Notice of Preliminary Determination of a Qualifying Conduit Hydropower Facility and Soliciting Comments and Motions To Intervene; InPipe Energy, 31311-31312 [2019-13934]
Download as PDF
Federal Register / Vol. 84, No. 126 / Monday, July 1, 2019 / Notices
intervention because they allege that the
Authority failed to demonstrate an
interest that may be directly affected by
the outcome of the proceeding or that
the Authority’s participation is in the
public interest.3 In its March 15, 2019
response, the Authority states that it is
an agent for the five municipalities that
surround Candlewood Lake and act on
their behalf on matters related to lake,
shoreline, and watershed management
to foster the preservation and
enhancement of recreational, economic,
scenic, public safety, and environmental
values of Candlewood Lake.4
Pursuant to Rule 214(c)(2) of the
Commission’s Rules of Practice and
Procedure, if an answer in opposition to
a timely motion to intervene is filed
within 15 days after the motion to
intervene is filed, the movant becomes
a party only when the motion is
expressly granted.5
The Authority has an interest in the
potential project impacts on
Candlewood Lake. Therefore, the
Authority’s motion to intervene is
granted.
Dated: June 25, 2019.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2019–13953 Filed 6–28–19; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. CD19–8–000]
Notice of Preliminary Determination of
a Qualifying Conduit Hydropower
Facility and Soliciting Comments and
Motions To Intervene; InPipe Energy
On June 13, 2019, InPipe Energy filed
a notice of intent to construct a
qualifying conduit hydropower facility,
pursuant to section 30 of the Federal
Power Act (FPA). The proposed Carson
Water Recycling Facility Hydroelectric
Project would have an installed capacity
of 130 kilowatts (kW), and would be
located along an existing 14-inch
pipeline within the Juanita Millender-
31311
McDonald Carson Regional Water
Recycling Plant in the city of Carson,
Los Angeles County, California.
Applicant Contact: Gregg Semler,
InPipe Energy, 222 NW 8th Ave.,
Portland, OR 97209, Phone No. (503)
341–0004, Email: gregg@
inpipeenergy.com.
FERC Contact: Christopher Chaney,
Phone No. (202) 502–6778, Email:
christopher.chaney@ferc.gov.
Qualifying Conduit Hydropower
Facility Description: The proposed
project would consist of: (1) One 130kW turbine-generator unit; (2) a 12-inch
pipeline transporting water from the
existing 14-inch pipeline to the
generator, and returning it to the
mainline; and (3) appurtenant facilities.
The proposed project would have an
estimated annual generation of up to
575 megawatt-hours.
A qualifying conduit hydropower
facility is one that is determined or
deemed to meet all of the criteria shown
in the table below.
TABLE 1—CRITERIA FOR QUALIFYING CONDUIT HYDROPOWER FACILITY
Statutory provision
Description
Satisfies
(Y/N)
FPA 30(a)(3)(A) .........................
The conduit the facility uses is a tunnel, canal, pipeline, aqueduct, flume, ditch, or similar manmade water conveyance that is operated for the distribution of water for agricultural, municipal, or industrial consumption and not primarily for the generation of electricity.
The facility is constructed, operated, or maintained for the generation of electric power and
uses for such generation only the hydroelectric potential of a non-federally owned conduit.
The facility has an installed capacity that does not exceed 40 megawatts ...................................
On or before August 9, 2013, the facility is not licensed, or exempted from the licensing requirements of Part I of the FPA.
Y
FPA 30(a)(3)(C)(i) ......................
khammond on DSKBBV9HB2PROD with NOTICES
FPA 30(a)(3)(C)(ii) .....................
FPA 30(a)(3)(C)(iii) ....................
Preliminary Determination: The
proposed Carson Water Recycling
Facility Hydroelectric Project will not
interfere with the primary purpose of
the conduit, which is used for the City’s
non-potable municipal water supply
distribution system, which feeds
commercial, industrial, and residential
customers. Therefore, based upon the
above criteria, Commission staff
preliminarily determines that the
proposal satisfies the requirements for a
qualifying conduit hydropower facility,
which is not required to be licensed or
exempted from licensing.
Comments and Motions to Intervene:
Deadline for filing comments contesting
whether the facility meets the qualifying
criteria is 30 days from the issuance
date of this notice.
Deadline for filing motions to
intervene is 30 days from the issuance
date of this notice.
3 See
Applicants’ March 7, 2019 Answer at 2.
VerDate Sep<11>2014
19:58 Jun 28, 2019
Jkt 247001
Anyone may submit comments or a
motion to intervene in accordance with
the requirements of Rules of Practice
and Procedure, 18 CFR 385.210 and
385.214. Any motions to intervene must
be received on or before the specified
deadline date for the particular
proceeding.
Filing and Service of Responsive
Documents: All filings must (1) bear in
all capital letters the ‘‘COMMENTS
CONTESTING QUALIFICATION FOR A
CONDUIT HYDROPOWER FACILITY’’
or ‘‘MOTION TO INTERVENE,’’ as
applicable; (2) state in the heading the
name of the applicant and the project
number of the application to which the
filing responds; (3) state the name,
address, and telephone number of the
person filing; and (4) otherwise comply
with the requirements of sections
385.2001 through 385.2005 of the
Commission’s regulations.1 All
4 The Authority’s March 15, 2019 Supplemental
Filing at 1–2.
PO 00000
Frm 00025
Fmt 4703
Sfmt 4703
Y
Y
Y
comments contesting Commission staff’s
preliminary determination that the
facility meets the qualifying criteria
must set forth their evidentiary basis.
The Commission strongly encourages
electronic filing. Please file motions to
intervene and comments using the
Commission’s eFiling system at https://
www.ferc.gov/docs-filing/efiling.asp.
Commenters can submit brief comments
up to 6,000 characters, without prior
registration, using the eComment system
at https://www.ferc.gov/docs-filing/
ecomment.asp. You must include your
name and contact information at the end
of your comments. For assistance,
please contact FERC Online Support at
FERCOnlineSupport@ferc.gov, (866)
208–3676 (toll free), or (202) 502–8659
(TTY). In lieu of electronic filing, please
send a paper copy to: Secretary, Federal
Energy Regulatory Commission, 888
First Street NE, Washington, DC 20426.
5 18
1 18
E:\FR\FM\01JYN1.SGM
CFR 385.214(c) (2018).
CFR 385.2001–2005 (2018).
01JYN1
31312
Federal Register / Vol. 84, No. 126 / Monday, July 1, 2019 / Notices
A copy of all other filings in reference
to this application must be accompanied
by proof of service on all persons listed
in the service list prepared by the
Commission in this proceeding, in
accordance with 18 CFR 4.34(b) and
385.2010.
Locations of Notice of Intent: Copies
of the notice of intent can be obtained
directly from the applicant or such
copies can be viewed and reproduced at
the Commission in its Public Reference
Room, Room 2A, 888 First Street NE,
Washington, DC 20426. The filing may
also be viewed on the web at https://
www.ferc.gov/docs-filing/elibrary.asp
using the ‘‘eLibrary’’ link. Enter the
docket number (i.e., CD19–8) in the
docket number field to access the
document. For assistance, call toll-free
1–866–208–3676 or email
FERCOnlineSupport@ferc.gov. For TTY,
call (202) 502–8659.
Dated: June 24, 2019.
Kimberly D. Bose,
Secretary.
[FR Doc. 2019–13934 Filed 6–28–19; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 2082–062; Project No. 14803–
000]
khammond on DSKBBV9HB2PROD with NOTICES
PacifiCorp; Klamath River Renewal
Corporation; Notice of Teleconference
for Tribal Consultation Meeting
a. Project Names and Numbers:
Klamath and Lower Klamath
Hydroelectric Projects No. 2082 and
14803.
b. Project licensee: PacifiCorp and
Klamath River Renewal Corporation.
c. Date and Time of Teleconference:
Tuesday, July 9, 2019, from 1:00 p.m. to
3:00 p.m. Eastern Standard Time.
d. FERC Contact Jennifer Polardino,
(202) 502–6437 or jennifer.polardino@
ferc.gov.
e. Purpose of Meeting: Commission
staff will hold a teleconference with the
Yurok Tribe to discuss PacifiCorp and
the Klamath River Renewal
Corporation’s (Renewal Corporation)
application to transfer the Lower
Klamath Project No. 14803, consisting of
the J.C. Boyle, Copco No. 1, Copco No.
2, and Iron Gate developments, to the
Renewal Corporation. If the Commission
were to approve the transfer application,
then in a separate proceeding, the
Renewal Corporation would propose to
surrender the project license and
remove the above four developments.
VerDate Sep<11>2014
19:58 Jun 28, 2019
Jkt 247001
f. Members of the public and
intervenors in the referenced
proceedings may attend the
teleconference; however, participation
will be limited to tribal representatives
of the Yurok Tribe and the
Commission’s representatives. If the
Yurok Tribe decides to disclose
information about a specific location
which could create a risk or harm to an
archaeological site or Native American
cultural resource, the public will be
excused for that portion of the meeting
when such information is disclosed.
The teleconference meeting will be
transcribed by a court reporter and the
transcript will be placed in the public
record of these proceedings.
g. Please call or email Jennifer
Polardino at (202) 502–6437 or
jennifer.polardino@ferc.gov by Monday,
July 8, 2019, to RSVP and to receive the
teleconference call-in information.
Applicants: Paulding Wind Farm III
LLC.
Description: Compliance filing:
Compliance Filing Under ER19–2270 to
be effective 10/20/2018.
Filed Date: 6/25/19.
Accession Number: 20190625–5009.
Comments Due: 5 p.m. ET 7/16/19.
Docket Numbers: ER18–2317–003.
Applicants: Meadow Lake Wind Farm
V LLC.
Description: Compliance filing:
Compliance Filing Under ER19–2317 to
be effective 10/27/2018.
Filed Date: 6/25/19.
Accession Number: 20190625–5008.
Comments Due: 5 p.m. ET 7/16/19.
Docket Numbers: ER19–2241–000.
Applicants: Midcontinent
Independent System Operator, Inc.,
International Transmission Company,
Michigan Electric Transmission
Company.
Dated: June 25, 2019.
Description: § 205(d) Rate Filing:
Kimberly D. Bose,
2019–06–24_ITC Schedule 33 Blackstart
to be effective 8/24/2019.
Secretary.
Filed Date: 6/24/19.
[FR Doc. 2019–13972 Filed 6–28–19; 8:45 am]
Accession Number: 20190624–5156.
BILLING CODE 6717–01–P
Comments Due: 5 p.m. ET 7/15/19.
Docket Numbers: ER19–2242–000.
DEPARTMENT OF ENERGY
Applicants: Southwest Power Pool,
Inc.
Federal Energy Regulatory
Description: § 205(d) Rate Filing:
Commission
1977R13 Nemaha-Marshall Electric
Cooperative NITSA NOA to be effective
Combined Notice of Filings #1
9/1/2019.
Filed Date: 6/25/19.
Take notice that the Commission
Accession Number: 20190625–5038.
received the following electric rate
Comments Due: 5 p.m. ET 7/16/19.
filings:
Docket Numbers: ER19–2243–000.
Docket Numbers: ER18–1906–001;
Applicants: Southwest Power Pool,
ER16–221–002; ER18–1907–001; ER17–
1757–002; ER10–1767–004; ER10–1532– Inc.
Description: § 205(d) Rate Filing:
004; ER10–1541–005; ER10–1642–006;
1636R23 Kansas Electric Power
ER13–2349–003; ER13–2350–003.
Cooperative, Inc. NITSA NOA to be
Applicants: Entergy Arkansas, LLC,
effective 9/1/2019.
Entergy Louisiana, LLC, Entergy
Filed Date: 6/25/19.
Mississippi, LLC, Entergy New Orleans,
Accession Number: 20190625–5045.
LLC, Entergy Texas, Inc., Entergy
Comments Due: 5 p.m. ET 7/16/19.
Nuclear Palisades, LLC, Entergy Power,
LLC, EWO Marketing, LLC, EAM Nelson
Docket Numbers: ER19–2244–000.
Holding, LLC, RS Cogen, LLC.
Applicants: Southwest Power Pool,
Description: Notification of Change in Inc.
Status of the Entergy Central MBR
Description: § 205(d) Rate Filing:
Utilities.
2900R11 KMEA NITSA NOA to be
Filed Date: 6/24/19.
effective 9/1/2019.
Accession Number: 20190624–5177.
Filed Date: 6/25/19.
Comments Due: 5 p.m. ET 7/15/19.
Accession Number: 20190625–5060.
Comments Due: 5 p.m. ET 7/16/19.
Docket Numbers: ER18–2002–002.
Applicants: Essential Power Rock
Docket Numbers: ER19–2245–000.
Springs, LLC.
Applicants: Midcontinent
Description: Compliance filing:
Independent System Operator, In.,
Settlement Compliance Filing to be
ALLETE, Inc.
effective 9/14/2018.
Description: § 205(d) Rate Filing:
Filed Date: 6/25/19.
2019–06–25_SA 3318 MP-Enbridge
Accession Number: 20190625–5042.
Reimbursement Agreement (Swatara) to
Comments Due: 5 p.m. ET 7/16/19.
be effective 6/25/2019.
Docket Numbers: ER18–2270–003.
Filed Date: 6/25/19.
PO 00000
Frm 00026
Fmt 4703
Sfmt 4703
E:\FR\FM\01JYN1.SGM
01JYN1
Agencies
[Federal Register Volume 84, Number 126 (Monday, July 1, 2019)]
[Notices]
[Pages 31311-31312]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2019-13934]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Docket No. CD19-8-000]
Notice of Preliminary Determination of a Qualifying Conduit
Hydropower Facility and Soliciting Comments and Motions To Intervene;
InPipe Energy
On June 13, 2019, InPipe Energy filed a notice of intent to
construct a qualifying conduit hydropower facility, pursuant to section
30 of the Federal Power Act (FPA). The proposed Carson Water Recycling
Facility Hydroelectric Project would have an installed capacity of 130
kilowatts (kW), and would be located along an existing 14-inch pipeline
within the Juanita Millender-McDonald Carson Regional Water Recycling
Plant in the city of Carson, Los Angeles County, California.
Applicant Contact: Gregg Semler, InPipe Energy, 222 NW 8th Ave.,
Portland, OR 97209, Phone No. (503) 341-0004, Email:
[email protected].
FERC Contact: Christopher Chaney, Phone No. (202) 502-6778, Email:
[email protected].
Qualifying Conduit Hydropower Facility Description: The proposed
project would consist of: (1) One 130-kW turbine-generator unit; (2) a
12-inch pipeline transporting water from the existing 14-inch pipeline
to the generator, and returning it to the mainline; and (3) appurtenant
facilities. The proposed project would have an estimated annual
generation of up to 575 megawatt-hours.
A qualifying conduit hydropower facility is one that is determined
or deemed to meet all of the criteria shown in the table below.
Table 1--Criteria for Qualifying Conduit Hydropower Facility
----------------------------------------------------------------------------------------------------------------
Satisfies (Y/
Statutory provision Description N)
----------------------------------------------------------------------------------------------------------------
FPA 30(a)(3)(A)................................ The conduit the facility uses is a tunnel, canal, Y
pipeline, aqueduct, flume, ditch, or similar
manmade water conveyance that is operated for
the distribution of water for agricultural,
municipal, or industrial consumption and not
primarily for the generation of electricity.
FPA 30(a)(3)(C)(i)............................. The facility is constructed, operated, or Y
maintained for the generation of electric power
and uses for such generation only the
hydroelectric potential of a non-federally owned
conduit.
FPA 30(a)(3)(C)(ii)............................ The facility has an installed capacity that does Y
not exceed 40 megawatts.
FPA 30(a)(3)(C)(iii)........................... On or before August 9, 2013, the facility is not Y
licensed, or exempted from the licensing
requirements of Part I of the FPA.
----------------------------------------------------------------------------------------------------------------
Preliminary Determination: The proposed Carson Water Recycling
Facility Hydroelectric Project will not interfere with the primary
purpose of the conduit, which is used for the City's non-potable
municipal water supply distribution system, which feeds commercial,
industrial, and residential customers. Therefore, based upon the above
criteria, Commission staff preliminarily determines that the proposal
satisfies the requirements for a qualifying conduit hydropower
facility, which is not required to be licensed or exempted from
licensing.
Comments and Motions to Intervene: Deadline for filing comments
contesting whether the facility meets the qualifying criteria is 30
days from the issuance date of this notice.
Deadline for filing motions to intervene is 30 days from the
issuance date of this notice.
Anyone may submit comments or a motion to intervene in accordance
with the requirements of Rules of Practice and Procedure, 18 CFR
385.210 and 385.214. Any motions to intervene must be received on or
before the specified deadline date for the particular proceeding.
Filing and Service of Responsive Documents: All filings must (1)
bear in all capital letters the ``COMMENTS CONTESTING QUALIFICATION FOR
A CONDUIT HYDROPOWER FACILITY'' or ``MOTION TO INTERVENE,'' as
applicable; (2) state in the heading the name of the applicant and the
project number of the application to which the filing responds; (3)
state the name, address, and telephone number of the person filing; and
(4) otherwise comply with the requirements of sections 385.2001 through
385.2005 of the Commission's regulations.\1\ All comments contesting
Commission staff's preliminary determination that the facility meets
the qualifying criteria must set forth their evidentiary basis.
---------------------------------------------------------------------------
\1\ 18 CFR 385.2001-2005 (2018).
---------------------------------------------------------------------------
The Commission strongly encourages electronic filing. Please file
motions to intervene and comments using the Commission's eFiling system
at https://www.ferc.gov/docs-filing/efiling.asp. Commenters can submit
brief comments up to 6,000 characters, without prior registration,
using the eComment system at https://www.ferc.gov/docs-filing/ecomment.asp. You must include your name and contact information at the
end of your comments. For assistance, please contact FERC Online
Support at [email protected], (866) 208-3676 (toll free), or
(202) 502-8659 (TTY). In lieu of electronic filing, please send a paper
copy to: Secretary, Federal Energy Regulatory Commission, 888 First
Street NE, Washington, DC 20426.
[[Page 31312]]
A copy of all other filings in reference to this application must be
accompanied by proof of service on all persons listed in the service
list prepared by the Commission in this proceeding, in accordance with
18 CFR 4.34(b) and 385.2010.
Locations of Notice of Intent: Copies of the notice of intent can
be obtained directly from the applicant or such copies can be viewed
and reproduced at the Commission in its Public Reference Room, Room 2A,
888 First Street NE, Washington, DC 20426. The filing may also be
viewed on the web at https://www.ferc.gov/docs-filing/elibrary.asp using
the ``eLibrary'' link. Enter the docket number (i.e., CD19-8) in the
docket number field to access the document. For assistance, call toll-
free 1-866-208-3676 or email [email protected]. For TTY, call
(202) 502-8659.
Dated: June 24, 2019.
Kimberly D. Bose,
Secretary.
[FR Doc. 2019-13934 Filed 6-28-19; 8:45 am]