Federal Register / Vol. 84, No. 127 / Tuesday, July 2, 2019 / Notices
new license for Project No. 7153.
Pursuant to 18 CFR 16.8, 16.9, and 16.10
each application for a new license and
any competing license applications
must be filed with the Commission at
least 24 months prior to the expiration
of the existing license. All applications
for license for this project must be filed
by April 30, 2022.
p. Register online at https://
www.ferc.gov/docs-filing/
esubscription.asp to be notified via
email of new filing and issuances
related to this or other pending projects.
For assistance, contact FERC Online
Support.
Dated: June 26, 2019.
Kimberly D. Bose,
Secretary.
[FR Doc. 2019–14082 Filed 7–1–19; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. CP19–19–000]
khammond on DSKBBV9HB2PROD with NOTICES
Magnolia LNG, LLC; Notice of
Schedule for Environmental Review of
the Magnolia LNG Production Capacity
Amendment
On November 19, 2018, Magnolia
LNG, LLC (Magnolia LNG), filed an
application in Docket No. CP19–19–000
requesting an authorization pursuant to
Section 3(a) of the Natural Gas Act to
amend the authorization granted by the
Federal Energy Regulatory Commission
(FERC or Commission) on April 15,
2016, in Docket No. CP14–347–000. The
proposed project is known as the
Magnolia LNG Production Capacity
Amendment, and would increase the
total production capacity of Magnolia
LNG’s liquefaction project from the
currently authorized 8 million tons per
annum (MTPA) to 8.8 MTPA, or 1.4
billion cubic feet per day. Magnolia
LNG states that the increased LNG
production capacity would be realized
through the optimization of its final
design and would not require any
increase in the authorized feed gas rates.
Magnolia LNG’s approved terminal site
is in Lake Charles, Calcasieu Parish,
Louisiana, and no new facilities are
proposed.
On December 6, 2018, the
Commission issued its Notice of
Application for the project. Among
other things, that notice alerted agencies
issuing federal authorizations of the
requirement to complete all necessary
reviews and to reach a final decision on
a request for a federal authorization
VerDate Sep<11>2014
17:00 Jul 01, 2019
Jkt 247001
within 90 days of the date of issuance
of the Commission staff’s final
environmental document for the project.
Subsequent to the issuance of the Notice
of Application, staff determined that a
supplemental environmental impact
statement (EIS) would be necessary for
the amended project. This instant notice
identifies the FERC staff’s planned
schedule for completion of the
supplemental final EIS, which is based
on issuance of the supplemental draft
EIS in September 2019.
31587
or at FERCOnlineSupport@ferc.gov. The
eLibrary link on the FERC website also
provides access to the texts of formal
documents issued by the Commission,
such as orders, notices, and rule
makings.
Kimberly D. Bose,
Secretary.
[FR Doc. 2019–14080 Filed 7–1–19; 8:45 am]
BILLING CODE 6717–01–P
Schedule for Environmental Review
Notice of Availability of the
supplemental final—EIS January 24,
2020
90-day Federal Authorization Decision
Deadline—April 23, 2020
If a schedule change becomes
necessary for the final supplemental
EIS, additional notice will be provided
so that the relevant agencies are kept
informed of the project’s progress.
ENVIRONMENTAL PROTECTION
AGENCY
Background
On June 7, 2019, the Commission
issued a Notice of Intent to Prepare a
Supplemental Environmental Impact
Statement for the Proposed Magnolia
LNG Production Capacity Amendment
and Request for Comments on
Environmental Issues (NOI). The NOI
was sent to affected landowners; federal,
state, and local government agencies;
elected officials; environmental and
public interest groups; Native American
tribes; other interested parties; and local
libraries and newspapers. All
substantive comments received will be
addressed in the supplemental EIS.
AGENCY:
Additional Information
In order to receive notification of the
issuance of the supplemental EIS and to
keep track of all formal issuances and
submittals in specific dockets, the
Commission offers a free service called
eSubscription. This can reduce the
amount of time you spend researching
proceedings by automatically providing
you with notification of these filings,
document summaries, and direct links
to the documents. Go to www.ferc.gov/
docs-filing/esubscription.asp.
Additional information about the
project is available from the
Commission’s Office of External Affairs
at (866) 208–FERC or on the FERC
website (www.ferc.gov). Using the
‘‘eLibrary’’ link, select ‘‘General Search’’
from the eLibrary menu, enter the
selected date range and ‘‘Docket
Number’’ excluding the last three digits
(i.e., CP19–19), and follow the
instructions. For assistance with access
to eLibrary, the helpline can be reached
at (866) 208–3676, TTY (202) 502–8659,
PO 00000
Frm 00027
Fmt 4703
Sfmt 4703
[EPA–HQ–OAR–2004–0060; FRL–9995–65–
OAR]
Proposed Information Collection
Request; Comment Request;
Certification and Compliance
Requirements for Nonroad SparkIgnition Engines (Renewal), ICR
1695.11, OMB 2060–0338
Environmental Protection
Agency.
ACTION: Notice.
The Environmental Protection
Agency (EPA) is planning to submit an
information collection request (ICR),
‘‘Certification and Compliance
Requirements for Nonroad SparkIgnition Engines (Renewal)’’, ICR
1695.11, OMB 2060–0338 to the Office
of Management and Budget (OMB) for
review and approval in accordance with
the Paperwork Reduction Act. Before
doing so, EPA is soliciting public
comments on specific aspects of the
proposed information collection request
as described below. This notice is a
proposed extension of the Nonroad
Spark-Ignition Engines ICR, which is
currently approved through October 31,
2019. An Agency may not conduct or
sponsor and a person is not required to
respond to a collection of information
unless it displays a currently valid OMB
control number.
DATES: Comments must be submitted on
or before September 3, 2019.
ADDRESSES: Submit your comments,
referencing the Docket ID No. EPA–HQ–
OAR–2004–0060, to the EPA: Online
using www.regulations.gov (our
preferred method), or by mail to: EPA
Docket Center, Environmental
Protection Agency, Mail Code 28221T,
1200 Pennsylvania Ave. NW,
Washington, DC 20460.
EPA’s policy is that all comments
received will be included in the public
docket without change including any
personal information provided, unless
the comment includes profanity, threats,
information claimed to be Confidential
SUMMARY:
E:\FR\FM\02JYN1.SGM
02JYN1
Agencies
[Federal Register Volume 84, Number 127 (Tuesday, July 2, 2019)]
[Notices]
[Page 31587]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2019-14080]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Docket No. CP19-19-000]
Magnolia LNG, LLC; Notice of Schedule for Environmental Review of
the Magnolia LNG Production Capacity Amendment
On November 19, 2018, Magnolia LNG, LLC (Magnolia LNG), filed an
application in Docket No. CP19-19-000 requesting an authorization
pursuant to Section 3(a) of the Natural Gas Act to amend the
authorization granted by the Federal Energy Regulatory Commission (FERC
or Commission) on April 15, 2016, in Docket No. CP14-347-000. The
proposed project is known as the Magnolia LNG Production Capacity
Amendment, and would increase the total production capacity of Magnolia
LNG's liquefaction project from the currently authorized 8 million tons
per annum (MTPA) to 8.8 MTPA, or 1.4 billion cubic feet per day.
Magnolia LNG states that the increased LNG production capacity would be
realized through the optimization of its final design and would not
require any increase in the authorized feed gas rates. Magnolia LNG's
approved terminal site is in Lake Charles, Calcasieu Parish, Louisiana,
and no new facilities are proposed.
On December 6, 2018, the Commission issued its Notice of
Application for the project. Among other things, that notice alerted
agencies issuing federal authorizations of the requirement to complete
all necessary reviews and to reach a final decision on a request for a
federal authorization within 90 days of the date of issuance of the
Commission staff's final environmental document for the project.
Subsequent to the issuance of the Notice of Application, staff
determined that a supplemental environmental impact statement (EIS)
would be necessary for the amended project. This instant notice
identifies the FERC staff's planned schedule for completion of the
supplemental final EIS, which is based on issuance of the supplemental
draft EIS in September 2019.
Schedule for Environmental Review
Notice of Availability of the supplemental final--EIS January 24, 2020
90-day Federal Authorization Decision Deadline--April 23, 2020
If a schedule change becomes necessary for the final supplemental
EIS, additional notice will be provided so that the relevant agencies
are kept informed of the project's progress.
Background
On June 7, 2019, the Commission issued a Notice of Intent to
Prepare a Supplemental Environmental Impact Statement for the Proposed
Magnolia LNG Production Capacity Amendment and Request for Comments on
Environmental Issues (NOI). The NOI was sent to affected landowners;
federal, state, and local government agencies; elected officials;
environmental and public interest groups; Native American tribes; other
interested parties; and local libraries and newspapers. All substantive
comments received will be addressed in the supplemental EIS.
Additional Information
In order to receive notification of the issuance of the
supplemental EIS and to keep track of all formal issuances and
submittals in specific dockets, the Commission offers a free service
called eSubscription. This can reduce the amount of time you spend
researching proceedings by automatically providing you with
notification of these filings, document summaries, and direct links to
the documents. Go to www.ferc.gov/docs-filing/esubscription.asp.
Additional information about the project is available from the
Commission's Office of External Affairs at (866) 208-FERC or on the
FERC website (www.ferc.gov). Using the ``eLibrary'' link, select
``General Search'' from the eLibrary menu, enter the selected date
range and ``Docket Number'' excluding the last three digits (i.e.,
CP19-19), and follow the instructions. For assistance with access to
eLibrary, the helpline can be reached at (866) 208-3676, TTY (202) 502-
8659, or at [email protected]. The eLibrary link on the FERC
website also provides access to the texts of formal documents issued by
the Commission, such as orders, notices, and rule makings.
Kimberly D. Bose,
Secretary.