Bluewater Gas Storage, LLC; Notice of Application, 27627 [2019-12458]

Download as PDF Federal Register / Vol. 84, No. 114 / Thursday, June 13, 2019 / Notices DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. CP19–471–000] khammond on DSKBBV9HB2PROD with NOTICES Bluewater Gas Storage, LLC; Notice of Application Take notice that on March 23, 2019, Bluewater Gas Storage, LLC (Bluewater) 333 South Wales Center Road, Columbus, MI 48063, filed in Docket No. CP19–471–000, an application pursuant to section 7(c) of the Natural Gas Act and Part 157 of the Commission’s regulations to construct and maintain a new compressor station in Macomb County, Michigan adjacent to Bluewater’s existing 20-inch-diameter pipeline. The proposed compressor station will deliver natural gas to Vector Pipeline L.P (Vector) using a single gasdriven turbine with a centrifugal compressor unit, which will provide approximately 11,150 nominal horsepower of compression. Bluewater’s proposed Project is an operational upgrade that will restore the originally authorized 500,000 Mcf/d of firm delivery capacity of natural gas at its interconnect with Vector, all as more fully set forth in the application, which is on file with the Commission and open to public inspection. The filing may also be viewed on the web at https://www.ferc.gov using the eLibrary link. Enter the docket number excluding the last three digits in the docket number field to access the document. For assistance, contact FERC at FERCOnlineSupport@ferc.gov or call toll-free, (866) 208–3676 or TTY, (202) 502–8659. Any questions regarding this application should be directed to Conor Ward, WEC Business Services LLC, 231 W Michigan Street, Milwaukee, WI 53203 at (414) 221–2539 or by email at conor.ward@wecenergygroup.com. Pursuant to section 157.9 of the Commission’s rules, 18 CFR 157.9, within 90 days of this Notice the Commission staff will either: Complete its environmental assessment (EA) and place it into the Commission’s public record (eLibrary) for this proceeding; or issue a Notice of Schedule for Environmental Review. If a Notice of Schedule for Environmental Review is issued, it will indicate, among other milestones, the anticipated date for the Commission staff’s issuance of the final environmental impact statement (FEIS) or EA for this proposal. The filing of the EA in the Commission’s public record for this proceeding or the issuance of a Notice of Schedule for Environmental Review will serve to notify federal and VerDate Sep<11>2014 16:55 Jun 12, 2019 Jkt 247001 state agencies of the timing for the completion of all necessary reviews, and the subsequent need to complete all federal authorizations within 90 days of the date of issuance of the Commission staff’s FEIS or EA. There are two ways to become involved in the Commission’s review of this project. First, any person wishing to obtain legal status by becoming a party to the proceedings for this project should, on or before the comment date stated below, file with the Federal Energy Regulatory Commission, 888 First Street NE, Washington, DC 20426, a motion to intervene in accordance with the requirements of the Commission’s Rules of Practice and Procedure (18 CFR 385.214 or 385.211) and the Regulations under the NGA (18 CFR 157.10). A person obtaining party status will be placed on the service list maintained by the Secretary of the Commission and will receive copies of all documents filed by the applicant and by all other parties. A party must submit 3 copies of filings made with the Commission and must provide a copy to the applicant and to every other party in the proceeding. Only parties to the proceeding can ask for court review of Commission orders in the proceeding. However, a person does not have to intervene in order to have comments considered. The second way to participate is by filing with the Secretary of the Commission, as soon as possible, an original and two copies of comments in support of or in opposition to this project. The Commission will consider these comments in determining the appropriate action to be taken, but the filing of a comment alone will not serve to make the filer a party to the proceeding. The Commission’s rules require that persons filing comments in opposition to the project provide copies of their protests only to the party or parties directly involved in the protest. Persons who wish to comment only on the environmental review of this project should submit an original and two copies of their comments to the Secretary of the Commission. Environmental commentors will be placed on the Commission’s environmental mailing list and will be notified of any meetings associated with the Commission’s environmental review process. Environmental commentors will not be required to serve copies of filed documents on all other parties. However, the non-party commentors will not receive copies of all documents filed by other parties or issued by the Commission and will not have the right to seek court review of the Commission’s final order. PO 00000 Frm 00049 Fmt 4703 Sfmt 4703 27627 As of the February 27, 2018 date of the Commission’s order in Docket No. CP16–4–001, the Commission will apply its revised practice concerning out-of-time motions to intervene in any new Natural Gas Act section 3 or section 7 proceeding.1 Persons desiring to become a party to a certificate proceeding are to intervene in a timely manner. If seeking to intervene out-oftime, the movant is required to show good cause why the time limitation should be waived, and should provide justification by reference to factors set forth in Rule 214(d)(1) of the Commission’s Rules and Regulations.2 The Commission strongly encourages electronic filings of comments, protests and interventions in lieu of paper using the eFiling link at https://www.ferc.gov. Persons unable to file electronically should submit an original and 3 copies of the protest or intervention to the Federal Energy Regulatory Commission, 888 First Street NE, Washington, DC 20426. Comment Date: 5:00 p.m. Eastern Time on June 28, 2019. Dated: June 7, 2019. Kimberly D. Bose, Secretary. [FR Doc. 2019–12458 Filed 6–12–19; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket Nos. CP14–347–000, CP19–19–000] Magnolia LNG, LLC; Notice of Intent To Prepare a Supplemental Environmental Impact Statement for the Proposed Magnolia LNG Production Capacity Amendment and Request for Comments on Environmental Issues The staff of the Federal Energy Regulatory Commission (FERC or Commission) will prepare a supplemental environmental impact statement (supplemental EIS) that will discuss the potential environmental impacts resulting from Magnolia LNG, LLC’s (Magnolia LNG) proposal to increase the liquefied natural gas (LNG) production capacity at its authorized LNG facility in Calcasieu, Louisiana from that previously approved by the Commission in Docket No. CP14–347– 000 (Magnolia LNG Production Capacity Amendment). The Commission will use this supplemental EIS in its decisionmaking process to determine whether 1 Tennessee Gas Pipeline Company, L.L.C., 162 FERC 61,167 at 50 (2018). 2 18 CFR 385.214(d)(1). E:\FR\FM\13JNN1.SGM 13JNN1

Agencies

[Federal Register Volume 84, Number 114 (Thursday, June 13, 2019)]
[Notices]
[Page 27627]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2019-12458]



[[Page 27627]]

=======================================================================
-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Docket No. CP19-471-000]


Bluewater Gas Storage, LLC; Notice of Application

    Take notice that on March 23, 2019, Bluewater Gas Storage, LLC 
(Bluewater) 333 South Wales Center Road, Columbus, MI 48063, filed in 
Docket No. CP19-471-000, an application pursuant to section 7(c) of the 
Natural Gas Act and Part 157 of the Commission's regulations to 
construct and maintain a new compressor station in Macomb County, 
Michigan adjacent to Bluewater's existing 20-inch-diameter pipeline. 
The proposed compressor station will deliver natural gas to Vector 
Pipeline L.P (Vector) using a single gas-driven turbine with a 
centrifugal compressor unit, which will provide approximately 11,150 
nominal horsepower of compression. Bluewater's proposed Project is an 
operational upgrade that will restore the originally authorized 500,000 
Mcf/d of firm delivery capacity of natural gas at its interconnect with 
Vector, all as more fully set forth in the application, which is on 
file with the Commission and open to public inspection.
    The filing may also be viewed on the web at https://www.ferc.gov 
using the eLibrary link. Enter the docket number excluding the last 
three digits in the docket number field to access the document. For 
assistance, contact FERC at [email protected] or call toll-
free, (866) 208-3676 or TTY, (202) 502-8659.
    Any questions regarding this application should be directed to 
Conor Ward, WEC Business Services LLC, 231 W Michigan Street, 
Milwaukee, WI 53203 at (414) 221-2539 or by email at 
[email protected].
    Pursuant to section 157.9 of the Commission's rules, 18 CFR 157.9, 
within 90 days of this Notice the Commission staff will either: 
Complete its environmental assessment (EA) and place it into the 
Commission's public record (eLibrary) for this proceeding; or issue a 
Notice of Schedule for Environmental Review. If a Notice of Schedule 
for Environmental Review is issued, it will indicate, among other 
milestones, the anticipated date for the Commission staff's issuance of 
the final environmental impact statement (FEIS) or EA for this 
proposal. The filing of the EA in the Commission's public record for 
this proceeding or the issuance of a Notice of Schedule for 
Environmental Review will serve to notify federal and state agencies of 
the timing for the completion of all necessary reviews, and the 
subsequent need to complete all federal authorizations within 90 days 
of the date of issuance of the Commission staff's FEIS or EA.
    There are two ways to become involved in the Commission's review of 
this project. First, any person wishing to obtain legal status by 
becoming a party to the proceedings for this project should, on or 
before the comment date stated below, file with the Federal Energy 
Regulatory Commission, 888 First Street NE, Washington, DC 20426, a 
motion to intervene in accordance with the requirements of the 
Commission's Rules of Practice and Procedure (18 CFR 385.214 or 
385.211) and the Regulations under the NGA (18 CFR 157.10). A person 
obtaining party status will be placed on the service list maintained by 
the Secretary of the Commission and will receive copies of all 
documents filed by the applicant and by all other parties. A party must 
submit 3 copies of filings made with the Commission and must provide a 
copy to the applicant and to every other party in the proceeding. Only 
parties to the proceeding can ask for court review of Commission orders 
in the proceeding.
    However, a person does not have to intervene in order to have 
comments considered. The second way to participate is by filing with 
the Secretary of the Commission, as soon as possible, an original and 
two copies of comments in support of or in opposition to this project. 
The Commission will consider these comments in determining the 
appropriate action to be taken, but the filing of a comment alone will 
not serve to make the filer a party to the proceeding. The Commission's 
rules require that persons filing comments in opposition to the project 
provide copies of their protests only to the party or parties directly 
involved in the protest.
    Persons who wish to comment only on the environmental review of 
this project should submit an original and two copies of their comments 
to the Secretary of the Commission. Environmental commentors will be 
placed on the Commission's environmental mailing list and will be 
notified of any meetings associated with the Commission's environmental 
review process. Environmental commentors will not be required to serve 
copies of filed documents on all other parties. However, the non-party 
commentors will not receive copies of all documents filed by other 
parties or issued by the Commission and will not have the right to seek 
court review of the Commission's final order.
    As of the February 27, 2018 date of the Commission's order in 
Docket No. CP16-4-001, the Commission will apply its revised practice 
concerning out-of-time motions to intervene in any new Natural Gas Act 
section 3 or section 7 proceeding.\1\ Persons desiring to become a 
party to a certificate proceeding are to intervene in a timely manner. 
If seeking to intervene out-of-time, the movant is required to show 
good cause why the time limitation should be waived, and should provide 
justification by reference to factors set forth in Rule 214(d)(1) of 
the Commission's Rules and Regulations.\2\
---------------------------------------------------------------------------

    \1\ Tennessee Gas Pipeline Company, L.L.C., 162 FERC 61,167 at 
50 (2018).
    \2\ 18 CFR 385.214(d)(1).
---------------------------------------------------------------------------

    The Commission strongly encourages electronic filings of comments, 
protests and interventions in lieu of paper using the eFiling link at 
https://www.ferc.gov. Persons unable to file electronically should 
submit an original and 3 copies of the protest or intervention to the 
Federal Energy Regulatory Commission, 888 First Street NE, Washington, 
DC 20426.
    Comment Date: 5:00 p.m. Eastern Time on June 28, 2019.

    Dated: June 7, 2019.
Kimberly D. Bose,
Secretary.
[FR Doc. 2019-12458 Filed 6-12-19; 8:45 am]
 BILLING CODE 6717-01-P