Notice of Meeting: Jordan Cove Energy Project, L.P.; Pacific Connector Gas Pipeline, L.P., 27106 [2019-12250]
Download as PDF
27106
Federal Register / Vol. 84, No. 112 / Tuesday, June 11, 2019 / Notices
Description: Compliance filing:
Energia Sierra Juarez U.S., LLC
Compliance Filing to be effective 5/28/
2019.
Filed Date: 6/3/19.
Accession Number: 20190603–5157.
Comments Due: 5 p.m. ET 6/24/19.
Docket Numbers: ER19–2043–000.
Applicants: PJM Interconnection,
L.L.C.
Description: § 205(d) Rate Filing:
Original WMPA, SA No. 5415; Queue
No. AD2–215 to be effective 5/7/2019.
Filed Date: 6/4/19.
Accession Number: 20190604–5043.
Comments Due: 5 p.m. ET 6/25/19.
Docket Numbers: ER19–2044–000.
Applicants: Southern California
Edison Company.
Description: § 205(d) Rate Filing:
Letter Agreement Baldy Mesa Project SA
No. 234 to be effective 5/24/2019.
Filed Date: 6/4/19.
Accession Number: 20190604–5046.
Comments Due: 5 p.m. ET 6/25/19.
Docket Numbers: ER19–2045–000.
Applicants: Midcontinent
Independent System Operator Inc.
Description: § 205(d) Rate Filing:
2019–06–04_SA 3310 NSPM–GRE T–T
(Moon Lake) to be effective 7/1/2019.
Filed Date: 6/4/19.
Accession Number: 20190604–5077.
Comments Due: 5 p.m. ET 6/25/19.
Docket Numbers: ER19–2046–000.
Applicants: NSTAR Electric
Company.
Description: Notice of Termination of
Interconnection and Operation
Agreement (Rates Schedule No. 195) of
NSTAR Electric Company.
Filed Date: 6/4/19.
Accession Number: 20190604–5088.
Comments Due: 5 p.m. ET 6/25/19.
The filings are accessible in the
Commission’s eLibrary system by
clicking on the links or querying the
docket number.
Dated: June 4, 2019.
Kimberly D. Bose,
Secretary.
[FR Doc. 2019–12201 Filed 6–10–19; 8:45 am]
BILLING CODE 6717–01–P
97624, Thursday, June 13, 2019, 1:00
p.m. PDT
Members of the public and
intervenors in the referenced proceeding
may attend and observe this meeting;
however, participation will be limited to
tribal representatives and federal agency
staff. If tribal representatives choose to
disclose information about a specific
location which could create a risk or
harm to an archeological site or Native
American cultural resource, the public
will be excused for that portion of the
meeting. A summary of the meeting will
be entered into the Commission’s
administrative record.
If you plan to attend this meeting,
please contact Mr. John Peconom,
Environmental Project Manager at (202)
502–6352 or John.Peconom@ferc.gov.
Dated: June 4, 2019.
Kimberly D. Bose,
Secretary.
[FR Doc. 2019–12250 Filed 6–10–19; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
DEPARTMENT OF ENERGY
[Docket Nos. CP17–495–000, CP17–494–
000]
Notice of Meeting: Jordan Cove Energy
Project, L.P.; Pacific Connector Gas
Pipeline, L.P.
The environmental staff of the Federal
Energy Regulatory Commission
(Commission) along with other federal
agency staff will meet with
representatives of The Klamath Tribes to
discuss the proposed Jordan Cove
Energy Project. The meeting will be held
at the location and time listed below:
Chiloquin Community Center, 140
South 1st Avenue, Chiloquin, Oregon
Federal Energy Regulatory
Commission
[Docket No. CP17–495–000; Docket No.
CP17–494–000]
Jordan Cove Energy Project LP,
Pacific Connector Gas Pipeline L.P.;
Notice of Dates and Locations for
Public Comment Sessions on the
Jordan Cove Energy Project Draft
Environmental Impact Statement
The staff of the Federal Energy
Regulatory Commission (FERC or
Commission) will be present to receive
comments on the draft Environmental
Impact Statement for the Jordan Cove
Energy Project as follows:
Date and time (PDT)
Location
June 24, 2019; 1:00–8:00 p.m ....
Southwestern Oregon Community College, Hale Center for the Performing Arts, 1988 Newmark Avenue,
Coos Bay, OR 97420.
South Umpqua High School, 501 Chadwick Lane, Myrtle Creek, OR 97457.
Ramada Medford Hotel and Conference Center, 2250 Biddle Road, Medford, OR 97504.
Klamath County Fairgrounds/Event Center, 3531 South 6th Street, Klamath Falls, OR 97603.
June 25, 2019; 1:00–8:00 p.m ....
June 26, 2019; 1:00–8:00 p.m ....
June 27, 2019; 1:00–8:00 p.m ....
khammond on DSKBBV9HB2PROD with NOTICES
Any person desiring to intervene or
protest in any of the above proceedings
must file in accordance with Rules 211
and 214 of the Commission’s
Regulations (18 CFR 385.211 and
385.214) on or before 5:00 p.m. Eastern
time on the specified comment date.
Protests may be considered, but
intervention is necessary to become a
party to the proceeding.
eFiling is encouraged. More detailed
information relating to filing
requirements, interventions, protests,
service, and qualifying facilities filings
can be found at: https://www.ferc.gov/
docs-filing/efiling/filing-req.pdf. For
other information, call (866) 208–3676
(toll free). For TTY, call (202) 502–8659.
Please do not contact these venues
directly with questions. Any questions
regarding the public comment sessions
should be directed to the FERC at: (866)
208–3372.
The public’s review of a draft
Environmental Impact Statement is an
important part of the Commission’s
environmental review process.
Although not required, the Commission
is holding these public comment
VerDate Sep<11>2014
17:36 Jun 10, 2019
Jkt 247001
sessions, so that interested parties can
provide their specific comments on the
analyses and findings of the draft
Environmental Impact Statement for the
Jordan Cove Energy Project (draft EIS),
which was issued on March 29, 2019.
These comment sessions have been
purposefully designed to efficiently and
effectively allow for the greatest number
of individuals to provide comments on
the draft EIS.
PO 00000
Frm 00032
Fmt 4703
Sfmt 4703
Recognizing significant public interest
for this project and in anticipation of a
large turnout, FERC staff has chosen to
allot more time for the public comment
sessions than is typical. As described in
the table above, the public comment
sessions will be held between 1:00 and
8:00 p.m. You may arrive at any time
after 1:00 p.m. Individuals arriving
before 1:00 p.m. will not be permitted
in the venue and should expect to wait.
E:\FR\FM\11JNN1.SGM
11JNN1
Agencies
[Federal Register Volume 84, Number 112 (Tuesday, June 11, 2019)]
[Notices]
[Page 27106]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2019-12250]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Docket Nos. CP17-495-000, CP17-494-000]
Notice of Meeting: Jordan Cove Energy Project, L.P.; Pacific
Connector Gas Pipeline, L.P.
The environmental staff of the Federal Energy Regulatory Commission
(Commission) along with other federal agency staff will meet with
representatives of The Klamath Tribes to discuss the proposed Jordan
Cove Energy Project. The meeting will be held at the location and time
listed below:
Chiloquin Community Center, 140 South 1st Avenue, Chiloquin, Oregon
97624, Thursday, June 13, 2019, 1:00 p.m. PDT
Members of the public and intervenors in the referenced proceeding
may attend and observe this meeting; however, participation will be
limited to tribal representatives and federal agency staff. If tribal
representatives choose to disclose information about a specific
location which could create a risk or harm to an archeological site or
Native American cultural resource, the public will be excused for that
portion of the meeting. A summary of the meeting will be entered into
the Commission's administrative record.
If you plan to attend this meeting, please contact Mr. John
Peconom, Environmental Project Manager at (202) 502-6352 or
[email protected].
Dated: June 4, 2019.
Kimberly D. Bose,
Secretary.
[FR Doc. 2019-12250 Filed 6-10-19; 8:45 am]