Commission Information Collection Activities (FERC-914); Comment Request; Extension, 31058-31060 [2019-13822]
Download as PDF
31058
Federal Register / Vol. 84, No. 125 / Friday, June 28, 2019 / Notices
The filings in the above-referenced
proceeding are accessible in the
Commission’s eLibrary system by
clicking on the appropriate link in the
above list. They are also available for
electronic review in the Commission’s
Public Reference Room in Washington,
DC. There is an eSubscription link on
the website that enables subscribers to
receive email notification when a
document is added to a subscribed
docket(s). For assistance with any FERC
Online service, please email
FERCOnlineSupport@ferc.gov. or call
(866) 208–3676 (toll free). For TTY, call
(202) 502–8659.
Dated: June 24, 2019.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2019–13846 Filed 6–27–19; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
khammond on DSKBBV9HB2PROD with NOTICES
Combined Notice of Filings #1
Take notice that the Commission
received the following exempt
wholesale generator filings:
Docket Numbers: EG19–141–000.
Applicants: SR Meridian III, LLC.
Description: Notice of SelfCertification of Exempt Wholesale
Generator Status of SR Meridian III,
LLC.
Filed Date: 6/21/19.
Accession Number: 20190621–5189.
Comments Due: 5 p.m. ET 7/12/19.
Take notice that the Commission
received the following electric rate
filings:
Docket Numbers: ER10–2126–005.
Applicants: Idaho Power Company.
Description: Updated Market Power
Analysis for the Northwest Region of
Idaho Power Company.
Filed Date: 6/21/19.
Accession Number: 20190621–5180.
Comments Due: 5 p.m. ET 8/20/19.
Docket Numbers: ER11–2105–003.
Applicants: Oklahoma Gas and
Electric Company.
Description: Notice of Non-Material
Change in Status of Oklahoma Gas and
Electric Company.
Filed Date: 6/21/19.
Accession Number: 20190621–5184.
Comments Due: 5 p.m. ET 7/12/19.
Docket Numbers: ER15–1682–008.
Applicants: TransCanyon DCR, LLC.
Description: Compliance filing:
Amended Formula Rate Templace
Second Compliance Filing for ADIT to
be effective 6/27/2018.
VerDate Sep<11>2014
17:41 Jun 27, 2019
Jkt 247001
Filed Date: 6/24/19.
Accession Number: 20190624–5106.
Comments Due: 5 p.m. ET 7/15/19.
Docket Numbers: ER17–802–005.
Applicants: Exelon Generation
Company, LLC.
Description: Compliance filing:
Informational Filing Regarding Three
Mile Island Unit Retirement to be
effective N/A.
Filed Date: 6/21/19.
Accession Number: 20190621–5081.
Comments Due: 5 p.m. ET 7/12/19.
Docket Numbers: ER19–1826–001.
Applicants: Bolt Energy, LLC.
Description: Tariff Amendment: MBR
Tariff to be effective 6/12/2019.
Filed Date: 6/24/19.
Accession Number: 20190624–5117.
Comments Due: 5 p.m. ET 7/15/19.
Docket Numbers: ER19–2234–000.
Applicants: Southwest Power Pool,
Inc.
Description: § 205(d) Rate Filing:
1276R20 KCPL NITSA NOA to be
effective 9/1/2019.
Filed Date: 6/24/19.
Accession Number: 20190624–5015.
Comments Due: 5 p.m. ET 7/15/19.
Docket Numbers: ER19–2235–000.
Applicants: Tuscola Bay Wind, LLC.
Description: Baseline eTariff Filing:
Reactive Power Compensation Baseline
to be effective 8/23/2019.
Filed Date: 6/24/19.
Accession Number: 20190624–5044.
Comments Due: 5 p.m. ET 7/15/19.
Docket Numbers: ER19–2236–000.
Applicants: Southwest Power Pool,
Inc.
Description: § 205(d) Rate Filing:
2415R12 Kansas Municipal Energy
Agency NITSA NOA to be effective
9/1/2019.
Filed Date: 6/24/19.
Accession Number: 20190624–5054.
Comments Due: 5 p.m. ET 7/15/19.
Docket Numbers: ER19–2237–000.
Applicants: Public Service Company
of Colorado.
Description: § 205(d) Rate Filing:
PSCo-TSGT-Utility Svcs Agrmt-379Exhibit D–0.1.0 to be effective
6/25/2019.
Filed Date: 6/24/19.
Accession Number: 20190624–5056.
Comments Due: 5 p.m. ET 7/15/19.
Docket Numbers: ER19–2238–000.
Applicants: NorthWestern
Corporation.
Description: § 205(d) Rate Filing:
Revised Rate Schedule No. 188 (MT)—
Colstrip 1 & 2 Transmission Agreement
to be effective 9/1/2019.
Filed Date: 6/24/19.
Accession Number: 20190624–5074.
Comments Due: 5 p.m. ET 7/15/19.
PO 00000
Frm 00042
Fmt 4703
Sfmt 4703
Docket Numbers: ER19–2239–000.
Applicants: AES Shady Point, LLC.
Description: Tariff Cancellation: AES
Shady Point Notice of Tariff
Cancellation to be effective 6/25/2019.
Filed Date: 6/24/19.
Accession Number: 20190624–5116.
Comments Due: 5 p.m. ET 7/15/19.
Docket Numbers: ER19–2240–000.
Applicants: PJM Interconnection,
L.L.C.
Description: § 205(d) Rate Filing:
Revisions to the OATT and OA re FTR
Hourly Cost Calculation Update to be
effective 9/1/2019.
Filed Date: 6/24/19.
Accession Number: 20190624–5152.
Comments Due: 5 p.m. ET 7/15/19.
The filings are accessible in the
Commission’s eLibrary system by
clicking on the links or querying the
docket number.
Any person desiring to intervene or
protest in any of the above proceedings
must file in accordance with Rules 211
and 214 of the Commission’s
Regulations (18 CFR 385.211 and
385.214) on or before 5:00 p.m. Eastern
time on the specified comment date.
Protests may be considered, but
intervention is necessary to become a
party to the proceeding.
eFiling is encouraged. More detailed
information relating to filing
requirements, interventions, protests,
service, and qualifying facilities filings
can be found at: https://www.ferc.gov/
docs-filing/efiling/filing-req.pdf. For
other information, call (866) 208–3676
(toll free). For TTY, call (202) 502–8659.
Dated: June 24, 2019.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2019–13845 Filed 6–27–19; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. IC19–6–000]
Commission Information Collection
Activities (FERC–914); Comment
Request; Extension
Federal Energy Regulatory
Commission.
ACTION: Notice of information collection
and request for comments.
AGENCY:
In compliance with the
requirements of the Paperwork
Reduction Act of 1995, the Federal
Energy Regulatory Commission
(Commission or FERC) is soliciting
public comment on the currently
SUMMARY:
E:\FR\FM\28JNN1.SGM
28JNN1
Federal Register / Vol. 84, No. 125 / Friday, June 28, 2019 / Notices
approved information collection, FERC–
914 (Cogeneration and Small Power
Production—Tariff Filings) and
submitting the information collection to
the Office of Management and Budget
(OMB) for review. Any interested
person may file comments directly with
OMB and should address a copy of
those comments to the Commission as
explained below. On January 31, 2019,
the Commission published a Notice in
the Federal Register in Docket No.
IC19–6–000 requesting public
comments. The Commission received no
public comments and is noting that in
the related submittal to OMB.
DATES: Comments on the collection of
information are due July 29, 2019.
ADDRESSES: Comments filed with OMB,
identified by OMB Control No. 1902–
0231, should be sent via email to the
Office of Information and Regulatory
Affairs: oira_submission@omb.gov.
Attention: Federal Energy Regulatory
Commission Desk Officer.
A copy of the comments should also
be sent to the Commission, in Docket
No. IC19–6–000, by either of the
following methods:
• eFiling at Commission’s website:
https://www.ferc.gov/docs-filing/
efiling.asp.
• Mail/Hand Delivery/Courier:
Federal Energy Regulatory Commission,
Secretary of the Commission, 888 First
Street NE, Washington, DC 20426.
Instructions: All submissions must be
formatted and filed in accordance with
submission guidelines at: https://
www.ferc.gov/help/submissionguide.asp. For user assistance, contact
FERC Online Support by email at
ferconlinesupport@ferc.gov, or by phone
at: (866) 208–3676 (toll-free), or (202)
502–8659 for TTY.
Docket: Users interested in receiving
automatic notification of activity in this
docket or in viewing/downloading
comments and issuances in this docket
may do so at https://www.ferc.gov/docsfiling/docs-filing.asp.
FOR FURTHER INFORMATION CONTACT:
Ellen Brown may be reached by email
at DataClearance@FERC.gov, telephone
at (202) 502–8663, and fax at (202) 273–
0873.
SUPPLEMENTARY INFORMATION:
Title: FERC–914, Cogeneration and
Small Power Production—Tariff Filings.
OMB Control No.: 1902–0231.
Type of Request: Three-year extension
of the FERC–914 information collection
requirements with no changes to the
current reporting requirements.
Abstract: Section 205(c) of the Federal
Power Act (FPA) and 18 CFR 292
require that every public utility have all
of its jurisdictional rates and tariffs on
file with the Commission and make
them available for public inspection,
within such time and in such form as
the Commission may designate. Section
205(d) of the FPA requires that every
public utility must provide notice to the
Commission and the public of any
changes to its jurisdictional rates and
tariffs, file such changes with the
Commission, and make them available
for public inspection, in such manner as
directed by the Commission. In
addition, FPA section 206 requires the
Commission, upon complaint or its own
motion, to modify existing rates or
services that are found to be unjust,
unreasonable, unduly discriminatory or
preferential. FPA section 207 requires
the Commission upon complaint by a
state commission and a finding of
insufficient interstate service, to order
the rendering of adequate interstate
service by public utilities, the rates for
which would be filed in accordance
with FPA sections 205 and 206.
In Order Nos. 671 and 671–A,1 the
Commission revised its regulations that
govern qualifying small power
production and cogeneration facilities.
Among other things, the Commission
31059
eliminated certain exemptions from rate
regulation that were previously
available to qualifying facilities (QFs).
New qualifying facilities may need to
make tariff filings if they do not meet
the exemption requirements.
FERC implemented the Congressional
mandate of the Energy Policy Act of
2005 (EPAct 2005) to establish criteria
for new qualifying cogeneration
facilities by: (1) Amending the
exemptions available to qualifying
facilities from the FPA and from Public
Utility Holding Company Act (PUHCA)
[resulting in the burden imposed by
FERC–914, the subject of this notice]; (2)
ensuring that these facilities are using
their thermal output in a productive and
beneficial manner; that the electrical,
thermal, chemical and mechanical
output of new qualifying cogeneration
facilities is used fundamentally for
commercial, residential or industrial
purposes; and there is continuing
progress in the development of efficient
electric energy generating technology;
(3) amending the FERC Form 556 2 to
reflect the criteria for new qualifying
cogeneration facilities; and (4)
eliminating ownership limitations for
qualifying cogeneration and small
power production facilities. The
Commission satisfied the statutory
mandate and its continuing obligation to
review its policies encouraging
cogeneration and small power
production, energy conservation,
efficient use of facilities and resources
by electric utilities, and equitable rates
for energy customers.
Type of Respondents: New qualifying
facilities and small power producers
that do not meet Commission exemption
criteria
Estimate of Annual Burden: 3 The
Commission estimates the annual public
reporting burden and cost 4 for the
information collection as:
FERC–914—COGENERATION AND SMALL POWER PRODUCTION—TARIFF FILINGS
Number of
respondents
Annual
number of
responses per
respondent
Total number
of responses
Average burden
hours & cost
($)
per response
Total annual
burden hours &
total annual cost
($)
Cost per
respondent
($)
(1)
(2)
(1) * (2) = (3)
(4)
(3) * (4) = (5)
(5) ÷ (1)
183 hrs.; $14,457 ....
6,405 hrs.; $505,995 ...
khammond on DSKBBV9HB2PROD with NOTICES
FPA Section 205 Filings ..
35
1 Revised Regulations Governing Small Power
Production and Cogeneration Facilities, Order No.
671, 71 FR 7852 (2/15/2006), FERC Stats. & Regs.
¶ 31,203 (2006); and Revised Regulations Governing
Small Power Production and Cogeneration
Facilities, Order 671–A, 71 FR 30585 (5/30/2006),
in Docket No. RM05–36.
2 The FERC Form 556 (Certification of Qualifying
Facility (QF) Status for a Small Power Production
VerDate Sep<11>2014
17:41 Jun 27, 2019
Jkt 247001
1
35
or Cogeneration Facility) is cleared separately as
OMB Control No. 1902–0075 and is not a subject
of this notice.
3 Burden is the total time, effort, or financial
resources expended by persons to generate,
maintain, retain, or disclose or provide information
to or for a Federal agency. For further explanation
of what is included in the information collection
PO 00000
Frm 00043
Fmt 4703
Sfmt 4703
$14,457
burden, refer to 5 Code of Federal Regulations
1320.3.
4 FERC staff estimates that industry costs for
salary plus benefits are similar to Commission
costs. The cost figure is the FY2018 FERC average
annual salary plus benefits ($164,820/year or $79/
hour).
E:\FR\FM\28JNN1.SGM
28JNN1
31060
Federal Register / Vol. 84, No. 125 / Friday, June 28, 2019 / Notices
FERC–914—COGENERATION AND SMALL POWER PRODUCTION—TARIFF FILINGS—Continued
Number of
respondents
Annual
number of
responses per
respondent
Total number
of responses
Average burden
hours & cost
($)
per response
Total annual
burden hours &
total annual cost
($)
Cost per
respondent
($)
(1)
(2)
(1) * (2) = (3)
(4)
(3) * (4) = (5)
(5) ÷ (1)
Electric Quarterly Reports
(initial).
Electric Quarterly Reports
(later).
Change of Status .............
0
0
0
230 hrs.; $18,170 ....
0 hrs.; $0 .....................
0
35
4
140
6 hrs.; $474 .............
840 hrs.; $66,360 ........
1,896
10
1
10
3 hrs.; $237 .............
30 hrs.; $2,370 ............
237
Total ..........................
........................
........................
185
..................................
7,275 hrs.; $574,725 ...
........................
Comments: Comments are invited on:
(1) Whether the collection of
information is necessary for the proper
performance of the functions of the
Commission, including whether the
information will have practical utility;
(2) the accuracy of the agency’s estimate
of the burden and cost of the collection
of information, including the validity of
the methodology and assumptions used;
(3) ways to enhance the quality, utility
and clarity of the information collection;
and (4) ways to minimize the burden of
the collection of information on those
who are to respond, including the use
of automated collection techniques or
other forms of information technology.
Dated: June 13, 2019.
Kimberly D. Bose,
Secretary.
[FR Doc. 2019–13822 Filed 6–27–19; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 14988–000]
khammond on DSKBBV9HB2PROD with NOTICES
ECOsponsible, LLC; Notice of
Preliminary Permit Application
Accepted for Filing and Soliciting
Comments, Motions To Intervene, and
Competing Applications
On April 22, 2019, ECOsponsible,
LLC, filed an application for a
preliminary permit, pursuant to section
4(f) of the Federal Power Act (FPA),
proposing to study the feasibility of the
Whitney Point Dam Hydroelectric
Project to be located at the U.S. Army
Corps of Engineers’ (Corps) Whitney
Point Dam on the Otselic River in
Broome County, New York. The sole
purpose of a preliminary permit, if
issued, is to grant the permit holder
priority to file a license application
during the permit term. A preliminary
permit does not authorize the permit
VerDate Sep<11>2014
17:41 Jun 27, 2019
Jkt 247001
holder to perform any land-disturbing
activities or otherwise enter upon lands
or waters owned by others without the
owners’ express permission.
The proposed project would consist of
the following: (1) A new open or
covered 50-foot-wide intake flume with
a New York State Department of
Environmental Conservation-approved
trash rack design downstream of the
existing Corps’ gated outlet; (2) a new
50-foot-long, 50-foot-wide, 50-foot-high
powerhouse containing a turbinegenerator unit with a capacity of 6
megawatts; (3) an 800-foot-long, 60-footwide tailrace; (4) a new switchyard
adjacent to the existing parking lot; (5)
a new 360-foot-long transmission line
connecting the switchyard to a nearby
electric grid interconnection point with
options to evaluate multiple grid
interconnection locations; and (6)
appurtenant facilities. The proposed
project would have an annual
generation of 24,000 megawatt-hours.
Applicant Contact: Dennis Ryan,
ECOsponsible, LLC, P.O. Box 114, West
Falls, NY 14170; phone: 716–222–2188.
FERC Contact: Woohee Choi; phone:
(202) 502–6336.
Deadline for filing comments, motions
to intervene, competing applications
(without notices of intent), or notices of
intent to file competing applications: 60
days from the issuance of this notice.
Competing applications and notices of
intent must meet the requirements of 18
CFR 4.36.
The Commission strongly encourages
electronic filing. Please file comments,
motions to intervene, notices of intent,
and competing applications using the
Commission’s eFiling system at https://
www.ferc.gov/docs-filing/efiling.asp.
Commenters can submit brief comments
up to 6,000 characters, without prior
registration, using the eComment system
at https://www.ferc.gov/docs-filing/
ecomment.asp. You must include your
name and contact information at the end
of your comments. For assistance,
please contact FERC Online Support at
PO 00000
Frm 00044
Fmt 4703
Sfmt 4703
FERCOnlineSupport@ferc.gov, (866)
208–3676 (toll free), or (202) 502–8659
(TTY). In lieu of electronic filing, please
send a paper copy to: Secretary, Federal
Energy Regulatory Commission, 888
First Street NE, Washington, DC 20426.
The first page of any filing should
include docket number P–14988–000.
More information about this project,
including a copy of the application, can
be viewed or printed on the ‘‘eLibrary’’
link of the Commission’s website at
https://www.ferc.gov/docs-filing/
elibrary.asp. Enter the docket number
(P–14988) in the docket number field to
access the document. For assistance,
contact FERC Online Support.
Dated: June 13, 2019.
Kimberly D. Bose,
Secretary.
[FR Doc. 2019–13827 Filed 6–27–19; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. ER19–2231–000]
Chief Conemaugh Power II, LLC;
Supplemental Notice That Initial
Market-Based Rate Filing Includes
Request for Blanket Section 204
Authorization
This is a supplemental notice in the
above-referenced proceeding of Chief
Conemaugh Power II, LLC’s application
for market-based rate authority, with an
accompanying rate tariff, noting that
such application includes a request for
blanket authorization, under 18 CFR
part 34, of future issuances of securities
and assumptions of liability.
Any person desiring to intervene or to
protest should file with the Federal
Energy Regulatory Commission, 888
First Street NE, Washington, DC 20426,
in accordance with Rules 211 and 214
of the Commission’s Rules of Practice
and Procedure (18 CFR 385.211 and
E:\FR\FM\28JNN1.SGM
28JNN1
Agencies
[Federal Register Volume 84, Number 125 (Friday, June 28, 2019)]
[Notices]
[Pages 31058-31060]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2019-13822]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Docket No. IC19-6-000]
Commission Information Collection Activities (FERC-914); Comment
Request; Extension
AGENCY: Federal Energy Regulatory Commission.
ACTION: Notice of information collection and request for comments.
-----------------------------------------------------------------------
SUMMARY: In compliance with the requirements of the Paperwork Reduction
Act of 1995, the Federal Energy Regulatory Commission (Commission or
FERC) is soliciting public comment on the currently
[[Page 31059]]
approved information collection, FERC-914 (Cogeneration and Small Power
Production--Tariff Filings) and submitting the information collection
to the Office of Management and Budget (OMB) for review. Any interested
person may file comments directly with OMB and should address a copy of
those comments to the Commission as explained below. On January 31,
2019, the Commission published a Notice in the Federal Register in
Docket No. IC19-6-000 requesting public comments. The Commission
received no public comments and is noting that in the related submittal
to OMB.
DATES: Comments on the collection of information are due July 29, 2019.
ADDRESSES: Comments filed with OMB, identified by OMB Control No. 1902-
0231, should be sent via email to the Office of Information and
Regulatory Affairs: [email protected]. Attention: Federal Energy
Regulatory Commission Desk Officer.
A copy of the comments should also be sent to the Commission, in
Docket No. IC19-6-000, by either of the following methods:
eFiling at Commission's website: https://www.ferc.gov/docs-filing/efiling.asp.
Mail/Hand Delivery/Courier: Federal Energy Regulatory
Commission, Secretary of the Commission, 888 First Street NE,
Washington, DC 20426.
Instructions: All submissions must be formatted and filed in
accordance with submission guidelines at: https://www.ferc.gov/help/submission-guide.asp. For user assistance, contact FERC Online Support
by email at [email protected], or by phone at: (866) 208-3676
(toll-free), or (202) 502-8659 for TTY.
Docket: Users interested in receiving automatic notification of
activity in this docket or in viewing/downloading comments and
issuances in this docket may do so at https://www.ferc.gov/docs-filing/docs-filing.asp.
FOR FURTHER INFORMATION CONTACT: Ellen Brown may be reached by email at
[email protected], telephone at (202) 502-8663, and fax at (202)
273-0873.
SUPPLEMENTARY INFORMATION:
Title: FERC-914, Cogeneration and Small Power Production--Tariff
Filings.
OMB Control No.: 1902-0231.
Type of Request: Three-year extension of the FERC-914 information
collection requirements with no changes to the current reporting
requirements.
Abstract: Section 205(c) of the Federal Power Act (FPA) and 18 CFR
292 require that every public utility have all of its jurisdictional
rates and tariffs on file with the Commission and make them available
for public inspection, within such time and in such form as the
Commission may designate. Section 205(d) of the FPA requires that every
public utility must provide notice to the Commission and the public of
any changes to its jurisdictional rates and tariffs, file such changes
with the Commission, and make them available for public inspection, in
such manner as directed by the Commission. In addition, FPA section 206
requires the Commission, upon complaint or its own motion, to modify
existing rates or services that are found to be unjust, unreasonable,
unduly discriminatory or preferential. FPA section 207 requires the
Commission upon complaint by a state commission and a finding of
insufficient interstate service, to order the rendering of adequate
interstate service by public utilities, the rates for which would be
filed in accordance with FPA sections 205 and 206.
In Order Nos. 671 and 671-A,\1\ the Commission revised its
regulations that govern qualifying small power production and
cogeneration facilities. Among other things, the Commission eliminated
certain exemptions from rate regulation that were previously available
to qualifying facilities (QFs). New qualifying facilities may need to
make tariff filings if they do not meet the exemption requirements.
---------------------------------------------------------------------------
\1\ Revised Regulations Governing Small Power Production and
Cogeneration Facilities, Order No. 671, 71 FR 7852 (2/15/2006), FERC
Stats. & Regs. ] 31,203 (2006); and Revised Regulations Governing
Small Power Production and Cogeneration Facilities, Order 671-A, 71
FR 30585 (5/30/2006), in Docket No. RM05-36.
---------------------------------------------------------------------------
FERC implemented the Congressional mandate of the Energy Policy Act
of 2005 (EPAct 2005) to establish criteria for new qualifying
cogeneration facilities by: (1) Amending the exemptions available to
qualifying facilities from the FPA and from Public Utility Holding
Company Act (PUHCA) [resulting in the burden imposed by FERC-914, the
subject of this notice]; (2) ensuring that these facilities are using
their thermal output in a productive and beneficial manner; that the
electrical, thermal, chemical and mechanical output of new qualifying
cogeneration facilities is used fundamentally for commercial,
residential or industrial purposes; and there is continuing progress in
the development of efficient electric energy generating technology; (3)
amending the FERC Form 556 \2\ to reflect the criteria for new
qualifying cogeneration facilities; and (4) eliminating ownership
limitations for qualifying cogeneration and small power production
facilities. The Commission satisfied the statutory mandate and its
continuing obligation to review its policies encouraging cogeneration
and small power production, energy conservation, efficient use of
facilities and resources by electric utilities, and equitable rates for
energy customers.
---------------------------------------------------------------------------
\2\ The FERC Form 556 (Certification of Qualifying Facility (QF)
Status for a Small Power Production or Cogeneration Facility) is
cleared separately as OMB Control No. 1902-0075 and is not a subject
of this notice.
---------------------------------------------------------------------------
Type of Respondents: New qualifying facilities and small power
producers that do not meet Commission exemption criteria
Estimate of Annual Burden: \3\ The Commission estimates the annual
public reporting burden and cost \4\ for the information collection as:
---------------------------------------------------------------------------
\3\ Burden is the total time, effort, or financial resources
expended by persons to generate, maintain, retain, or disclose or
provide information to or for a Federal agency. For further
explanation of what is included in the information collection
burden, refer to 5 Code of Federal Regulations 1320.3.
\4\ FERC staff estimates that industry costs for salary plus
benefits are similar to Commission costs. The cost figure is the
FY2018 FERC average annual salary plus benefits ($164,820/year or
$79/hour).
FERC-914--Cogeneration and Small Power Production--Tariff Filings
--------------------------------------------------------------------------------------------------------------------------------------------------------
Annual number
Number of of responses Total number Average burden hours & Total annual burden hours & Cost per
respondents per respondent of responses cost ($) per response total annual cost ($) respondent ($)
(1) (2) (1) * (2) = (4)....................... (3) * (4) = (5).............. (5) / (1)
(3)
--------------------------------------------------------------------------------------------------------------------------------------------------------
FPA Section 205 Filings...... 35 1 35 183 hrs.; $14,457......... 6,405 hrs.; $505,995......... $14,457
[[Page 31060]]
Electric Quarterly Reports 0 0 0 230 hrs.; $18,170......... 0 hrs.; $0................... 0
(initial).
Electric Quarterly Reports 35 4 140 6 hrs.; $474.............. 840 hrs.; $66,360............ 1,896
(later).
Change of Status............. 10 1 10 3 hrs.; $237.............. 30 hrs.; $2,370.............. 237
--------------------------------------------------------------------------------------------------------------------------
Total.................... .............. .............. 185 .......................... 7,275 hrs.; $574,725......... ..............
--------------------------------------------------------------------------------------------------------------------------------------------------------
Comments: Comments are invited on: (1) Whether the collection of
information is necessary for the proper performance of the functions of
the Commission, including whether the information will have practical
utility; (2) the accuracy of the agency's estimate of the burden and
cost of the collection of information, including the validity of the
methodology and assumptions used; (3) ways to enhance the quality,
utility and clarity of the information collection; and (4) ways to
minimize the burden of the collection of information on those who are
to respond, including the use of automated collection techniques or
other forms of information technology.
Dated: June 13, 2019.
Kimberly D. Bose,
Secretary.
[FR Doc. 2019-13822 Filed 6-27-19; 8:45 am]
BILLING CODE 6717-01-P