Polaris Wind Energy LLC; Supplemental Notice That Initial Market-Based Rate Filing Includes Request for Blanket Section 204 Authorization, 31057-31058 [2019-13846]

Download as PDF khammond on DSKBBV9HB2PROD with NOTICES Federal Register / Vol. 84, No. 125 / Friday, June 28, 2019 / Notices mark@gravityrenewables.com and/or Celeste N. Fay, Regulatory Manager, Gravity Renewables, Inc., 5 Dartmouth Drive, Suite 104, Auburn, NH 03032; (413) 262–9466; email—celeste@ gravityrenewables.com. i. FERC Contact: Monir Chowdhury at (202) 502–6736; or email at monir.chowdhury@ferc.gov. j. Cooperating agencies: Federal, state, local, and tribal agencies with jurisdiction and/or special expertise with respect to environmental issues that wish to cooperate in the preparation of the environmental document should follow the instructions for filing such requests described in item l below. Cooperating agencies should note the Commission’s policy that agencies that cooperate in the preparation of the environmental document cannot also intervene. See, 94 FERC ¶ 61,076 (2001). k. Pursuant to section 4.32(b)(7) of 18 CFR of the Commission’s regulations, if any resource agency, Indian Tribe, or person believes that an additional scientific study should be conducted in order to form an adequate factual basis for a complete analysis of the application on its merit, the resource agency, Indian Tribe, or person must file a request for a study with the Commission not later than 60 days from the date of filing of the application, and serve a copy of the request on the applicant. l. Deadline for filing additional study requests and requests for cooperating agency status: July 30, 2019. The Commission strongly encourages electronic filing. Please file additional study requests and requests for cooperating agency status using the Commission’s eFiling system at https:// www.ferc.gov/docs-filing/efiling.asp. For assistance, please contact FERC Online Support at FERCOnlineSupport@ ferc.gov, (866) 208–3676 (toll free), or (202) 502–8659 (TTY). In lieu of electronic filing, please send a paper copy to: Secretary, Federal Energy Regulatory Commission, 888 First Street NE, Washington, DC 20426. The first page of any filing should include docket number P–3273–024. m. This application is not ready for environmental analysis at this time. n. The Chittenden Falls Project consists of the following existing facilities: (1) An approximately 4-foothigh, 320-foot-long overflow concrete gravity dam, topped with 2-foot-high wooden flashboards, and having a dam crest elevation of 59.6 feet National Geodetic Vertical Datum of 1929 (NGVD29); (2) a reservoir with a surface area of about 18 acres and a storage capacity of 63 acre-feet at a normal pool VerDate Sep<11>2014 17:41 Jun 27, 2019 Jkt 247001 elevation of 61.6 feet NGVD29; (3) an 8foot-wide, 22-foot-long intake structure on the east side of the dam connecting to an 8-foot-wide, 118-foot-long concrete and wooden power canal; (4) a 7.5-footdiameter, 45-foot-long steel penstock that conveys water from the power canal to a powerhouse on the east side of the dam containing two turbine-generator units with a total rated capacity of 453 kilowatts (kW); (5) an 8-foot-wide, 10foot-long intake structure on the west side of the dam connecting to a 6-footdiameter, 62-foot-long steel penstock; (6) a powerhouse on the west side of the dam containing a single turbinegenerator unit with a rated capacity of 300 kW; (7) two 40-foot-long, 480-volt generator leads connecting the east powerhouse to a transformer yard and a 400-foot-long, 2,300-volt generator lead connecting the west powerhouse to the transformer yard; and (8) appurtenant facilities. The Chittenden Falls Project is operated in a run-of-river mode with an estimated average annual generation of 2,300 megawatt-hours between 2012 and 2018. o. A copy of the application is available for review at the Commission in the Public Reference Room or may be viewed on the Commission’s website at https://www.ferc.gov using the ‘‘eLibrary’’ link. Enter the docket number excluding the last three digits in the docket number field to access the document. For assistance, contact FERC Online Support. A copy is also available for inspection and reproduction at the address in item h above. You may also register online at https:// www.ferc.gov/docs-filing/ esubscription.asp to be notified via email of new filings and issuances related to this or other pending projects. For assistance, contact FERC Online Support. p. Procedural schedule and final amendments: The application will be processed according to the following preliminary schedule. Revisions to the schedule will be made as appropriate. Issue Deficiency Letter (if necessary)— July 2019 Request Additional Information—July 2019 Issue Acceptance Letter—October 2019 Issue Scoping Document 1 for comments—November 2019 Request Additional Information (if necessary)—January 2020 Issue Scoping Document 2—February 2020 Issue notice of ready for environmental analysis—February 2020 Commission issues EA—August 2020 Comments on EA—September 2020 PO 00000 Frm 00041 Fmt 4703 Sfmt 4703 31057 Final amendments to the application must be filed with the Commission no later than 30 days from the issuance date of the notice of ready for environmental analysis. Dated: June 13, 2019. Kimberly D. Bose, Secretary. [FR Doc. 2019–13825 Filed 6–27–19; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. ER19–2230–000] Polaris Wind Energy LLC; Supplemental Notice That Initial Market-Based Rate Filing Includes Request for Blanket Section 204 Authorization This is a supplemental notice in the above-referenced proceeding of Polaris Wind Energy LLC’s application for market-based rate authority, with an accompanying rate tariff, noting that such application includes a request for blanket authorization, under 18 CFR part 34, of future issuances of securities and assumptions of liability. Any person desiring to intervene or to protest should file with the Federal Energy Regulatory Commission, 888 First Street NE, Washington, DC 20426, in accordance with Rules 211 and 214 of the Commission’s Rules of Practice and Procedure (18 CFR 385.211 and 385.214). Anyone filing a motion to intervene or protest must serve a copy of that document on the Applicant. Notice is hereby given that the deadline for filing protests with regard to the applicant’s request for blanket authorization, under 18 CFR part 34, of future issuances of securities and assumptions of liability, is July 15, 2019. The Commission encourages electronic submission of protests and interventions in lieu of paper, using the FERC Online links at https:// www.ferc.gov. To facilitate electronic service, persons with internet access who will eFile a document and/or be listed as a contact for an intervenor must create and validate an eRegistration account using the eRegistration link. Select the eFiling link to log on and submit the intervention or protests. Persons unable to file electronically should submit an original and 5 copies of the intervention or protest to the Federal Energy Regulatory Commission, 888 First Street NE, Washington, DC 20426. E:\FR\FM\28JNN1.SGM 28JNN1 31058 Federal Register / Vol. 84, No. 125 / Friday, June 28, 2019 / Notices The filings in the above-referenced proceeding are accessible in the Commission’s eLibrary system by clicking on the appropriate link in the above list. They are also available for electronic review in the Commission’s Public Reference Room in Washington, DC. There is an eSubscription link on the website that enables subscribers to receive email notification when a document is added to a subscribed docket(s). For assistance with any FERC Online service, please email FERCOnlineSupport@ferc.gov. or call (866) 208–3676 (toll free). For TTY, call (202) 502–8659. Dated: June 24, 2019. Nathaniel J. Davis, Sr., Deputy Secretary. [FR Doc. 2019–13846 Filed 6–27–19; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission khammond on DSKBBV9HB2PROD with NOTICES Combined Notice of Filings #1 Take notice that the Commission received the following exempt wholesale generator filings: Docket Numbers: EG19–141–000. Applicants: SR Meridian III, LLC. Description: Notice of SelfCertification of Exempt Wholesale Generator Status of SR Meridian III, LLC. Filed Date: 6/21/19. Accession Number: 20190621–5189. Comments Due: 5 p.m. ET 7/12/19. Take notice that the Commission received the following electric rate filings: Docket Numbers: ER10–2126–005. Applicants: Idaho Power Company. Description: Updated Market Power Analysis for the Northwest Region of Idaho Power Company. Filed Date: 6/21/19. Accession Number: 20190621–5180. Comments Due: 5 p.m. ET 8/20/19. Docket Numbers: ER11–2105–003. Applicants: Oklahoma Gas and Electric Company. Description: Notice of Non-Material Change in Status of Oklahoma Gas and Electric Company. Filed Date: 6/21/19. Accession Number: 20190621–5184. Comments Due: 5 p.m. ET 7/12/19. Docket Numbers: ER15–1682–008. Applicants: TransCanyon DCR, LLC. Description: Compliance filing: Amended Formula Rate Templace Second Compliance Filing for ADIT to be effective 6/27/2018. VerDate Sep<11>2014 17:41 Jun 27, 2019 Jkt 247001 Filed Date: 6/24/19. Accession Number: 20190624–5106. Comments Due: 5 p.m. ET 7/15/19. Docket Numbers: ER17–802–005. Applicants: Exelon Generation Company, LLC. Description: Compliance filing: Informational Filing Regarding Three Mile Island Unit Retirement to be effective N/A. Filed Date: 6/21/19. Accession Number: 20190621–5081. Comments Due: 5 p.m. ET 7/12/19. Docket Numbers: ER19–1826–001. Applicants: Bolt Energy, LLC. Description: Tariff Amendment: MBR Tariff to be effective 6/12/2019. Filed Date: 6/24/19. Accession Number: 20190624–5117. Comments Due: 5 p.m. ET 7/15/19. Docket Numbers: ER19–2234–000. Applicants: Southwest Power Pool, Inc. Description: § 205(d) Rate Filing: 1276R20 KCPL NITSA NOA to be effective 9/1/2019. Filed Date: 6/24/19. Accession Number: 20190624–5015. Comments Due: 5 p.m. ET 7/15/19. Docket Numbers: ER19–2235–000. Applicants: Tuscola Bay Wind, LLC. Description: Baseline eTariff Filing: Reactive Power Compensation Baseline to be effective 8/23/2019. Filed Date: 6/24/19. Accession Number: 20190624–5044. Comments Due: 5 p.m. ET 7/15/19. Docket Numbers: ER19–2236–000. Applicants: Southwest Power Pool, Inc. Description: § 205(d) Rate Filing: 2415R12 Kansas Municipal Energy Agency NITSA NOA to be effective 9/1/2019. Filed Date: 6/24/19. Accession Number: 20190624–5054. Comments Due: 5 p.m. ET 7/15/19. Docket Numbers: ER19–2237–000. Applicants: Public Service Company of Colorado. Description: § 205(d) Rate Filing: PSCo-TSGT-Utility Svcs Agrmt-379Exhibit D–0.1.0 to be effective 6/25/2019. Filed Date: 6/24/19. Accession Number: 20190624–5056. Comments Due: 5 p.m. ET 7/15/19. Docket Numbers: ER19–2238–000. Applicants: NorthWestern Corporation. Description: § 205(d) Rate Filing: Revised Rate Schedule No. 188 (MT)— Colstrip 1 & 2 Transmission Agreement to be effective 9/1/2019. Filed Date: 6/24/19. Accession Number: 20190624–5074. Comments Due: 5 p.m. ET 7/15/19. PO 00000 Frm 00042 Fmt 4703 Sfmt 4703 Docket Numbers: ER19–2239–000. Applicants: AES Shady Point, LLC. Description: Tariff Cancellation: AES Shady Point Notice of Tariff Cancellation to be effective 6/25/2019. Filed Date: 6/24/19. Accession Number: 20190624–5116. Comments Due: 5 p.m. ET 7/15/19. Docket Numbers: ER19–2240–000. Applicants: PJM Interconnection, L.L.C. Description: § 205(d) Rate Filing: Revisions to the OATT and OA re FTR Hourly Cost Calculation Update to be effective 9/1/2019. Filed Date: 6/24/19. Accession Number: 20190624–5152. Comments Due: 5 p.m. ET 7/15/19. The filings are accessible in the Commission’s eLibrary system by clicking on the links or querying the docket number. Any person desiring to intervene or protest in any of the above proceedings must file in accordance with Rules 211 and 214 of the Commission’s Regulations (18 CFR 385.211 and 385.214) on or before 5:00 p.m. Eastern time on the specified comment date. Protests may be considered, but intervention is necessary to become a party to the proceeding. eFiling is encouraged. More detailed information relating to filing requirements, interventions, protests, service, and qualifying facilities filings can be found at: https://www.ferc.gov/ docs-filing/efiling/filing-req.pdf. For other information, call (866) 208–3676 (toll free). For TTY, call (202) 502–8659. Dated: June 24, 2019. Nathaniel J. Davis, Sr., Deputy Secretary. [FR Doc. 2019–13845 Filed 6–27–19; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. IC19–6–000] Commission Information Collection Activities (FERC–914); Comment Request; Extension Federal Energy Regulatory Commission. ACTION: Notice of information collection and request for comments. AGENCY: In compliance with the requirements of the Paperwork Reduction Act of 1995, the Federal Energy Regulatory Commission (Commission or FERC) is soliciting public comment on the currently SUMMARY: E:\FR\FM\28JNN1.SGM 28JNN1

Agencies

[Federal Register Volume 84, Number 125 (Friday, June 28, 2019)]
[Notices]
[Pages 31057-31058]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2019-13846]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Docket No. ER19-2230-000]


Polaris Wind Energy LLC; Supplemental Notice That Initial Market-
Based Rate Filing Includes Request for Blanket Section 204 
Authorization

    This is a supplemental notice in the above-referenced proceeding of 
Polaris Wind Energy LLC's application for market-based rate authority, 
with an accompanying rate tariff, noting that such application includes 
a request for blanket authorization, under 18 CFR part 34, of future 
issuances of securities and assumptions of liability.
    Any person desiring to intervene or to protest should file with the 
Federal Energy Regulatory Commission, 888 First Street NE, Washington, 
DC 20426, in accordance with Rules 211 and 214 of the Commission's 
Rules of Practice and Procedure (18 CFR 385.211 and 385.214). Anyone 
filing a motion to intervene or protest must serve a copy of that 
document on the Applicant.
    Notice is hereby given that the deadline for filing protests with 
regard to the applicant's request for blanket authorization, under 18 
CFR part 34, of future issuances of securities and assumptions of 
liability, is July 15, 2019.
    The Commission encourages electronic submission of protests and 
interventions in lieu of paper, using the FERC Online links at https://www.ferc.gov. To facilitate electronic service, persons with internet 
access who will eFile a document and/or be listed as a contact for an 
intervenor must create and validate an eRegistration account using the 
eRegistration link. Select the eFiling link to log on and submit the 
intervention or protests.
    Persons unable to file electronically should submit an original and 
5 copies of the intervention or protest to the Federal Energy 
Regulatory Commission, 888 First Street NE, Washington, DC 20426.

[[Page 31058]]

    The filings in the above-referenced proceeding are accessible in 
the Commission's eLibrary system by clicking on the appropriate link in 
the above list. They are also available for electronic review in the 
Commission's Public Reference Room in Washington, DC. There is an 
eSubscription link on the website that enables subscribers to receive 
email notification when a document is added to a subscribed docket(s). 
For assistance with any FERC Online service, please email 
[email protected]. or call (866) 208-3676 (toll free). For 
TTY, call (202) 502-8659.

    Dated: June 24, 2019.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2019-13846 Filed 6-27-19; 8:45 am]
BILLING CODE 6717-01-P


This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.