Combined Notice of Filings #1, 27105-27106 [2019-12201]
Download as PDF
Federal Register / Vol. 84, No. 112 / Tuesday, June 11, 2019 / Notices
Filed Date: 6/5/19.
Accession Number: 20190605–5047.
Comments Due: 5 p.m. ET 6/26/19.
Docket Numbers: ER19–2049–000.
Applicants: Appalachian Power
Company.
Description: Tariff Cancellation:
20111027 VPI Revised PSA to be
effective 4/30/2019.
Filed Date: 6/5/19.
Accession Number: 20190605–5094.
Comments Due: 5 p.m. ET 6/26/19.
Docket Numbers: ER19–2050–000.
Applicants: Midcontinent
Independent System Operator, Inc.,
GridLiance Heartland LLC.
Description: § 205(d) Rate Filing:
2019–06–05_GridLiance Heartland
Revisions to Incorporate Formula Rate
to be effective 9/1/2019.
Filed Date: 6/5/19.
Accession Number: 20190605–5097.
Comments Due: 5 p.m. ET 6/26/19.
khammond on DSKBBV9HB2PROD with NOTICES
Docket Numbers: ER19–2051–000.
Applicants: Midcontinent
Independent System Operator, Inc.
Description: § 205(d) Rate Filing:
2019–06–05_SA 3306 Storm Lake I GIA
to be effective 5/21/2019.
Filed Date: 6/5/19.
Accession Number: 20190605–5100.
Comments Due: 5 p.m. ET 6/26/19.
The filings are accessible in the
Commission’s eLibrary system by
clicking on the links or querying the
docket number.
Any person desiring to intervene or
protest in any of the above proceedings
must file in accordance with Rules 211
and 214 of the Commission’s
Regulations (18 CFR 385.211 and
385.214) on or before 5:00 p.m. Eastern
time on the specified comment date.
Protests may be considered, but
intervention is necessary to become a
party to the proceeding.
eFiling is encouraged. More detailed
information relating to filing
requirements, interventions, protests,
service, and qualifying facilities filings
can be found at: https://www.ferc.gov/
docs-filing/efiling/filing-req.pdf. For
other information, call (866) 208–3676
(toll free). For TTY, call (202) 502–8659.
Kimberly D. Bose,
Secretary.
[FR Doc. 2019–12246 Filed 6–10–19; 8:45 am]
BILLING CODE 6717–01–P
VerDate Sep<11>2014
17:36 Jun 10, 2019
Jkt 247001
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Combined Notice of Filings #1
Take notice that the Commission
received the following electric corporate
filings:
Docket Numbers: EC19–98–000.
Applicants: Grady Wind Energy
Center, LLC, Pattern Energy Group Inc.
Description: Application for
Authorization Under Section 203 of the
Federal Power Act, et al. of Grady Wind
Energy Center, et al.
Filed Date: 6/3/19.
Accession Number: 20190603–5200.
Comments Due: 5 p.m. ET 6/24/19.
Docket Numbers: EC19–99–000.
Applicants: Empire Generating Co,
LLC.
Description: Application for
Authorization Under Section 203 of the
Federal Power Act, et al. of Emprie
Generating Co, LLC.
Filed Date: 6/4/19.
Accession Number: 20190604–5080.
Comments Due: 5 p.m. ET 6/25/19.
Take notice that the Commission
received the following exempt
wholesale generator filings:
Docket Numbers: EG19–118–000.
Applicants: Story County Wind, LLC.
Description: Notification of SelfCertification of Exempt Wholesale
Generator Status of Story County Wind,
LLC.
Filed Date: 6/3/19.
Accession Number: 20190603–5138.
Comments Due: 5 p.m. ET 6/24/19.
Docket Numbers: EG19–119–000.
Applicants: Ashtabula Wind I, LLC.
Description: Notice of SelfCertification of Exempt Wholesale
Generator Status of Ashtabula Wind I,
LLC.
Filed Date: 6/4/19.
Accession Number: 20190604–5073.
Comments Due: 5 p.m. ET 6/25/19.
Docket Numbers: EG19–120–000.
Applicants: Quitman Solar, LLC.
Description: Notice of SelfCertification of Exempt Wholesale
Generator Status of Quitman Solar, LLC.
Filed Date: 6/4/19.
Accession Number: 20190604–5074.
Comments Due: 5 p.m. ET 6/25/19.
Docket Numbers: EG19–121–000.
Applicants: Dougherty County Solar,
LLC.
Description: Notice of SelfCertification of Exempt Wholesale
Generator Status of Dougherty County
Solar, LLC.
Filed Date: 6/4/19.
Accession Number: 20190604–5075.
PO 00000
Frm 00031
Fmt 4703
Sfmt 4703
27105
Comments Due: 5 p.m. ET 6/25/19.
Take notice that the Commission
received the following electric rate
filings:
Docket Numbers: ER18–92–003.
Applicants: Carroll County Energy
LLC.
Description: Compliance filing:
Settlement Compliance Filing to be
effective 12/1/2017.
Filed Date: 6/3/19.
Accession Number: 20190603–5166.
Comments Due: 5 p.m. ET 6/24/19.
Docket Numbers: ER19–1230–000.
Applicants: TRS Fuel Cell, LLC.
Description: Report Filing: Refund
Report to be effective N/A.
Filed Date: 6/3/19.
Accession Number: 20190603–5162.
Comments Due: 5 p.m. ET 6/24/19.
Docket Numbers: ER19–2035–000.
Applicants: Frontier Utilities
Northeast LLC.
Description: § 205(d) Rate Filing:
Frontier Utilities Northeast LLC
Amendment to Notification of Change
in Status to be effective 6/4/2019.
Filed Date: 6/3/19.
Accession Number: 20190603–5214.
Comments Due: 5 p.m. ET 6/24/19.
Docket Numbers: ER19–2036–000.
Applicants: Emera Maine.
Description: Initial rate filing: Houlton
Water Company Service Agreement to
be effective 6/1/2019.
Filed Date: 6/3/19.
Accession Number: 20190603–5109.
Comments Due: 5 p.m. ET 6/24/19.
Docket Numbers: ER19–2037–000.
Applicants: ITC Midwest LLC.
Description: § 205(d) Rate Filing:
Filing of Joint Use Pole Agreement with
Access Energy to be effective 8/3/2019.
Filed Date: 6/3/19.
Accession Number: 20190603–5141.
Comments Due: 5 p.m. ET 6/24/19.
Docket Numbers: ER19–2038–000.
Applicants: ITC Midwest LLC.
Description: § 205(d) Rate Filing:
Filing of Master JUA with Eastern Iowa
to be effective 8/3/2019.
Filed Date: 6/3/19.
Accession Number: 20190603–5147.
Comments Due: 5 p.m. ET 6/24/19.
Docket Numbers: ER19–2039–000.
Applicants: PJM Interconnection,
L.L.C.
Description: § 205(d) Rate Filing: ISA,
SA No. 5382; Queue No. W3–003/AD2–
026/AE1–156; Cancel WMPA, SA No.
3333 to be effective 5/3/2019.
Filed Date: 6/3/19.
Accession Number: 20190603–5148.
Comments Due: 5 p.m. ET 6/24/19.
Docket Numbers: ER19–2040–000.
Applicants: Energia Sierra Juarez U.S.,
LLC.
E:\FR\FM\11JNN1.SGM
11JNN1
27106
Federal Register / Vol. 84, No. 112 / Tuesday, June 11, 2019 / Notices
Description: Compliance filing:
Energia Sierra Juarez U.S., LLC
Compliance Filing to be effective 5/28/
2019.
Filed Date: 6/3/19.
Accession Number: 20190603–5157.
Comments Due: 5 p.m. ET 6/24/19.
Docket Numbers: ER19–2043–000.
Applicants: PJM Interconnection,
L.L.C.
Description: § 205(d) Rate Filing:
Original WMPA, SA No. 5415; Queue
No. AD2–215 to be effective 5/7/2019.
Filed Date: 6/4/19.
Accession Number: 20190604–5043.
Comments Due: 5 p.m. ET 6/25/19.
Docket Numbers: ER19–2044–000.
Applicants: Southern California
Edison Company.
Description: § 205(d) Rate Filing:
Letter Agreement Baldy Mesa Project SA
No. 234 to be effective 5/24/2019.
Filed Date: 6/4/19.
Accession Number: 20190604–5046.
Comments Due: 5 p.m. ET 6/25/19.
Docket Numbers: ER19–2045–000.
Applicants: Midcontinent
Independent System Operator Inc.
Description: § 205(d) Rate Filing:
2019–06–04_SA 3310 NSPM–GRE T–T
(Moon Lake) to be effective 7/1/2019.
Filed Date: 6/4/19.
Accession Number: 20190604–5077.
Comments Due: 5 p.m. ET 6/25/19.
Docket Numbers: ER19–2046–000.
Applicants: NSTAR Electric
Company.
Description: Notice of Termination of
Interconnection and Operation
Agreement (Rates Schedule No. 195) of
NSTAR Electric Company.
Filed Date: 6/4/19.
Accession Number: 20190604–5088.
Comments Due: 5 p.m. ET 6/25/19.
The filings are accessible in the
Commission’s eLibrary system by
clicking on the links or querying the
docket number.
Dated: June 4, 2019.
Kimberly D. Bose,
Secretary.
[FR Doc. 2019–12201 Filed 6–10–19; 8:45 am]
BILLING CODE 6717–01–P
97624, Thursday, June 13, 2019, 1:00
p.m. PDT
Members of the public and
intervenors in the referenced proceeding
may attend and observe this meeting;
however, participation will be limited to
tribal representatives and federal agency
staff. If tribal representatives choose to
disclose information about a specific
location which could create a risk or
harm to an archeological site or Native
American cultural resource, the public
will be excused for that portion of the
meeting. A summary of the meeting will
be entered into the Commission’s
administrative record.
If you plan to attend this meeting,
please contact Mr. John Peconom,
Environmental Project Manager at (202)
502–6352 or John.Peconom@ferc.gov.
Dated: June 4, 2019.
Kimberly D. Bose,
Secretary.
[FR Doc. 2019–12250 Filed 6–10–19; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
DEPARTMENT OF ENERGY
[Docket Nos. CP17–495–000, CP17–494–
000]
Notice of Meeting: Jordan Cove Energy
Project, L.P.; Pacific Connector Gas
Pipeline, L.P.
The environmental staff of the Federal
Energy Regulatory Commission
(Commission) along with other federal
agency staff will meet with
representatives of The Klamath Tribes to
discuss the proposed Jordan Cove
Energy Project. The meeting will be held
at the location and time listed below:
Chiloquin Community Center, 140
South 1st Avenue, Chiloquin, Oregon
Federal Energy Regulatory
Commission
[Docket No. CP17–495–000; Docket No.
CP17–494–000]
Jordan Cove Energy Project LP,
Pacific Connector Gas Pipeline L.P.;
Notice of Dates and Locations for
Public Comment Sessions on the
Jordan Cove Energy Project Draft
Environmental Impact Statement
The staff of the Federal Energy
Regulatory Commission (FERC or
Commission) will be present to receive
comments on the draft Environmental
Impact Statement for the Jordan Cove
Energy Project as follows:
Date and time (PDT)
Location
June 24, 2019; 1:00–8:00 p.m ....
Southwestern Oregon Community College, Hale Center for the Performing Arts, 1988 Newmark Avenue,
Coos Bay, OR 97420.
South Umpqua High School, 501 Chadwick Lane, Myrtle Creek, OR 97457.
Ramada Medford Hotel and Conference Center, 2250 Biddle Road, Medford, OR 97504.
Klamath County Fairgrounds/Event Center, 3531 South 6th Street, Klamath Falls, OR 97603.
June 25, 2019; 1:00–8:00 p.m ....
June 26, 2019; 1:00–8:00 p.m ....
June 27, 2019; 1:00–8:00 p.m ....
khammond on DSKBBV9HB2PROD with NOTICES
Any person desiring to intervene or
protest in any of the above proceedings
must file in accordance with Rules 211
and 214 of the Commission’s
Regulations (18 CFR 385.211 and
385.214) on or before 5:00 p.m. Eastern
time on the specified comment date.
Protests may be considered, but
intervention is necessary to become a
party to the proceeding.
eFiling is encouraged. More detailed
information relating to filing
requirements, interventions, protests,
service, and qualifying facilities filings
can be found at: https://www.ferc.gov/
docs-filing/efiling/filing-req.pdf. For
other information, call (866) 208–3676
(toll free). For TTY, call (202) 502–8659.
Please do not contact these venues
directly with questions. Any questions
regarding the public comment sessions
should be directed to the FERC at: (866)
208–3372.
The public’s review of a draft
Environmental Impact Statement is an
important part of the Commission’s
environmental review process.
Although not required, the Commission
is holding these public comment
VerDate Sep<11>2014
17:36 Jun 10, 2019
Jkt 247001
sessions, so that interested parties can
provide their specific comments on the
analyses and findings of the draft
Environmental Impact Statement for the
Jordan Cove Energy Project (draft EIS),
which was issued on March 29, 2019.
These comment sessions have been
purposefully designed to efficiently and
effectively allow for the greatest number
of individuals to provide comments on
the draft EIS.
PO 00000
Frm 00032
Fmt 4703
Sfmt 4703
Recognizing significant public interest
for this project and in anticipation of a
large turnout, FERC staff has chosen to
allot more time for the public comment
sessions than is typical. As described in
the table above, the public comment
sessions will be held between 1:00 and
8:00 p.m. You may arrive at any time
after 1:00 p.m. Individuals arriving
before 1:00 p.m. will not be permitted
in the venue and should expect to wait.
E:\FR\FM\11JNN1.SGM
11JNN1
Agencies
[Federal Register Volume 84, Number 112 (Tuesday, June 11, 2019)]
[Notices]
[Pages 27105-27106]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2019-12201]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
Combined Notice of Filings #1
Take notice that the Commission received the following electric
corporate filings:
Docket Numbers: EC19-98-000.
Applicants: Grady Wind Energy Center, LLC, Pattern Energy Group
Inc.
Description: Application for Authorization Under Section 203 of the
Federal Power Act, et al. of Grady Wind Energy Center, et al.
Filed Date: 6/3/19.
Accession Number: 20190603-5200.
Comments Due: 5 p.m. ET 6/24/19.
Docket Numbers: EC19-99-000.
Applicants: Empire Generating Co, LLC.
Description: Application for Authorization Under Section 203 of the
Federal Power Act, et al. of Emprie Generating Co, LLC.
Filed Date: 6/4/19.
Accession Number: 20190604-5080.
Comments Due: 5 p.m. ET 6/25/19.
Take notice that the Commission received the following exempt
wholesale generator filings:
Docket Numbers: EG19-118-000.
Applicants: Story County Wind, LLC.
Description: Notification of Self-Certification of Exempt Wholesale
Generator Status of Story County Wind, LLC.
Filed Date: 6/3/19.
Accession Number: 20190603-5138.
Comments Due: 5 p.m. ET 6/24/19.
Docket Numbers: EG19-119-000.
Applicants: Ashtabula Wind I, LLC.
Description: Notice of Self-Certification of Exempt Wholesale
Generator Status of Ashtabula Wind I, LLC.
Filed Date: 6/4/19.
Accession Number: 20190604-5073.
Comments Due: 5 p.m. ET 6/25/19.
Docket Numbers: EG19-120-000.
Applicants: Quitman Solar, LLC.
Description: Notice of Self-Certification of Exempt Wholesale
Generator Status of Quitman Solar, LLC.
Filed Date: 6/4/19.
Accession Number: 20190604-5074.
Comments Due: 5 p.m. ET 6/25/19.
Docket Numbers: EG19-121-000.
Applicants: Dougherty County Solar, LLC.
Description: Notice of Self-Certification of Exempt Wholesale
Generator Status of Dougherty County Solar, LLC.
Filed Date: 6/4/19.
Accession Number: 20190604-5075.
Comments Due: 5 p.m. ET 6/25/19.
Take notice that the Commission received the following electric
rate filings:
Docket Numbers: ER18-92-003.
Applicants: Carroll County Energy LLC.
Description: Compliance filing: Settlement Compliance Filing to be
effective 12/1/2017.
Filed Date: 6/3/19.
Accession Number: 20190603-5166.
Comments Due: 5 p.m. ET 6/24/19.
Docket Numbers: ER19-1230-000.
Applicants: TRS Fuel Cell, LLC.
Description: Report Filing: Refund Report to be effective N/A.
Filed Date: 6/3/19.
Accession Number: 20190603-5162.
Comments Due: 5 p.m. ET 6/24/19.
Docket Numbers: ER19-2035-000.
Applicants: Frontier Utilities Northeast LLC.
Description: Sec. 205(d) Rate Filing: Frontier Utilities Northeast
LLC Amendment to Notification of Change in Status to be effective 6/4/
2019.
Filed Date: 6/3/19.
Accession Number: 20190603-5214.
Comments Due: 5 p.m. ET 6/24/19.
Docket Numbers: ER19-2036-000.
Applicants: Emera Maine.
Description: Initial rate filing: Houlton Water Company Service
Agreement to be effective 6/1/2019.
Filed Date: 6/3/19.
Accession Number: 20190603-5109.
Comments Due: 5 p.m. ET 6/24/19.
Docket Numbers: ER19-2037-000.
Applicants: ITC Midwest LLC.
Description: Sec. 205(d) Rate Filing: Filing of Joint Use Pole
Agreement with Access Energy to be effective 8/3/2019.
Filed Date: 6/3/19.
Accession Number: 20190603-5141.
Comments Due: 5 p.m. ET 6/24/19.
Docket Numbers: ER19-2038-000.
Applicants: ITC Midwest LLC.
Description: Sec. 205(d) Rate Filing: Filing of Master JUA with
Eastern Iowa to be effective 8/3/2019.
Filed Date: 6/3/19.
Accession Number: 20190603-5147.
Comments Due: 5 p.m. ET 6/24/19.
Docket Numbers: ER19-2039-000.
Applicants: PJM Interconnection, L.L.C.
Description: Sec. 205(d) Rate Filing: ISA, SA No. 5382; Queue No.
W3-003/AD2-026/AE1-156; Cancel WMPA, SA No. 3333 to be effective 5/3/
2019.
Filed Date: 6/3/19.
Accession Number: 20190603-5148.
Comments Due: 5 p.m. ET 6/24/19.
Docket Numbers: ER19-2040-000.
Applicants: Energia Sierra Juarez U.S., LLC.
[[Page 27106]]
Description: Compliance filing: Energia Sierra Juarez U.S., LLC
Compliance Filing to be effective 5/28/2019.
Filed Date: 6/3/19.
Accession Number: 20190603-5157.
Comments Due: 5 p.m. ET 6/24/19.
Docket Numbers: ER19-2043-000.
Applicants: PJM Interconnection, L.L.C.
Description: Sec. 205(d) Rate Filing: Original WMPA, SA No. 5415;
Queue No. AD2-215 to be effective 5/7/2019.
Filed Date: 6/4/19.
Accession Number: 20190604-5043.
Comments Due: 5 p.m. ET 6/25/19.
Docket Numbers: ER19-2044-000.
Applicants: Southern California Edison Company.
Description: Sec. 205(d) Rate Filing: Letter Agreement Baldy Mesa
Project SA No. 234 to be effective 5/24/2019.
Filed Date: 6/4/19.
Accession Number: 20190604-5046.
Comments Due: 5 p.m. ET 6/25/19.
Docket Numbers: ER19-2045-000.
Applicants: Midcontinent Independent System Operator Inc.
Description: Sec. 205(d) Rate Filing: 2019-06-04_SA 3310 NSPM-GRE
T-T (Moon Lake) to be effective 7/1/2019.
Filed Date: 6/4/19.
Accession Number: 20190604-5077.
Comments Due: 5 p.m. ET 6/25/19.
Docket Numbers: ER19-2046-000.
Applicants: NSTAR Electric Company.
Description: Notice of Termination of Interconnection and Operation
Agreement (Rates Schedule No. 195) of NSTAR Electric Company.
Filed Date: 6/4/19.
Accession Number: 20190604-5088.
Comments Due: 5 p.m. ET 6/25/19.
The filings are accessible in the Commission's eLibrary system by
clicking on the links or querying the docket number.
Any person desiring to intervene or protest in any of the above
proceedings must file in accordance with Rules 211 and 214 of the
Commission's Regulations (18 CFR 385.211 and 385.214) on or before 5:00
p.m. Eastern time on the specified comment date. Protests may be
considered, but intervention is necessary to become a party to the
proceeding.
eFiling is encouraged. More detailed information relating to filing
requirements, interventions, protests, service, and qualifying
facilities filings can be found at: https://www.ferc.gov/docs-filing/efiling/filing-req.pdf. For other information, call (866) 208-3676
(toll free). For TTY, call (202) 502-8659.
Dated: June 4, 2019.
Kimberly D. Bose,
Secretary.
[FR Doc. 2019-12201 Filed 6-10-19; 8:45 am]
BILLING CODE 6717-01-P