American Midstream (AlaTenn), LLC; Notice of Request Under Blanket Authorization, 28297-28298 [2019-12814]
Download as PDF
jbell on DSK3GLQ082PROD with NOTICES
Federal Register / Vol. 84, No. 117 / Tuesday, June 18, 2019 / Notices
Comments Due: 5 p.m. ET 7/2/19.
Docket Numbers: ER19–2103–000.
Applicants: GridLiance Heartland
LLC.
Description: § 205(d) Rate Filing: GLH
OATT TSA Filing to be effective 8/9/
2019.
Filed Date: 6/11/19.
Accession Number: 20190611–5133.
Comments Due: 5 p.m. ET 7/2/19.
Docket Numbers: ER19–2104–000.
Applicants: New York Independent
System Operator, Inc.
Description: § 205(d) Rate Filing:
NYISO 205 External ICAP Suppliers
Supplemental Resource Evaluation
(SRE) Penalty to be effective 8/12/2019.
Filed Date: 6/11/19.
Accession Number: 20190611–5135.
Comments Due: 5 p.m. ET 7/2/19.
Docket Numbers: ER19–2105–000.
Applicants: Appalachian Power
Company, PJM Interconnection, L.L.C.
Description: § 205(d) Rate Filing: PJM
TOs submit revisions to OATT,
Schedules 7 and 8 and Att. H–A re:
Border Rate to be effective 8/10/2019.
Filed Date: 6/11/19.
Accession Number: 20190611–5137.
Comments Due: 5 p.m. ET 7/2/19.
Docket Numbers: ER19–2106–000.
Applicants: Duke Energy Progress,
LLC.
Description: Petition for Waiver of
Tariff Provisions of Duke Energy
Progress, LLC.
Filed Date: 6/11/19.
Accession Number: 20190611–5138.
Comments Due: 5 p.m. ET 7/2/19.
Docket Numbers: ER19–2107–000.
Applicants: Black Rock Wind Force,
LLC.
Description: Request for Limited
Waiver, et al. of Black Rock Wind Force,
LLC.
Filed Date: 6/11/19.
Accession Number: 20190611–5142.
Comments Due: 5 p.m. ET 6/21/19.
Docket Numbers: ER19–2108–000.
Applicants: NSTAR Electric
Company.
Description: Notice of Termination of
the Related Facilities Service Agreement
(No. 80) of NSTAR Electric Company.
Filed Date: 6/11/19.
Accession Number: 20190611–5144.
Comments Due: 5 p.m. ET 7/2/19.
Docket Numbers: ER19–2109–000.
Applicants: PPL Electric Utilities
Corporation, PJM Interconnection,
L.L.C.
Description: § 205(d) Rate Filing: PPL
submits an ECSA, Service Agreement
No. 5419 with MAIT to be effective 8/
12/2019.
Filed Date: 6/12/19.
Accession Number: 20190612–5039.
VerDate Sep<11>2014
17:23 Jun 17, 2019
Jkt 247001
Comments Due: 5 p.m. ET 7/3/19.
Docket Numbers: ER19–2110–000.
Applicants: Midcontinent
Independent System Operator, Inc.
Description: § 205(d) Rate Filing:
2019–06–12_SA 3317 NSPM-Nobles 2
Power Partners E&P (J512) to be
effective 5/13/2019.
Filed Date: 6/12/19.
Accession Number: 20190612–5093.
Comments Due: 5 p.m. ET 7/3/19.
The filings are accessible in the
Commission’s eLibrary system by
clicking on the links or querying the
docket number.
Any person desiring to intervene or
protest in any of the above proceedings
must file in accordance with Rules 211
and 214 of the Commission’s
Regulations (18 CFR 385.211 and
385.214) on or before 5:00 p.m. Eastern
time on the specified comment date.
Protests may be considered, but
intervention is necessary to become a
party to the proceeding.
eFiling is encouraged. More detailed
information relating to filing
requirements, interventions, protests,
service, and qualifying facilities filings
can be found at: https://www.ferc.gov/
docs-filing/efiling/filing-req.pdf. For
other information, call (866) 208–3676
(toll free). For TTY, call (202) 502–8659.
Dated: June 12, 2019.
Kimberly D. Bose,
Secretary.
[FR Doc. 2019–12812 Filed 6–17–19; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. CP19–476–000]
American Midstream (AlaTenn), LLC;
Notice of Request Under Blanket
Authorization
Take notice that on June 3, 2019,
American Midstream (AlaTenn), LLC
(AlaTenn), 2103 City West Boulevard,
Building #4, Suite 800, Houston, Texas
77042, filed in the above referenced
docket a prior notice request pursuant to
sections 157.205, 157.208, 157.210, and
157.216 of the Commission’s regulations
under the Natural Gas Act (NGA) and its
blanket certificate issued in Docket No.
CP89–2201–000 for authorization to: (i)
Abandon in-place four existing
compressor units, totaling 1,455
horsepower (hp), at its Decatur
Compression Station in Limestone
County, Alabama; and (ii) install two
new compressor units, totaling 3,550
hp, and appurtenances at its Decatur
PO 00000
Frm 00032
Fmt 4703
Sfmt 4703
28297
Compressor Station. AlaTenn states that
the proposed project will allow it to
provide additional firm transportation
service to the City of Huntsville,
Alabama, d/b/a Huntsville Utilities and
improve system reliability. AlaTenn
estimates the cost of the project to be
$5,415,200, all as more fully set forth in
the request which is on file with the
Commission and open to public
inspection.
The filing is available for review at
the Commission in the Public Reference
Room or may be viewed on the
Commission’s website web at https://
www.ferc.gov using the ‘‘eLibrary’’ link.
Enter the docket number excluding the
last three digits in the docket number
field to access the document. For
assistance, contact FERC at
FERCOnlineSupport@ferc.gov or call
toll-free, (886) 208–3676 or TYY, (202)
502–8659.
Any questions regarding this
application should be directed to
Dennis J. Kelly, Senior Attorney,
American Midstream (AlaTenn), LLC
(AlaTenn), 2103 City West Boulevard,
Building #4, Suite 800, Houston, Texas
77042, by telephone at (345) 241–3546
or by email at dkelly@
americanmidstream.com.
Any person or the Commission’s staff
may, within 60 days after issuance of
the instant notice by the Commission,
file pursuant to Rule 214 of the
Commission’s Procedural Rules (18 CFR
385.214) a motion to intervene or notice
of intervention and pursuant to section
157.205 of the regulations under the
NGA (18 CFR 157.205), a protest to the
request. If no protest is filed within the
time allowed therefore, the proposed
activity shall be deemed to be
authorized effective the day after the
time allowed for filing a protest. If a
protest is filed and not withdrawn
within 30 days after the allowed time
for filing a protest, the instant request
shall be treated as an application for
authorization pursuant to section 7 of
the NGA.
Pursuant to section 157.9 of the
Commission’s rules, 18 CFR 157.9,
within 90 days of this Notice the
Commission staff will either: Complete
its environmental assessment (EA) and
place it into the Commission’s public
record (eLibrary) for this proceeding; or
issue a Notice of Schedule for
Environmental Review. If a Notice of
Schedule for Environmental Review is
issued, it will indicate, among other
milestones, the anticipated date for the
Commission staff’s issuance of the EA
for this proposal. The filing of the EA
in the Commission’s public record for
this proceeding or the issuance of a
Notice of Schedule for Environmental
E:\FR\FM\18JNN1.SGM
18JNN1
28298
Federal Register / Vol. 84, No. 117 / Tuesday, June 18, 2019 / Notices
Review will serve to notify federal and
state agencies of the timing for the
completion of all necessary reviews, and
the subsequent need to complete all
federal authorizations within 90 days of
the date of issuance of the Commission
staff’s EA.
Persons who wish to comment only
on the environmental review of this
project should submit an original and
two copies of their comments to the
Secretary of the Commission.
Environmental commenters will be
placed on the Commission’s
environmental mailing list and will be
notified of any meetings associated with
the Commission’s environmental review
process. Environmental commenters
will not be required to serve copies of
filed documents on all other parties.
However, the non-party commenters
will not receive copies of all documents
filed by other parties or issued by the
Commission and will not have the right
to seek court review of the
Commission’s final order.
The Commission strongly encourages
electronic filings of comments, protests
and interventions in lieu of paper using
the ‘‘eFiling’’ link at https://
www.ferc.gov. Persons unable to file
electronically should submit an original
and 3 copies of the protest or
intervention to the Federal Energy
regulatory Commission, 888 First Street
NE, Washington, DC 20426.
Dated: June 12, 2019.
Kimberly D. Bose,
Secretary.
[FR Doc. 2019–12814 Filed 6–17–19; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. OR19–27–000]
jbell on DSK3GLQ082PROD with NOTICES
Gunvor USA LLC v. Colonial Pipeline
Company; Notice of Complaint
Take notice that on June 11, 2019,
pursuant to sections 1(5), 6, 8, 9, 13, 15
and 16 of the Interstate Commerce Act,1
section 1803 of the Energy Policy Act of
1992 (EPAct),2 Rule 206 of the Rules of
Practice and Procedures of the Federal
Energy Regulatory Commission
(Commission),3 and Rules 343.2 of the
Commission’s Procedural Rules
Applicable to Oil Pipeline Proceedings,4
Gunvor USA LLC (Complainant) filed a
formal complaint against Colonial
1 49
U.S.C. App. 1(5), 6, 8, 9, 13, 15 and 16.
Law 102–486, 106 Stat. 2772 (1992).
3 18 CFR 385.206 (2018).
4 18 CFR 343.2 (2018).
2 Public
VerDate Sep<11>2014
17:23 Jun 17, 2019
Jkt 247001
Pipeline Company (Respondent)
challenging the just and reasonableness
of (1) Respondent’s cost-based
transportation rates in FERC Tariff No.
99.36.0 and predecessor tariffs; (2)
Respondent’s market-based rate
authority and rates charged pursuant to
that authority; and (3) Respondent’s
charges relating to product loss
allocation and transmix, all as more
fully explained in the complaint.
Complainant certifies that copies of
the complaint were served on the
contacts for Respondent as listed on the
Commission’s list of Corporate Officials.
Any person desiring to intervene or to
protest this filing must file in
accordance with Rules 211 and 214 of
the Commission’s Rules of Practice and
Procedure (18 CFR 385.211, 385.214).
Protests will be considered by the
Commission in determining the
appropriate action to be taken, but will
not serve to make protestants parties to
the proceeding. Any person wishing to
become a party must file a notice of
intervention or motion to intervene, as
appropriate. The Respondent’s answer
and all interventions, or protests must
be filed on or before the comment date.
The Respondent’s answer, motions to
intervene, and protests must be served
on the Complainants.
The Commission encourages
electronic submission of protests and
interventions in lieu of paper using the
‘‘eFiling’’ link at https://www.ferc.gov.
Persons unable to file electronically
should submit an original and 5 copies
of the protest or intervention to the
Federal Energy Regulatory Commission,
888 First Street NE, Washington, DC
20426.
This filing is accessible on-line at
https://www.ferc.gov, using the
‘‘eLibrary’’ link and is available for
electronic review in the Commission’s
Public Reference Room in Washington,
DC. There is an ‘‘eSubscription’’ link on
the website that enables subscribers to
receive email notification when a
document is added to a subscribed
docket(s). For assistance with any FERC
Online service, please email
FERCOnlineSupport@ferc.gov, or call
(866) 208–3676 (toll free). For TTY, call
(202) 502–8659.
Comment Date: 5 p.m. Eastern Time
on July 11, 2019.
Dated: June 12, 2019.
Kimberly D. Bose,
Secretary.
[FR Doc. 2019–12817 Filed 6–17–19; 8:45 am]
BILLING CODE 6717–01–P
PO 00000
Frm 00033
Fmt 4703
Sfmt 4703
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. CP19–474–000]
Florida Gas Transmission Company,
LLC; Notice of Application
Take notice that on May 31, 2019,
Florida Gas Transmission Company,
LLC (FGT), 1300 Main Street, Houston,
Texas 77002, filed in Docket No. CP19–
474–000 an application pursuant to
section 7(c) of the Natural Gas Act
(NGA) requesting authorization to
construct, install, and operate: (i)
Approximately 13.7 miles of 30-inchdiameter mainline pipe loop extension
and auxiliary facilities in Columbia and
Union Counties, Florida; (ii)
approximately 7 miles of 30-inchdiameter mainline pipe loop extension
and auxiliary facilities in Clay and
Putnam Counties, Florida; (iii) minor
modifications to Compressor Station 18
in Orange County, Florida; and (iv) a
relocation of existing pig receivers in
Clay, Putnam, and Union Counties,
Florida. FGT states that the project
would enable the delivery of up to
169,000 Million British thermal units
per day (MMBtu/d) of firm
transportation natural gas to their
customers—109,000 MMBtu/d would
utilize existing capacity and 60,000
MMBtu/d would be created by the
proposed facilities. FGT is proposing
negotiated rates and estimates the total
cost of the Putnam Expansion Project to
be approximately $102,572,436, all as
more fully set forth in the application
which is on file with the Commission
and open to public inspection.
The filing is available for review at
the Commission in the Public Reference
Room or may be viewed on the
Commission’s website web at https://
www.ferc.gov using the ‘‘eLibrary’’ link.
Enter the docket number excluding the
last three digits in the docket number
field to access the document. For
assistance, contact FERC at
FERCOnlineSupport@ferc.gov or call
toll-free, (886) 208–3676 or TYY, (202)
502–8659.
Any questions concerning this
application may be directed to Blair
Lichtenwalter, Senior Director—
Certificates, Florida Gas Transmission
Company, LLC, 1300 Main Street,
Houston, Texas 77002, by telephone at
(713) 989–2605, by facsimile at (713)
989–1205, or by email at
Blair.Lichtenwalter@energytransfer.com.
Pursuant to section 157.9 of the
Commission’s rules, 18 CFR 157.9,
within 90 days of this Notice the
Commission staff will either: complete
E:\FR\FM\18JNN1.SGM
18JNN1
Agencies
[Federal Register Volume 84, Number 117 (Tuesday, June 18, 2019)]
[Notices]
[Pages 28297-28298]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2019-12814]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Docket No. CP19-476-000]
American Midstream (AlaTenn), LLC; Notice of Request Under
Blanket Authorization
Take notice that on June 3, 2019, American Midstream (AlaTenn), LLC
(AlaTenn), 2103 City West Boulevard, Building #4, Suite 800, Houston,
Texas 77042, filed in the above referenced docket a prior notice
request pursuant to sections 157.205, 157.208, 157.210, and 157.216 of
the Commission's regulations under the Natural Gas Act (NGA) and its
blanket certificate issued in Docket No. CP89-2201-000 for
authorization to: (i) Abandon in-place four existing compressor units,
totaling 1,455 horsepower (hp), at its Decatur Compression Station in
Limestone County, Alabama; and (ii) install two new compressor units,
totaling 3,550 hp, and appurtenances at its Decatur Compressor Station.
AlaTenn states that the proposed project will allow it to provide
additional firm transportation service to the City of Huntsville,
Alabama, d/b/a Huntsville Utilities and improve system reliability.
AlaTenn estimates the cost of the project to be $5,415,200, all as more
fully set forth in the request which is on file with the Commission and
open to public inspection.
The filing is available for review at the Commission in the Public
Reference Room or may be viewed on the Commission's website web at
https://www.ferc.gov using the ``eLibrary'' link. Enter the docket
number excluding the last three digits in the docket number field to
access the document. For assistance, contact FERC at
[email protected] or call toll-free, (886) 208-3676 or TYY,
(202) 502-8659.
Any questions regarding this application should be directed to
Dennis J. Kelly, Senior Attorney, American Midstream (AlaTenn), LLC
(AlaTenn), 2103 City West Boulevard, Building #4, Suite 800, Houston,
Texas 77042, by telephone at (345) 241-3546 or by email at
[email protected].
Any person or the Commission's staff may, within 60 days after
issuance of the instant notice by the Commission, file pursuant to Rule
214 of the Commission's Procedural Rules (18 CFR 385.214) a motion to
intervene or notice of intervention and pursuant to section 157.205 of
the regulations under the NGA (18 CFR 157.205), a protest to the
request. If no protest is filed within the time allowed therefore, the
proposed activity shall be deemed to be authorized effective the day
after the time allowed for filing a protest. If a protest is filed and
not withdrawn within 30 days after the allowed time for filing a
protest, the instant request shall be treated as an application for
authorization pursuant to section 7 of the NGA.
Pursuant to section 157.9 of the Commission's rules, 18 CFR 157.9,
within 90 days of this Notice the Commission staff will either:
Complete its environmental assessment (EA) and place it into the
Commission's public record (eLibrary) for this proceeding; or issue a
Notice of Schedule for Environmental Review. If a Notice of Schedule
for Environmental Review is issued, it will indicate, among other
milestones, the anticipated date for the Commission staff's issuance of
the EA for this proposal. The filing of the EA in the Commission's
public record for this proceeding or the issuance of a Notice of
Schedule for Environmental
[[Page 28298]]
Review will serve to notify federal and state agencies of the timing
for the completion of all necessary reviews, and the subsequent need to
complete all federal authorizations within 90 days of the date of
issuance of the Commission staff's EA.
Persons who wish to comment only on the environmental review of
this project should submit an original and two copies of their comments
to the Secretary of the Commission. Environmental commenters will be
placed on the Commission's environmental mailing list and will be
notified of any meetings associated with the Commission's environmental
review process. Environmental commenters will not be required to serve
copies of filed documents on all other parties. However, the non-party
commenters will not receive copies of all documents filed by other
parties or issued by the Commission and will not have the right to seek
court review of the Commission's final order.
The Commission strongly encourages electronic filings of comments,
protests and interventions in lieu of paper using the ``eFiling'' link
at https://www.ferc.gov. Persons unable to file electronically should
submit an original and 3 copies of the protest or intervention to the
Federal Energy regulatory Commission, 888 First Street NE, Washington,
DC 20426.
Dated: June 12, 2019.
Kimberly D. Bose,
Secretary.
[FR Doc. 2019-12814 Filed 6-17-19; 8:45 am]