Combined Notice of Filings #1, 29511-29513 [2019-13339]

Download as PDF Federal Register / Vol. 84, No. 121 / Monday, June 24, 2019 / Notices website that enables subscribers to receive email notification when a document is added to a subscribed docket(s). For assistance with any FERC Online service, please email FERCOnlineSupport@ferc.gov, or call (866) 208–3676 (toll free). For TTY, call (202) 502–8659. Comment Date: 5:00 p.m. Eastern Time on July 8, 2019. DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. EL19–81–000] jbell on DSK3GLQ082PROD with NOTICES Nevada Hydro Company, Inc. v. California Independent System Operator Corporation; Notice of Complaint Take notice that on June 17, 2019, pursuant to section 206 of the Federal Power Act 16 U.S.C. 824e and Rule 206 of the Federal Energy Regulatory Commission’s (Commission) Rules of Practice and Procedure, 18 CFR 385.206, Nevada Hydro Company, Inc. (Complainant), filed a formal complaint against California Independent System Operator Corporation (CAISO or Respondent) alleging that CAISO failed to follow its Tariff and otherwise failed to perform a just and reasonable, open, transparent, comparable and not unduly discriminatory study of Lake Elsinore Advanced Pumped Storage project and also order CAISO to correct its modeling errors and produce new results using the data it already has, all as more fully explained in the complaint. Complainant certifies that copies of the Complaint were served on Respondent as listed on the Commission’s list of Corporate Officials. Any person desiring to intervene or to protest this filing must file in accordance with Rules 211 and 214 of the Commission’s Rules of Practice and Procedure (18 CFR 385.211 and 385.214). Protests will be considered by the Commission in determining the appropriate action to be taken, but will not serve to make protestants parties to the proceeding. Any person wishing to become a party must file a notice of intervention or motion to intervene, as appropriate. The Respondents’ answers and all interventions, or protests must be filed on or before the comment date. The Respondents’ answers, motions to intervene, and protests must be served on the Complainant. The Commission encourages electronic submissions of protests and interventions in lieu of paper using the ‘‘eFiling’’ link at https://www.ferc.gov. Persons unable to file electronically should submit an original and 5 copies of the protest or intervention to the Federal Energy Regulatory Commission, 888 First Street NE, Washington, DC 20426. This filing is accessible on-line at https://www.ferc.gov, using the ‘‘eLibrary’’ link and is available for review in the Commission’s Public Reference Room in Washington, DC. There is an ‘‘eSubscription’’ link on the VerDate Sep<11>2014 16:50 Jun 21, 2019 Jkt 247001 Dated: June 18, 2019. Nathaniel J. Davis, Sr., Deputy Secretary. [FR Doc. 2019–13343 Filed 6–21–19; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. ER19–2189–000] Palmetto Plains Solar Project, LLC; Supplemental Notice That Initial Market-Based Rate Filing Includes Request for Blanket Section 204 Authorization This is a supplemental notice in the above-referenced proceeding of Palmetto Plains Solar Project, LLC’s application for market-based rate authority, with an accompanying rate tariff, noting that such application includes a request for blanket authorization, under 18 CFR part 34, of future issuances of securities and assumptions of liability. Any person desiring to intervene or to protest should file with the Federal Energy Regulatory Commission, 888 First Street NE, Washington, DC 20426, in accordance with Rules 211 and 214 of the Commission’s Rules of Practice and Procedure (18 CFR 385.211 and 385.214). Anyone filing a motion to intervene or protest must serve a copy of that document on the Applicant. Notice is hereby given that the deadline for filing protests with regard to the applicant’s request for blanket authorization, under 18 CFR part 34, of future issuances of securities and assumptions of liability, is July 8, 2019. The Commission encourages electronic submission of protests and interventions in lieu of paper, using the FERC Online links at https:// www.ferc.gov. To facilitate electronic service, persons with internet access who will eFile a document and/or be listed as a contact for an intervenor must create and validate an eRegistration account using the eRegistration link. Select the eFiling link to log on and submit the intervention or protests. PO 00000 Frm 00019 Fmt 4703 Sfmt 4703 29511 Persons unable to file electronically should submit an original and 5 copies of the intervention or protest to the Federal Energy Regulatory Commission, 888 First Street NE, Washington, DC 20426. The filings in the above-referenced proceeding are accessible in the Commission’s eLibrary system by clicking on the appropriate link in the above list. They are also available for electronic review in the Commission’s Public Reference Room in Washington, DC. There is an eSubscription link on the website that enables subscribers to receive email notification when a document is added to a subscribed docket(s). For assistance with any FERC Online service, please email FERCOnlineSupport@ferc.gov or call (866) 208–3676 (toll free). For TTY, call (202) 502–8659. Dated: June 18, 2019. Nathaniel J. Davis, Sr., Deputy Secretary. [FR Doc. 2019–13344 Filed 6–21–19; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Combined Notice of Filings #1 Take notice that the Commission received the following electric corporate filings: Docket Numbers: EC19–99–000. Applicants: Empire Generating Co, LLC. Description: Amendment to June 4, 2019 Application for Authorization Under Section 203 of the Federal Power Act, et al. of Empire Generating Co, LLC. Filed Date: 6/17/19. Accession Number: 20190617–5207. Comments Due: 5 p.m. ET 7/8/19. Docket Numbers: EC19–102–000. Applicants: Lyonsdale Biomass, LLC, ReEnergy Ashland LLC, ReEnergy Black River LLC, ReEnergy Fort Fairfield LLC, ReEnergy Livermore Falls LLC, ReEnergy Stratton LLC. Description: Joint Application for Authorization Under Section 203 of the Federal Power Act, et al. of Lyonsdale Biomass, LLC, et al. Filed Date: 6/17/19. Accession Number: 20190617–5213. Comments Due: 5 p.m. ET 7/8/19. Take notice that the Commission received the following exempt wholesale generator filings: Docket Numbers: EG19–133–000. Applicants: Cubico Palmetto Lessee, LLC. E:\FR\FM\24JNN1.SGM 24JNN1 jbell on DSK3GLQ082PROD with NOTICES 29512 Federal Register / Vol. 84, No. 121 / Monday, June 24, 2019 / Notices Description: Notice of Self Certification of Exempt Wholesale Generator Request of Cubico Palmetto Lessee, LLC. Filed Date: 6/18/19. Accession Number: 20190618–5042. Comments Due: 5 p.m. ET 7/9/19. Docket Numbers: EG19–134–000. Applicants: Palmetto Plains Solar Project, LLC. Description: Notice of SelfCertification of Exempt Wholesale Generator of Palmetto Plains Solar Project, LLC. Filed Date: 6/18/19. Accession Number: 20190618–5045. Comments Due: 5 p.m. ET 7/9/19. Take notice that the Commission received the following electric rate filings: Docket Numbers: ER10–2238–009; ER10–2239–009; ER10–2237–009; ER12–896–005; ER14–1818–019; ER19– 1577–001. Applicants: Indigo Generation LLC, Larkspur Energy LLC, Wildflower Energy LP, Mariposa Energy, LLC, Boston Energy Trading and Marketing LLC, Kearny Mesa Storage, LLC. Description: Triennial Updated Market Power Analysis for the Southwest Region of the DGC Southwest Sellers. Filed Date: 6/17/19. Accession Number: 20190617–5218. Comments Due: 5 p.m. ET 8/16/19. Docket Numbers: ER10–2487–005; ER15–2380 003. Applicants: Pacific Summit Energy LLC. Description: Supplement to April 1, 2019 Notice of Change in Status of Pacific Summit Energy LLC, et al. Filed Date: 6/17/19. Accession Number: 20190617–5209. Comments Due: 5 p.m. ET 7/8/19. Docket Numbers: ER19–2167–000. Applicants: Midcontinent Independent System Operator, Inc. Description: § 205(d) Rate Filing: 2019–06–17_SA 3223 Richland WindMidAmerican 1st Rev GIA Supplement (J535) to be effective 6/3/2019. Filed Date: 6/17/19. Accession Number: 20190617–5096. Comments Due: 5 p.m. ET 7/8/19. Docket Numbers: ER19–2173–000. Applicants: ITC Midwest LLC. Description: § 205(d) Rate Filing: Filing of 4th A&R OGS Unit 1 Facilities and Operating Agreement to be effective 6/27/2019. Filed Date: 6/17/19. Accession Number: 20190617–5163. Comments Due: 5 p.m. ET 7/8/19. Docket Numbers: ER19–2174–000. Applicants: Sierra Pacific Power Company. VerDate Sep<11>2014 16:50 Jun 21, 2019 Jkt 247001 Description: Tariff Cancellation: Rate Schedule No. 66 SPPC & Liberty EPC Cancellation to be effective 8/17/2019. Filed Date: 6/17/19. Accession Number: 20190617–5165. Comments Due: 5 p.m. ET 7/8/19. Docket Numbers: ER19–2175–000. Applicants: PJM Interconnection, L.L.C. Description: § 205(d) Rate Filing: Second Revised ISA, SA No. 2178, Queue No. AC2–125/AC2–126 to be effective 5/17/2019. Filed Date: 6/17/19. Accession Number: 20190617–5172. Comments Due: 5 p.m. ET 7/8/19. Docket Numbers: ER19–2176–000. Applicants: Sierra Pacific Power Company. Description: Tariff Cancellation: Rate Schedule No. 71—CalPeco & SPPC 609 Line Agreement Cancellation to be effective 8/17/2019. Filed Date: 6/17/19. Accession Number: 20190617–5174. Comments Due: 5 p.m. ET 7/8/19. Docket Numbers: ER19–2177–000. Applicants: Alta Wind I, LLC. Description: § 205(d) Rate Filing: Revisions to Market-Based Rate Tariff and Requests for Waivers to be effective 6/18/2019. Filed Date: 6/17/19. Accession Number: 20190617–5176. Comments Due: 5 p.m. ET 7/8/19. Docket Numbers: ER19–2178–000. Applicants: Alta Wind II, LLC. Description: § 205(d) Rate Filing: Revisions to Market-Based Rate Tariff and Requests for Waivers to be effective 6/18/2019. Filed Date: 6/17/19. Accession Number: 20190617–5177. Comments Due: 5 p.m. ET 7/8/19. Docket Numbers: ER19–2179–000. Applicants: Alta Wind III, LLC. Description: § 205(d) Rate Filing: Revisions to Market-Based Rate Tariff and Requests for Waivers to be effective 6/18/2019. Filed Date: 6/17/19. Accession Number: 20190617–5178. Comments Due: 5 p.m. ET 7/8/19. Docket Numbers: ER19–2180–000. Applicants: Alta Wind IV, LLC. Description: § 205(d) Rate Filing: Revisions to Market-Based Rate Tariff and Requests for Waivers to be effective 6/18/2019. Filed Date: 6/17/19. Accession Number: 20190617–5182. Comments Due: 5 p.m. ET 7/8/19. Docket Numbers: ER19–2181–000. Applicants: Alta Wind V, LLC. Description: § 205(d) Rate Filing: Revisions to Market-Based Rate Tariff and Requests for Waivers to be effective 6/18/2019. PO 00000 Frm 00020 Fmt 4703 Sfmt 4703 Filed Date: 6/17/19. Accession Number: 20190617–5189. Comments Due: 5 p.m. ET 7/8/19. Docket Numbers: ER19–2182–000. Applicants: Alta Wind X, LLC. Description: § 205(d) Rate Filing: Revisions to Market-Based Rate Tariff and Requests for Waivers to be effective 6/18/2019. Filed Date: 6/17/19. Accession Number: 20190617–5190. Comments Due: 5 p.m. ET 7/8/19. Docket Numbers: ER19–2183–000. Applicants: Alta Wind XI, LLC. Description: § 205(d) Rate Filing: Revisions to Market-Based Rate Tariff and Requests for Waivers to be effective 6/18/2019. Filed Date: 6/17/19. Accession Number: 20190617–5191. Comments Due: 5 p.m. ET 7/8/19. Docket Numbers: ER19–2184–000. Applicants: Carlsbad Energy Center LLC. Description: § 205(d) Rate Filing: Revisions to Market-Based Rate Tariff and Requests for Waivers to be effective 6/18/2019. Filed Date: 6/17/19. Accession Number: 20190617–5192. Comments Due: 5 p.m. ET 7/8/19. Docket Numbers: ER19–2185–000. Applicants: El Segundo Energy Center LLC. Description: § 205(d) Rate Filing: Revisions to Market-Based Rate Tariff and Requests for Waivers to be effective 6/18/2019. Filed Date: 6/17/19. Accession Number: 20190617–5193. Comments Due: 5 p.m. ET 7/8/19. Docket Numbers: ER19–2186–000. Applicants: High Plains Ranch II, LLC. Description: § 205(d) Rate Filing: Revisions to Market-Based Rate Tariff and Requests for Waivers to be effective 6/18/2019. Filed Date: 6/17/19. Accession Number: 20190617–5195. Comments Due: 5 p.m. ET 7/8/19. Docket Numbers: ER19–2187–000. Applicants: TransCanyon DCR, LLC. Description: Compliance filing: Formula Rate Second Compliance Filing on ADIT to be effective 6/27/2019. Filed Date: 6/17/19. Accession Number: 20190617–5197. Comments Due: 5 p.m. ET 7/8/19. Docket Numbers: ER19–2188–000. Applicants: Pacific Gas and Electric Company. Description: Tariff Cancellation: Notice of Termination of Lathrop Irrigation District 60 kV IA (SA 298) to be effective 8/16/2019. Filed Date: 6/17/19. E:\FR\FM\24JNN1.SGM 24JNN1 jbell on DSK3GLQ082PROD with NOTICES Federal Register / Vol. 84, No. 121 / Monday, June 24, 2019 / Notices Accession Number: 20190617–5201. Comments Due: 5 p.m. ET 7/8/19. Docket Numbers: ER19–2189–000. Applicants: Palmetto Plains Solar Project, LLC. Description: Baseline eTariff Filing: Application for MBR, Waivers, Blanket Authority, Confidential & Expedited Action to be effective 6/18/2019. Filed Date: 6/17/19. Accession Number: 20190617–5202. Comments Due: 5 p.m. ET 7/8/19. Docket Numbers: ER19–2190–000. Applicants: Cubico Palmetto Lessee, LLC. Description: Baseline eTariff Filing: Application for MBR, Waivers, Blanket Authority, Confidential & Expedited Action to be effective 6/19/2019. Filed Date: 6/18/19. Accession Number: 20190618–5001. Comments Due: 5 p.m. ET 7/9/19. Docket Numbers: ER19–2191–000. Applicants: Dominion Energy South Carolina, Inc. Description: Baseline eTariff Filing: Baseline Power Sales Tariffs and Name Change to be effective 8/16/2019. Filed Date: 6/18/19. Accession Number: 20190618–5003. Comments Due: 5 p.m. ET 7/9/19. Docket Numbers: ER19–2192–000. Applicants: Southwest Power Pool, Inc. Description: § 205(d) Rate Filing: 1891R8 Westar Energy, Inc.—Mulberry NITSA NOA to be effective 9/1/2019. Filed Date: 6/18/19. Accession Number: 20190618–5009. Comments Due: 5 p.m. ET 7/9/19. Docket Numbers: ER19–2193–000. Applicants: Wabash Valley Power Association, Inc. Description: § 205(d) Rate Filing: Amendment to Section 1.8—Optional Co-op Solar Energy Rider to be effective 8/18/2019. Filed Date: 6/18/19. Accession Number: 20190618–5010. Comments Due: 5 p.m. ET 7/9/19. Docket Numbers: ER19–2194–000. Applicants: Southwest Power Pool, Inc. Description: § 205(d) Rate Filing: 1892R8 Westar Energy, Inc.—Robinson NITSA NOA to be effective 9/1/2019. Filed Date: 6/18/19. Accession Number: 20190618–5011. Comments Due: 5 p.m. ET 7/9/19. Docket Numbers: ER19–2195–000. Applicants: Southwest Power Pool, Inc. Description: § 205(d) Rate Filing: 1893R9 Westar Energy, Inc.—Savonburg NITSA NOA to be effective 9/1/2019. Filed Date: 6/18/19. Accession Number: 20190618–5015. VerDate Sep<11>2014 16:50 Jun 21, 2019 Jkt 247001 Comments Due: 5 p.m. ET 7/9/19. Docket Numbers: ER19–2196–000. Applicants: Southwest Power Pool, Inc. Description: § 205(d) Rate Filing: 1894R8 Westar Energy, Inc.—Vermillion NITSA NOA to be effective 9/1/2019. Filed Date: 6/18/19. Accession Number: 20190618–5053. Comments Due: 5 p.m. ET 7/9/19. Docket Numbers: ER19–2197–000. Applicants: Mid-Atlantic Interstate Transmission, LLC, PJM Interconnection, L.L.C. Description: § 205(d) Rate Filing: MAIT submits 3 ECSAs, Service Agreement Nos. 5273, 5280 and 5337 to be effective 8/20/2019. Filed Date: 6/18/19. Accession Number: 20190618–5056. Comments Due: 5 p.m. ET 7/9/19. The filings are accessible in the Commission’s eLibrary system by clicking on the links or querying the docket number. Any person desiring to intervene or protest in any of the above proceedings must file in accordance with Rules 211 and 214 of the Commission’s Regulations (18 CFR 385.211 and 385.214) on or before 5:00 p.m. Eastern time on the specified comment date. Protests may be considered, but intervention is necessary to become a party to the proceeding. eFiling is encouraged. More detailed information relating to filing requirements, interventions, protests, service, and qualifying facilities filings can be found at: https://www.ferc.gov/ docs-filing/efiling/filing-req.pdf. For other information, call (866) 208–3676 (toll free). For TTY, call (202) 502–8659. Dated: June 18, 2019. Nathaniel J. Davis, Sr., Deputy Secretary. [FR Doc. 2019–13339 Filed 6–21–19; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 2839–000] Village of Lyndonville Electric Department; Notice of Authorization for Continued Project Operation On May 26, 2017, the Village of Lyndonville Electric Department, licensee for the Great Falls Hydroelectric Project, filed an Application for a New License pursuant to the Federal Power Act (FPA) and the Commission’s regulations thereunder. The Great Falls Hydroelectric Project is PO 00000 Frm 00021 Fmt 4703 Sfmt 9990 29513 located on the Passumpsic River, in the Town of Lyndonville, Caledonia County, Vermont. The license for Project No. 2839 was issued for a period ending May 31, 2019. Section 15(a)(1) of the FPA, 16 U.S.C. 808(a)(1), requires the Commission, at the expiration of a license term, to issue from year-to-year an annual license to the then licensee under the terms and conditions of the prior license until a new license is issued, or the project is otherwise disposed of as provided in section 15 or any other applicable section of the FPA. If the project’s prior license waived the applicability of section 15 of the FPA, then, based on section 9(b) of the Administrative Procedure Act, 5 U.S.C. 558(c), and as set forth at 18 CFR 16.21(a), if the licensee of such project has filed an application for a subsequent license, the licensee may continue to operate the project in accordance with the terms and conditions of the license after the minor or minor part license expires, until the Commission acts on its application. If the licensee of such a project has not filed an application for a subsequent license, then it may be required, pursuant to 18 CFR 16.21(b), to continue project operations until the Commission issues someone else a license for the project or otherwise orders disposition of the project. If the project is subject to section 15 of the FPA, notice is hereby given that an annual license for Project No. 2839 is issued to the licensee for a period effective June 1, 2019 through May 31, 2020, or until the issuance of a new license for the project or other disposition under the FPA, whichever comes first. If issuance of a new license (or other disposition) does not take place on or before May 31, 2020, notice is hereby given that, pursuant to 18 CFR 16.18(c), an annual license under section 15(a)(1) of the FPA is renewed automatically without further order or notice by the Commission, unless the Commission orders otherwise. If the project is not subject to section 15 of the FPA, notice is hereby given that the licensee, Village of Lyndonville Electric Department, is authorized to continue operation of the Great Falls Hydroelectric Project until such time as the Commission acts on its application for a subsequent license. Dated: June 18, 2019. Nathaniel J. Davis, Sr., Deputy Secretary. [FR Doc. 2019–13346 Filed 6–21–19; 8:45 am] BILLING CODE 6717–01–P E:\FR\FM\24JNN1.SGM 24JNN1

Agencies

[Federal Register Volume 84, Number 121 (Monday, June 24, 2019)]
[Notices]
[Pages 29511-29513]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2019-13339]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission


Combined Notice of Filings #1

    Take notice that the Commission received the following electric 
corporate filings:

    Docket Numbers: EC19-99-000.
    Applicants: Empire Generating Co, LLC.
    Description: Amendment to June 4, 2019 Application for 
Authorization Under Section 203 of the Federal Power Act, et al. of 
Empire Generating Co, LLC.
    Filed Date: 6/17/19.
    Accession Number: 20190617-5207.
    Comments Due: 5 p.m. ET 7/8/19.

    Docket Numbers: EC19-102-000.
    Applicants: Lyonsdale Biomass, LLC, ReEnergy Ashland LLC, ReEnergy 
Black River LLC, ReEnergy Fort Fairfield LLC, ReEnergy Livermore Falls 
LLC, ReEnergy Stratton LLC.
    Description: Joint Application for Authorization Under Section 203 
of the Federal Power Act, et al. of Lyonsdale Biomass, LLC, et al.
    Filed Date: 6/17/19.
    Accession Number: 20190617-5213.
    Comments Due: 5 p.m. ET 7/8/19.

    Take notice that the Commission received the following exempt 
wholesale generator filings:

    Docket Numbers: EG19-133-000.
    Applicants: Cubico Palmetto Lessee, LLC.

[[Page 29512]]

    Description: Notice of Self Certification of Exempt Wholesale 
Generator Request of Cubico Palmetto Lessee, LLC.
    Filed Date: 6/18/19.
    Accession Number: 20190618-5042.
    Comments Due: 5 p.m. ET 7/9/19.

    Docket Numbers: EG19-134-000.
    Applicants: Palmetto Plains Solar Project, LLC.
    Description: Notice of Self-Certification of Exempt Wholesale 
Generator of Palmetto Plains Solar Project, LLC.
    Filed Date: 6/18/19.
    Accession Number: 20190618-5045.
    Comments Due: 5 p.m. ET 7/9/19.

    Take notice that the Commission received the following electric 
rate filings:

    Docket Numbers: ER10-2238-009; ER10-2239-009; ER10-2237-009; ER12-
896-005; ER14-1818-019; ER19-1577-001.
    Applicants: Indigo Generation LLC, Larkspur Energy LLC, Wildflower 
Energy LP, Mariposa Energy, LLC, Boston Energy Trading and Marketing 
LLC, Kearny Mesa Storage, LLC.
    Description: Triennial Updated Market Power Analysis for the 
Southwest Region of the DGC Southwest Sellers.
    Filed Date: 6/17/19.
    Accession Number: 20190617-5218.
    Comments Due: 5 p.m. ET 8/16/19.

    Docket Numbers: ER10-2487-005; ER15-2380 003.
    Applicants: Pacific Summit Energy LLC.
    Description: Supplement to April 1, 2019 Notice of Change in Status 
of Pacific Summit Energy LLC, et al.
    Filed Date: 6/17/19.
    Accession Number: 20190617-5209.
    Comments Due: 5 p.m. ET 7/8/19.

    Docket Numbers: ER19-2167-000.
    Applicants: Midcontinent Independent System Operator, Inc.
    Description: Sec.  205(d) Rate Filing: 2019-06-17_SA 3223 Richland 
Wind-MidAmerican 1st Rev GIA Supplement (J535) to be effective 6/3/
2019.
    Filed Date: 6/17/19.
    Accession Number: 20190617-5096.
    Comments Due: 5 p.m. ET 7/8/19.

    Docket Numbers: ER19-2173-000.
    Applicants: ITC Midwest LLC.
    Description: Sec.  205(d) Rate Filing: Filing of 4th A&R OGS Unit 1 
Facilities and Operating Agreement to be effective 6/27/2019.
    Filed Date: 6/17/19.
    Accession Number: 20190617-5163.
    Comments Due: 5 p.m. ET 7/8/19.

    Docket Numbers: ER19-2174-000.
    Applicants: Sierra Pacific Power Company.
    Description: Tariff Cancellation: Rate Schedule No. 66 SPPC & 
Liberty EPC Cancellation to be effective 8/17/2019.
    Filed Date: 6/17/19.
    Accession Number: 20190617-5165.
    Comments Due: 5 p.m. ET 7/8/19.

    Docket Numbers: ER19-2175-000.
    Applicants: PJM Interconnection, L.L.C.
    Description: Sec.  205(d) Rate Filing: Second Revised ISA, SA No. 
2178, Queue No. AC2-125/AC2-126 to be effective 5/17/2019.
    Filed Date: 6/17/19.
    Accession Number: 20190617-5172.
    Comments Due: 5 p.m. ET 7/8/19.

    Docket Numbers: ER19-2176-000.
    Applicants: Sierra Pacific Power Company.
    Description: Tariff Cancellation: Rate Schedule No. 71--CalPeco & 
SPPC 609 Line Agreement Cancellation to be effective 8/17/2019.
    Filed Date: 6/17/19.
    Accession Number: 20190617-5174.
    Comments Due: 5 p.m. ET 7/8/19.

    Docket Numbers: ER19-2177-000.
    Applicants: Alta Wind I, LLC.
    Description: Sec.  205(d) Rate Filing: Revisions to Market-Based 
Rate Tariff and Requests for Waivers to be effective 6/18/2019.
    Filed Date: 6/17/19.
    Accession Number: 20190617-5176.
    Comments Due: 5 p.m. ET 7/8/19.

    Docket Numbers: ER19-2178-000.
    Applicants: Alta Wind II, LLC.
    Description: Sec.  205(d) Rate Filing: Revisions to Market-Based 
Rate Tariff and Requests for Waivers to be effective 6/18/2019.
    Filed Date: 6/17/19.
    Accession Number: 20190617-5177.
    Comments Due: 5 p.m. ET 7/8/19.

    Docket Numbers: ER19-2179-000.
    Applicants: Alta Wind III, LLC.
    Description: Sec.  205(d) Rate Filing: Revisions to Market-Based 
Rate Tariff and Requests for Waivers to be effective 6/18/2019.
    Filed Date: 6/17/19.
    Accession Number: 20190617-5178.
    Comments Due: 5 p.m. ET 7/8/19.

    Docket Numbers: ER19-2180-000.
    Applicants: Alta Wind IV, LLC.
    Description: Sec.  205(d) Rate Filing: Revisions to Market-Based 
Rate Tariff and Requests for Waivers to be effective 6/18/2019.
    Filed Date: 6/17/19.
    Accession Number: 20190617-5182.
    Comments Due: 5 p.m. ET 7/8/19.

    Docket Numbers: ER19-2181-000.
    Applicants: Alta Wind V, LLC.
    Description: Sec.  205(d) Rate Filing: Revisions to Market-Based 
Rate Tariff and Requests for Waivers to be effective 6/18/2019.
    Filed Date: 6/17/19.
    Accession Number: 20190617-5189.
    Comments Due: 5 p.m. ET 7/8/19.

    Docket Numbers: ER19-2182-000.
    Applicants: Alta Wind X, LLC.
    Description: Sec.  205(d) Rate Filing: Revisions to Market-Based 
Rate Tariff and Requests for Waivers to be effective 6/18/2019.
    Filed Date: 6/17/19.
    Accession Number: 20190617-5190.
    Comments Due: 5 p.m. ET 7/8/19.

    Docket Numbers: ER19-2183-000.
    Applicants: Alta Wind XI, LLC.
    Description: Sec.  205(d) Rate Filing: Revisions to Market-Based 
Rate Tariff and Requests for Waivers to be effective 6/18/2019.
    Filed Date: 6/17/19.
    Accession Number: 20190617-5191.
    Comments Due: 5 p.m. ET 7/8/19.

    Docket Numbers: ER19-2184-000.
    Applicants: Carlsbad Energy Center LLC.
    Description: Sec.  205(d) Rate Filing: Revisions to Market-Based 
Rate Tariff and Requests for Waivers to be effective 6/18/2019.
    Filed Date: 6/17/19.
    Accession Number: 20190617-5192.
    Comments Due: 5 p.m. ET 7/8/19.

    Docket Numbers: ER19-2185-000.
    Applicants: El Segundo Energy Center LLC.
    Description: Sec.  205(d) Rate Filing: Revisions to Market-Based 
Rate Tariff and Requests for Waivers to be effective 6/18/2019.
    Filed Date: 6/17/19.
    Accession Number: 20190617-5193.
    Comments Due: 5 p.m. ET 7/8/19.

    Docket Numbers: ER19-2186-000.
    Applicants: High Plains Ranch II, LLC.
    Description: Sec.  205(d) Rate Filing: Revisions to Market-Based 
Rate Tariff and Requests for Waivers to be effective 6/18/2019.
    Filed Date: 6/17/19.
    Accession Number: 20190617-5195.
    Comments Due: 5 p.m. ET 7/8/19.

    Docket Numbers: ER19-2187-000.
    Applicants: TransCanyon DCR, LLC.
    Description: Compliance filing: Formula Rate Second Compliance 
Filing on ADIT to be effective 6/27/2019.
    Filed Date: 6/17/19.
    Accession Number: 20190617-5197.
    Comments Due: 5 p.m. ET 7/8/19.

    Docket Numbers: ER19-2188-000.
    Applicants: Pacific Gas and Electric Company.
    Description: Tariff Cancellation: Notice of Termination of Lathrop 
Irrigation District 60 kV IA (SA 298) to be effective 8/16/2019.
    Filed Date: 6/17/19.

[[Page 29513]]

    Accession Number: 20190617-5201.
    Comments Due: 5 p.m. ET 7/8/19.

    Docket Numbers: ER19-2189-000.
    Applicants: Palmetto Plains Solar Project, LLC.
    Description: Baseline eTariff Filing: Application for MBR, Waivers, 
Blanket Authority, Confidential & Expedited Action to be effective 6/
18/2019.
    Filed Date: 6/17/19.
    Accession Number: 20190617-5202.
    Comments Due: 5 p.m. ET 7/8/19.

    Docket Numbers: ER19-2190-000.
    Applicants: Cubico Palmetto Lessee, LLC.
    Description: Baseline eTariff Filing: Application for MBR, Waivers, 
Blanket Authority, Confidential & Expedited Action to be effective 6/
19/2019.
    Filed Date: 6/18/19.
    Accession Number: 20190618-5001.
    Comments Due: 5 p.m. ET 7/9/19.

    Docket Numbers: ER19-2191-000.
    Applicants: Dominion Energy South Carolina, Inc.
    Description: Baseline eTariff Filing: Baseline Power Sales Tariffs 
and Name Change to be effective 8/16/2019.
    Filed Date: 6/18/19.
    Accession Number: 20190618-5003.
    Comments Due: 5 p.m. ET 7/9/19.

    Docket Numbers: ER19-2192-000.
    Applicants: Southwest Power Pool, Inc.
    Description: Sec.  205(d) Rate Filing: 1891R8 Westar Energy, Inc.--
Mulberry NITSA NOA to be effective 9/1/2019.
    Filed Date: 6/18/19.
    Accession Number: 20190618-5009.
    Comments Due: 5 p.m. ET 7/9/19.

    Docket Numbers: ER19-2193-000.
    Applicants: Wabash Valley Power Association, Inc.
    Description: Sec.  205(d) Rate Filing: Amendment to Section 1.8--
Optional Co-op Solar Energy Rider to be effective 8/18/2019.
    Filed Date: 6/18/19.
    Accession Number: 20190618-5010.
    Comments Due: 5 p.m. ET 7/9/19.

    Docket Numbers: ER19-2194-000.
    Applicants: Southwest Power Pool, Inc.
    Description: Sec.  205(d) Rate Filing: 1892R8 Westar Energy, Inc.--
Robinson NITSA NOA to be effective 9/1/2019.
    Filed Date: 6/18/19.
    Accession Number: 20190618-5011.
    Comments Due: 5 p.m. ET 7/9/19.

    Docket Numbers: ER19-2195-000.
    Applicants: Southwest Power Pool, Inc.
    Description: Sec.  205(d) Rate Filing: 1893R9 Westar Energy, Inc.--
Savonburg NITSA NOA to be effective 9/1/2019.
    Filed Date: 6/18/19.
    Accession Number: 20190618-5015.
    Comments Due: 5 p.m. ET 7/9/19.

    Docket Numbers: ER19-2196-000.
    Applicants: Southwest Power Pool, Inc.
    Description: Sec.  205(d) Rate Filing: 1894R8 Westar Energy, Inc.--
Vermillion NITSA NOA to be effective 9/1/2019.
    Filed Date: 6/18/19.
    Accession Number: 20190618-5053.
    Comments Due: 5 p.m. ET 7/9/19.

    Docket Numbers: ER19-2197-000.
    Applicants: Mid-Atlantic Interstate Transmission, LLC, PJM 
Interconnection, L.L.C.
    Description: Sec.  205(d) Rate Filing: MAIT submits 3 ECSAs, 
Service Agreement Nos. 5273, 5280 and 5337 to be effective 8/20/2019.
    Filed Date: 6/18/19.
    Accession Number: 20190618-5056.
    Comments Due: 5 p.m. ET 7/9/19.

    The filings are accessible in the Commission's eLibrary system by 
clicking on the links or querying the docket number.
    Any person desiring to intervene or protest in any of the above 
proceedings must file in accordance with Rules 211 and 214 of the 
Commission's Regulations (18 CFR 385.211 and 385.214) on or before 5:00 
p.m. Eastern time on the specified comment date. Protests may be 
considered, but intervention is necessary to become a party to the 
proceeding.
    eFiling is encouraged. More detailed information relating to filing 
requirements, interventions, protests, service, and qualifying 
facilities filings can be found at: https://www.ferc.gov/docs-filing/efiling/filing-req.pdf. For other information, call (866) 208-3676 
(toll free). For TTY, call (202) 502-8659.

    Dated: June 18, 2019.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2019-13339 Filed 6-21-19; 8:45 am]
 BILLING CODE 6717-01-P
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.