Download as PDF 31312 Federal Register / Vol. 84, No. 126 / Monday, July 1, 2019 / Notices A copy of all other filings in reference to this application must be accompanied by proof of service on all persons listed in the service list prepared by the Commission in this proceeding, in accordance with 18 CFR 4.34(b) and 385.2010. Locations of Notice of Intent: Copies of the notice of intent can be obtained directly from the applicant or such copies can be viewed and reproduced at the Commission in its Public Reference Room, Room 2A, 888 First Street NE, Washington, DC 20426. The filing may also be viewed on the web at https:// www.ferc.gov/docs-filing/elibrary.asp using the ‘‘eLibrary’’ link. Enter the docket number (i.e., CD19–8) in the docket number field to access the document. For assistance, call toll-free 1–866–208–3676 or email FERCOnlineSupport@ferc.gov. For TTY, call (202) 502–8659. Dated: June 24, 2019. Kimberly D. Bose, Secretary. [FR Doc. 2019–13934 Filed 6–28–19; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 2082–062; Project No. 14803– 000] khammond on DSKBBV9HB2PROD with NOTICES PacifiCorp; Klamath River Renewal Corporation; Notice of Teleconference for Tribal Consultation Meeting a. Project Names and Numbers: Klamath and Lower Klamath Hydroelectric Projects No. 2082 and 14803. b. Project licensee: PacifiCorp and Klamath River Renewal Corporation. c. Date and Time of Teleconference: Tuesday, July 9, 2019, from 1:00 p.m. to 3:00 p.m. Eastern Standard Time. d. FERC Contact Jennifer Polardino, (202) 502–6437 or jennifer.polardino@ ferc.gov. e. Purpose of Meeting: Commission staff will hold a teleconference with the Yurok Tribe to discuss PacifiCorp and the Klamath River Renewal Corporation’s (Renewal Corporation) application to transfer the Lower Klamath Project No. 14803, consisting of the J.C. Boyle, Copco No. 1, Copco No. 2, and Iron Gate developments, to the Renewal Corporation. If the Commission were to approve the transfer application, then in a separate proceeding, the Renewal Corporation would propose to surrender the project license and remove the above four developments. VerDate Sep<11>2014 19:58 Jun 28, 2019 Jkt 247001 f. Members of the public and intervenors in the referenced proceedings may attend the teleconference; however, participation will be limited to tribal representatives of the Yurok Tribe and the Commission’s representatives. If the Yurok Tribe decides to disclose information about a specific location which could create a risk or harm to an archaeological site or Native American cultural resource, the public will be excused for that portion of the meeting when such information is disclosed. The teleconference meeting will be transcribed by a court reporter and the transcript will be placed in the public record of these proceedings. g. Please call or email Jennifer Polardino at (202) 502–6437 or jennifer.polardino@ferc.gov by Monday, July 8, 2019, to RSVP and to receive the teleconference call-in information. Applicants: Paulding Wind Farm III LLC. Description: Compliance filing: Compliance Filing Under ER19–2270 to be effective 10/20/2018. Filed Date: 6/25/19. Accession Number: 20190625–5009. Comments Due: 5 p.m. ET 7/16/19. Docket Numbers: ER18–2317–003. Applicants: Meadow Lake Wind Farm V LLC. Description: Compliance filing: Compliance Filing Under ER19–2317 to be effective 10/27/2018. Filed Date: 6/25/19. Accession Number: 20190625–5008. Comments Due: 5 p.m. ET 7/16/19. Docket Numbers: ER19–2241–000. Applicants: Midcontinent Independent System Operator, Inc., International Transmission Company, Michigan Electric Transmission Company. Dated: June 25, 2019. Description: § 205(d) Rate Filing: Kimberly D. Bose, 2019–06–24_ITC Schedule 33 Blackstart to be effective 8/24/2019. Secretary. Filed Date: 6/24/19. [FR Doc. 2019–13972 Filed 6–28–19; 8:45 am] Accession Number: 20190624–5156. BILLING CODE 6717–01–P Comments Due: 5 p.m. ET 7/15/19. Docket Numbers: ER19–2242–000. DEPARTMENT OF ENERGY Applicants: Southwest Power Pool, Inc. Federal Energy Regulatory Description: § 205(d) Rate Filing: Commission 1977R13 Nemaha-Marshall Electric Cooperative NITSA NOA to be effective Combined Notice of Filings #1 9/1/2019. Filed Date: 6/25/19. Take notice that the Commission Accession Number: 20190625–5038. received the following electric rate Comments Due: 5 p.m. ET 7/16/19. filings: Docket Numbers: ER19–2243–000. Docket Numbers: ER18–1906–001; Applicants: Southwest Power Pool, ER16–221–002; ER18–1907–001; ER17– 1757–002; ER10–1767–004; ER10–1532– Inc. Description: § 205(d) Rate Filing: 004; ER10–1541–005; ER10–1642–006; 1636R23 Kansas Electric Power ER13–2349–003; ER13–2350–003. Cooperative, Inc. NITSA NOA to be Applicants: Entergy Arkansas, LLC, effective 9/1/2019. Entergy Louisiana, LLC, Entergy Filed Date: 6/25/19. Mississippi, LLC, Entergy New Orleans, Accession Number: 20190625–5045. LLC, Entergy Texas, Inc., Entergy Comments Due: 5 p.m. ET 7/16/19. Nuclear Palisades, LLC, Entergy Power, LLC, EWO Marketing, LLC, EAM Nelson Docket Numbers: ER19–2244–000. Holding, LLC, RS Cogen, LLC. Applicants: Southwest Power Pool, Description: Notification of Change in Inc. Status of the Entergy Central MBR Description: § 205(d) Rate Filing: Utilities. 2900R11 KMEA NITSA NOA to be Filed Date: 6/24/19. effective 9/1/2019. Accession Number: 20190624–5177. Filed Date: 6/25/19. Comments Due: 5 p.m. ET 7/15/19. Accession Number: 20190625–5060. Comments Due: 5 p.m. ET 7/16/19. Docket Numbers: ER18–2002–002. Applicants: Essential Power Rock Docket Numbers: ER19–2245–000. Springs, LLC. Applicants: Midcontinent Description: Compliance filing: Independent System Operator, In., Settlement Compliance Filing to be ALLETE, Inc. effective 9/14/2018. Description: § 205(d) Rate Filing: Filed Date: 6/25/19. 2019–06–25_SA 3318 MP-Enbridge Accession Number: 20190625–5042. Reimbursement Agreement (Swatara) to Comments Due: 5 p.m. ET 7/16/19. be effective 6/25/2019. Docket Numbers: ER18–2270–003. Filed Date: 6/25/19. PO 00000 Frm 00026 Fmt 4703 Sfmt 4703 E:\FR\FM\01JYN1.SGM 01JYN1 khammond on DSKBBV9HB2PROD with NOTICES Federal Register / Vol. 84, No. 126 / Monday, July 1, 2019 / Notices Accession Number: 20190625–5070. Comments Due: 5 p.m. ET 7/16/19. Docket Numbers: ER19–2246–000. Applicants: Wellhead Power Gates, LLC. Description: Tariff Cancellation: Notice of Cancellation of MBR Tariff to be effective 8/23/2019. Filed Date: 6/25/19. Accession Number: 20190625–5081. Comments Due: 5 p.m. ET 7/16/19. Docket Numbers: ER19–2247–000. Applicants: AEP Texas Inc. Description: § 205(d) Rate Filing: AEPTX-Big Country EC-Golden Spread EC IA 1st Amend & Restated to be effective 6/12/2019. Filed Date: 6/25/19. Accession Number: 20190625–5100. Comments Due: 5 p.m. ET 7/16/19. Docket Numbers: ER19–2248–000. Applicants: Pacific Gas and Electric Company. Description: § 205(d) Rate Filing: Amendment to Extend CCSF Hunters Point (SA 36) to be effective 7/1/2019. Filed Date: 6/25/19. Accession Number: 20190625–5101. Comments Due: 5 p.m. ET 7/16/19. Docket Numbers: ER19–2249–000. Applicants: CSOLAR IV West, LLC. Description: § 205(d) Rate Filing: Market-Based Rate Tariff Revisions to be effective 6/26/2019. Filed Date: 6/25/19. Accession Number: 20190625–5102. Comments Due: 5 p.m. ET 7/16/19. Docket Numbers: ER19–2250–000. Applicants: TrailStone Energy Marketing, LLC. Description: § 205(d) Rate Filing: Name change filing Normal 2019 to be effective 6/26/2019. Filed Date: 6/25/19. Accession Number: 20190625–5103. Comments Due: 5 p.m. ET 7/16/19. Take notice that the Commission received the following electric securities filings: Docket Numbers: ES19–36–000. Applicants: NorthWestern Corporation. Description: Application for Authorization Under Section 204 of the Federal Power Act to Issue Securities of NorthWestern Corporation. Filed Date: 6/25/19. Accession Number: 20190625–5072. Comments Due: 5 p.m. ET 7/16/19. Take notice that the Commission received the following public utility holding company filings: Docket Numbers: PH19–13–000. Applicants: Spire Inc. Description: Spire Inc. submits FERC 65–A Notice of Material Change in Facts of Exemption Notification. VerDate Sep<11>2014 19:58 Jun 28, 2019 Jkt 247001 Filed Date: 6/25/19. Accession Number: 20190625–5105. Comments Due: 5 p.m. ET 7/16/19. The filings are accessible in the Commission’s eLibrary system by clicking on the links or querying the docket number. Any person desiring to intervene or protest in any of the above proceedings must file in accordance with Rules 211 and 214 of the Commission’s Regulations (18 CFR 385.211 and 385.214) on or before 5:00 p.m. Eastern time on the specified comment date. Protests may be considered, but intervention is necessary to become a party to the proceeding. eFiling is encouraged. More detailed information relating to filing requirements, interventions, protests, service, and qualifying facilities filings can be found at: https://www.ferc.gov/ docs-filing/efiling/filing-req.pdf. For other information, call (866) 208–3676 (toll free). For TTY, call (202) 502–8659. Dated: June 25, 2019. Nathaniel J. Davis, Sr., Deputy Secretary. [FR Doc. 2019–13950 Filed 6–28–19; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. EL19–82–000] Harbor Cogeneration Company, LLC v. Southern California Edison Company; Notice of Complaint Take notice that on June 24, 2019, pursuant to sections 206, 306, and 309 of the Federal Power Act, 16 U.S.C. 824e, 825e, and 825h, and Rule 206 of the Federal Energy Regulatory Commission’s (Commission) Rules of Practice and Procedure, 18 CFR 385.206, 385.212, and 385.217, Harbor Cogeneration Company LLC (Complainant) filed a formal complaint against Southern California Edison Company (Respondent) alleging that Respondent has assessed and collected charges that violate its Transmission Owner Tariff on file with the Commission as the rate schedule governing the service that Respondent has provided to Complainant under a series of interconnection agreements and related amendments, all as more fully explained in the complaint. The Complainant certifies that copies of the complaint were served on the contacts listed for Respondent in the Commission’s list of Corporate Officials. Any person desiring to intervene or to protest this filing must file in PO 00000 Frm 00027 Fmt 4703 Sfmt 4703 31313 accordance with Rules 211 and 214 of the Commission’s Rules of Practice and Procedure (18 CFR 385.211, 385.214). Protests will be considered by the Commission in determining the appropriate action to be taken, but will not serve to make protestants parties to the proceeding. Any person wishing to become a party must file a notice of intervention or motion to intervene, as appropriate. The Respondent’s answer and all interventions, or protests must be filed on or before the comment date. The Respondent’s answer, motions to intervene, and protests must be served on the Complainants. The Commission encourages electronic submission of protests and interventions in lieu of paper using the ‘‘eFiling’’ link at https://www.ferc.gov. Persons unable to file electronically should submit an original and 5 copies of the protest or intervention to the Federal Energy Regulatory Commission, 888 First Street NE, Washington, DC 20426. This filing is accessible on-line at https://www.ferc.gov, using the ‘‘eLibrary’’ link and is available for electronic review in the Commission’s Public Reference Room in Washington, DC. There is an ‘‘eSubscription’’ link on the website that enables subscribers to receive email notification when a document is added to a subscribed docket(s). For assistance with any FERC Online service, please email FERCOnlineSupport@ferc.gov, or call (866) 208–3676 (toll free). For TTY, call (202) 502–8659. Comment Date: 5 p.m. Eastern Time on July 15, 2019. Dated: June 25, 2019. Kimberly D. Bose, Secretary. [FR Doc. 2019–13973 Filed 6–28–19; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. EL19–74–000] Notice of Institution of Section 206 Proceeding and Refund Effective Date: Diamond State Generation Partners, LLC On June 25, 2019, the Commission issued an order in Docket No. EL19–74– 000, pursuant to section 206 of the Federal Power Act (FPA), 16 U.S.C. 824e (2012), instituting an investigation into the continued justness and reasonableness of Diamond State Generation Partners, LLC’s rates for E:\FR\FM\01JYN1.SGM 01JYN1

Agencies

[Federal Register Volume 84, Number 126 (Monday, July 1, 2019)]
[Notices]
[Pages 31312-31313]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2019-13950]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission


Combined Notice of Filings #1

    Take notice that the Commission received the following electric 
rate filings:

    Docket Numbers: ER18-1906-001; ER16-221-002; ER18-1907-001; ER17-
1757-002; ER10-1767-004; ER10-1532-004; ER10-1541-005; ER10-1642-006; 
ER13-2349-003; ER13-2350-003.
    Applicants: Entergy Arkansas, LLC, Entergy Louisiana, LLC, Entergy 
Mississippi, LLC, Entergy New Orleans, LLC, Entergy Texas, Inc., 
Entergy Nuclear Palisades, LLC, Entergy Power, LLC, EWO Marketing, LLC, 
EAM Nelson Holding, LLC, RS Cogen, LLC.
    Description: Notification of Change in Status of the Entergy 
Central MBR Utilities.
    Filed Date: 6/24/19.
    Accession Number: 20190624-5177.
    Comments Due: 5 p.m. ET 7/15/19.

    Docket Numbers: ER18-2002-002.
    Applicants: Essential Power Rock Springs, LLC.
    Description: Compliance filing: Settlement Compliance Filing to be 
effective 9/14/2018.
    Filed Date: 6/25/19.
    Accession Number: 20190625-5042.
    Comments Due: 5 p.m. ET 7/16/19.

    Docket Numbers: ER18-2270-003.
    Applicants: Paulding Wind Farm III LLC.
    Description: Compliance filing: Compliance Filing Under ER19-2270 
to be effective 10/20/2018.
    Filed Date: 6/25/19.
    Accession Number: 20190625-5009.
    Comments Due: 5 p.m. ET 7/16/19.

    Docket Numbers: ER18-2317-003.
    Applicants: Meadow Lake Wind Farm V LLC.
    Description: Compliance filing: Compliance Filing Under ER19-2317 
to be effective 10/27/2018.
    Filed Date: 6/25/19.
    Accession Number: 20190625-5008.
    Comments Due: 5 p.m. ET 7/16/19.

    Docket Numbers: ER19-2241-000.
    Applicants: Midcontinent Independent System Operator, Inc., 
International Transmission Company, Michigan Electric Transmission 
Company.
    Description: Sec.  205(d) Rate Filing: 2019-06-24_ITC Schedule 33 
Blackstart to be effective 8/24/2019.
    Filed Date: 6/24/19.
    Accession Number: 20190624-5156.
    Comments Due: 5 p.m. ET 7/15/19.

    Docket Numbers: ER19-2242-000.
    Applicants: Southwest Power Pool, Inc.
    Description: Sec.  205(d) Rate Filing: 1977R13 Nemaha-Marshall 
Electric Cooperative NITSA NOA to be effective 9/1/2019.
    Filed Date: 6/25/19.
    Accession Number: 20190625-5038.
    Comments Due: 5 p.m. ET 7/16/19.

    Docket Numbers: ER19-2243-000.
    Applicants: Southwest Power Pool, Inc.
    Description: Sec.  205(d) Rate Filing: 1636R23 Kansas Electric 
Power Cooperative, Inc. NITSA NOA to be effective 9/1/2019.
    Filed Date: 6/25/19.
    Accession Number: 20190625-5045.
    Comments Due: 5 p.m. ET 7/16/19.

    Docket Numbers: ER19-2244-000.
    Applicants: Southwest Power Pool, Inc.
    Description: Sec.  205(d) Rate Filing: 2900R11 KMEA NITSA NOA to be 
effective 9/1/2019.
    Filed Date: 6/25/19.
    Accession Number: 20190625-5060.
    Comments Due: 5 p.m. ET 7/16/19.

    Docket Numbers: ER19-2245-000.
    Applicants: Midcontinent Independent System Operator, In., ALLETE, 
Inc.
    Description: Sec.  205(d) Rate Filing: 2019-06-25_SA 3318 MP-
Enbridge Reimbursement Agreement (Swatara) to be effective 6/25/2019.
    Filed Date: 6/25/19.

[[Page 31313]]

    Accession Number: 20190625-5070.
    Comments Due: 5 p.m. ET 7/16/19.

    Docket Numbers: ER19-2246-000.
    Applicants: Wellhead Power Gates, LLC.
    Description: Tariff Cancellation: Notice of Cancellation of MBR 
Tariff to be effective 8/23/2019.
    Filed Date: 6/25/19.
    Accession Number: 20190625-5081.
    Comments Due: 5 p.m. ET 7/16/19.

    Docket Numbers: ER19-2247-000.
    Applicants: AEP Texas Inc.
    Description: Sec.  205(d) Rate Filing: AEPTX-Big Country EC-Golden 
Spread EC IA 1st Amend & Restated to be effective 6/12/2019.
    Filed Date: 6/25/19.
    Accession Number: 20190625-5100.
    Comments Due: 5 p.m. ET 7/16/19.

    Docket Numbers: ER19-2248-000.
    Applicants: Pacific Gas and Electric Company.
    Description: Sec.  205(d) Rate Filing: Amendment to Extend CCSF 
Hunters Point (SA 36) to be effective 7/1/2019.
    Filed Date: 6/25/19.
    Accession Number: 20190625-5101.
    Comments Due: 5 p.m. ET 7/16/19.

    Docket Numbers: ER19-2249-000.
    Applicants: CSOLAR IV West, LLC.
    Description: Sec.  205(d) Rate Filing: Market-Based Rate Tariff 
Revisions to be effective 6/26/2019.
    Filed Date: 6/25/19.
    Accession Number: 20190625-5102.
    Comments Due: 5 p.m. ET 7/16/19.

    Docket Numbers: ER19-2250-000.
    Applicants: TrailStone Energy Marketing, LLC.
    Description: Sec.  205(d) Rate Filing: Name change filing Normal 
2019 to be effective 6/26/2019.
    Filed Date: 6/25/19.
    Accession Number: 20190625-5103.
    Comments Due: 5 p.m. ET 7/16/19.

    Take notice that the Commission received the following electric 
securities filings:

    Docket Numbers: ES19-36-000.
    Applicants: NorthWestern Corporation.
    Description: Application for Authorization Under Section 204 of the 
Federal Power Act to Issue Securities of NorthWestern Corporation.
    Filed Date: 6/25/19.
    Accession Number: 20190625-5072.
    Comments Due: 5 p.m. ET 7/16/19.

    Take notice that the Commission received the following public 
utility holding company filings:

    Docket Numbers: PH19-13-000.
    Applicants: Spire Inc.
    Description: Spire Inc. submits FERC 65-A Notice of Material Change 
in Facts of Exemption Notification.
    Filed Date: 6/25/19.
    Accession Number: 20190625-5105.
    Comments Due: 5 p.m. ET 7/16/19.
    The filings are accessible in the Commission's eLibrary system by 
clicking on the links or querying the docket number.

    Any person desiring to intervene or protest in any of the above 
proceedings must file in accordance with Rules 211 and 214 of the 
Commission's Regulations (18 CFR 385.211 and 385.214) on or before 5:00 
p.m. Eastern time on the specified comment date. Protests may be 
considered, but intervention is necessary to become a party to the 
proceeding.
    eFiling is encouraged. More detailed information relating to filing 
requirements, interventions, protests, service, and qualifying 
facilities filings can be found at: https://www.ferc.gov/docs-filing/efiling/filing-req.pdf. For other information, call (866) 208-3676 
(toll free). For TTY, call (202) 502-8659.

    Dated: June 25, 2019.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2019-13950 Filed 6-28-19; 8:45 am]
 BILLING CODE 6717-01-P
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.