Oregon State University; Notice of Application Tendered for Filing With the Commission, 27104 [2019-12199]

Download as PDF 27104 Federal Register / Vol. 84, No. 112 / Tuesday, June 11, 2019 / Notices Confidential Business Information Pursuant to 10 CFR 1004.11, any person submitting information that he or she believes to be confidential and exempt by law from public disclosure should submit via email two well marked copies: One copy of the document marked ‘‘confidential’’ including all the information believed to be confidential, and one copy of the document marked ‘‘non-confidential’’ with the information believed to be confidential deleted. DOE will make its own determination about the confidential status of the information and treat it according to its determination. Factors of interest to DOE when evaluating requests to treat submitted information as confidential include: (1) A description of the items, (2) whether and why such items are customarily treated as confidential within the industry, (3) whether the information is generally known by or available from other sources, (4) whether the information has previously been made available to others without obligation concerning its confidentiality, (5) an explanation of the competitive injury to the submitting person that would result from public disclosure, (6) when such information might lose its confidential character due to the passage of time, and (7) why disclosure of the information would be contrary to the public interest. Signed in Washington, DC, on May 30, 2019. Alejandro Moreno, Director, Water Power Technology Office. [FR Doc. 2019–12262 Filed 6–10–19; 8:45 am] BILLING CODE 6450–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 14616–001] khammond on DSKBBV9HB2PROD with NOTICES Oregon State University; Notice of Application Tendered for Filing With the Commission Take notice that the following hydroelectric application has been filed with the Commission and is available for public inspection. a. Type of Application: Original License for Major Unconstructed Project. b. Project No.: 14616–001. c. Date filed: May 31, 2019. d. Applicant: Oregon State University. e. Name of Project: PacWave South Project. f. Location: On the Pacific Ocean 6 nautical miles off the central Oregon VerDate Sep<11>2014 17:36 Jun 10, 2019 Jkt 247001 coast near the city of Newport, in Lincoln County, Oregon. The project occupies 1,695 acres of United States submerged lands on the Outer Continental Shelf administered by the Bureau of Ocean Energy Management. g. Filed Pursuant to: Federal Power Act 16 U.S.C. 791 (a)–825(r). h. Applicant Contact: Cherise Gaffney, Stoel Rives LLP, 600 University St, Suite 3600, Seattle, WA 98101; (206) 386–7622; or email at cherise.gaffney@ stoel.com. i. FERC Contact: Jim Hastreiter at (503) 552–2760; or email at james.hastreiter@ferc.gov. j. The application is not ready for environmental analysis at this time. k. The proposed PacWave South Project would consist of: (1) Four offshore test berths; (2) a maximum of 20 wave energy conversion (WEC) devices with a maximum total installed capacity of 20 megawatts; (3) various WEC devices including point absorbers, oscillating water column, overtopping, attenuator, and ‘‘other’’ types that utilize a combination of technology designs; (4) various anchoring systems including gravity based anchors, drag anchors, and embedment anchors, consisting of steel, concrete, or a mixture of steel and concrete; (5) singleor 3-point mooring systems consisting of chain, steel cables, or synthetic materials; (6) mooring infrastructure including surface buoys, subsurface floats, and chain, wire or rope, as catenary, tendon or bridle lines; (7) subsea connectors; (8) five buried 8.3mile-long subsea transmission cables converging in a nearshore conduit; (9) up to five onshore 10-foot by 10-foot by 10-foot cable splice vaults (beach manholes), where the subsea cables would transition to terrestrial cables; (10) five buried 0.5-mile-long subterranean transmission cables connecting to a power monitoring and conditioning facility; (11) gridinterconnection at Central Lincoln Public Utility District substation; and (12) appurtenant facilities. l. A copy of the application is available for review at the Commission in the Public Reference Room or may be viewed on the Commission’s website at https://www.ferc.gov using the ‘‘eLibrary’’ link. Enter the docket number excluding the last three digits in the docket number field to access the document. For assistance, contact FERC Online Support. A copy is also available for inspection and reproduction at the address in item h above. You may also register online at https:// www.ferc.gov/docs-filing/ esubscription.asp to be notified via email of new filings and issuances PO 00000 Frm 00030 Fmt 4703 Sfmt 4703 related to this or other pending projects. For assistance, contact FERC Online Support. m. Procedural schedule: The application will be processed according to the following preliminary Hydro Licensing Schedule. Revisions to the schedule will be made as appropriate. Issue Notice of Application Tendered: June 2019. Issue Notice of Application Acceptance and Soliciting Final Terms and Conditions: August 2019. Commission issues EA: December 2019. Dated: June 4, 2019. Kimberly D. Bose, Secretary. [FR Doc. 2019–12199 Filed 6–10–19; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Combined Notice of Filings #1 June 5, 2019. Take notice that the Commission received the following electric corporate filings: Docket Numbers: EC19–100–000. Applicants: Tucson Electric Power Company. Description: Application for Authorization Under Section 203 of the Federal Power Act, et al. of Tucson Electric Power Company. Filed Date: 6/5/19. Accession Number: 20190605–5107. Comments Due: 5 p.m. ET 6/26/19. Take notice that the Commission received the following electric rate filings: Docket Numbers: ER19–1405–001. Applicants: Precept Power LLC. Description: Supplement to May 6, 2019 Precept Power LLC tariff filing. Filed Date: 6/5/19. Accession Number: 20190605–5105. Comments Due: 5 p.m. ET 6/17/19. Docket Numbers: ER19–2047–000. Applicants: Alabama Power Company. Description: § 205(d) Rate Filing: Georgia SNF Development 1 Amended and Restated LGIA Filing to be effective 5/16/2019. Filed Date: 6/4/19. Accession Number: 20190604–5112. Comments Due: 5 p.m. ET 6/25/19. Docket Numbers: ER19–2048–000. Applicants: PJM Interconnection, L.L.C. Description: § 205(d) Rate Filing: Original WMPA SA No. 5318; Queue AD2–164 to be effective 5/6/2019. E:\FR\FM\11JNN1.SGM 11JNN1

Agencies

[Federal Register Volume 84, Number 112 (Tuesday, June 11, 2019)]
[Notices]
[Page 27104]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2019-12199]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Project No. 14616-001]


Oregon State University; Notice of Application Tendered for 
Filing With the Commission

    Take notice that the following hydroelectric application has been 
filed with the Commission and is available for public inspection.
    a. Type of Application: Original License for Major Unconstructed 
Project.
    b. Project No.: 14616-001.
    c. Date filed: May 31, 2019.
    d. Applicant: Oregon State University.
    e. Name of Project: PacWave South Project.
    f. Location: On the Pacific Ocean 6 nautical miles off the central 
Oregon coast near the city of Newport, in Lincoln County, Oregon. The 
project occupies 1,695 acres of United States submerged lands on the 
Outer Continental Shelf administered by the Bureau of Ocean Energy 
Management.
    g. Filed Pursuant to: Federal Power Act 16 U.S.C. 791 (a)-825(r).
    h. Applicant Contact: Cherise Gaffney, Stoel Rives LLP, 600 
University St, Suite 3600, Seattle, WA 98101; (206) 386-7622; or email 
at [email protected].
    i. FERC Contact: Jim Hastreiter at (503) 552-2760; or email at 
[email protected].
    j. The application is not ready for environmental analysis at this 
time.
    k. The proposed PacWave South Project would consist of: (1) Four 
offshore test berths; (2) a maximum of 20 wave energy conversion (WEC) 
devices with a maximum total installed capacity of 20 megawatts; (3) 
various WEC devices including point absorbers, oscillating water 
column, overtopping, attenuator, and ``other'' types that utilize a 
combination of technology designs; (4) various anchoring systems 
including gravity based anchors, drag anchors, and embedment anchors, 
consisting of steel, concrete, or a mixture of steel and concrete; (5) 
single- or 3-point mooring systems consisting of chain, steel cables, 
or synthetic materials; (6) mooring infrastructure including surface 
buoys, subsurface floats, and chain, wire or rope, as catenary, tendon 
or bridle lines; (7) subsea connectors; (8) five buried 8.3-mile-long 
subsea transmission cables converging in a nearshore conduit; (9) up to 
five onshore 10-foot by 10-foot by 10-foot cable splice vaults (beach 
manholes), where the subsea cables would transition to terrestrial 
cables; (10) five buried 0.5-mile-long subterranean transmission cables 
connecting to a power monitoring and conditioning facility; (11) grid-
interconnection at Central Lincoln Public Utility District substation; 
and (12) appurtenant facilities.
    l. A copy of the application is available for review at the 
Commission in the Public Reference Room or may be viewed on the 
Commission's website at https://www.ferc.gov using the ``eLibrary'' 
link. Enter the docket number excluding the last three digits in the 
docket number field to access the document. For assistance, contact 
FERC Online Support. A copy is also available for inspection and 
reproduction at the address in item h above.
    You may also register online at https://www.ferc.gov/docs-filing/esubscription.asp to be notified via email of new filings and issuances 
related to this or other pending projects. For assistance, contact FERC 
Online Support.
    m. Procedural schedule: The application will be processed according 
to the following preliminary Hydro Licensing Schedule. Revisions to the 
schedule will be made as appropriate.
    Issue Notice of Application Tendered: June 2019.
    Issue Notice of Application Acceptance and Soliciting Final Terms 
and Conditions: August 2019.
    Commission issues EA: December 2019.

    Dated: June 4, 2019.
Kimberly D. Bose,
Secretary.
[FR Doc. 2019-12199 Filed 6-10-19; 8:45 am]
 BILLING CODE 6717-01-P