Federal Register / Vol. 84, No. 124 / Thursday, June 27, 2019 / Notices
jspears on DSK30JT082PROD with NOTICES
such application includes a request for
blanket authorization, under 18 CFR
part 34, of future issuances of securities
and assumptions of liability.
Any person desiring to intervene or to
protest should file with the Federal
Energy Regulatory Commission, 888
First Street NE, Washington, DC 20426,
in accordance with Rules 211 and 214
of the Commission’s Rules of Practice
and Procedure (18 CFR 385.211 and
385.214). Anyone filing a motion to
intervene or protest must serve a copy
of that document on the Applicant.
Notice is hereby given that the
deadline for filing protests with regard
to the applicant’s request for blanket
authorization, under 18 CFR part 34, of
future issuances of securities and
assumptions of liability, is July 9, 2019.
The Commission encourages
electronic submission of protests and
interventions in lieu of paper, using the
FERC Online links at https://
www.ferc.gov. To facilitate electronic
service, persons with internet access
who will eFile a document and/or be
listed as a contact for an intervenor
must create and validate an
eRegistration account using the
eRegistration link. Select the eFiling
link to log on and submit the
intervention or protests.
Persons unable to file electronically
should submit an original and 5 copies
of the intervention or protest to the
Federal Energy Regulatory Commission,
888 First Street NE, Washington, DC
20426.
The filings in the above-referenced
proceeding are accessible in the
Commission’s eLibrary system by
clicking on the appropriate link in the
above list. They are also available for
electronic review in the Commission’s
Public Reference Room in Washington,
DC. There is an eSubscription link on
the website that enables subscribers to
receive email notification when a
document is added to a subscribed
docket(s). For assistance with any FERC
Online service, please email
FERCOnlineSupport@ferc.gov. or call
(866) 208–3676 (toll free). For TTY, call
(202) 502–8659.
Dated: June 19, 2019.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2019–13720 Filed 6–26–19; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Federal Energy Regulatory
Commission
Combined Notice of Filings #1
[Docket No. EF14–1–003]
Southwestern Power Administration;
Notice of Filing
Take notice that on June 12, 2019,
Southwestern Power Administration
submitted tariff filing per: 2013
Integrated System Power Rates Schedule
Amendment to be effective July 1, 2019.
Any person desiring to intervene or to
protest this filing must file in
accordance with Rules 211 and 214 of
the Commission’s Rules of Practice and
Procedure (18 CFR 385.211, 385.214).
Protests will be considered by the
Commission in determining the
appropriate action to be taken, but will
not serve to make protestants parties to
the proceeding. Any person wishing to
become a party must file a notice of
intervention or motion to intervene, as
appropriate. Such notices, motions, or
protests must be filed on or before the
comment date. On or before the
comment date, it is not necessary to
serve motions to intervene or protests
on persons other than the Applicant.
The Commission encourages
electronic submission of protests and
interventions in lieu of paper using the
eFiling link at https://www.ferc.gov.
Persons unable to file electronically
should submit an original and 5 copies
of the protest or intervention to the
Federal Energy Regulatory Commission,
888 First Street NE, Washington, DC
20426.
This filing is accessible on-line at
https://www.ferc.gov, using the eLibrary
link and is available for review in the
Commission’s Public Reference Room in
Washington, DC. There is an
eSubscription link on the website that
enables subscribers to receive email
notification when a document is added
to a subscribed docket(s). For assistance
with any FERC Online service, please
email FERCOnlineSupport@ferc.gov, or
call (866) 208–3676 (toll free). For TTY,
call (202) 502–8659.
Comment Date: 5:00 p.m. Eastern
Time on July 12, 2019.
Dated: June 21, 2019.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2019–13719 Filed 6–26–19; 8:45 am]
BILLING CODE 6717–01–P
VerDate Sep<11>2014
20:15 Jun 26, 2019
Jkt 247001
PO 00000
Frm 00021
Fmt 4703
Sfmt 4703
Take notice that the Commission
received the following electric corporate
filings:
Docket Numbers: EC19–105–000.
Applicants: Diamond State
Generation Partners, LLC.
Description: Application for
Authorization Under Section 203 of the
Federal Power Act, et al. of Diamond
State Generation Partners, LLC.
Filed Date: 6/20/19.
Accession Number: 20190620–5150.
Comments Due: 5 p.m. ET 7/11/19.
Take notice that the Commission
received the following exempt
wholesale generator filings:
Docket Numbers: EG19–140–000.
Applicants: Polaris Wind Energy LLC.
Description: Notice of SelfCertification of Exempt Wholesale
Generator Status of Polaris Wind Energy
LLC.
Filed Date: 6/21/19.
Accession Number: 20190621–5145.
Comments Due: 5 p.m. ET 7/12/19.
Take notice that the Commission
received the following electric rate
filings:
Docket Numbers: ER12–2498–019;
ER12–2499–019; ER17–382–004; ER17–
383–004; ER17–384–004; ER13–764–
019; ER14–1927–007; ER18–1416–003;
ER11–4055–009; ER12–1566–013;
ER14–1548–012; ER16–1327–002;
ER12–199–016; ER17–2141–002; ER17–
2142–002; ER17–2385–002; ER11–3987–
014; ER16–1325–002; ER16–1326–002;
ER18–855–003; ER14–1775–007.
Applicants: Alpaugh 50, LLC,
Alpaugh North, LLC, CED Ducor Solar
1, LLC, CED Ducor Solar 2, LLC, CED
Ducor Solar 3, LLC, CED White River
Solar, LLC, CED White River Solar 2,
LLC, CED Wistaria Solar, LLC, Copper
Mountain Solar 1, LLC, Copper
Mountain Solar 2, LLC, Copper
Mountain Solar 3, LLC, Copper
Mountain Solar 4, LLC, Coram
California Development, L.P., Great
Valley Solar 1, LLC, Great Valley Solar
2, LLC, Great Valley Solar 3, LLC,
Mesquite Solar 1, LLC, Mesquite Solar
2, LLC, Mesquite Solar 3, LLC, Panoche
Valley Solar, LLC, SEP II, LLC.
Description: Updated Market Power
Analysis for the Southwest Region of
the Consolidated Edison, Inc.
subsidiaries.
Filed Date: 6/20/19.
Accession Number: 20190620–5154.
Comments Due: 5 p.m. ET 8/19/19.
E:\FR\FM\27JNN1.SGM
27JNN1
jspears on DSK30JT082PROD with NOTICES
Federal Register / Vol. 84, No. 124 / Thursday, June 27, 2019 / Notices
Docket Numbers: ER14–1421–002.
Applicants: Diamond State
Generation Partners, LLC.
Description: Compliance filing:
Informational Filing and Requests for
Waiver and Expedited Consideration to
be effective N/A.
Filed Date: 6/20/19.
Accession Number: 20190620–5117.
Comments Due: 5 p.m. ET 7/11/19.
Docket Numbers: ER16–999–008;
ER18–920–003; ER11–2335–013.
Applicants: Greenleaf Energy Unit 1
LLC, Marco DM Holdings, L.L.C., Plum
Point Services Company, LLC.
Description: Updated Market Power
Analysis for the Southwest Region of
Greenleaf Energy Unit 1 LLC, et al.
Filed Date: 6/20/19.
Accession Number: 20190620–5151.
Comments Due: 5 p.m. ET 8/19/19.
Docket Numbers: ER19–1920–001.
Applicants: Tampa Electric Company.
Description: Compliance filing:
Amendment to Compliance Filing under
Order Nos. 845 and 845A to be effective
5/22/2019.
Filed Date: 6/21/19.
Accession Number: 20190621–5120.
Comments Due: 5 p.m. ET 7/12/19.
Docket Numbers: ER19–2217–000.
Applicants: Avenal Park LLC.
Description: § 205(d) Rate Filing:
Revisions to Market-Based Rate Tariff
and Requests for Waivers to be effective
6/21/2019.
Filed Date: 6/20/19.
Accession Number: 20190620–5108.
Comments Due: 5 p.m. ET 7/11/19.
Docket Numbers: ER19–2218–000.
Applicants: Sand Drag LLC.
Description: § 205(d) Rate Filing:
Revisions to Market-Based Rate Tariff
and Requests for Waivers to be effective
6/21/2019.
Filed Date: 6/20/19.
Accession Number: 20190620–5109.
Comments Due: 5 p.m. ET 7/11/19.
Docket Numbers: ER19–2219–000.
Applicants: Sun City Project LLC.
Description: § 205(d) Rate Filing:
Revisions to Market-Based Rate Tariff
and Requests for Waivers to be effective
6/21/2019.
Filed Date: 6/20/19.
Accession Number: 20190620–5110.
Comments Due: 5 p.m. ET 7/11/19.
Docket Numbers: ER19–2220–000.
Applicants: Big Sky North, LLC.
Description: § 205(d) Rate Filing: Big
Sky North, LLC Co Tenancy Agreement
to be effective 6/21/2019.
Filed Date: 6/20/19.
Accession Number: 20190620–5125.
Comments Due: 5 p.m. ET 7/11/19.
Docket Numbers: ER19–2221–000.
Applicants: Avista Corporation.
VerDate Sep<11>2014
20:15 Jun 26, 2019
Jkt 247001
Description: Compliance filing: Avista
Corp OATT Request for Limited Waiver
to be effective 6/21/2019.
Filed Date: 6/20/19.
Accession Number: 20190620–5126.
Comments Due: 5 p.m. ET 7/11/19.
Docket Numbers: ER19–2222–000.
Applicants: Southwest Power Pool,
Inc.
Description: § 205(d) Rate Filing:
2829R3 Midwest Energy & Westar
Energy Meter Agent Agreement to be
effective 6/1/2019.
Filed Date: 6/21/19.
Accession Number: 20190621–5009.
Comments Due: 5 p.m. ET 7/12/19.
Docket Numbers: ER19–2223–000.
Applicants: Bolt Energy, LLC.
Description: § 205(d) Rate Filing: MBR
Tariff to be effective 6/12/2019.
Filed Date: 6/21/19.
Accession Number: 20190621–5031.
Comments Due: 5 p.m. ET 7/12/19.
Docket Numbers: ER19–2224–000.
Applicants: Turtle Creek Wind Farm
LLC.
Description: Baseline eTariff Filing:
Reactive Power Compensation Baseline
to be effective 8/20/2019.
Filed Date: 6/21/19.
Accession Number: 20190621–5032.
Comments Due: 5 p.m. ET 7/12/19.
Docket Numbers: ER19–2225–000.
Applicants: City of Dover Delaware.
Description: Petition for Limited
Waiver of Tariff Deadline, et al. of the
City of Dover, Delaware.
Filed Date: 6/20/19.
Accession Number: 20190620–5152.
Comments Due: 5 p.m. ET 7/11/19.
Docket Numbers: ER19–2226–000.
Applicants: Public Service Company
of Colorado.
Description: § 205(d) Rate Filing:
PSCo–CSU–A&R O&M–Jcksn Fllr–395–
0.1.0 to be effective 6/22/2019.
Filed Date: 6/21/19.
Accession Number: 20190621–5064.
Comments Due: 5 p.m. ET 7/12/19.
Docket Numbers: ER19–2227–000.
Applicants: PacifiCorp.
Description: § 205(d) Rate Filing:
UAMPS Trans IC Agmt—Purgatory Flat
to be effective 6/22/2019.
Filed Date: 6/21/19.
Accession Number: 20190621–5101.
Comments Due: 5 p.m. ET 7/12/19.
Docket Numbers: ER19–2228–000.
Applicants: Antelope Expansion 2,
LLC.
Description: § 205(d) Rate Filing:
LGIA Co-Tenancy Agreement to be
effective 6/22/2019.
Filed Date: 6/21/19.
Accession Number: 20190621–5110.
Comments Due: 5 p.m. ET 7/12/19.
Docket Numbers: ER19–2229–000.
PO 00000
Frm 00022
Fmt 4703
Sfmt 4703
30711
Applicants: San Pablo Raceway, LLC.
Description: § 205(d) Rate Filing:
LGIA Co-Tenancy Agreement to be
effective 6/22/2019.
Filed Date: 6/21/19.
Accession Number: 20190621–5112.
Comments Due: 5 p.m. ET 7/12/19.
Docket Numbers: ER19–2230–000.
Applicants: Polaris Wind Energy LLC.
Description: Baseline eTariff Filing:
Application for Market-Based Rate
Authorization to be effective 8/21/2019.
Filed Date: 6/21/19.
Accession Number: 20190621–5117.
Comments Due: 5 p.m. ET 7/12/19.
Docket Numbers: ER19–2230–001.
Applicants: Polaris Wind Energy LLC.
Description: Tariff Amendment:
Supplement to Application for MarketBased Rate Authorization to be effective
8/21/2019.
Filed Date: 6/21/19.
Accession Number: 20190621–5124.
Comments Due: 5 p.m. ET 7/12/19.
Docket Numbers: ER19–2231–000.
Applicants: Chief Conemaugh Power
II, LLC.
Description: Baseline eTariff Filing:
Market-Based Rate Application to be
effective 8/21/2019.
Filed Date: 6/21/19.
Accession Number: 20190621–5122.
Comments Due: 5 p.m. ET 7/12/19.
Docket Numbers: ER19–2232–000.
Applicants: Chief Keystone Power II,
LLC.
Description: Baseline eTariff Filing:
Market-Based Rate Application to be
effective 8/21/2019.
Filed Date: 6/21/19.
Accession Number: 20190621–5125.
Comments Due: 5 p.m. ET 7/12/19.
Docket Numbers: ER19–2233–000.
Applicants: Smoky Mountain
Transmission LLC.
Description: Compliance filing: Order
Nos. 845 and 845–A Compliance Filing
to be effective 5/22/2019.
Filed Date: 6/21/19.
Accession Number: 20190621–5158.
Comments Due: 5 p.m. ET 7/12/19.
Take notice that the Commission
received the following foreign utility
company status filings:
Docket Numbers: FC19–5–000.
Applicants: I Squared Capital.
Description: Self-Certification of FC of
I Squared Capital.
Filed Date: 6/20/19.
Accession Number: 20190620–5115.
Comments Due: 5 p.m. ET 7/11/19.
Docket Numbers: FC19–6–000.
Applicants: Chenya Power Co., Ltd.
Description: Self-Certification of FC of
I Squared Capital.
Filed Date: 6/21/19.
Accession Number: 20190621–5035.
E:\FR\FM\27JNN1.SGM
27JNN1
30712
Federal Register / Vol. 84, No. 124 / Thursday, June 27, 2019 / Notices
Comments Due: 5 p.m. ET 7/12/19.
The filings are accessible in the
Commission’s eLibrary system by
clicking on the links or querying the
docket number.
Any person desiring to intervene or
protest in any of the above proceedings
must file in accordance with Rules 211
and 214 of the Commission’s
Regulations (18 CFR 385.211 and
385.214) on or before 5:00 p.m. Eastern
time on the specified comment date.
Protests may be considered, but
intervention is necessary to become a
party to the proceeding.
eFiling is encouraged. More detailed
information relating to filing
requirements, interventions, protests,
service, and qualifying facilities filings
can be found at: https://www.ferc.gov/
docs-filing/efiling/filing-req.pdf. For
other information, call (866) 208–3676
(toll free). For TTY, call (202) 502–8659.
Dated: June 21, 2019.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2019–13718 Filed 6–26–19; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. CP19–118–000]
jspears on DSK30JT082PROD with NOTICES
Trans-Foreland Pipeline Company,
LLC; Notice of Schedule for
Environmental Review of the Kenai
LNG Cool Down Project
On March 29, 2019, Trans-Foreland
Pipeline Company, LLC filed an
application in Docket No. CP19–118–
000 requesting an authorization
pursuant to Section 3(a) of the Natural
Gas Act to construct and operate certain
liquefied natural gas (LNG) facilities.
The proposed project is known as the
Kenai LNG Cool Down Project (Project),
and would allow the Kenai LNG Plant
to provide up to 7.0 million standard
cubic feet per day of natural gas to
Trans-Foreland’s affiliated Kenai
Refinery adjacent to the Kenai LNG
Plant.
On April 12, 2019, the Federal Energy
Regulatory Commission (Commission or
FERC) issued its Notice of Application
for the Project. Among other things, that
notice alerted agencies issuing federal
authorizations of the requirement to
complete all necessary reviews and to
reach a final decision on a request for
a federal authorization within 90 days of
the date of issuance of the Commission
staff’s Environmental Assessment (EA)
for the Project. This instant notice
VerDate Sep<11>2014
20:15 Jun 26, 2019
Jkt 247001
identifies the FERC staff’s planned
schedule for the completion of the EA
for the Project.
Schedule for Environmental Review
Issuance of EA—December 13, 2019
90-day Federal Authorization Decision
Deadline—March 12, 2020
If a schedule change becomes
necessary, additional notice will be
provided so that the relevant agencies
are kept informed of the Project’s
progress.
Project Description
Trans-Foreland proposes to make
facility modifications to bring parts of
Kenai LNG Plant out of its current warm
idle status to allow for the import of
LNG. Trans-Foreland proposes to
install, construct, and operate a new
1,000 horsepower electric-driven boiloff-gas (BOG) booster compressor unit,
trim vaporizers, additional LNG transfer
system valves, equipment to manage the
existing BOG facilities (collectively
referred to as the BOG Management
System), and ancillary facilities to
facilitate the import of LNG to cool
down the existing LNG storage tanks
and associated LNG facilities.
Background
On May 13, 2019, the Commission
issued a Notice of Intent to Prepare an
Environmental Assessment for the
Proposed Kenai LNG Cool Down Project
and Request for Comments on
Environmental Issues (NOI). The NOI
was sent to affected landowners; federal,
state, and local government agencies;
elected officials; environmental and
public interest groups; Native American
tribes; other interested parties; and local
libraries and newspapers. In response to
the NOI, the Commission received
comments from the Alaska State
Historic Preservation Office regarding
the Section 106 of the National Historic
Preservation Act consultation, noting
that the existing LNG facilities may be
a historic property. All substantive
comments will be addressed in the EA.
The U.S. Coast Guard, U.S.
Department of Energy, and the U.S.
Department of Transportation are
cooperating agencies in the preparation
of the EA.
Additional Information
In order to receive notification of the
issuance of the EA and to keep track of
all formal issuances and submittals in
specific dockets, the Commission offers
a free service called eSubscription. This
can reduce the amount of time you
spend researching proceedings by
automatically providing you with
notification of these filings, document
PO 00000
Frm 00023
Fmt 4703
Sfmt 4703
summaries, and direct links to the
documents. Go to www.ferc.gov/docsfiling/esubscription.asp.
Additional information about the
Project is available from the
Commission’s Office of External Affairs
at (866) 208–FERC or on the FERC
website (www.ferc.gov). Using the
‘‘eLibrary’’ link, select ‘‘General Search’’
from the eLibrary menu, enter the
selected date range and ‘‘Docket
Number’’ excluding the last three digits
(i.e., CP19–118), and follow the
instructions. For assistance with access
to eLibrary, the helpline can be reached
at (866) 208–3676, TTY (202) 502–8659,
or at FERCOnlineSupport@ferc.gov. The
eLibrary link on the FERC website also
provides access to the texts of formal
documents issued by the Commission,
such as orders, notices, and rule
makings.
Dated: June 19, 2019.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2019–13717 Filed 6–26–19; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Western Area Power Administration
Central Valley Project, CaliforniaOregon Transmission Project, Pacific
Alternating Current Intertie, and ThirdParty Transmission Service—Rate
Order No. WAPA–185
Western Area Power
Administration, DOE.
ACTION: Notice of rate order extending
Sierra Nevada Region’s power,
transmission, and ancillary services
formula rates.
AGENCY:
The Under Secretary of
Energy confirms, approves, and places
into effect, on an interim basis, the
extension of the existing Central Valley
Project power, transmission, and
ancillary service; California-Oregon
Transmission Project transmission;
Pacific Alternating Current Intertie
transmission; and third-party
transmission formula rates. Western
Area Power Administration (WAPA)
will submit them to the Federal Energy
Regulatory Commission (FERC) for
confirmation and approval on a final
basis. The existing formula rates are set
to expire on September 30, 2019. This
rate extension makes no changes to the
existing formula rates and extends them
through September 30, 2024.
DATES: The formula rates will be placed
into effect on an interim basis on
October 1, 2019.
SUMMARY:
E:\FR\FM\27JNN1.SGM
27JNN1
Agencies
[Federal Register Volume 84, Number 124 (Thursday, June 27, 2019)]
[Notices]
[Pages 30710-30712]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2019-13718]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
Combined Notice of Filings #1
Take notice that the Commission received the following electric
corporate filings:
Docket Numbers: EC19-105-000.
Applicants: Diamond State Generation Partners, LLC.
Description: Application for Authorization Under Section 203 of the
Federal Power Act, et al. of Diamond State Generation Partners, LLC.
Filed Date: 6/20/19.
Accession Number: 20190620-5150.
Comments Due: 5 p.m. ET 7/11/19.
Take notice that the Commission received the following exempt
wholesale generator filings:
Docket Numbers: EG19-140-000.
Applicants: Polaris Wind Energy LLC.
Description: Notice of Self-Certification of Exempt Wholesale
Generator Status of Polaris Wind Energy LLC.
Filed Date: 6/21/19.
Accession Number: 20190621-5145.
Comments Due: 5 p.m. ET 7/12/19.
Take notice that the Commission received the following electric
rate filings:
Docket Numbers: ER12-2498-019; ER12-2499-019; ER17-382-004; ER17-
383-004; ER17-384-004; ER13-764-019; ER14-1927-007; ER18-1416-003;
ER11-4055-009; ER12-1566-013; ER14-1548-012; ER16-1327-002; ER12-199-
016; ER17-2141-002; ER17-2142-002; ER17-2385-002; ER11-3987-014; ER16-
1325-002; ER16-1326-002; ER18-855-003; ER14-1775-007.
Applicants: Alpaugh 50, LLC, Alpaugh North, LLC, CED Ducor Solar 1,
LLC, CED Ducor Solar 2, LLC, CED Ducor Solar 3, LLC, CED White River
Solar, LLC, CED White River Solar 2, LLC, CED Wistaria Solar, LLC,
Copper Mountain Solar 1, LLC, Copper Mountain Solar 2, LLC, Copper
Mountain Solar 3, LLC, Copper Mountain Solar 4, LLC, Coram California
Development, L.P., Great Valley Solar 1, LLC, Great Valley Solar 2,
LLC, Great Valley Solar 3, LLC, Mesquite Solar 1, LLC, Mesquite Solar
2, LLC, Mesquite Solar 3, LLC, Panoche Valley Solar, LLC, SEP II, LLC.
Description: Updated Market Power Analysis for the Southwest Region
of the Consolidated Edison, Inc. subsidiaries.
Filed Date: 6/20/19.
Accession Number: 20190620-5154.
Comments Due: 5 p.m. ET 8/19/19.
[[Page 30711]]
Docket Numbers: ER14-1421-002.
Applicants: Diamond State Generation Partners, LLC.
Description: Compliance filing: Informational Filing and Requests
for Waiver and Expedited Consideration to be effective N/A.
Filed Date: 6/20/19.
Accession Number: 20190620-5117.
Comments Due: 5 p.m. ET 7/11/19.
Docket Numbers: ER16-999-008; ER18-920-003; ER11-2335-013.
Applicants: Greenleaf Energy Unit 1 LLC, Marco DM Holdings, L.L.C.,
Plum Point Services Company, LLC.
Description: Updated Market Power Analysis for the Southwest Region
of Greenleaf Energy Unit 1 LLC, et al.
Filed Date: 6/20/19.
Accession Number: 20190620-5151.
Comments Due: 5 p.m. ET 8/19/19.
Docket Numbers: ER19-1920-001.
Applicants: Tampa Electric Company.
Description: Compliance filing: Amendment to Compliance Filing
under Order Nos. 845 and 845A to be effective 5/22/2019.
Filed Date: 6/21/19.
Accession Number: 20190621-5120.
Comments Due: 5 p.m. ET 7/12/19.
Docket Numbers: ER19-2217-000.
Applicants: Avenal Park LLC.
Description: Sec. 205(d) Rate Filing: Revisions to Market-Based
Rate Tariff and Requests for Waivers to be effective 6/21/2019.
Filed Date: 6/20/19.
Accession Number: 20190620-5108.
Comments Due: 5 p.m. ET 7/11/19.
Docket Numbers: ER19-2218-000.
Applicants: Sand Drag LLC.
Description: Sec. 205(d) Rate Filing: Revisions to Market-Based
Rate Tariff and Requests for Waivers to be effective 6/21/2019.
Filed Date: 6/20/19.
Accession Number: 20190620-5109.
Comments Due: 5 p.m. ET 7/11/19.
Docket Numbers: ER19-2219-000.
Applicants: Sun City Project LLC.
Description: Sec. 205(d) Rate Filing: Revisions to Market-Based
Rate Tariff and Requests for Waivers to be effective 6/21/2019.
Filed Date: 6/20/19.
Accession Number: 20190620-5110.
Comments Due: 5 p.m. ET 7/11/19.
Docket Numbers: ER19-2220-000.
Applicants: Big Sky North, LLC.
Description: Sec. 205(d) Rate Filing: Big Sky North, LLC Co
Tenancy Agreement to be effective 6/21/2019.
Filed Date: 6/20/19.
Accession Number: 20190620-5125.
Comments Due: 5 p.m. ET 7/11/19.
Docket Numbers: ER19-2221-000.
Applicants: Avista Corporation.
Description: Compliance filing: Avista Corp OATT Request for
Limited Waiver to be effective 6/21/2019.
Filed Date: 6/20/19.
Accession Number: 20190620-5126.
Comments Due: 5 p.m. ET 7/11/19.
Docket Numbers: ER19-2222-000.
Applicants: Southwest Power Pool, Inc.
Description: Sec. 205(d) Rate Filing: 2829R3 Midwest Energy &
Westar Energy Meter Agent Agreement to be effective 6/1/2019.
Filed Date: 6/21/19.
Accession Number: 20190621-5009.
Comments Due: 5 p.m. ET 7/12/19.
Docket Numbers: ER19-2223-000.
Applicants: Bolt Energy, LLC.
Description: Sec. 205(d) Rate Filing: MBR Tariff to be effective
6/12/2019.
Filed Date: 6/21/19.
Accession Number: 20190621-5031.
Comments Due: 5 p.m. ET 7/12/19.
Docket Numbers: ER19-2224-000.
Applicants: Turtle Creek Wind Farm LLC.
Description: Baseline eTariff Filing: Reactive Power Compensation
Baseline to be effective 8/20/2019.
Filed Date: 6/21/19.
Accession Number: 20190621-5032.
Comments Due: 5 p.m. ET 7/12/19.
Docket Numbers: ER19-2225-000.
Applicants: City of Dover Delaware.
Description: Petition for Limited Waiver of Tariff Deadline, et al.
of the City of Dover, Delaware.
Filed Date: 6/20/19.
Accession Number: 20190620-5152.
Comments Due: 5 p.m. ET 7/11/19.
Docket Numbers: ER19-2226-000.
Applicants: Public Service Company of Colorado.
Description: Sec. 205(d) Rate Filing: PSCo-CSU-A&R O&M-Jcksn Fllr-
395-0.1.0 to be effective 6/22/2019.
Filed Date: 6/21/19.
Accession Number: 20190621-5064.
Comments Due: 5 p.m. ET 7/12/19.
Docket Numbers: ER19-2227-000.
Applicants: PacifiCorp.
Description: Sec. 205(d) Rate Filing: UAMPS Trans IC Agmt--
Purgatory Flat to be effective 6/22/2019.
Filed Date: 6/21/19.
Accession Number: 20190621-5101.
Comments Due: 5 p.m. ET 7/12/19.
Docket Numbers: ER19-2228-000.
Applicants: Antelope Expansion 2, LLC.
Description: Sec. 205(d) Rate Filing: LGIA Co-Tenancy Agreement to
be effective 6/22/2019.
Filed Date: 6/21/19.
Accession Number: 20190621-5110.
Comments Due: 5 p.m. ET 7/12/19.
Docket Numbers: ER19-2229-000.
Applicants: San Pablo Raceway, LLC.
Description: Sec. 205(d) Rate Filing: LGIA Co-Tenancy Agreement to
be effective 6/22/2019.
Filed Date: 6/21/19.
Accession Number: 20190621-5112.
Comments Due: 5 p.m. ET 7/12/19.
Docket Numbers: ER19-2230-000.
Applicants: Polaris Wind Energy LLC.
Description: Baseline eTariff Filing: Application for Market-Based
Rate Authorization to be effective 8/21/2019.
Filed Date: 6/21/19.
Accession Number: 20190621-5117.
Comments Due: 5 p.m. ET 7/12/19.
Docket Numbers: ER19-2230-001.
Applicants: Polaris Wind Energy LLC.
Description: Tariff Amendment: Supplement to Application for
Market-Based Rate Authorization to be effective 8/21/2019.
Filed Date: 6/21/19.
Accession Number: 20190621-5124.
Comments Due: 5 p.m. ET 7/12/19.
Docket Numbers: ER19-2231-000.
Applicants: Chief Conemaugh Power II, LLC.
Description: Baseline eTariff Filing: Market-Based Rate Application
to be effective 8/21/2019.
Filed Date: 6/21/19.
Accession Number: 20190621-5122.
Comments Due: 5 p.m. ET 7/12/19.
Docket Numbers: ER19-2232-000.
Applicants: Chief Keystone Power II, LLC.
Description: Baseline eTariff Filing: Market-Based Rate Application
to be effective 8/21/2019.
Filed Date: 6/21/19.
Accession Number: 20190621-5125.
Comments Due: 5 p.m. ET 7/12/19.
Docket Numbers: ER19-2233-000.
Applicants: Smoky Mountain Transmission LLC.
Description: Compliance filing: Order Nos. 845 and 845-A Compliance
Filing to be effective 5/22/2019.
Filed Date: 6/21/19.
Accession Number: 20190621-5158.
Comments Due: 5 p.m. ET 7/12/19.
Take notice that the Commission received the following foreign
utility company status filings:
Docket Numbers: FC19-5-000.
Applicants: I Squared Capital.
Description: Self-Certification of FC of I Squared Capital.
Filed Date: 6/20/19.
Accession Number: 20190620-5115.
Comments Due: 5 p.m. ET 7/11/19.
Docket Numbers: FC19-6-000.
Applicants: Chenya Power Co., Ltd.
Description: Self-Certification of FC of I Squared Capital.
Filed Date: 6/21/19.
Accession Number: 20190621-5035.
[[Page 30712]]
Comments Due: 5 p.m. ET 7/12/19.
The filings are accessible in the Commission's eLibrary system by
clicking on the links or querying the docket number.
Any person desiring to intervene or protest in any of the above
proceedings must file in accordance with Rules 211 and 214 of the
Commission's Regulations (18 CFR 385.211 and 385.214) on or before 5:00
p.m. Eastern time on the specified comment date. Protests may be
considered, but intervention is necessary to become a party to the
proceeding.
eFiling is encouraged. More detailed information relating to filing
requirements, interventions, protests, service, and qualifying
facilities filings can be found at: https://www.ferc.gov/docs-filing/efiling/filing-req.pdf. For other information, call (866) 208-3676
(toll free). For TTY, call (202) 502-8659.
Dated: June 21, 2019.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2019-13718 Filed 6-26-19; 8:45 am]