Information Collection Request Submitted to OMB for Review and Approval; Comment Request; NESHAP for Area Sources: Primary Copper Smelting, Secondary Copper Smelting, and Primary Nonferrous Metals-Zinc, Cadmium, and Beryllium (Renewal), 30110-30111 [2019-13560]

Download as PDF 30110 Federal Register / Vol. 84, No. 123 / Wednesday, June 26, 2019 / Notices operators of the affected facilities. They are also required to maintain records of the occurrence and duration of any startup, shutdown, or malfunction in the operation of an affected facility, or any period during which the monitoring system is inoperative. These notifications, reports, and records are essential in determining compliance, and are required of all affected facilities subject to NSPS. Form Numbers: None. Respondents/affected entities: Coating lines used in the manufacture of pressure sensitive tape and label materials. Respondent’s obligation to respond: Mandatory (40 CFR part 60, subpart RR). Estimated number of respondents: 45 (total). Frequency of response: Initially, occasionally, and semiannually. Total estimated burden: 4,250 hours (per year). Burden is defined at 5 CFR 1320.3(b). Total estimated cost: $572,000 (per year), which includes $88,000 in annualized capital/startup and/or operation & maintenance costs. Changes in the estimates: There is an adjustment increase in the total estimated burden as currently identified in the OMB Inventory of Approved Burden; this increase is not due to any program changes. This increase is due to an increase in the number of respondents based on the assumption that one new respondent per year will be subject to the standard. There is also an adjustment increase in the operating and maintenance costs due to the increase in the number of respondents. Courtney Kerwin, Director, Regulatory Support Division. [FR Doc. 2019–13556 Filed 6–25–19; 8:45 am] BILLING CODE 6560–50–P ENVIRONMENTAL PROTECTION AGENCY [EPA–HQ–OECA–2012–0702; FRL–9995– 12–OMS] jbell on DSK3GLQ082PROD with NOTICES Information Collection Request Submitted to OMB for Review and Approval; Comment Request; NESHAP for Area Sources: Primary Copper Smelting, Secondary Copper Smelting, and Primary Nonferrous Metals-Zinc, Cadmium, and Beryllium (Renewal) Environmental Protection Agency (EPA). ACTION: Notice. AGENCY: The Environmental Protection Agency (EPA) has submitted an information collection request (ICR), SUMMARY: VerDate Sep<11>2014 18:47 Jun 25, 2019 Jkt 247001 NESHAP for Area Sources: Primary Copper Smelting, Secondary Copper Smelting, and Primary Nonferrous Metals-Zinc, Cadmium, and Beryllium (EPA ICR Number 2240.06, OMB Control Number 2060–0596), to the Office of Management and Budget (OMB) for review and approval in accordance with the Paperwork Reduction Act. This is a proposed extension of the ICR, which is currently approved through June 30, 2019. Public comments were previously requested, via the Federal Register on May 30, 2018 during a 60-day comment period. This notice allows for an additional 30 days for public comments. A fuller description of the ICR is given below, including its estimated burden and cost to the public. An agency may neither conduct nor sponsor, and a person is not required to respond to, a collection of information unless it displays a currently valid OMB control number. DATES: Additional comments may be submitted on or before July 26, 2019. ADDRESSES: Submit your comments, referencing Docket ID Number EPA– HQ–OECA–2012–0702, to: (1) EPA online using www.regulations.gov (our preferred method), or by email to docket.oeca@epa.gov, or by mail to: EPA Docket Center, Environmental Protection Agency, Mail Code 28221T, 1200 Pennsylvania Ave. NW, Washington, DC 20460; and (2) OMB via email to oira_submission@omb.eop.gov. Address comments to OMB Desk Officer for EPA. EPA’s policy is that all comments received will be included in the public docket without change, including any personal information provided, unless the comment includes profanity, threats, information claimed to be Confidential Business Information (CBI), or other information whose disclosure is restricted by statute. FOR FURTHER INFORMATION CONTACT: Patrick Yellin, Monitoring, Assistance, and Media Programs Division, Office of Compliance, Mail Code 2227A, Environmental Protection Agency, 1200 Pennsylvania Ave. NW, Washington, DC 20460; telephone number: (202) 564– 2970; fax number: (202) 564–0050; email address: yellin.patrick@epa.gov. SUPPLEMENTARY INFORMATION: Supporting documents which explain in detail the information that the EPA will be collecting are available in the public docket for this ICR. The docket can be viewed online at www.regulations.gov, or in person at the EPA Docket Center, WJC West, Room 3334, 1301 Constitution Ave. NW, Washington, DC. The telephone number for the Docket Center is 202–566–1744. For additional PO 00000 Frm 00029 Fmt 4703 Sfmt 4703 information about EPA’s public docket, visit: https://www.epa.gov/dockets. Abstract: The National Emission Standards for Hazardous Air Pollutants (NESHAP) for Area Sources: Primary Copper Smelting, Secondary Copper Smelting, and Primary Nonferrous Metals-Zinc, Cadmium, and Beryllium (40 CFR part 63, subparts EEEEEE, FFFFFF, and GGGGGG) were proposed on October 6, 2006, and promulgated on January 23, 2007. These regulations apply to both new and existing primary copper smelting facilities (subpart EEEEEE), new secondary copper smelting facilities (subpart FFFFFF), and both new and existing primary zinc or beryllium production facilities (subpart GGGGGG) that are an area source of hazardous air pollutant (HAP) emissions. New facilities include those that commenced construction or reconstruction after the date of proposal. This information is being collected to assure compliance with 40 CFR part 63, subparts EEEEEE, FFFFFF, and GGGGGG. In general, all NESHAP standards require initial notifications, performance tests, and periodic reports by the owners/operators of the affected facilities. They are also required to maintain records of the occurrence and duration of any startup, shutdown, or malfunction in the operation of an affected facility, or any period during which the monitoring system is inoperative. These notifications, reports, and records are essential in determining compliance, and are required of all affected facilities subject to NESHAP. Form Numbers: None. Respondents/affected entities: Primary copper smelting facilities, secondary copper smelting facilities, and primary zinc or beryllium production facilities. Respondent’s obligation to respond: Mandatory (40 CFR part 63). Estimated number of respondents: Five (total). Frequency of response: Semiannual. Total estimated burden: 74 hours (per year). Burden is defined at 5 CFR 1320.3(b). Total estimated cost: $8,380 (per year), which includes $0 for annualized capital/startup and/or operation & maintenance costs. Changes in the estimates: There is no change in the burden in this ICR compared to the previous ICR. This is due to two considerations. First, the regulations have not changed over the past three years and are not anticipated to change over the next three years. Secondly, the growth rate for the industry is very low, negative or nonexistent, so there is no significant E:\FR\FM\26JNN1.SGM 26JNN1 Federal Register / Vol. 84, No. 123 / Wednesday, June 26, 2019 / Notices change in the overall burden. There is an adjustment increase in the labor costs in this ICR compared to the previous ICR. Courtney Kerwin, Director, Regulatory Support Division. FOR FURTHER INFORMATION CONTACT: Patrick Yellin, Monitoring, Assistance, and Media Programs Division, Office of Compliance, Mail Code 2227A, Environmental Protection Agency, 1200 Pennsylvania Ave. NW, Washington, DC 20460; telephone number: (202) 564– 2970; fax number: (202) 564–0050; email address: yellin.patrick@epa.gov. [FR Doc. 2019–13560 Filed 6–25–19; 8:45 am] BILLING CODE 6560–50–P ENVIRONMENTAL PROTECTION AGENCY [EPA–HQ–OECA–2012–0703; FRL–9995– 07–OMS] Information Collection Request Submitted to OMB for Review and Approval; Comment Request; NESHAP for Prepared Feeds Manufacturing (Renewal) Environmental Protection Agency (EPA). ACTION: Notice. AGENCY: The Environmental Protection Agency (EPA) has submitted an information collection request (ICR), NESHAP for Prepared Feeds Manufacturing (EPA ICR Number 2354.05, OMB Control Number 2060– 0635), to the Office of Management and Budget (OMB) for review and approval in accordance with the Paperwork Reduction Act. This is a proposed extension of the ICR, which is currently approved through June 30, 2019. Public comments were previously requested via the Federal Register on May 30, 2018 during a 60-day comment period. This notice allows for an additional 30 days for public comments. A fuller description of the ICR is given below, including its estimated burden and cost to the public. An agency may neither conduct nor sponsor, and a person is not required to respond to, a collection of information unless it displays a currently valid OMB control number. DATES: Additional comments may be submitted on or before July 26, 2019. ADDRESSES: Submit your comments, referencing Docket ID Number EPA– HQ–OECA–2012–0703, to: (1) EPA online using www.regulations.gov (our preferred method), or by email to docket.oeca@epa.gov, or by mail to: EPA Docket Center, Environmental Protection Agency, Mail Code 28221T, 1200 Pennsylvania Ave. NW, Washington, DC 20460; and (2) OMB via email to oira_submission@omb.eop.gov. Address comments to OMB Desk Officer for EPA. EPA’s policy is that all comments received will be included in the public docket without change including any personal information provided, unless jbell on DSK3GLQ082PROD with NOTICES SUMMARY: VerDate Sep<11>2014 18:47 Jun 25, 2019 Jkt 247001 the comment includes profanity, threats, information claimed to be Confidential Business Information (CBI), or other information whose disclosure is restricted by statute. SUPPLEMENTARY INFORMATION: Supporting documents which explain in detail the information that the EPA will be collecting are available in the public docket for this ICR. The docket can be viewed online at www.regulations.gov or in person at the EPA Docket Center, EPA West, Room 3334, 1301 Constitution Ave. NW, Washington, DC. The telephone number for the Docket Center is 202–566–1744. For additional information about EPA’s public docket, visit: https://www.epa.gov/dockets. Abstract: The National Emission Standards for Hazardous Air Pollutants (NESHAP) for Prepared Feeds Manufacturing were proposed on July 27, 2009, promulgated on January 5, 2010, and amended on both July 20, 2010, and December 23, 2011. A prepared feed manufacturing facility is a facility where animal feed (other than feed products for dogs and cats) makes up at least half (by mass) of the facility’s annual production of all products. These regulations apply to new and existing area source prepared feeds manufacturing facilities that use one or more materials (additives/premixes) that contain 0.1 percent or greater by weight of chromium (Cr) or 1.0 percent or greater by weight of manganese (Mn). New facilities include those that commenced construction or reconstruction after the date of proposal. This information is being collected to assure compliance with 40 CFR part 63, subpart DDDDDDD. In general, all NESHAP standards require initial notifications, performance tests, and periodic reports by the owners/operators of the affected facilities. They are also required to maintain records of the occurrence and duration of any startup, shutdown, or malfunction in the operation of an affected facility, or any period during which the monitoring system is inoperative. These notifications, reports, and records are essential in determining compliance, and are required of all affected facilities subject to NESHAP. Form Numbers: None. PO 00000 Frm 00030 Fmt 4703 Sfmt 4703 30111 Respondents/affected entities: Prepared feed manufacturing facilities. Respondent’s obligation to respond: Mandatory (40 CFR part 63). Estimated number of respondents: 1,800 (total). Frequency of response: Annual. Total estimated burden: 64,100 hours (per year). Burden is defined at 5 CFR 1320.3(b). Total estimated cost: $7,350,000 (per year), which includes $37,200 in annualized capital/startup and/or operation & maintenance costs. Changes in the Estimates: There is no change in the burden in this ICR compared to the previous ICR. This is due to two considerations. First, the regulations have not changed over the past three years and are not anticipated to change over the next three years. Secondly, the growth rate for the industry is very low, negative or nonexistent, so there is no significant change in the overall burden. Courtney Kerwin, Director, Regulatory Support Division. [FR Doc. 2019–13559 Filed 6–25–19; 8:45 am] BILLING CODE 6560–50–P ENVIRONMENTAL PROTECTION AGENCY [EPA–HQ–OECA–2013–0355; FRL–9995– 73–OMS] Information Collection Request Submitted to OMB for Review and Approval; Comment Request; NESHAP for Clay Ceramics Manufacturing, Glass Manufacturing, and Secondary Nonferrous Metals Processing Area Sources (Renewal) Environmental Protection Agency (EPA). ACTION: Notice. AGENCY: The Environmental Protection Agency (EPA) has submitted an information collection request (ICR), NESHAP for Clay Ceramics Manufacturing, Glass Manufacturing, and Secondary Nonferrous Metals Processing Area Sources (EPA ICR Number 2274.06, OMB Control Number 2060–0606), to the Office of Management and Budget (OMB) for review and approval in accordance with the Paperwork Reduction Act. This is a proposed extension of the ICR, which is currently approved through August 31, 2019. Public comments were previously requested, via the Federal Register, on May 30, 2018 during a 60-day comment period. This notice allows for an additional 30 days for public comments. A fuller description of the ICR is given SUMMARY: E:\FR\FM\26JNN1.SGM 26JNN1

Agencies

[Federal Register Volume 84, Number 123 (Wednesday, June 26, 2019)]
[Notices]
[Pages 30110-30111]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2019-13560]


-----------------------------------------------------------------------

ENVIRONMENTAL PROTECTION AGENCY

[EPA-HQ-OECA-2012-0702; FRL-9995-12-OMS]


Information Collection Request Submitted to OMB for Review and 
Approval; Comment Request; NESHAP for Area Sources: Primary Copper 
Smelting, Secondary Copper Smelting, and Primary Nonferrous Metals-
Zinc, Cadmium, and Beryllium (Renewal)

AGENCY: Environmental Protection Agency (EPA).

ACTION: Notice.

-----------------------------------------------------------------------

SUMMARY: The Environmental Protection Agency (EPA) has submitted an 
information collection request (ICR), NESHAP for Area Sources: Primary 
Copper Smelting, Secondary Copper Smelting, and Primary Nonferrous 
Metals-Zinc, Cadmium, and Beryllium (EPA ICR Number 2240.06, OMB 
Control Number 2060-0596), to the Office of Management and Budget (OMB) 
for review and approval in accordance with the Paperwork Reduction Act. 
This is a proposed extension of the ICR, which is currently approved 
through June 30, 2019. Public comments were previously requested, via 
the Federal Register on May 30, 2018 during a 60-day comment period. 
This notice allows for an additional 30 days for public comments. A 
fuller description of the ICR is given below, including its estimated 
burden and cost to the public. An agency may neither conduct nor 
sponsor, and a person is not required to respond to, a collection of 
information unless it displays a currently valid OMB control number.

DATES: Additional comments may be submitted on or before July 26, 2019.

ADDRESSES: Submit your comments, referencing Docket ID Number EPA-HQ-
OECA-2012-0702, to: (1) EPA online using www.regulations.gov (our 
preferred method), or by email to [email protected], or by mail to: 
EPA Docket Center, Environmental Protection Agency, Mail Code 28221T, 
1200 Pennsylvania Ave. NW, Washington, DC 20460; and (2) OMB via email 
to [email protected]. Address comments to OMB Desk Officer 
for EPA.
    EPA's policy is that all comments received will be included in the 
public docket without change, including any personal information 
provided, unless the comment includes profanity, threats, information 
claimed to be Confidential Business Information (CBI), or other 
information whose disclosure is restricted by statute.

FOR FURTHER INFORMATION CONTACT: Patrick Yellin, Monitoring, 
Assistance, and Media Programs Division, Office of Compliance, Mail 
Code 2227A, Environmental Protection Agency, 1200 Pennsylvania Ave. NW, 
Washington, DC 20460; telephone number: (202) 564-2970; fax number: 
(202) 564-0050; email address: [email protected].

SUPPLEMENTARY INFORMATION: Supporting documents which explain in detail 
the information that the EPA will be collecting are available in the 
public docket for this ICR. The docket can be viewed online at 
www.regulations.gov, or in person at the EPA Docket Center, WJC West, 
Room 3334, 1301 Constitution Ave. NW, Washington, DC. The telephone 
number for the Docket Center is 202-566-1744. For additional 
information about EPA's public docket, visit: https://www.epa.gov/dockets.
    Abstract: The National Emission Standards for Hazardous Air 
Pollutants (NESHAP) for Area Sources: Primary Copper Smelting, 
Secondary Copper Smelting, and Primary Nonferrous Metals-Zinc, Cadmium, 
and Beryllium (40 CFR part 63, subparts EEEEEE, FFFFFF, and GGGGGG) 
were proposed on October 6, 2006, and promulgated on January 23, 2007. 
These regulations apply to both new and existing primary copper 
smelting facilities (subpart EEEEEE), new secondary copper smelting 
facilities (subpart FFFFFF), and both new and existing primary zinc or 
beryllium production facilities (subpart GGGGGG) that are an area 
source of hazardous air pollutant (HAP) emissions. New facilities 
include those that commenced construction or reconstruction after the 
date of proposal. This information is being collected to assure 
compliance with 40 CFR part 63, subparts EEEEEE, FFFFFF, and GGGGGG.
    In general, all NESHAP standards require initial notifications, 
performance tests, and periodic reports by the owners/operators of the 
affected facilities. They are also required to maintain records of the 
occurrence and duration of any startup, shutdown, or malfunction in the 
operation of an affected facility, or any period during which the 
monitoring system is inoperative. These notifications, reports, and 
records are essential in determining compliance, and are required of 
all affected facilities subject to NESHAP.
    Form Numbers: None.
    Respondents/affected entities: Primary copper smelting facilities, 
secondary copper smelting facilities, and primary zinc or beryllium 
production facilities.
    Respondent's obligation to respond: Mandatory (40 CFR part 63).
    Estimated number of respondents: Five (total).
    Frequency of response: Semiannual.
    Total estimated burden: 74 hours (per year). Burden is defined at 5 
CFR 1320.3(b).
    Total estimated cost: $8,380 (per year), which includes $0 for 
annualized capital/startup and/or operation & maintenance costs.
    Changes in the estimates: There is no change in the burden in this 
ICR compared to the previous ICR. This is due to two considerations. 
First, the regulations have not changed over the past three years and 
are not anticipated to change over the next three years. Secondly, the 
growth rate for the industry is very low, negative or non-existent, so 
there is no significant

[[Page 30111]]

change in the overall burden. There is an adjustment increase in the 
labor costs in this ICR compared to the previous ICR.

Courtney Kerwin,
Director, Regulatory Support Division.
[FR Doc. 2019-13560 Filed 6-25-19; 8:45 am]
BILLING CODE 6560-50-P


This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.