ECOsponsible, LLC; Notice of Preliminary Permit Application Accepted for Filing and Soliciting Comments, Motions To Intervene, and Competing Applications, 31060 [2019-13827]
Download as PDF
31060
Federal Register / Vol. 84, No. 125 / Friday, June 28, 2019 / Notices
FERC–914—COGENERATION AND SMALL POWER PRODUCTION—TARIFF FILINGS—Continued
Number of
respondents
Annual
number of
responses per
respondent
Total number
of responses
Average burden
hours & cost
($)
per response
Total annual
burden hours &
total annual cost
($)
Cost per
respondent
($)
(1)
(2)
(1) * (2) = (3)
(4)
(3) * (4) = (5)
(5) ÷ (1)
Electric Quarterly Reports
(initial).
Electric Quarterly Reports
(later).
Change of Status .............
0
0
0
230 hrs.; $18,170 ....
0 hrs.; $0 .....................
0
35
4
140
6 hrs.; $474 .............
840 hrs.; $66,360 ........
1,896
10
1
10
3 hrs.; $237 .............
30 hrs.; $2,370 ............
237
Total ..........................
........................
........................
185
..................................
7,275 hrs.; $574,725 ...
........................
Comments: Comments are invited on:
(1) Whether the collection of
information is necessary for the proper
performance of the functions of the
Commission, including whether the
information will have practical utility;
(2) the accuracy of the agency’s estimate
of the burden and cost of the collection
of information, including the validity of
the methodology and assumptions used;
(3) ways to enhance the quality, utility
and clarity of the information collection;
and (4) ways to minimize the burden of
the collection of information on those
who are to respond, including the use
of automated collection techniques or
other forms of information technology.
Dated: June 13, 2019.
Kimberly D. Bose,
Secretary.
[FR Doc. 2019–13822 Filed 6–27–19; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 14988–000]
khammond on DSKBBV9HB2PROD with NOTICES
ECOsponsible, LLC; Notice of
Preliminary Permit Application
Accepted for Filing and Soliciting
Comments, Motions To Intervene, and
Competing Applications
On April 22, 2019, ECOsponsible,
LLC, filed an application for a
preliminary permit, pursuant to section
4(f) of the Federal Power Act (FPA),
proposing to study the feasibility of the
Whitney Point Dam Hydroelectric
Project to be located at the U.S. Army
Corps of Engineers’ (Corps) Whitney
Point Dam on the Otselic River in
Broome County, New York. The sole
purpose of a preliminary permit, if
issued, is to grant the permit holder
priority to file a license application
during the permit term. A preliminary
permit does not authorize the permit
VerDate Sep<11>2014
17:41 Jun 27, 2019
Jkt 247001
holder to perform any land-disturbing
activities or otherwise enter upon lands
or waters owned by others without the
owners’ express permission.
The proposed project would consist of
the following: (1) A new open or
covered 50-foot-wide intake flume with
a New York State Department of
Environmental Conservation-approved
trash rack design downstream of the
existing Corps’ gated outlet; (2) a new
50-foot-long, 50-foot-wide, 50-foot-high
powerhouse containing a turbinegenerator unit with a capacity of 6
megawatts; (3) an 800-foot-long, 60-footwide tailrace; (4) a new switchyard
adjacent to the existing parking lot; (5)
a new 360-foot-long transmission line
connecting the switchyard to a nearby
electric grid interconnection point with
options to evaluate multiple grid
interconnection locations; and (6)
appurtenant facilities. The proposed
project would have an annual
generation of 24,000 megawatt-hours.
Applicant Contact: Dennis Ryan,
ECOsponsible, LLC, P.O. Box 114, West
Falls, NY 14170; phone: 716–222–2188.
FERC Contact: Woohee Choi; phone:
(202) 502–6336.
Deadline for filing comments, motions
to intervene, competing applications
(without notices of intent), or notices of
intent to file competing applications: 60
days from the issuance of this notice.
Competing applications and notices of
intent must meet the requirements of 18
CFR 4.36.
The Commission strongly encourages
electronic filing. Please file comments,
motions to intervene, notices of intent,
and competing applications using the
Commission’s eFiling system at https://
www.ferc.gov/docs-filing/efiling.asp.
Commenters can submit brief comments
up to 6,000 characters, without prior
registration, using the eComment system
at https://www.ferc.gov/docs-filing/
ecomment.asp. You must include your
name and contact information at the end
of your comments. For assistance,
please contact FERC Online Support at
PO 00000
Frm 00044
Fmt 4703
Sfmt 4703
FERCOnlineSupport@ferc.gov, (866)
208–3676 (toll free), or (202) 502–8659
(TTY). In lieu of electronic filing, please
send a paper copy to: Secretary, Federal
Energy Regulatory Commission, 888
First Street NE, Washington, DC 20426.
The first page of any filing should
include docket number P–14988–000.
More information about this project,
including a copy of the application, can
be viewed or printed on the ‘‘eLibrary’’
link of the Commission’s website at
https://www.ferc.gov/docs-filing/
elibrary.asp. Enter the docket number
(P–14988) in the docket number field to
access the document. For assistance,
contact FERC Online Support.
Dated: June 13, 2019.
Kimberly D. Bose,
Secretary.
[FR Doc. 2019–13827 Filed 6–27–19; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. ER19–2231–000]
Chief Conemaugh Power II, LLC;
Supplemental Notice That Initial
Market-Based Rate Filing Includes
Request for Blanket Section 204
Authorization
This is a supplemental notice in the
above-referenced proceeding of Chief
Conemaugh Power II, LLC’s application
for market-based rate authority, with an
accompanying rate tariff, noting that
such application includes a request for
blanket authorization, under 18 CFR
part 34, of future issuances of securities
and assumptions of liability.
Any person desiring to intervene or to
protest should file with the Federal
Energy Regulatory Commission, 888
First Street NE, Washington, DC 20426,
in accordance with Rules 211 and 214
of the Commission’s Rules of Practice
and Procedure (18 CFR 385.211 and
E:\FR\FM\28JNN1.SGM
28JNN1
Agencies
[Federal Register Volume 84, Number 125 (Friday, June 28, 2019)]
[Notices]
[Page 31060]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2019-13827]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Project No. 14988-000]
ECOsponsible, LLC; Notice of Preliminary Permit Application
Accepted for Filing and Soliciting Comments, Motions To Intervene, and
Competing Applications
On April 22, 2019, ECOsponsible, LLC, filed an application for a
preliminary permit, pursuant to section 4(f) of the Federal Power Act
(FPA), proposing to study the feasibility of the Whitney Point Dam
Hydroelectric Project to be located at the U.S. Army Corps of
Engineers' (Corps) Whitney Point Dam on the Otselic River in Broome
County, New York. The sole purpose of a preliminary permit, if issued,
is to grant the permit holder priority to file a license application
during the permit term. A preliminary permit does not authorize the
permit holder to perform any land-disturbing activities or otherwise
enter upon lands or waters owned by others without the owners' express
permission.
The proposed project would consist of the following: (1) A new open
or covered 50-foot-wide intake flume with a New York State Department
of Environmental Conservation-approved trash rack design downstream of
the existing Corps' gated outlet; (2) a new 50-foot-long, 50-foot-wide,
50-foot-high powerhouse containing a turbine-generator unit with a
capacity of 6 megawatts; (3) an 800-foot-long, 60-foot-wide tailrace;
(4) a new switchyard adjacent to the existing parking lot; (5) a new
360-foot-long transmission line connecting the switchyard to a nearby
electric grid interconnection point with options to evaluate multiple
grid interconnection locations; and (6) appurtenant facilities. The
proposed project would have an annual generation of 24,000 megawatt-
hours.
Applicant Contact: Dennis Ryan, ECOsponsible, LLC, P.O. Box 114,
West Falls, NY 14170; phone: 716-222-2188.
FERC Contact: Woohee Choi; phone: (202) 502-6336.
Deadline for filing comments, motions to intervene, competing
applications (without notices of intent), or notices of intent to file
competing applications: 60 days from the issuance of this notice.
Competing applications and notices of intent must meet the requirements
of 18 CFR 4.36.
The Commission strongly encourages electronic filing. Please file
comments, motions to intervene, notices of intent, and competing
applications using the Commission's eFiling system at https://www.ferc.gov/docs-filing/efiling.asp. Commenters can submit brief
comments up to 6,000 characters, without prior registration, using the
eComment system at https://www.ferc.gov/docs-filing/ecomment.asp. You
must include your name and contact information at the end of your
comments. For assistance, please contact FERC Online Support at
[email protected], (866) 208-3676 (toll free), or (202) 502-
8659 (TTY). In lieu of electronic filing, please send a paper copy to:
Secretary, Federal Energy Regulatory Commission, 888 First Street NE,
Washington, DC 20426. The first page of any filing should include
docket number P-14988-000.
More information about this project, including a copy of the
application, can be viewed or printed on the ``eLibrary'' link of the
Commission's website at https://www.ferc.gov/docs-filing/elibrary.asp.
Enter the docket number (P-14988) in the docket number field to access
the document. For assistance, contact FERC Online Support.
Dated: June 13, 2019.
Kimberly D. Bose,
Secretary.
[FR Doc. 2019-13827 Filed 6-27-19; 8:45 am]
BILLING CODE 6717-01-P