Village of Lyndonville Electric Department; Notice of Authorization for Continued Project Operation, 29513 [2019-13346]
Download as PDF
jbell on DSK3GLQ082PROD with NOTICES
Federal Register / Vol. 84, No. 121 / Monday, June 24, 2019 / Notices
Accession Number: 20190617–5201.
Comments Due: 5 p.m. ET 7/8/19.
Docket Numbers: ER19–2189–000.
Applicants: Palmetto Plains Solar
Project, LLC.
Description: Baseline eTariff Filing:
Application for MBR, Waivers, Blanket
Authority, Confidential & Expedited
Action to be effective 6/18/2019.
Filed Date: 6/17/19.
Accession Number: 20190617–5202.
Comments Due: 5 p.m. ET 7/8/19.
Docket Numbers: ER19–2190–000.
Applicants: Cubico Palmetto Lessee,
LLC.
Description: Baseline eTariff Filing:
Application for MBR, Waivers, Blanket
Authority, Confidential & Expedited
Action to be effective 6/19/2019.
Filed Date: 6/18/19.
Accession Number: 20190618–5001.
Comments Due: 5 p.m. ET 7/9/19.
Docket Numbers: ER19–2191–000.
Applicants: Dominion Energy South
Carolina, Inc.
Description: Baseline eTariff Filing:
Baseline Power Sales Tariffs and Name
Change to be effective 8/16/2019.
Filed Date: 6/18/19.
Accession Number: 20190618–5003.
Comments Due: 5 p.m. ET 7/9/19.
Docket Numbers: ER19–2192–000.
Applicants: Southwest Power Pool,
Inc.
Description: § 205(d) Rate Filing:
1891R8 Westar Energy, Inc.—Mulberry
NITSA NOA to be effective 9/1/2019.
Filed Date: 6/18/19.
Accession Number: 20190618–5009.
Comments Due: 5 p.m. ET 7/9/19.
Docket Numbers: ER19–2193–000.
Applicants: Wabash Valley Power
Association, Inc.
Description: § 205(d) Rate Filing:
Amendment to Section 1.8—Optional
Co-op Solar Energy Rider to be effective
8/18/2019.
Filed Date: 6/18/19.
Accession Number: 20190618–5010.
Comments Due: 5 p.m. ET 7/9/19.
Docket Numbers: ER19–2194–000.
Applicants: Southwest Power Pool,
Inc.
Description: § 205(d) Rate Filing:
1892R8 Westar Energy, Inc.—Robinson
NITSA NOA to be effective 9/1/2019.
Filed Date: 6/18/19.
Accession Number: 20190618–5011.
Comments Due: 5 p.m. ET 7/9/19.
Docket Numbers: ER19–2195–000.
Applicants: Southwest Power Pool,
Inc.
Description: § 205(d) Rate Filing:
1893R9 Westar Energy, Inc.—Savonburg
NITSA NOA to be effective 9/1/2019.
Filed Date: 6/18/19.
Accession Number: 20190618–5015.
VerDate Sep<11>2014
16:50 Jun 21, 2019
Jkt 247001
Comments Due: 5 p.m. ET 7/9/19.
Docket Numbers: ER19–2196–000.
Applicants: Southwest Power Pool,
Inc.
Description: § 205(d) Rate Filing:
1894R8 Westar Energy, Inc.—Vermillion
NITSA NOA to be effective 9/1/2019.
Filed Date: 6/18/19.
Accession Number: 20190618–5053.
Comments Due: 5 p.m. ET 7/9/19.
Docket Numbers: ER19–2197–000.
Applicants: Mid-Atlantic Interstate
Transmission, LLC, PJM
Interconnection, L.L.C.
Description: § 205(d) Rate Filing:
MAIT submits 3 ECSAs, Service
Agreement Nos. 5273, 5280 and 5337 to
be effective 8/20/2019.
Filed Date: 6/18/19.
Accession Number: 20190618–5056.
Comments Due: 5 p.m. ET 7/9/19.
The filings are accessible in the
Commission’s eLibrary system by
clicking on the links or querying the
docket number.
Any person desiring to intervene or
protest in any of the above proceedings
must file in accordance with Rules 211
and 214 of the Commission’s
Regulations (18 CFR 385.211 and
385.214) on or before 5:00 p.m. Eastern
time on the specified comment date.
Protests may be considered, but
intervention is necessary to become a
party to the proceeding.
eFiling is encouraged. More detailed
information relating to filing
requirements, interventions, protests,
service, and qualifying facilities filings
can be found at: https://www.ferc.gov/
docs-filing/efiling/filing-req.pdf. For
other information, call (866) 208–3676
(toll free). For TTY, call (202) 502–8659.
Dated: June 18, 2019.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2019–13339 Filed 6–21–19; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 2839–000]
Village of Lyndonville Electric
Department; Notice of Authorization
for Continued Project Operation
On May 26, 2017, the Village of
Lyndonville Electric Department,
licensee for the Great Falls
Hydroelectric Project, filed an
Application for a New License pursuant
to the Federal Power Act (FPA) and the
Commission’s regulations thereunder.
The Great Falls Hydroelectric Project is
PO 00000
Frm 00021
Fmt 4703
Sfmt 9990
29513
located on the Passumpsic River, in the
Town of Lyndonville, Caledonia
County, Vermont.
The license for Project No. 2839 was
issued for a period ending May 31,
2019. Section 15(a)(1) of the FPA, 16
U.S.C. 808(a)(1), requires the
Commission, at the expiration of a
license term, to issue from year-to-year
an annual license to the then licensee
under the terms and conditions of the
prior license until a new license is
issued, or the project is otherwise
disposed of as provided in section 15 or
any other applicable section of the FPA.
If the project’s prior license waived the
applicability of section 15 of the FPA,
then, based on section 9(b) of the
Administrative Procedure Act, 5 U.S.C.
558(c), and as set forth at 18 CFR
16.21(a), if the licensee of such project
has filed an application for a subsequent
license, the licensee may continue to
operate the project in accordance with
the terms and conditions of the license
after the minor or minor part license
expires, until the Commission acts on
its application. If the licensee of such a
project has not filed an application for
a subsequent license, then it may be
required, pursuant to 18 CFR 16.21(b),
to continue project operations until the
Commission issues someone else a
license for the project or otherwise
orders disposition of the project.
If the project is subject to section 15
of the FPA, notice is hereby given that
an annual license for Project No. 2839
is issued to the licensee for a period
effective June 1, 2019 through May 31,
2020, or until the issuance of a new
license for the project or other
disposition under the FPA, whichever
comes first. If issuance of a new license
(or other disposition) does not take
place on or before May 31, 2020, notice
is hereby given that, pursuant to 18 CFR
16.18(c), an annual license under
section 15(a)(1) of the FPA is renewed
automatically without further order or
notice by the Commission, unless the
Commission orders otherwise.
If the project is not subject to section
15 of the FPA, notice is hereby given
that the licensee, Village of Lyndonville
Electric Department, is authorized to
continue operation of the Great Falls
Hydroelectric Project until such time as
the Commission acts on its application
for a subsequent license.
Dated: June 18, 2019.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2019–13346 Filed 6–21–19; 8:45 am]
BILLING CODE 6717–01–P
E:\FR\FM\24JNN1.SGM
24JNN1
Agencies
[Federal Register Volume 84, Number 121 (Monday, June 24, 2019)]
[Notices]
[Page 29513]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2019-13346]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Project No. 2839-000]
Village of Lyndonville Electric Department; Notice of
Authorization for Continued Project Operation
On May 26, 2017, the Village of Lyndonville Electric Department,
licensee for the Great Falls Hydroelectric Project, filed an
Application for a New License pursuant to the Federal Power Act (FPA)
and the Commission's regulations thereunder. The Great Falls
Hydroelectric Project is located on the Passumpsic River, in the Town
of Lyndonville, Caledonia County, Vermont.
The license for Project No. 2839 was issued for a period ending May
31, 2019. Section 15(a)(1) of the FPA, 16 U.S.C. 808(a)(1), requires
the Commission, at the expiration of a license term, to issue from
year-to-year an annual license to the then licensee under the terms and
conditions of the prior license until a new license is issued, or the
project is otherwise disposed of as provided in section 15 or any other
applicable section of the FPA. If the project's prior license waived
the applicability of section 15 of the FPA, then, based on section 9(b)
of the Administrative Procedure Act, 5 U.S.C. 558(c), and as set forth
at 18 CFR 16.21(a), if the licensee of such project has filed an
application for a subsequent license, the licensee may continue to
operate the project in accordance with the terms and conditions of the
license after the minor or minor part license expires, until the
Commission acts on its application. If the licensee of such a project
has not filed an application for a subsequent license, then it may be
required, pursuant to 18 CFR 16.21(b), to continue project operations
until the Commission issues someone else a license for the project or
otherwise orders disposition of the project.
If the project is subject to section 15 of the FPA, notice is
hereby given that an annual license for Project No. 2839 is issued to
the licensee for a period effective June 1, 2019 through May 31, 2020,
or until the issuance of a new license for the project or other
disposition under the FPA, whichever comes first. If issuance of a new
license (or other disposition) does not take place on or before May 31,
2020, notice is hereby given that, pursuant to 18 CFR 16.18(c), an
annual license under section 15(a)(1) of the FPA is renewed
automatically without further order or notice by the Commission, unless
the Commission orders otherwise.
If the project is not subject to section 15 of the FPA, notice is
hereby given that the licensee, Village of Lyndonville Electric
Department, is authorized to continue operation of the Great Falls
Hydroelectric Project until such time as the Commission acts on its
application for a subsequent license.
Dated: June 18, 2019.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2019-13346 Filed 6-21-19; 8:45 am]