Environmental Impact Statements; Notice of Availability, 29201 [2019-13269]

Download as PDF jspears on DSK30JT082PROD with NOTICES Federal Register / Vol. 84, No. 120 / Friday, June 21, 2019 / Notices increase and allow the current rate schedules, which are set to expire September 30, 2019, to remain in effect. The deferral of a revenue adjustment (rate change) provides for rate stability and savings on the administrative cost of implementation and recognizes that the revenue sufficiency will be reexamined in the following year’s PRS. Therefore, Southwestern is proposing an extension of all current rate schedules, for the period October 1, 2019 to September 30, 2021. In accordance with 10 CFR 903.22(h), 903.23(a)(3), and 903.23(b), as amended (84 FR 5347 (Feb. 21, 2019)), and DOE Redelegation Order No. 00–002.10D (June 4, 2019), the Assistant Secretary may extend existing and provisional rates on an interim basis beyond the period specified by the Federal Energy Regulatory Commission (FERC). The Integrated System rate schedules (P–13, NFTS–13 and EE–13) were placed into effect on an interim basis by the Deputy Secretary of Energy effective September 1, 2013, and were confirmed and approved by FERC on a final basis on January 9, 2014, for a period that ended September 30, 2017. Subsequently, a new section 2.3.6 was added to the Non-Federal Transmission Service (NFTS) rate schedule NFTS–13 in order to replace a stated-rate for customers taking Southwest Power Pool (SPP) Network Integration Transmission Service (NITS) with a revenuerequirement based methodology that includes determining the SPP NITS Annual Revenue Requirement (ARR) portion of Southwestern’s NFTS ARR. The change had no impact on Southwestern’s Integrated System revenue requirements and the rate schedule was re-designated NFTS–13A to reflect the change to the initial rate schedule. The NFTS–13A rate schedule change was placed into effect on an interim basis by the Deputy Secretary of Energy effective January 1, 2017, and confirmed and approved on a final basis by FERC on March 9, 2017, under FERC Docket No. EF14–1–001. A two-year extension of all Integrated System rate schedules was approved on an interim basis September 13, 2017, by the Deputy Secretary for the period October 1, 2017 through September 30, 2019. Since the Integrated System rate schedules were placed into effect and subsequently extended, there has been one additional change with no impact on revenue requirements. Southwestern added section 4.2 within the Hydro Peaking Power rate schedule P–13 in order to effect a uniform shift in the time Southwestern requires its customers to submit Peaking Energy schedules. The rate schedule was re-designated P–13A VerDate Sep<11>2014 19:41 Jun 20, 2019 Jkt 247001 to reflect the change to the initial rate schedule. The P–13A rate schedule change was placed into effect on an interim basis by the Assistant Secretary effective July 1, 2019, and has been submitted to FERC for confirmation and approval on a final basis. The current Sam Rayburn Dam rate schedule (SRD–15) was placed into effect on an interim basis by the Deputy Secretary on December 17, 2015, and was confirmed and approved by the FERC on a final basis on June 30, 2016, for a period that ends September 30, 2019. The current Robert D. Willis rate schedule (RDW–15) was placed into effect on an interim basis by the Deputy Secretary of Energy on December 17, 2015, and was confirmed and approved by the FERC on a final basis on June 15, 2016, for a period that ends September 30, 2019. The Administrator will review and consider all written comments and the information gathered when submitting the finalized Rate Schedules Extension to the Assistant Secretary for confirmation and approval on an interim basis. Dated: June 13, 2019. Mike Wech, Administrator. [FR Doc. 2019–13227 Filed 6–20–19; 8:45 am] BILLING CODE 6450–01–P ENVIRONMENTAL PROTECTION AGENCY [ER–FRL–9045–4] Environmental Impact Statements; Notice of Availability Responsible Agency: Office of Federal Activities, General Information 202– 564–5632 or https://www.epa.gov/ nepa/. Weekly receipt of Environmental Impact Statements Filed 06/10/2019 Through 06/14/2019 Pursuant to 40 CFR 1506.9. 29201 EIS No. 20190131, Final, BLM, NV, Gemfield Mine Project, Review Period Ends: 07/22/2019, Contact: Kevin Hurrell 775–635–4000 EIS No. 20190132, Draft Supplement, USFS, MT, Montanore Evaluation Project, Comment Period Ends: 08/08/ 2019, Contact: Craig Towery 406– 293–6211 EIS No. 20190133, Draft, USFS, ID, Huckleberry Landscape Restoration Project, Comment Period Ends: 08/05/ 2019, Contact: Ronda Bishop 208– 253–0101 EIS No. 20190134, Draft, USFWS, CA, Placer County Conservation Program Environmental Impact Statement/ Environmental Impact Report, Comment Period Ends: 08/20/2019, Contact: Mike Thomas 916–414–6600 EIS No. 20190135, Draft, BLM, ID, Programmatic EIS for Fuel Breaks in the Great Basin, Comment Period Ends: 08/05/2019, Contact: Marlo Draper 208–373–3812 EIS No. 20190136, Draft, BLM, CO, Draft Eastern Colorado Resource Management Plan and Environmental Impact Statement, Comment Period Ends: 09/20/2019, Contact: John Smeins, Project Manager 719–269– 8581 EIS No. 20190138, Draft, FERC, CA, Bucks Creek Hydropower Project, Comment Period Ends: 08/05/2019, Contact: Office of External Affairs 866–208–3372 Amended Notice EIS No. 20140102, Final, USFS, ID, Lost Creek-Boulder Creek Landscape Restoration Project, Review Period Ends: 08/05/2019, Contact: Erin Phelps 208–347–0301 Revision to FR Notice Published 04/ 04/2014; the U.S. Department of Agriculture’s Forest Service is reopening the review period to end 08/ 05/2019 due to an errata to the Final EIS. Dated: June 18, 2019. Robert Tomiak, Director, Office of Federal Activities. Notice [FR Doc. 2019–13269 Filed 6–20–19; 8:45 am] Section 309(a) of the Clean Air Act requires that EPA make public its comments on EISs issued by other Federal agencies. EPA’s comment letters on EISs are available at: https:// cdxnodengn.epa.gov/cdx-enepa-public/ action/eis/search. EIS No. 20190110, Draft, USFS, UT, High Uintas Wilderness Domestic Sheep Analysis Project (Ashley and UWC National Forests), Comment Period Ends: 08/05/2019, Contact: Paul Cowley 801–999–2177 BILLING CODE 6560–50–P PO 00000 Frm 00045 Fmt 4703 Sfmt 4703 EXPORT-IMPORT BANK 2019 EXIM Bank Sub-Saharan Africa Advisory Committee Nomination Process Nominations are now being accepted for EXIM Bank’s 2019 Sub-Saharan Africa Advisory Committee. The Congressionally-established SubSaharan Africa Advisory Committee E:\FR\FM\21JNN1.SGM 21JNN1

Agencies

[Federal Register Volume 84, Number 120 (Friday, June 21, 2019)]
[Notices]
[Page 29201]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2019-13269]


=======================================================================
-----------------------------------------------------------------------

ENVIRONMENTAL PROTECTION AGENCY

[ER-FRL-9045-4]


Environmental Impact Statements; Notice of Availability

    Responsible Agency: Office of Federal Activities, General 
Information 202-564-5632 or https://www.epa.gov/ nepa/.

Weekly receipt of Environmental Impact Statements
Filed 06/10/2019 Through 06/14/2019
Pursuant to 40 CFR 1506.9.

Notice

    Section 309(a) of the Clean Air Act requires that EPA make public 
its comments on EISs issued by other Federal agencies. EPA's comment 
letters on EISs are available at: https://cdxnodengn.epa.gov/cdx-enepa-public/action/eis/search.

EIS No. 20190110, Draft, USFS, UT, High Uintas Wilderness Domestic 
Sheep Analysis Project (Ashley and UWC National Forests), Comment 
Period Ends: 08/05/2019, Contact: Paul Cowley 801-999-2177
EIS No. 20190131, Final, BLM, NV, Gemfield Mine Project, Review Period 
Ends: 07/22/2019, Contact: Kevin Hurrell 775-635-4000
EIS No. 20190132, Draft Supplement, USFS, MT, Montanore Evaluation 
Project, Comment Period Ends: 08/08/2019, Contact: Craig Towery 406-
293-6211
EIS No. 20190133, Draft, USFS, ID, Huckleberry Landscape Restoration 
Project, Comment Period Ends: 08/05/2019, Contact: Ronda Bishop 208-
253-0101
EIS No. 20190134, Draft, USFWS, CA, Placer County Conservation Program 
Environmental Impact Statement/Environmental Impact Report, Comment 
Period Ends: 08/20/2019, Contact: Mike Thomas 916-414-6600
EIS No. 20190135, Draft, BLM, ID, Programmatic EIS for Fuel Breaks in 
the Great Basin, Comment Period Ends: 08/05/2019, Contact: Marlo Draper 
208-373-3812
EIS No. 20190136, Draft, BLM, CO, Draft Eastern Colorado Resource 
Management Plan and Environmental Impact Statement, Comment Period 
Ends: 09/20/2019, Contact: John Smeins, Project Manager 719-269-8581
EIS No. 20190138, Draft, FERC, CA, Bucks Creek Hydropower Project, 
Comment Period Ends: 08/05/2019, Contact: Office of External Affairs 
866-208-3372

Amended Notice

EIS No. 20140102, Final, USFS, ID, Lost Creek-Boulder Creek Landscape 
Restoration Project, Review Period Ends: 08/05/2019, Contact: Erin 
Phelps 208-347-0301

    Revision to FR Notice Published 04/04/2014; the U.S. Department of 
Agriculture's Forest Service is reopening the review period to end 08/
05/2019 due to an errata to the Final EIS.

    Dated: June 18, 2019.
Robert Tomiak,
Director, Office of Federal Activities.
[FR Doc. 2019-13269 Filed 6-20-19; 8:45 am]
BILLING CODE 6560-50-P
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.