Polaris Wind Energy LLC; Supplemental Notice That Initial Market-Based Rate Filing Includes Request for Blanket Section 204 Authorization, 31057-31058 [2019-13846]
Download as PDF
khammond on DSKBBV9HB2PROD with NOTICES
Federal Register / Vol. 84, No. 125 / Friday, June 28, 2019 / Notices
mark@gravityrenewables.com and/or
Celeste N. Fay, Regulatory Manager,
Gravity Renewables, Inc., 5 Dartmouth
Drive, Suite 104, Auburn, NH 03032;
(413) 262–9466; email—celeste@
gravityrenewables.com.
i. FERC Contact: Monir Chowdhury at
(202) 502–6736; or email at
monir.chowdhury@ferc.gov.
j. Cooperating agencies: Federal, state,
local, and tribal agencies with
jurisdiction and/or special expertise
with respect to environmental issues
that wish to cooperate in the
preparation of the environmental
document should follow the
instructions for filing such requests
described in item l below. Cooperating
agencies should note the Commission’s
policy that agencies that cooperate in
the preparation of the environmental
document cannot also intervene. See, 94
FERC ¶ 61,076 (2001).
k. Pursuant to section 4.32(b)(7) of 18
CFR of the Commission’s regulations, if
any resource agency, Indian Tribe, or
person believes that an additional
scientific study should be conducted in
order to form an adequate factual basis
for a complete analysis of the
application on its merit, the resource
agency, Indian Tribe, or person must file
a request for a study with the
Commission not later than 60 days from
the date of filing of the application, and
serve a copy of the request on the
applicant.
l. Deadline for filing additional study
requests and requests for cooperating
agency status: July 30, 2019.
The Commission strongly encourages
electronic filing. Please file additional
study requests and requests for
cooperating agency status using the
Commission’s eFiling system at https://
www.ferc.gov/docs-filing/efiling.asp. For
assistance, please contact FERC Online
Support at FERCOnlineSupport@
ferc.gov, (866) 208–3676 (toll free), or
(202) 502–8659 (TTY). In lieu of
electronic filing, please send a paper
copy to: Secretary, Federal Energy
Regulatory Commission, 888 First Street
NE, Washington, DC 20426. The first
page of any filing should include docket
number P–3273–024.
m. This application is not ready for
environmental analysis at this time.
n. The Chittenden Falls Project
consists of the following existing
facilities: (1) An approximately 4-foothigh, 320-foot-long overflow concrete
gravity dam, topped with 2-foot-high
wooden flashboards, and having a dam
crest elevation of 59.6 feet National
Geodetic Vertical Datum of 1929
(NGVD29); (2) a reservoir with a surface
area of about 18 acres and a storage
capacity of 63 acre-feet at a normal pool
VerDate Sep<11>2014
17:41 Jun 27, 2019
Jkt 247001
elevation of 61.6 feet NGVD29; (3) an 8foot-wide, 22-foot-long intake structure
on the east side of the dam connecting
to an 8-foot-wide, 118-foot-long concrete
and wooden power canal; (4) a 7.5-footdiameter, 45-foot-long steel penstock
that conveys water from the power canal
to a powerhouse on the east side of the
dam containing two turbine-generator
units with a total rated capacity of 453
kilowatts (kW); (5) an 8-foot-wide, 10foot-long intake structure on the west
side of the dam connecting to a 6-footdiameter, 62-foot-long steel penstock;
(6) a powerhouse on the west side of the
dam containing a single turbinegenerator unit with a rated capacity of
300 kW; (7) two 40-foot-long, 480-volt
generator leads connecting the east
powerhouse to a transformer yard and a
400-foot-long, 2,300-volt generator lead
connecting the west powerhouse to the
transformer yard; and (8) appurtenant
facilities.
The Chittenden Falls Project is
operated in a run-of-river mode with an
estimated average annual generation of
2,300 megawatt-hours between 2012
and 2018.
o. A copy of the application is
available for review at the Commission
in the Public Reference Room or may be
viewed on the Commission’s website at
https://www.ferc.gov using the
‘‘eLibrary’’ link. Enter the docket
number excluding the last three digits in
the docket number field to access the
document. For assistance, contact FERC
Online Support. A copy is also available
for inspection and reproduction at the
address in item h above.
You may also register online at https://
www.ferc.gov/docs-filing/
esubscription.asp to be notified via
email of new filings and issuances
related to this or other pending projects.
For assistance, contact FERC Online
Support.
p. Procedural schedule and final
amendments: The application will be
processed according to the following
preliminary schedule. Revisions to the
schedule will be made as appropriate.
Issue Deficiency Letter (if necessary)—
July 2019
Request Additional Information—July
2019
Issue Acceptance Letter—October 2019
Issue Scoping Document 1 for
comments—November 2019
Request Additional Information (if
necessary)—January 2020
Issue Scoping Document 2—February
2020
Issue notice of ready for environmental
analysis—February 2020
Commission issues EA—August 2020
Comments on EA—September 2020
PO 00000
Frm 00041
Fmt 4703
Sfmt 4703
31057
Final amendments to the application
must be filed with the Commission no
later than 30 days from the issuance
date of the notice of ready for
environmental analysis.
Dated: June 13, 2019.
Kimberly D. Bose,
Secretary.
[FR Doc. 2019–13825 Filed 6–27–19; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. ER19–2230–000]
Polaris Wind Energy LLC;
Supplemental Notice That Initial
Market-Based Rate Filing Includes
Request for Blanket Section 204
Authorization
This is a supplemental notice in the
above-referenced proceeding of Polaris
Wind Energy LLC’s application for
market-based rate authority, with an
accompanying rate tariff, noting that
such application includes a request for
blanket authorization, under 18 CFR
part 34, of future issuances of securities
and assumptions of liability.
Any person desiring to intervene or to
protest should file with the Federal
Energy Regulatory Commission, 888
First Street NE, Washington, DC 20426,
in accordance with Rules 211 and 214
of the Commission’s Rules of Practice
and Procedure (18 CFR 385.211 and
385.214). Anyone filing a motion to
intervene or protest must serve a copy
of that document on the Applicant.
Notice is hereby given that the
deadline for filing protests with regard
to the applicant’s request for blanket
authorization, under 18 CFR part 34, of
future issuances of securities and
assumptions of liability, is July 15,
2019.
The Commission encourages
electronic submission of protests and
interventions in lieu of paper, using the
FERC Online links at https://
www.ferc.gov. To facilitate electronic
service, persons with internet access
who will eFile a document and/or be
listed as a contact for an intervenor
must create and validate an
eRegistration account using the
eRegistration link. Select the eFiling
link to log on and submit the
intervention or protests.
Persons unable to file electronically
should submit an original and 5 copies
of the intervention or protest to the
Federal Energy Regulatory Commission,
888 First Street NE, Washington, DC
20426.
E:\FR\FM\28JNN1.SGM
28JNN1
31058
Federal Register / Vol. 84, No. 125 / Friday, June 28, 2019 / Notices
The filings in the above-referenced
proceeding are accessible in the
Commission’s eLibrary system by
clicking on the appropriate link in the
above list. They are also available for
electronic review in the Commission’s
Public Reference Room in Washington,
DC. There is an eSubscription link on
the website that enables subscribers to
receive email notification when a
document is added to a subscribed
docket(s). For assistance with any FERC
Online service, please email
FERCOnlineSupport@ferc.gov. or call
(866) 208–3676 (toll free). For TTY, call
(202) 502–8659.
Dated: June 24, 2019.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2019–13846 Filed 6–27–19; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
khammond on DSKBBV9HB2PROD with NOTICES
Combined Notice of Filings #1
Take notice that the Commission
received the following exempt
wholesale generator filings:
Docket Numbers: EG19–141–000.
Applicants: SR Meridian III, LLC.
Description: Notice of SelfCertification of Exempt Wholesale
Generator Status of SR Meridian III,
LLC.
Filed Date: 6/21/19.
Accession Number: 20190621–5189.
Comments Due: 5 p.m. ET 7/12/19.
Take notice that the Commission
received the following electric rate
filings:
Docket Numbers: ER10–2126–005.
Applicants: Idaho Power Company.
Description: Updated Market Power
Analysis for the Northwest Region of
Idaho Power Company.
Filed Date: 6/21/19.
Accession Number: 20190621–5180.
Comments Due: 5 p.m. ET 8/20/19.
Docket Numbers: ER11–2105–003.
Applicants: Oklahoma Gas and
Electric Company.
Description: Notice of Non-Material
Change in Status of Oklahoma Gas and
Electric Company.
Filed Date: 6/21/19.
Accession Number: 20190621–5184.
Comments Due: 5 p.m. ET 7/12/19.
Docket Numbers: ER15–1682–008.
Applicants: TransCanyon DCR, LLC.
Description: Compliance filing:
Amended Formula Rate Templace
Second Compliance Filing for ADIT to
be effective 6/27/2018.
VerDate Sep<11>2014
17:41 Jun 27, 2019
Jkt 247001
Filed Date: 6/24/19.
Accession Number: 20190624–5106.
Comments Due: 5 p.m. ET 7/15/19.
Docket Numbers: ER17–802–005.
Applicants: Exelon Generation
Company, LLC.
Description: Compliance filing:
Informational Filing Regarding Three
Mile Island Unit Retirement to be
effective N/A.
Filed Date: 6/21/19.
Accession Number: 20190621–5081.
Comments Due: 5 p.m. ET 7/12/19.
Docket Numbers: ER19–1826–001.
Applicants: Bolt Energy, LLC.
Description: Tariff Amendment: MBR
Tariff to be effective 6/12/2019.
Filed Date: 6/24/19.
Accession Number: 20190624–5117.
Comments Due: 5 p.m. ET 7/15/19.
Docket Numbers: ER19–2234–000.
Applicants: Southwest Power Pool,
Inc.
Description: § 205(d) Rate Filing:
1276R20 KCPL NITSA NOA to be
effective 9/1/2019.
Filed Date: 6/24/19.
Accession Number: 20190624–5015.
Comments Due: 5 p.m. ET 7/15/19.
Docket Numbers: ER19–2235–000.
Applicants: Tuscola Bay Wind, LLC.
Description: Baseline eTariff Filing:
Reactive Power Compensation Baseline
to be effective 8/23/2019.
Filed Date: 6/24/19.
Accession Number: 20190624–5044.
Comments Due: 5 p.m. ET 7/15/19.
Docket Numbers: ER19–2236–000.
Applicants: Southwest Power Pool,
Inc.
Description: § 205(d) Rate Filing:
2415R12 Kansas Municipal Energy
Agency NITSA NOA to be effective
9/1/2019.
Filed Date: 6/24/19.
Accession Number: 20190624–5054.
Comments Due: 5 p.m. ET 7/15/19.
Docket Numbers: ER19–2237–000.
Applicants: Public Service Company
of Colorado.
Description: § 205(d) Rate Filing:
PSCo-TSGT-Utility Svcs Agrmt-379Exhibit D–0.1.0 to be effective
6/25/2019.
Filed Date: 6/24/19.
Accession Number: 20190624–5056.
Comments Due: 5 p.m. ET 7/15/19.
Docket Numbers: ER19–2238–000.
Applicants: NorthWestern
Corporation.
Description: § 205(d) Rate Filing:
Revised Rate Schedule No. 188 (MT)—
Colstrip 1 & 2 Transmission Agreement
to be effective 9/1/2019.
Filed Date: 6/24/19.
Accession Number: 20190624–5074.
Comments Due: 5 p.m. ET 7/15/19.
PO 00000
Frm 00042
Fmt 4703
Sfmt 4703
Docket Numbers: ER19–2239–000.
Applicants: AES Shady Point, LLC.
Description: Tariff Cancellation: AES
Shady Point Notice of Tariff
Cancellation to be effective 6/25/2019.
Filed Date: 6/24/19.
Accession Number: 20190624–5116.
Comments Due: 5 p.m. ET 7/15/19.
Docket Numbers: ER19–2240–000.
Applicants: PJM Interconnection,
L.L.C.
Description: § 205(d) Rate Filing:
Revisions to the OATT and OA re FTR
Hourly Cost Calculation Update to be
effective 9/1/2019.
Filed Date: 6/24/19.
Accession Number: 20190624–5152.
Comments Due: 5 p.m. ET 7/15/19.
The filings are accessible in the
Commission’s eLibrary system by
clicking on the links or querying the
docket number.
Any person desiring to intervene or
protest in any of the above proceedings
must file in accordance with Rules 211
and 214 of the Commission’s
Regulations (18 CFR 385.211 and
385.214) on or before 5:00 p.m. Eastern
time on the specified comment date.
Protests may be considered, but
intervention is necessary to become a
party to the proceeding.
eFiling is encouraged. More detailed
information relating to filing
requirements, interventions, protests,
service, and qualifying facilities filings
can be found at: https://www.ferc.gov/
docs-filing/efiling/filing-req.pdf. For
other information, call (866) 208–3676
(toll free). For TTY, call (202) 502–8659.
Dated: June 24, 2019.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2019–13845 Filed 6–27–19; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. IC19–6–000]
Commission Information Collection
Activities (FERC–914); Comment
Request; Extension
Federal Energy Regulatory
Commission.
ACTION: Notice of information collection
and request for comments.
AGENCY:
In compliance with the
requirements of the Paperwork
Reduction Act of 1995, the Federal
Energy Regulatory Commission
(Commission or FERC) is soliciting
public comment on the currently
SUMMARY:
E:\FR\FM\28JNN1.SGM
28JNN1
Agencies
[Federal Register Volume 84, Number 125 (Friday, June 28, 2019)]
[Notices]
[Pages 31057-31058]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2019-13846]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Docket No. ER19-2230-000]
Polaris Wind Energy LLC; Supplemental Notice That Initial Market-
Based Rate Filing Includes Request for Blanket Section 204
Authorization
This is a supplemental notice in the above-referenced proceeding of
Polaris Wind Energy LLC's application for market-based rate authority,
with an accompanying rate tariff, noting that such application includes
a request for blanket authorization, under 18 CFR part 34, of future
issuances of securities and assumptions of liability.
Any person desiring to intervene or to protest should file with the
Federal Energy Regulatory Commission, 888 First Street NE, Washington,
DC 20426, in accordance with Rules 211 and 214 of the Commission's
Rules of Practice and Procedure (18 CFR 385.211 and 385.214). Anyone
filing a motion to intervene or protest must serve a copy of that
document on the Applicant.
Notice is hereby given that the deadline for filing protests with
regard to the applicant's request for blanket authorization, under 18
CFR part 34, of future issuances of securities and assumptions of
liability, is July 15, 2019.
The Commission encourages electronic submission of protests and
interventions in lieu of paper, using the FERC Online links at https://www.ferc.gov. To facilitate electronic service, persons with internet
access who will eFile a document and/or be listed as a contact for an
intervenor must create and validate an eRegistration account using the
eRegistration link. Select the eFiling link to log on and submit the
intervention or protests.
Persons unable to file electronically should submit an original and
5 copies of the intervention or protest to the Federal Energy
Regulatory Commission, 888 First Street NE, Washington, DC 20426.
[[Page 31058]]
The filings in the above-referenced proceeding are accessible in
the Commission's eLibrary system by clicking on the appropriate link in
the above list. They are also available for electronic review in the
Commission's Public Reference Room in Washington, DC. There is an
eSubscription link on the website that enables subscribers to receive
email notification when a document is added to a subscribed docket(s).
For assistance with any FERC Online service, please email
[email protected]. or call (866) 208-3676 (toll free). For
TTY, call (202) 502-8659.
Dated: June 24, 2019.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2019-13846 Filed 6-27-19; 8:45 am]
BILLING CODE 6717-01-P