Download as PDF 29192 Federal Register / Vol. 84, No. 120 / Friday, June 21, 2019 / Notices good cause why the time limitation should be waived,’’ and should provide justification by reference to factors set forth in Rule 214(d)(1) (18 CFR 385.214(d)(1)) of the Commission’s Rules and Regulations. The Commission strongly encourages electronic filings of comments, protests, and interventions in lieu of paper using the ‘‘eFiling’’ link at https:// www.ferc.gov. Persons unable to file electronically should submit an original and 3 copies of the protest or intervention to the Federal Energy regulatory Commission, 888 First Street NE, Washington, DC 20426. Comment Date: 5:00 p.m. Eastern Time on July 8, 2019. Dated: June 17, 2019. Nathaniel J. Davis, Sr., Deputy Secretary. [FR Doc. 2019–13234 Filed 6–20–19; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 619–164] jspears on DSK30JT082PROD with NOTICES Pacific Gas and Electric Company and City of Santa Clara, California; Notice of Availability of the Draft Environmental Impact Statement for the Bucks Creek Hydropower Project In accordance with the National Environmental Policy Act of 1969 and the Federal Energy Regulatory Commission’s (Commission) regulations, 18 CFR part 380, the Office of Energy Projects has reviewed the application for license for the Bucks Creek Hydropower Project (FERC No. 619) and has prepared a draft environmental impact statement (EIS) for the project. The project is located on Bucks, Grizzly, and Milk Ranch Creeks in Plumas County, California. Portions of the project are located within the Plumas National Forest. The draft EIS contains staff’s evaluations of the co-applicants’ proposal and the alternatives for relicensing the Bucks Creek Hydropower Project. The draft EIS documents the views of governmental agencies, non-governmental organizations, affected Indian tribes, the public, the license applicants, and Commission staff. A copy of the draft EIS is available for review in the Commission’s Public Reference Branch, Room 2A, located at 888 First Street NE, Washington, DC 20426. The draft EIS also may be viewed on the Commission’s website at https:// VerDate Sep<11>2014 18:30 Jun 20, 2019 Jkt 247001 www.ferc.gov under the eLibrary link. Enter the docket number excluding the last three digits in the docket number field to access the document. For assistance, contact FERC Online Support at FERCOnlineSupport@ ferc.gov, (866) 208–3676 (toll free), or (202) 502–8659 (TTY). You may also register online at https:// www.ferc.gov/docs-filing/ esubscription.asp to be notified via email of new filings and issuances related to this or other pending projects. For assistance, contact FERC Online Support. All comments must be filed by August 13, 2019. The Commission strongly encourages electronic filing. Please file comments using the Commission’s eFiling system at https://www.ferc.gov/docs-filing/ efiling.asp. Commenters can submit brief comments up to 6,000 characters, without prior registration, using the eComment system at https:// www.ferc.gov/docs-filing/ ecomment.asp. You must include your name and contact information at the end of your comments. For assistance, please contact FERC Online Support. In lieu of electronic filing, please send a paper copy to: Secretary, Federal Energy Regulatory Commission, 888 First Street NE, Washington, DC 20426. The first page of any filing should include docket number P–619–164. Anyone may intervene in this proceeding based on this draft EIS (18 CFR 380.10). You must file your request to intervene as specified above.1 You do not need intervenor status to have your comments considered. Commission staff will hold two public meetings for the purpose of receiving comments on the draft EIS. The daytime meeting will focus on resource agency, Indian tribes, and non-governmental organization comments, while the evening meeting is primarily for receiving input from the public. All interested individuals and entities will be invited to attend one or both of the public meetings. A notice detailing the exact date, time, and location of the public meetings will be forthcoming. For further information, please contact Alan Mitchnick at (202) 502– 6074 or at alan.mitchnick@ferc.gov. Dated: June 14, 2019. Nathaniel J. Davis, Sr., Deputy Secretary. [FR Doc. 2019–13132 Filed 6–20–19; 8:45 am] BILLING CODE 6717–01–P 1 Interventions may also be filed electronically via the internet in lieu of paper. See the previous discussion on filing comments electronically. PO 00000 Frm 00036 Fmt 4703 Sfmt 4703 DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Combined Notice of Filings #1 Take notice that the Commission received the following electric corporate filings: Docket Numbers: EC19–63–000. Applicants: NRG Wholesale Generation LP, Entergy Mississippi, LLC. Description: Response of GenOn Wholesale Generation LP and Entergy Mississippi, LLC, to May 16, 2019 deficiency letter. Filed Date: 6/14/19. Accession Number: 20190614–5211. Comments Due: 5 p.m. ET 7/5/19. Take notice that the Commission received the following exempt wholesale generator filings: Docket Numbers: EG19–128–000. Applicants: PSEG Keys Energy Center LLC, PSEG Fossil Sewaren Urban Renewal LLC. Description: Self-Certifications of EG of PSEG Keys Energy Center LLC and PSEG Fossil Sewaren Urban Entitiy LLC. Filed Date: 6/14/19. Accession Number: 20190614–5145. Comments Due: 5 p.m. ET 7/5/19. Docket Numbers: EG19–129–000. Applicants: Wessington Springs Wind, LLC. Description: Notice of SelfCertification of Exempt Wholesale Generator Status of Wessington Springs Wind, LLC. Filed Date: 6/14/19. Accession Number: 20190614–5155. Comments Due: 5 p.m. ET 7/5/19. Docket Numbers: EG19–131–000. Applicants: PSEG Keys Energy Center LLC. Description: Self-Certification of EG of PSEG Keys Energy Center LLC. Filed Date: 6/17/19. Accession Number: 20190617–5143. Comments Due: 5 p.m. ET 7/8/19. Docket Numbers: EG19–132–000. Applicants: PSEG Fossil Sewaren Urban Renewal LLC. Description: Self-Certification of EG of PSEG Fossil Sewaren Urban Renewal LLC. Filed Date: 6/17/19. Accession Number: 20190617–5145. Comments Due: 5 p.m. ET 7/8/19. Take notice that the Commission received the following electric rate filings: Docket Numbers: ER18–1739–002. Applicants: Midcontinent Independent System Operator, Inc. E:\FR\FM\21JNN1.SGM 21JNN1 jspears on DSK30JT082PROD with NOTICES Federal Register / Vol. 84, No. 120 / Friday, June 21, 2019 / Notices Description: Compliance filing: 2019– 06–17_Addtl Compliance by MISO TOs to revise Att O and ADIT Work Papers to be effective 1/1/2019. Filed Date: 6/17/19. Accession Number: 20190617–5098. Comments Due: 5 p.m. ET 7/8/19. Docket Numbers: ER18–2063–002. Applicants: Flemington Solar, LLC. Description: Compliance filing: Flemington Solar Compliance Filing to be effective 10/1/2018. Filed Date: 6/17/19. Accession Number: 20190617–5123. Comments Due: 5 p.m. ET 7/8/19. Docket Numbers: ER18–2323–003. Applicants: Midcontinent Independent System Operator, Inc., Michigan Electric Transmission Company, LLC. Description: Compliance filing: 2019– 06–17_Addtl Compliance Filing re METC Revisions to Att O Formula Rates to be effective 1/1/2019. Filed Date: 6/17/19. Accession Number: 20190617–5086. Comments Due: 5 p.m. ET 7/8/19. Docket Numbers: ER18–2323–004. Applicants: Midcontinent Independent System Operator, Inc., ITC Midwest LLC, International Transmission Company. Description: Compliance filing: 2019– 06–17_Addtl Compliance Filing re ITC Companies Revisions to Att O to be effective 1/1/2019. Filed Date: 6/17/19. Accession Number: 20190617–5118. Comments Due: 5 p.m. ET 7/8/19. Docket Numbers: ER19–1806–001. Applicants: Mitsui Bussan Commodities, Ltd. Description: Compliance filing: Amendment to MBR filing to be effective 8/19/2019. Filed Date: 6/17/19. Accession Number: 20190617–5091. Comments Due: 5 p.m. ET 7/8/19. Docket Numbers: ER19–2154–000. Applicants: Sayreville Power, LLC. Description: Baseline eTariff Filing: New Baseline Reactive Tariff Filing to be effective 9/1/2019. Filed Date: 6/14/19. Accession Number: 20190614–5161. Comments Due: 5 p.m. ET 7/5/19. Docket Numbers: ER19–2155–000. Applicants: Portland Power, LLC. Description: Baseline eTariff Filing: New Baseline Reactive Tariff Filings to be effective 9/1/2019. Filed Date: 6/14/19. Accession Number: 20190614–5162. Comments Due: 5 p.m. ET 7/5/19. Docket Numbers: ER19–2156–000. Applicants: Warren Generation, LLC. Description: Baseline eTariff Filing: New Baseline Reactive Tariff Filing to be effective 9/1/2019. VerDate Sep<11>2014 18:30 Jun 20, 2019 Jkt 247001 Filed Date: 6/14/19. Accession Number: 20190614–5165. Comments Due: 5 p.m. ET 7/5/19. Docket Numbers: ER19–2157–000. Applicants: Mountain Power, LLC. Description: Baseline eTariff Filing: New Baseline Reactive Tariff Filing to be effective 9/1/2019. Filed Date: 6/14/19. Accession Number: 20190614–5166. Comments Due: 5 p.m. ET 7/5/19. Docket Numbers: ER19–2158–000. Applicants: Orrtanna Power, LLC. Description: Baseline eTariff Filing: New Baseline Reactive Tariff Filing to be effective 9/1/2019. Filed Date: 6/14/19. Accession Number: 20190614–5168. Comments Due: 5 p.m. ET 7/5/19. Docket Numbers: ER19–2159–000. Applicants: Shawnee Power, LLC. Description: Baseline eTariff Filing: New Baseline Reactive Tariff Filing to be effective 9/1/2019. Filed Date: 6/14/19. Accession Number: 20190614–5169. Comments Due: 5 p.m. ET 7/5/19. Docket Numbers: ER19–2160–000. Applicants: Titus Power, LLC. Description: Baseline eTariff Filing: New Baseline Reactive Tariff Filing to be effective 9/1/2019. Filed Date: 6/14/19. Accession Number: 20190614–5171. Comments Due: 5 p.m. ET 7/5/19. Docket Numbers: ER19–2161–000. Applicants: Hamilton Power, LLC. Description: Baseline eTariff Filing: New Baseline Reactive Tariff Filing to be effective 9/1/2019. Filed Date: 6/14/19. Accession Number: 20190614–5172. Comments Due: 5 p.m. ET 7/5/19. Docket Numbers: ER19–2162–000. Applicants: Blossburg Power, LLC. Description: Baseline eTariff Filing: New Baseline Reactive Tariff Filing to be effective 9/1/2019. Filed Date: 6/14/19. Accession Number: 20190614–5173. Comments Due: 5 p.m. ET 7/5/19. Docket Numbers: ER19–2163–000. Applicants: Hunterstown Power, LLC. Description: Baseline eTariff Filing: New Baseline Reactive Tariff Filing to be effective 9/1/2019. Filed Date: 6/14/19. Accession Number: 20190614–5174. Comments Due: 5 p.m. ET 7/5/19. Docket Numbers: ER19–2164–000. Applicants: Tolna Power, LLC. Description: Baseline eTariff Filing: New Baseline Reactive Tariff Filing to be effective 9/1/2019. Filed Date: 6/14/19. Accession Number: 20190614–5176. Comments Due: 5 p.m. ET 7/5/19. PO 00000 Frm 00037 Fmt 4703 Sfmt 4703 29193 Docket Numbers: ER19–2165–000. Applicants: Western Interconnect LLC. Description: Compliance filing: Order No. 845 Compliance Filing to be effective 5/22/2019. Filed Date: 6/14/19. Accession Number: 20190614–5180. Comments Due: 5 p.m. ET 7/5/19. Docket Numbers: ER19–2166–000. Applicants: Southwest Power Pool, Inc. Description: § 205(d) Rate Filing: 1888R9 Westar Energy, Inc. NITSA NOA to be effective 9/1/2019. Filed Date: 6/17/19. Accession Number: 20190617–5025. Comments Due: 5 p.m. ET 7/8/19. Docket Numbers: ER19–2168–000. Applicants: Southwest Power Pool, Inc. Description: § 205(d) Rate Filing: 1889R8 Westar Energy, Inc.— Mindenmines NITSA NOA to be effective 9/1/2019. Filed Date: 6/17/19. Accession Number: 20190617–5037. Comments Due: 5 p.m. ET 7/8/19. Docket Numbers: ER19–2169–000. Applicants: Southwest Power Pool, Inc. Description: § 205(d) Rate Filing: 1890R9 Westar Energy, Inc.—Moran NITSA NOA to be effective 9/1/2019. Filed Date: 6/17/19. Accession Number: 20190617–5064. Comments Due: 5 p.m. ET 7/8/19. Docket Numbers: ER19–2170–000. Applicants: Duke Energy Progress, LLC. Description: § 205(d) Rate Filing: DEP–5 Towns Dynamic Schedule Agmts Concurrence to be effective 6/8/2019. Filed Date: 6/17/19. Accession Number: 20190617–5079. Comments Due: 5 p.m. ET 7/8/19. Docket Numbers: ER19–2171–000. Applicants: NSTAR Electric Company. Description: Initial rate filing: Vineyard Wind Design and Engineering Agreement to be effective 6/17/2019. Filed Date: 6/17/19. Accession Number: 20190617–5097. Comments Due: 5 p.m. ET 7/8/19. Docket Numbers: ER19–2172–000. Applicants: PJM Interconnection, L.L.C. Description: § 205(d) Rate Filing: SA No. 5420 and SA No. 5421 re NITSAs Among PJM and NRG Power Marketing LLC to be effective 6/1/2019. Filed Date: 6/17/19. Accession Number: 20190617–5113. Comments Due: 5 p.m. ET 7/8/19. The filings are accessible in the Commission’s eLibrary system by E:\FR\FM\21JNN1.SGM 21JNN1 29194 Federal Register / Vol. 84, No. 120 / Friday, June 21, 2019 / Notices clicking on the links or querying the docket number. Any person desiring to intervene or protest in any of the above proceedings must file in accordance with Rules 211 and 214 of the Commission’s Regulations (18 CFR 385.211 and 385.214) on or before 5:00 p.m. Eastern time on the specified comment date. Protests may be considered, but intervention is necessary to become a party to the proceeding. eFiling is encouraged. More detailed information relating to filing requirements, interventions, protests, service, and qualifying facilities filings can be found at: https://www.ferc.gov/ docs-filing/efiling/filing-req.pdf. For other information, call (866) 208–3676 (toll free). For TTY, call (202) 502–8659. Dated: June 17, 2019. Nathaniel J. Davis, Sr., Deputy Secretary. [FR Doc. 2019–13239 Filed 6–20–19; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. CP19–191–000] jspears on DSK30JT082PROD with NOTICES Texas Eastern Transmission, L.P.; Notice of Schedule for Environmental Review of the Bernville Compressor Units Replacement Project On April 18, 2019, Texas Eastern Transmission, L.P. (Texas Eastern) filed an application in Docket No. CP19–191– 000 requesting a Certificate of Public Convenience and Necessity pursuant to Sections 7(b) and 7(c) of the Natural Gas Act to abandon, construct, and operate certain natural gas pipeline facilities at its existing Bernville Compressor Station in Berks County, Pennsylvania. The proposed project is known as the Bernville Compressor Units Replacement Project (Project). On April 30, 2019, the Federal Energy Regulatory Commission (Commission or FERC) issued its Notice of Application for the Project. Among other things, that notice alerted agencies issuing federal authorizations of the requirement to complete all necessary reviews and to reach a final decision on a request for a federal authorization within 90 days of the date of issuance of the Commission staff’s Environmental Assessment (EA) for the Project. This instant notice identifies the FERC staff’s planned schedule for the completion of the EA for the Project. Schedule for Environmental Review Issuance of EA ................... VerDate Sep<11>2014 September 30, 2019. 18:30 Jun 20, 2019 Jkt 247001 90-day Federal Authorization Decision Deadline. December 29, 2019. If a schedule change becomes necessary, additional notice will be provided so that the relevant agencies are kept informed of the Project’s progress. Project Description Texas Eastern proposes to replace two existing compressor units (one 22,000 horsepower [hp] and one 19,800 hp unit) with two new compressor units (one 26,000 hp and one 18,100 hp unit). Texas Eastern would install software controls to limit the total horsepower of the 26,000 hp compressor unit to 23,700 hp. Therefore, no additional compression would occur as a result of this Project. The replacement activities would require the use of additional temporary workspace beyond the existing facility boundary. Background On June 7, 2019 the Commission issued a Notice of Intent to Prepare an Environmental Assessment for the Proposed Bernville Compressor Unit Replacement Project and Request for Comments on Environmental Issues (NOI). The NOI was sent to affected landowners; federal, state, and local government agencies; elected officials; environmental and public interest groups; Native American tribes; other interested parties; and local libraries and newspapers. Comments on the NOI should be received by the Commission in Washington, DC on or before 5:00 p.m. Eastern Time on July 8, 2019. All substantive comments will be addressed in the EA. Additional Information In order to receive notification of the issuance of the EA and to keep track of all formal issuances and submittals in specific dockets, the Commission offers a free service called eSubscription. This can reduce the amount of time you spend researching proceedings by automatically providing you with notification of these filings, document summaries, and direct links to the documents. Go to www.ferc.gov/docsfiling/esubscription.asp. Additional information about the Project is available from the Commission’s Office of External Affairs at (866) 208–FERC or on the FERC website (www.ferc.gov). Using the ‘‘eLibrary’’ link, select ‘‘General Search’’ from the eLibrary menu, enter the selected date range and ‘‘Docket Number’’ excluding the last three digits (i.e., CP19–191), and follow the instructions. For assistance with access to eLibrary, the helpline can be reached PO 00000 Frm 00038 Fmt 4703 Sfmt 4703 at (866) 208–3676, TTY (202) 502–8659, or at FERCOnlineSupport@ferc.gov. The eLibrary link on the FERC website also provides access to the texts of formal documents issued by the Commission, such as orders, notices, and rule makings. Dated: June 17, 2019. Nathaniel J. Davis, Sr., Deputy Secretary. [FR Doc. 2019–13237 Filed 6–20–19; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. IC19–19–000] Commission Information Collection Activities (FERC–542); Comment Request Federal Energy Regulatory Commission, DOE. ACTION: Notice of information collection and request for comments. AGENCY: In compliance with the requirements of the Paperwork Reduction Act of 1995, the Federal Energy Regulatory Commission (Commission or FERC) is submitting its information collection FERC–542 (Pipeline Rates: Rate Tracking) to the Office of Management and Budget (OMB) for review of the information collection requirements. Any interested person may file comments directly with OMB and should address a copy of those comments to the Commission as explained below. The Commission previously published a Notice in the Federal Register (4/10/2019) requesting public comments. The Commission received no public comments and is making this notation in its submittal to OMB. DATES: Comments on the collection of information are due July 22, 2019. ADDRESSES: Comments filed with OMB, identified by the OMB Control No. 1902–0070 (FERC–542), should be sent via email to the Office of Information and Regulatory Affairs: oira_ submission@omb.gov, Attention: Federal Energy Regulatory Commission Desk Officer. A copy of the comments should also be sent to the Commission, in Docket No. IC19–19–000, by either of the following methods: • eFiling at Commission’s website: https://www.ferc.gov/docs-filing/ efiling.asp. • Mail/Hand Delivery/Courier: Federal Energy Regulatory Commission, SUMMARY: E:\FR\FM\21JNN1.SGM 21JNN1

Agencies

[Federal Register Volume 84, Number 120 (Friday, June 21, 2019)]
[Notices]
[Pages 29192-29194]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2019-13239]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission


Combined Notice of Filings #1

    Take notice that the Commission received the following electric 
corporate filings:

    Docket Numbers: EC19-63-000.
    Applicants: NRG Wholesale Generation LP, Entergy Mississippi, LLC.
    Description: Response of GenOn Wholesale Generation LP and Entergy 
Mississippi, LLC, to May 16, 2019 deficiency letter.
    Filed Date: 6/14/19.
    Accession Number: 20190614-5211.
    Comments Due: 5 p.m. ET 7/5/19.

    Take notice that the Commission received the following exempt 
wholesale generator filings:

    Docket Numbers: EG19-128-000.
    Applicants: PSEG Keys Energy Center LLC, PSEG Fossil Sewaren Urban 
Renewal LLC.
    Description: Self-Certifications of EG of PSEG Keys Energy Center 
LLC and PSEG Fossil Sewaren Urban Entitiy LLC.
    Filed Date: 6/14/19.
    Accession Number: 20190614-5145.
    Comments Due: 5 p.m. ET 7/5/19.

    Docket Numbers: EG19-129-000.
    Applicants: Wessington Springs Wind, LLC.
    Description: Notice of Self-Certification of Exempt Wholesale 
Generator Status of Wessington Springs Wind, LLC.
    Filed Date: 6/14/19.
    Accession Number: 20190614-5155.
    Comments Due: 5 p.m. ET 7/5/19.

    Docket Numbers: EG19-131-000.
    Applicants: PSEG Keys Energy Center LLC.
    Description: Self-Certification of EG of PSEG Keys Energy Center 
LLC.
    Filed Date: 6/17/19.
    Accession Number: 20190617-5143.
    Comments Due: 5 p.m. ET 7/8/19.

    Docket Numbers: EG19-132-000.
    Applicants: PSEG Fossil Sewaren Urban Renewal LLC.
    Description: Self-Certification of EG of PSEG Fossil Sewaren Urban 
Renewal LLC.
    Filed Date: 6/17/19.
    Accession Number: 20190617-5145.
    Comments Due: 5 p.m. ET 7/8/19.

    Take notice that the Commission received the following electric 
rate filings:

    Docket Numbers: ER18-1739-002.
    Applicants: Midcontinent Independent System Operator, Inc.

[[Page 29193]]

    Description: Compliance filing: 2019-06-17_Addtl Compliance by MISO 
TOs to revise Att O and ADIT Work Papers to be effective 1/1/2019.
    Filed Date: 6/17/19.
    Accession Number: 20190617-5098.
    Comments Due: 5 p.m. ET 7/8/19.

    Docket Numbers: ER18-2063-002.
    Applicants: Flemington Solar, LLC.
    Description: Compliance filing: Flemington Solar Compliance Filing 
to be effective 10/1/2018.
    Filed Date: 6/17/19.
    Accession Number: 20190617-5123.
    Comments Due: 5 p.m. ET 7/8/19.

    Docket Numbers: ER18-2323-003.
    Applicants: Midcontinent Independent System Operator, Inc., 
Michigan Electric Transmission Company, LLC.
    Description: Compliance filing: 2019-06-17_Addtl Compliance Filing 
re METC Revisions to Att O Formula Rates to be effective 1/1/2019.
    Filed Date: 6/17/19.
    Accession Number: 20190617-5086.
    Comments Due: 5 p.m. ET 7/8/19.

    Docket Numbers: ER18-2323-004.
    Applicants: Midcontinent Independent System Operator, Inc., ITC 
Midwest LLC, International Transmission Company.
    Description: Compliance filing: 2019-06-17_Addtl Compliance Filing 
re ITC Companies Revisions to Att O to be effective 1/1/2019.
    Filed Date: 6/17/19.
    Accession Number: 20190617-5118.
    Comments Due: 5 p.m. ET 7/8/19.

    Docket Numbers: ER19-1806-001.
    Applicants: Mitsui Bussan Commodities, Ltd.
    Description: Compliance filing: Amendment to MBR filing to be 
effective 8/19/2019.
    Filed Date: 6/17/19.
    Accession Number: 20190617-5091.
    Comments Due: 5 p.m. ET 7/8/19.

    Docket Numbers: ER19-2154-000.
    Applicants: Sayreville Power, LLC.
    Description: Baseline eTariff Filing: New Baseline Reactive Tariff 
Filing to be effective 9/1/2019.
    Filed Date: 6/14/19.
    Accession Number: 20190614-5161.
    Comments Due: 5 p.m. ET 7/5/19.

    Docket Numbers: ER19-2155-000.
    Applicants: Portland Power, LLC.
    Description: Baseline eTariff Filing: New Baseline Reactive Tariff 
Filings to be effective 9/1/2019.
    Filed Date: 6/14/19.
    Accession Number: 20190614-5162.
    Comments Due: 5 p.m. ET 7/5/19.

    Docket Numbers: ER19-2156-000.
    Applicants: Warren Generation, LLC.
    Description: Baseline eTariff Filing: New Baseline Reactive Tariff 
Filing to be effective 9/1/2019.
    Filed Date: 6/14/19.
    Accession Number: 20190614-5165.
    Comments Due: 5 p.m. ET 7/5/19.

    Docket Numbers: ER19-2157-000.
    Applicants: Mountain Power, LLC.
    Description: Baseline eTariff Filing: New Baseline Reactive Tariff 
Filing to be effective 9/1/2019.
    Filed Date: 6/14/19.
    Accession Number: 20190614-5166.
    Comments Due: 5 p.m. ET 7/5/19.

    Docket Numbers: ER19-2158-000.
    Applicants: Orrtanna Power, LLC.
    Description: Baseline eTariff Filing: New Baseline Reactive Tariff 
Filing to be effective 9/1/2019.
    Filed Date: 6/14/19.
    Accession Number: 20190614-5168.
    Comments Due: 5 p.m. ET 7/5/19.

    Docket Numbers: ER19-2159-000.
    Applicants: Shawnee Power, LLC.
    Description: Baseline eTariff Filing: New Baseline Reactive Tariff 
Filing to be effective 9/1/2019.
    Filed Date: 6/14/19.
    Accession Number: 20190614-5169.
    Comments Due: 5 p.m. ET 7/5/19.

    Docket Numbers: ER19-2160-000.
    Applicants: Titus Power, LLC.
    Description: Baseline eTariff Filing: New Baseline Reactive Tariff 
Filing to be effective 9/1/2019.
    Filed Date: 6/14/19.
    Accession Number: 20190614-5171.
    Comments Due: 5 p.m. ET 7/5/19.

    Docket Numbers: ER19-2161-000.
    Applicants: Hamilton Power, LLC.
    Description: Baseline eTariff Filing: New Baseline Reactive Tariff 
Filing to be effective 9/1/2019.
    Filed Date: 6/14/19.
    Accession Number: 20190614-5172.
    Comments Due: 5 p.m. ET 7/5/19.

    Docket Numbers: ER19-2162-000.
    Applicants: Blossburg Power, LLC.
    Description: Baseline eTariff Filing: New Baseline Reactive Tariff 
Filing to be effective 9/1/2019.
    Filed Date: 6/14/19.
    Accession Number: 20190614-5173.
    Comments Due: 5 p.m. ET 7/5/19.

    Docket Numbers: ER19-2163-000.
    Applicants: Hunterstown Power, LLC.
    Description: Baseline eTariff Filing: New Baseline Reactive Tariff 
Filing to be effective 9/1/2019.
    Filed Date: 6/14/19.
    Accession Number: 20190614-5174.
    Comments Due: 5 p.m. ET 7/5/19.

    Docket Numbers: ER19-2164-000.
    Applicants: Tolna Power, LLC.
    Description: Baseline eTariff Filing: New Baseline Reactive Tariff 
Filing to be effective 9/1/2019.
    Filed Date: 6/14/19.
    Accession Number: 20190614-5176.
    Comments Due: 5 p.m. ET 7/5/19.

    Docket Numbers: ER19-2165-000.
    Applicants: Western Interconnect LLC.
    Description: Compliance filing: Order No. 845 Compliance Filing to 
be effective 5/22/2019.
    Filed Date: 6/14/19.
    Accession Number: 20190614-5180.
    Comments Due: 5 p.m. ET 7/5/19.

    Docket Numbers: ER19-2166-000.
    Applicants: Southwest Power Pool, Inc.
    Description: Sec.  205(d) Rate Filing: 1888R9 Westar Energy, Inc. 
NITSA NOA to be effective 9/1/2019.
    Filed Date: 6/17/19.
    Accession Number: 20190617-5025.
    Comments Due: 5 p.m. ET 7/8/19.

    Docket Numbers: ER19-2168-000.
    Applicants: Southwest Power Pool, Inc.
    Description: Sec.  205(d) Rate Filing: 1889R8 Westar Energy, Inc.--
Mindenmines NITSA NOA to be effective 9/1/2019.
    Filed Date: 6/17/19.
    Accession Number: 20190617-5037.
    Comments Due: 5 p.m. ET 7/8/19.

    Docket Numbers: ER19-2169-000.
    Applicants: Southwest Power Pool, Inc.
    Description: Sec.  205(d) Rate Filing: 1890R9 Westar Energy, Inc.--
Moran NITSA NOA to be effective 9/1/2019.
    Filed Date: 6/17/19.
    Accession Number: 20190617-5064.
    Comments Due: 5 p.m. ET 7/8/19.

    Docket Numbers: ER19-2170-000.
    Applicants: Duke Energy Progress, LLC.
    Description: Sec.  205(d) Rate Filing: DEP-5 Towns Dynamic Schedule 
Agmts Concurrence to be effective 6/8/2019.
    Filed Date: 6/17/19.
    Accession Number: 20190617-5079.
    Comments Due: 5 p.m. ET 7/8/19.

    Docket Numbers: ER19-2171-000.
    Applicants: NSTAR Electric Company.
    Description: Initial rate filing: Vineyard Wind Design and 
Engineering Agreement to be effective 6/17/2019.
    Filed Date: 6/17/19.
    Accession Number: 20190617-5097.
    Comments Due: 5 p.m. ET 7/8/19.

    Docket Numbers: ER19-2172-000.
    Applicants: PJM Interconnection, L.L.C.
    Description: Sec.  205(d) Rate Filing: SA No. 5420 and SA No. 5421 
re NITSAs Among PJM and NRG Power Marketing LLC to be effective 6/1/
2019.
    Filed Date: 6/17/19.
    Accession Number: 20190617-5113.
    Comments Due: 5 p.m. ET 7/8/19.

    The filings are accessible in the Commission's eLibrary system by

[[Page 29194]]

clicking on the links or querying the docket number.
    Any person desiring to intervene or protest in any of the above 
proceedings must file in accordance with Rules 211 and 214 of the 
Commission's Regulations (18 CFR 385.211 and 385.214) on or before 5:00 
p.m. Eastern time on the specified comment date. Protests may be 
considered, but intervention is necessary to become a party to the 
proceeding.
    eFiling is encouraged. More detailed information relating to filing 
requirements, interventions, protests, service, and qualifying 
facilities filings can be found at: https://www.ferc.gov/docs-filing/efiling/filing-req.pdf. For other information, call (866) 208-3676 
(toll free). For TTY, call (202) 502-8659.

    Dated: June 17, 2019.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2019-13239 Filed 6-20-19; 8:45 am]