
Download as PDF
khammond on DSKBBV9HB2PROD with NOTICES
31586
Federal Register / Vol. 84, No. 127 / Tuesday, July 2, 2019 / Notices
Applicants: Turquoise Nevada LLC.
Description: Baseline eTariff Filing:
Turquoise Nevada FERC MBR
Application to be effective 6/27/2019.
Filed Date: 6/26/19.
Accession Number: 20190626–5164.
Comments Due: 5 p.m. ET 7/17/19.
Docket Numbers: ER19–2260–000.
Applicants: Valentine Solar, LLC.
Description: Market-Based Triennial
Review Filing: 2019 Triennial Market
Power Update for the Southwest
Region—Valentine Solar to be effective
8/26/2019.
Filed Date: 6/26/19.
Accession Number: 20190626–5166.
Comments Due: 5 p.m. ET 8/26/19.
Docket Numbers: ER19–2261–000.
Applicants: RE Mustang LLC.
Description: § 205(d) Rate Filing:
Request for Cat. 1 Seller Status in the
SW Region & Revised MBR Tariff to be
effective 6/27/2019.
Filed Date: 6/26/19.
Accession Number: 20190626–5172.
Comments Due: 5 p.m. ET 7/17/19.
Docket Numbers: ER19–2262–000.
Applicants: RE Mustang 3 LLC.
Description: § 205(d) Rate Filing:
Request for Cat. 1 Seller Status in the
SW Region & Revised MBR Tariff to be
effective 6/27/2019.
Filed Date: 6/26/19.
Accession Number: 20190626–5174.
Comments Due: 5 p.m. ET 7/17/19.
Docket Numbers: ER19–2263–000.
Applicants: RE Mustang 4 LLC.
Description: § 205(d) Rate Filing:
Request for Cat. 1 Seller Status in the
SW Region & Revised MBR Tariff to be
effective 6/27/2019.
Filed Date: 6/26/19.
Accession Number: 20190626–5178.
Comments Due: 5 p.m. ET 7/17/19.
Docket Numbers: ER19–2264–000.
Applicants: Northern Indiana Public
Service Company.
Description: § 205(d) Rate Filing:
Filing of an Amended CIAC Agreement
to be effective 6/27/2019.
Filed Date: 6/26/19.
Accession Number: 20190626–5179.
Comments Due: 5 p.m. ET 7/17/19.
Docket Numbers: ER19–2265–000.
Applicants: TransCanada Energy
Sales Ltd.
Description: § 205(d) Rate Filing:
TransCanada Energy Sales—Revised
Electric MBR Tariff to be effective 6/27/
2019.
Filed Date: 6/26/19.
Accession Number: 20190626–5185.
Comments Due: 5 p.m. ET 7/17/19.
Docket Numbers: ER19–2266–000.
Applicants: Quitman Solar, LLC.
Description: Baseline eTariff Filing:
Quitman Solar, LLC Application for
VerDate Sep<11>2014
17:00 Jul 01, 2019
Jkt 247001
Market-Based Rate Authority to be
effective 8/26/2019.
Filed Date: 6/26/19.
Accession Number: 20190626–5186.
Comments Due: 5 p.m. ET 7/17/19.
Docket Numbers: ER19–2267–000.
Applicants: TransCanada Power
Marketing Ltd.
Description: § 205(d) Rate Filing:
TransCanada Power Marketing Revised
Electric Tariff to be effective 6/27/2019.
Filed Date: 6/26/19.
Accession Number: 20190626–5187.
Comments Due: 5 p.m. ET 7/17/19.
The filings are accessible in the
Commission’s eLibrary system by
clicking on the links or querying the
docket number.
Any person desiring to intervene or
protest in any of the above proceedings
must file in accordance with Rules 211
and 214 of the Commission’s
Regulations (18 CFR 385.211 and
385.214) on or before 5:00 p.m. Eastern
time on the specified comment date.
Protests may be considered, but
intervention is necessary to become a
party to the proceeding.
eFiling is encouraged. More detailed
information relating to filing
requirements, interventions, protests,
service, and qualifying facilities filings
can be found at: https://www.ferc.gov/
docs-filing/efiling/filing-req.pdf. For
other information, call (866) 208–3676
(toll free). For TTY, call (202) 502–8659.
Dated: June 26, 2019.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2019–14092 Filed 7–1–19; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 7153–017]
Consolidated Hydro New York, LLC;
Notice of Intent To File License
Application, Filing of Pre-Application
Document, and Approving Use of the
Traditional Licensing Process
a. Type of Application: Notice of
Intent to File License Application and
Request to Use the Traditional Licensing
Process.
b. Project No.: 7153–017.
c. Date filed: April 30, 2019.
d. Submitted by: Consolidated Hydro
New York, LLC (Consolidated Hydro).
e. Name of Project: Victory Mills
Hydroelectric Project.
f. Location: Located on Fish Creek in
the Village of Victory, Town of Saratoga,
Saratoga County, New York. The project
does not occupy any federal lands.
PO 00000
Frm 00026
Fmt 4703
Sfmt 4703
g. Filed Pursuant to: 18 CFR 5.3 of the
Commission’s regulations.
h. Potential Applicant Contact: Mr.
Kevin Webb, Hydro Licensing Manager,
Enel Green Power North America, Inc.,
100 Brickstone Square, Suite 300,
Andover, MA 01810, Phone: (978) 935–
6039, Email: Kevin.Webb@enel.com.
i. FERC Contact: Laurie Bauer, Phone:
(202) 502–6519, Email: laurie.bauer@
ferc.gov.
j. Consolidated Hydro filed its request
to use the Traditional Licensing Process
on April 30, 2019. Consolidated Hydro
provided public notice of its request on
April 25, 2019. In a letter dated June 26,
2019, the Director of the Division of
Hydropower Licensing approved
Consolidated Hydro’s request to use the
Traditional Licensing Process.
k. With this notice, we are initiating
informal consultation with the U.S. Fish
and Wildlife Service and/or NOAA
Fisheries under section 7 of the
Endangered Species Act and the joint
agency regulations thereunder at 50
CFR, Part 402; and NOAA Fisheries
under section 305(b) of the MagnusonStevens Fishery Conservation and
Management Act and implementing
regulations at 50 CFR 600.920. We are
also initiating consultation with the
New York State Historic Preservation
Officer, as required by section 106,
National Historic Preservation Act, and
the implementing regulations of the
Advisory Council on Historic
Preservation at 36 CFR 800.2.
l. With this notice, we are designating
Consolidated Hydro as the
Commission’s non-federal
representative for carrying out informal
consultation pursuant to section 7 of the
Endangered Species Act; and
consultation pursuant to section 106 of
the National Historic Preservation Act.
m. Consolidated Hydro filed a PreApplication Document (PAD; including
a proposed process plan and schedule)
with the Commission, pursuant to 18
CFR 5.6 of the Commission’s
regulations.
n. A copy of the PAD is available for
review at the Commission in the Public
Reference Room or may be viewed on
the Commission’s website (https://
www.ferc.gov), using the ‘‘eLibrary’’
link. Enter the docket number,
excluding the last three digits in the
docket number field to access the
document. For assistance, contact FERC
Online Support at
FERCONlineSupport@ferc.gov, (866)
208–3676 (toll free), or (202) 502–8659
(TTY). A copy is also available for
inspection and reproduction at the
address in paragraph h.
o. The licensee states its unequivocal
intent to submit an application for a
E:\FR\FM\02JYN1.SGM
02JYN1
Federal Register / Vol. 84, No. 127 / Tuesday, July 2, 2019 / Notices
new license for Project No. 7153.
Pursuant to 18 CFR 16.8, 16.9, and 16.10
each application for a new license and
any competing license applications
must be filed with the Commission at
least 24 months prior to the expiration
of the existing license. All applications
for license for this project must be filed
by April 30, 2022.
p. Register online at https://
www.ferc.gov/docs-filing/
esubscription.asp to be notified via
email of new filing and issuances
related to this or other pending projects.
For assistance, contact FERC Online
Support.
Dated: June 26, 2019.
Kimberly D. Bose,
Secretary.
[FR Doc. 2019–14082 Filed 7–1–19; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. CP19–19–000]
khammond on DSKBBV9HB2PROD with NOTICES
Magnolia LNG, LLC; Notice of
Schedule for Environmental Review of
the Magnolia LNG Production Capacity
Amendment
On November 19, 2018, Magnolia
LNG, LLC (Magnolia LNG), filed an
application in Docket No. CP19–19–000
requesting an authorization pursuant to
Section 3(a) of the Natural Gas Act to
amend the authorization granted by the
Federal Energy Regulatory Commission
(FERC or Commission) on April 15,
2016, in Docket No. CP14–347–000. The
proposed project is known as the
Magnolia LNG Production Capacity
Amendment, and would increase the
total production capacity of Magnolia
LNG’s liquefaction project from the
currently authorized 8 million tons per
annum (MTPA) to 8.8 MTPA, or 1.4
billion cubic feet per day. Magnolia
LNG states that the increased LNG
production capacity would be realized
through the optimization of its final
design and would not require any
increase in the authorized feed gas rates.
Magnolia LNG’s approved terminal site
is in Lake Charles, Calcasieu Parish,
Louisiana, and no new facilities are
proposed.
On December 6, 2018, the
Commission issued its Notice of
Application for the project. Among
other things, that notice alerted agencies
issuing federal authorizations of the
requirement to complete all necessary
reviews and to reach a final decision on
a request for a federal authorization
VerDate Sep<11>2014
17:00 Jul 01, 2019
Jkt 247001
within 90 days of the date of issuance
of the Commission staff’s final
environmental document for the project.
Subsequent to the issuance of the Notice
of Application, staff determined that a
supplemental environmental impact
statement (EIS) would be necessary for
the amended project. This instant notice
identifies the FERC staff’s planned
schedule for completion of the
supplemental final EIS, which is based
on issuance of the supplemental draft
EIS in September 2019.
31587
or at FERCOnlineSupport@ferc.gov. The
eLibrary link on the FERC website also
provides access to the texts of formal
documents issued by the Commission,
such as orders, notices, and rule
makings.
Kimberly D. Bose,
Secretary.
[FR Doc. 2019–14080 Filed 7–1–19; 8:45 am]
BILLING CODE 6717–01–P
Schedule for Environmental Review
Notice of Availability of the
supplemental final—EIS January 24,
2020
90-day Federal Authorization Decision
Deadline—April 23, 2020
If a schedule change becomes
necessary for the final supplemental
EIS, additional notice will be provided
so that the relevant agencies are kept
informed of the project’s progress.
ENVIRONMENTAL PROTECTION
AGENCY
Background
On June 7, 2019, the Commission
issued a Notice of Intent to Prepare a
Supplemental Environmental Impact
Statement for the Proposed Magnolia
LNG Production Capacity Amendment
and Request for Comments on
Environmental Issues (NOI). The NOI
was sent to affected landowners; federal,
state, and local government agencies;
elected officials; environmental and
public interest groups; Native American
tribes; other interested parties; and local
libraries and newspapers. All
substantive comments received will be
addressed in the supplemental EIS.
AGENCY:
Additional Information
In order to receive notification of the
issuance of the supplemental EIS and to
keep track of all formal issuances and
submittals in specific dockets, the
Commission offers a free service called
eSubscription. This can reduce the
amount of time you spend researching
proceedings by automatically providing
you with notification of these filings,
document summaries, and direct links
to the documents. Go to www.ferc.gov/
docs-filing/esubscription.asp.
Additional information about the
project is available from the
Commission’s Office of External Affairs
at (866) 208–FERC or on the FERC
website (www.ferc.gov). Using the
‘‘eLibrary’’ link, select ‘‘General Search’’
from the eLibrary menu, enter the
selected date range and ‘‘Docket
Number’’ excluding the last three digits
(i.e., CP19–19), and follow the
instructions. For assistance with access
to eLibrary, the helpline can be reached
at (866) 208–3676, TTY (202) 502–8659,
PO 00000
Frm 00027
Fmt 4703
Sfmt 4703
[EPA–HQ–OAR–2004–0060; FRL–9995–65–
OAR]
Proposed Information Collection
Request; Comment Request;
Certification and Compliance
Requirements for Nonroad SparkIgnition Engines (Renewal), ICR
1695.11, OMB 2060–0338
Environmental Protection
Agency.
ACTION: Notice.
The Environmental Protection
Agency (EPA) is planning to submit an
information collection request (ICR),
‘‘Certification and Compliance
Requirements for Nonroad SparkIgnition Engines (Renewal)’’, ICR
1695.11, OMB 2060–0338 to the Office
of Management and Budget (OMB) for
review and approval in accordance with
the Paperwork Reduction Act. Before
doing so, EPA is soliciting public
comments on specific aspects of the
proposed information collection request
as described below. This notice is a
proposed extension of the Nonroad
Spark-Ignition Engines ICR, which is
currently approved through October 31,
2019. An Agency may not conduct or
sponsor and a person is not required to
respond to a collection of information
unless it displays a currently valid OMB
control number.
DATES: Comments must be submitted on
or before September 3, 2019.
ADDRESSES: Submit your comments,
referencing the Docket ID No. EPA–HQ–
OAR–2004–0060, to the EPA: Online
using www.regulations.gov (our
preferred method), or by mail to: EPA
Docket Center, Environmental
Protection Agency, Mail Code 28221T,
1200 Pennsylvania Ave. NW,
Washington, DC 20460.
EPA’s policy is that all comments
received will be included in the public
docket without change including any
personal information provided, unless
the comment includes profanity, threats,
information claimed to be Confidential
SUMMARY:
E:\FR\FM\02JYN1.SGM
02JYN1
Agencies
[Federal Register Volume 84, Number 127 (Tuesday, July 2, 2019)]
[Notices]
[Pages 31586-31587]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2019-14082]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Project No. 7153-017]
Consolidated Hydro New York, LLC; Notice of Intent To File
License Application, Filing of Pre-Application Document, and Approving
Use of the Traditional Licensing Process
a. Type of Application: Notice of Intent to File License
Application and Request to Use the Traditional Licensing Process.
b. Project No.: 7153-017.
c. Date filed: April 30, 2019.
d. Submitted by: Consolidated Hydro New York, LLC (Consolidated
Hydro).
e. Name of Project: Victory Mills Hydroelectric Project.
f. Location: Located on Fish Creek in the Village of Victory, Town
of Saratoga, Saratoga County, New York. The project does not occupy any
federal lands.
g. Filed Pursuant to: 18 CFR 5.3 of the Commission's regulations.
h. Potential Applicant Contact: Mr. Kevin Webb, Hydro Licensing
Manager, Enel Green Power North America, Inc., 100 Brickstone Square,
Suite 300, Andover, MA 01810, Phone: (978) 935-6039, Email:
[email protected].
i. FERC Contact: Laurie Bauer, Phone: (202) 502-6519, Email:
[email protected].
j. Consolidated Hydro filed its request to use the Traditional
Licensing Process on April 30, 2019. Consolidated Hydro provided public
notice of its request on April 25, 2019. In a letter dated June 26,
2019, the Director of the Division of Hydropower Licensing approved
Consolidated Hydro's request to use the Traditional Licensing Process.
k. With this notice, we are initiating informal consultation with
the U.S. Fish and Wildlife Service and/or NOAA Fisheries under section
7 of the Endangered Species Act and the joint agency regulations
thereunder at 50 CFR, Part 402; and NOAA Fisheries under section 305(b)
of the Magnuson-Stevens Fishery Conservation and Management Act and
implementing regulations at 50 CFR 600.920. We are also initiating
consultation with the New York State Historic Preservation Officer, as
required by section 106, National Historic Preservation Act, and the
implementing regulations of the Advisory Council on Historic
Preservation at 36 CFR 800.2.
l. With this notice, we are designating Consolidated Hydro as the
Commission's non-federal representative for carrying out informal
consultation pursuant to section 7 of the Endangered Species Act; and
consultation pursuant to section 106 of the National Historic
Preservation Act.
m. Consolidated Hydro filed a Pre-Application Document (PAD;
including a proposed process plan and schedule) with the Commission,
pursuant to 18 CFR 5.6 of the Commission's regulations.
n. A copy of the PAD is available for review at the Commission in
the Public Reference Room or may be viewed on the Commission's website
(https://www.ferc.gov), using the ``eLibrary'' link. Enter the docket
number, excluding the last three digits in the docket number field to
access the document. For assistance, contact FERC Online Support at
[email protected], (866) 208-3676 (toll free), or (202) 502-
8659 (TTY). A copy is also available for inspection and reproduction at
the address in paragraph h.
o. The licensee states its unequivocal intent to submit an
application for a
[[Page 31587]]
new license for Project No. 7153. Pursuant to 18 CFR 16.8, 16.9, and
16.10 each application for a new license and any competing license
applications must be filed with the Commission at least 24 months prior
to the expiration of the existing license. All applications for license
for this project must be filed by April 30, 2022.
p. Register online at https://www.ferc.gov/docs-filing/esubscription.asp to be notified via email of new filing and issuances
related to this or other pending projects. For assistance, contact FERC
Online Support.
Dated: June 26, 2019.
Kimberly D. Bose,
Secretary.
[FR Doc. 2019-14082 Filed 7-1-19; 8:45 am]