Notice of Meeting: Jordan Cove Energy Project, L.P.; Pacific Connector Gas Pipeline, L.P., 27106 [2019-12250]

Download as PDF 27106 Federal Register / Vol. 84, No. 112 / Tuesday, June 11, 2019 / Notices Description: Compliance filing: Energia Sierra Juarez U.S., LLC Compliance Filing to be effective 5/28/ 2019. Filed Date: 6/3/19. Accession Number: 20190603–5157. Comments Due: 5 p.m. ET 6/24/19. Docket Numbers: ER19–2043–000. Applicants: PJM Interconnection, L.L.C. Description: § 205(d) Rate Filing: Original WMPA, SA No. 5415; Queue No. AD2–215 to be effective 5/7/2019. Filed Date: 6/4/19. Accession Number: 20190604–5043. Comments Due: 5 p.m. ET 6/25/19. Docket Numbers: ER19–2044–000. Applicants: Southern California Edison Company. Description: § 205(d) Rate Filing: Letter Agreement Baldy Mesa Project SA No. 234 to be effective 5/24/2019. Filed Date: 6/4/19. Accession Number: 20190604–5046. Comments Due: 5 p.m. ET 6/25/19. Docket Numbers: ER19–2045–000. Applicants: Midcontinent Independent System Operator Inc. Description: § 205(d) Rate Filing: 2019–06–04_SA 3310 NSPM–GRE T–T (Moon Lake) to be effective 7/1/2019. Filed Date: 6/4/19. Accession Number: 20190604–5077. Comments Due: 5 p.m. ET 6/25/19. Docket Numbers: ER19–2046–000. Applicants: NSTAR Electric Company. Description: Notice of Termination of Interconnection and Operation Agreement (Rates Schedule No. 195) of NSTAR Electric Company. Filed Date: 6/4/19. Accession Number: 20190604–5088. Comments Due: 5 p.m. ET 6/25/19. The filings are accessible in the Commission’s eLibrary system by clicking on the links or querying the docket number. Dated: June 4, 2019. Kimberly D. Bose, Secretary. [FR Doc. 2019–12201 Filed 6–10–19; 8:45 am] BILLING CODE 6717–01–P 97624, Thursday, June 13, 2019, 1:00 p.m. PDT Members of the public and intervenors in the referenced proceeding may attend and observe this meeting; however, participation will be limited to tribal representatives and federal agency staff. If tribal representatives choose to disclose information about a specific location which could create a risk or harm to an archeological site or Native American cultural resource, the public will be excused for that portion of the meeting. A summary of the meeting will be entered into the Commission’s administrative record. If you plan to attend this meeting, please contact Mr. John Peconom, Environmental Project Manager at (202) 502–6352 or John.Peconom@ferc.gov. Dated: June 4, 2019. Kimberly D. Bose, Secretary. [FR Doc. 2019–12250 Filed 6–10–19; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission DEPARTMENT OF ENERGY [Docket Nos. CP17–495–000, CP17–494– 000] Notice of Meeting: Jordan Cove Energy Project, L.P.; Pacific Connector Gas Pipeline, L.P. The environmental staff of the Federal Energy Regulatory Commission (Commission) along with other federal agency staff will meet with representatives of The Klamath Tribes to discuss the proposed Jordan Cove Energy Project. The meeting will be held at the location and time listed below: Chiloquin Community Center, 140 South 1st Avenue, Chiloquin, Oregon Federal Energy Regulatory Commission [Docket No. CP17–495–000; Docket No. CP17–494–000] Jordan Cove Energy Project LP, Pacific Connector Gas Pipeline L.P.; Notice of Dates and Locations for Public Comment Sessions on the Jordan Cove Energy Project Draft Environmental Impact Statement The staff of the Federal Energy Regulatory Commission (FERC or Commission) will be present to receive comments on the draft Environmental Impact Statement for the Jordan Cove Energy Project as follows: Date and time (PDT) Location June 24, 2019; 1:00–8:00 p.m .... Southwestern Oregon Community College, Hale Center for the Performing Arts, 1988 Newmark Avenue, Coos Bay, OR 97420. South Umpqua High School, 501 Chadwick Lane, Myrtle Creek, OR 97457. Ramada Medford Hotel and Conference Center, 2250 Biddle Road, Medford, OR 97504. Klamath County Fairgrounds/Event Center, 3531 South 6th Street, Klamath Falls, OR 97603. June 25, 2019; 1:00–8:00 p.m .... June 26, 2019; 1:00–8:00 p.m .... June 27, 2019; 1:00–8:00 p.m .... khammond on DSKBBV9HB2PROD with NOTICES Any person desiring to intervene or protest in any of the above proceedings must file in accordance with Rules 211 and 214 of the Commission’s Regulations (18 CFR 385.211 and 385.214) on or before 5:00 p.m. Eastern time on the specified comment date. Protests may be considered, but intervention is necessary to become a party to the proceeding. eFiling is encouraged. More detailed information relating to filing requirements, interventions, protests, service, and qualifying facilities filings can be found at: https://www.ferc.gov/ docs-filing/efiling/filing-req.pdf. For other information, call (866) 208–3676 (toll free). For TTY, call (202) 502–8659. Please do not contact these venues directly with questions. Any questions regarding the public comment sessions should be directed to the FERC at: (866) 208–3372. The public’s review of a draft Environmental Impact Statement is an important part of the Commission’s environmental review process. Although not required, the Commission is holding these public comment VerDate Sep<11>2014 17:36 Jun 10, 2019 Jkt 247001 sessions, so that interested parties can provide their specific comments on the analyses and findings of the draft Environmental Impact Statement for the Jordan Cove Energy Project (draft EIS), which was issued on March 29, 2019. These comment sessions have been purposefully designed to efficiently and effectively allow for the greatest number of individuals to provide comments on the draft EIS. PO 00000 Frm 00032 Fmt 4703 Sfmt 4703 Recognizing significant public interest for this project and in anticipation of a large turnout, FERC staff has chosen to allot more time for the public comment sessions than is typical. As described in the table above, the public comment sessions will be held between 1:00 and 8:00 p.m. You may arrive at any time after 1:00 p.m. Individuals arriving before 1:00 p.m. will not be permitted in the venue and should expect to wait. E:\FR\FM\11JNN1.SGM 11JNN1

Agencies

[Federal Register Volume 84, Number 112 (Tuesday, June 11, 2019)]
[Notices]
[Page 27106]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2019-12250]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Docket Nos. CP17-495-000, CP17-494-000]


Notice of Meeting: Jordan Cove Energy Project, L.P.; Pacific 
Connector Gas Pipeline, L.P.

    The environmental staff of the Federal Energy Regulatory Commission 
(Commission) along with other federal agency staff will meet with 
representatives of The Klamath Tribes to discuss the proposed Jordan 
Cove Energy Project. The meeting will be held at the location and time 
listed below:

Chiloquin Community Center, 140 South 1st Avenue, Chiloquin, Oregon 
97624, Thursday, June 13, 2019, 1:00 p.m. PDT

    Members of the public and intervenors in the referenced proceeding 
may attend and observe this meeting; however, participation will be 
limited to tribal representatives and federal agency staff. If tribal 
representatives choose to disclose information about a specific 
location which could create a risk or harm to an archeological site or 
Native American cultural resource, the public will be excused for that 
portion of the meeting. A summary of the meeting will be entered into 
the Commission's administrative record.
    If you plan to attend this meeting, please contact Mr. John 
Peconom, Environmental Project Manager at (202) 502-6352 or 
[email protected].

     Dated: June 4, 2019.
Kimberly D. Bose,
Secretary.
[FR Doc. 2019-12250 Filed 6-10-19; 8:45 am]
 BILLING CODE 6717-01-P


This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.