Combined Notice of Filings, 26668-26671 [2019-12049]

Download as PDF 26668 Federal Register / Vol. 84, No. 110 / Friday, June 7, 2019 / Notices notification of these filings, document summaries, and direct links to the documents. Go to www.ferc.gov/docsfiling/esubscription.asp. Additional information about the Project is available from the Commission’s Office of External Affairs at (866) 208–FERC or on the FERC website (www.ferc.gov). Using the ‘‘eLibrary’’ link, select ‘‘General Search’’ from the eLibrary menu, enter the selected date range and ‘‘Docket Number’’ excluding the last three digits (i.e., CP19–125), and follow the instructions. For assistance with access to eLibrary, the helpline can be reached at (866) 208–3676, TTY (202) 502–8659, or at FERCOnlineSupport@ferc.gov. The eLibrary link on the FERC website also provides access to the texts of formal documents issued by the Commission, such as orders, notices, and rule makings. Dated: June 3, 2019. Kimberly D. Bose, Secretary. [FR Doc. 2019–12050 Filed 6–6–19; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Combined Notice of Filings jbell on DSK3GLQ082PROD with NOTICES Take notice that the Commission has received the following Natural Gas Pipeline Rate and Refund Report filings: Filings Instituting Proceedings Docket Number: PR19–61–000. Applicants: Louisville Gas and Electric Company. Description: Tariff filing per 284.123(b),(e)/: Revised Statement of Operating Conditions to be effective 5/1/2019. Filed Date: 5/23/19. Accession Number: 201905235129. Comments/Protests Due: 5 p.m. ET 6/13/19. Docket Number: PR19–62–000. Applicants: Columbia Gas of Maryland, Inc. Description: Tariff filing per 284.123(b),(e)/: CMD Rates effective May 8 2019. Filed Date: 5/28/19. Accession Number: 201905285101. Comments/Protests Due: 5 p.m. ET 6/18/19. Docket Number: PR19–63–000. Applicants: Centana Intrastate Pipeline, LLC. Description: Tariff filing per 284.123(b),(e)/: CIPCO SOC Nomination Time Change Filing to be effective 4/1/2016. VerDate Sep<11>2014 18:13 Jun 06, 2019 Jkt 247001 Filed Date: 5/30/19. Accession Number: 201905305221. Comments/Protests Due: 5 p.m. ET 6/13/19. Docket Number: PR19–64–000. Applicants: Southern California Gas Company. Description: Tariff filing per 284.123(b),(e)+(g): Offshore_Delivery_ Service_Rate_Revision_May_2019 to be effective 5/1/2019. Filed Date: 5/30/19. Accession Number: 201905305300. Comments Due: 5 p.m. ET 6/20/19. 284.123(g) Protests Due: 5 p.m. ET 7/29/19. Docket Numbers: RP19–1195–001. Applicants: Texas Gas Transmission, LLC. Description: Texas Gas Transmission, LLC submits tariff filing per 154.205(b): Amendment to RP19–1195 to be effective 5/1/2019 under RP19–1195. Filed Date: 05/30/2019. Accession Number: 20190530–5166. Comment Date: 5:00 p.m. ET 6/11/19. Docket Numbers: RP19–1248–000. Applicants: NEXUS Gas Transmission, LLC. Description: NEXUS Gas Transmission, LLC submits tariff filing per 154.204: Negotiated Rates— Columbia Gas 860005 June 1 Releases to be effective 6/1/2019. Filed Date: 05/30/2019. Accession Number: 20190530–5005. Comment Date: 5:00 p.m. ET 6/11/19. Docket Numbers: RP19–1249–000. Applicants: Texas Eastern Transmission, LP. Description: Texas Eastern Transmission, LP submits tariff filing per 154.204: Negotiated Rates—MC Global 6–1–2019 Releases to be effective 6/1/2019. Filed Date: 05/30/2019. Accession Number: 20190530–5020. Comment Date: 5:00 p.m. ET 6/11/19. Docket Numbers: RP19–1250–000. Applicants: Texas Eastern Transmission, LP. Description: Texas Eastern Transmission, LP submits tariff filing per 154.204: Negotiated rate—Center point to Range 8957691 eff 6–1–19 to be effective 6/1/2019. Filed Date: 05/30/2019. Accession Number: 20190530–5021. Comment Date: 5:00 p.m. ET 6/11/19. Docket Numbers: RP19–1251–000. Applicants: Algonquin Gas Transmission, LLC. Description: Algonquin Gas Transmission, LLC submits tariff filing per 154.204: Negotitated Rate—NSTAR release to SFE Energy 799340 eff 6–1– 19 to be effective 6/1/2019. PO 00000 Frm 00028 Fmt 4703 Sfmt 4703 Filed Date: 05/30/2019. Accession Number: 20190530–5086. Comment Date: 5:00 p.m. ET 6/11/19. Docket Numbers: RP19–1252–000. Applicants: Transcontinental Gas Pipe Line Company, LLC. Description: Transcontinental Gas Pipe Line Company, LLC submits tariff filing per 154.204: Negotiated Rates— Cherokee AGL—Replacement Shippers—Jun 2019 to be effective 6/1/2019. Filed Date: 05/30/2019. Accession Number: 20190530–5122. Comment Date: 5:00 p.m. ET 6/11/19. Docket Numbers: RP19–1253–000. Applicants: Algonquin Gas Transmission, LLC. Description: Algonquin Gas Transmission, LLC submits tariff filing per 154.204: Negotiated Rate—Bay releases to BBPC eff 6–1–19 to be effective 6/1/2019. Filed Date: 05/30/2019. Accession Number: 20190530–5144. Comment Date: 5:00 p.m. ET 6/11/19. Docket Numbers: RP19–1254–000. Applicants: Northwest Pipeline LLC. Description: Northwest Pipeline LLC submits tariff filing per 154.204: Housekeeping 2019 Mid-Year to be effective 7/1/2019. Filed Date: 05/30/2019. Accession Number: 20190530–5167. Comment Date: 5:00 p.m. ET 6/11/19. Docket Numbers: RP19–1255–000. Applicants: TransColorado Gas Transmission Company LLC. Description: TransColorado Gas Transmission Company LLC submits tariff filing per 154.403(d)(2): Qrtly FLU Update to be effective 7/1/2019. Filed Date: 05/30/2019. Accession Number: 20190530–5178. Comment Date: 5:00 p.m. ET 6/11/19. Docket Numbers: RP19–1256–000. Applicants: Colorado Interstate Gas Company, L.L.C. Description: Colorado Interstate Gas Company, L.L.C. submits tariff filing per 154.403(d)(2): Quarterly LUF Update FIling to be effective 7/1/2019. Filed Date: 05/30/2019. Accession Number: 20190530–5196. Comment Date: 5:00 p.m. ET 6/11/19. Docket Numbers: RP19–1257–000. Applicants: Dauphin Island Gathering Partners. Description: Dauphin Island Gathering Partners submits tariff filing per 154.204: Negotiated Rate Filing WT 5–30–2019 to be effective 6/1/2019. Filed Date: 05/30/2019. Accession Number: 20190530–5214. Comment Date: 5:00 p.m. ET 6/11/19. Docket Numbers: RP19–1258–000. E:\FR\FM\07JNN1.SGM 07JNN1 jbell on DSK3GLQ082PROD with NOTICES Federal Register / Vol. 84, No. 110 / Friday, June 7, 2019 / Notices Applicants: Colorado Interstate Gas Company, L.L.C. Description: Colorado Interstate Gas Company, L.L.C. submits tariff filing per 154.204: Non-Conforming Agreement Filing—Black Hills NW Wyoming Gas Utility Co #214677 to be effective 7/1/ 2019 Filed Date: 05/30/2019. Accession Number: 20190530–5217. Comment Date: 5:00 p.m. ET 6/11/19. Docket Numbers: RP19–1259–000. Applicants: El Paso Natural Gas Company, L.L.C. Description: El Paso Natural Gas Company, L.L.C. submits tariff filing per 154.601: Negotiated Rate Agreement Update (APS June 2019) to be effective 6/1/2019. Filed Date: 05/30/2019. Accession Number: 20190530–5218. Comment Date: 5:00 p.m. ET 6/11/19. Docket Numbers: RP19–1260–000. Applicants: Eastern Shore Natural Gas Company. Description: Eastern Shore Natural Gas Company submits tariff filing per 154.204: Fuel Retention and Cash-Out Adjustment 2019 to be effective 7/1/2019. Filed Date: 05/30/2019. Accession Number: 20190530–5344. Comment Date: 5:00 p.m. ET 6/11/19. Docket Numbers: RP18–1167–003. Applicants: Equitrans, L.P. Description: Equitrans, L.P. submits tariff filing per 154.203: 2019 Settlement—Compliance Filing to be effective 6/1/2019. Filed Date: 05/31/2019. Accession Number: 20190531–5207. Comment Date: 5:00 p.m. ET 6/12/19. Docket Numbers: RP18–940–006. Applicants: Empire Pipeline, Inc. Description: Empire Pipeline, Inc. submits tariff filing per 154.203: Empire Rate Case Settlement Compliance Filing to be effective 7/3/2019. Filed Date: 05/31/2019. Accession Number: 20190531–5255. Comment Date: 5:00 p.m. ET 6/12/19. Docket Numbers: RP19–1261–000. Applicants: Equitrans, L.P. Description: Equitrans, L.P. submits tariff filing per 154.601: Negotiated Retainage Agreement 6–1–2019 to be effective 6/1/2019. Filed Date: 05/31/2019. Accession Number: 20190531–5033. Comment Date: 5:00 p.m. ET 6/12/19. Docket Numbers: RP19–1262–000. Applicants: Texas Eastern Transmission, LP. Description: Texas Eastern Transmission, LP submits tariff filing per 154.204: Negotiated Rate—Range to Castleton 8957873 eff 6–1–19 to be effective 6/1/2019. VerDate Sep<11>2014 18:13 Jun 06, 2019 Jkt 247001 Filed Date: 05/31/2019. Accession Number: 20190531–5048. Comment Date: 5:00 p.m. ET 6/12/19. Docket Numbers: RP19–1263–000. Applicants: Millennium Pipeline Company, LLC. Description: Millennium Pipeline Company, LLC submits tariff filing per 154.204: Negotiated Rate Amd—DTE to be effective 6/1/2019. Filed Date: 05/31/2019. Accession Number: 20190531–5073. Comment Date: 5:00 p.m. ET 6/12/19. Docket Numbers: RP19–1264–000. Applicants: Kinder Morgan Louisiana Pipeline LLC. Description: Kinder Morgan Louisiana Pipeline LLC submits tariff filing per 154.403(d)(2): Periodic Rate Adjustment—Fuel and Unaccounted for Gas Tracker to be effective 7/1/2019. Filed Date: 05/31/2019. Accession Number: 20190531–5074. Comment Date: 5:00 p.m. ET 6/12/19. Docket Numbers: RP19–1265–000. Applicants: MarkWest Pioneer, L.L.C. Description: MarkWest Pioneer, L.L.C. submits tariff filing per 154.403(d)(2): Quarterly Fuel Adjustment Filing to be effective 7/1/2019. Filed Date: 05/31/2019. Accession Number: 20190531–5098. Comment Date: 5:00 p.m. ET 6/12/19. Docket Numbers: RP19–1266–000. Applicants: NEXUS Gas Transmission, LLC. Description: NEXUS Gas Transmission, LLC submits tariff filing per 154.204: Negotitated Rate—CNX 860004 releases eff 6–1–19 to be effective 6/1/2019. Filed Date: 05/31/2019. Accession Number: 20190531–5138. Comment Date: 5:00 p.m. ET 6/12/19. Docket Numbers: RP19–1267–000. Applicants: Equitrans, L.P. Description: Equitrans, L.P. submits tariff filing per 154.204: Negotiated Rate Service Agreements 6–1–2019 to be effective 6/1/2019. Filed Date: 05/31/2019. Accession Number: 20190531–5142. Comment Date: 5:00 p.m. ET 6/12/19. Docket Numbers: RP19–1268–000. Applicants: NEXUS Gas Transmission, LLC. Description: NEXUS Gas Transmission, LLC submits tariff filing per 154.204: Negotiated Rate—BP Energy to BP Canada eff 6–1–19 to be effective 6/1/2019. Filed Date: 05/31/2019. Accession Number: 20190531–5162. Comment Date: 5:00 p.m. ET 6/12/19. Docket Numbers: RP19–1269–000. Applicants: Crossroads Pipeline Company. PO 00000 Frm 00029 Fmt 4703 Sfmt 4703 26669 Description: Crossroads Pipeline Company submits tariff filing per 154.204: PAL Housekeeping to be effective 7/1/2019. Filed Date: 05/31/2019. Accession Number: 20190531–5200. Comment Date: 5:00 p.m. ET 6/12/19. Docket Numbers: RP19–1270–000. Applicants: Cheniere Corpus Christi Pipeline, LP. Description: Cheniere Corpus Christi Pipeline, LP submits tariff filing per 154.204: EPC—Usage Clarification to be effective 7/1/2019. Filed Date: 05/31/2019. Accession Number: 20190531–5201. Comment Date: 5:00 p.m. ET 6/12/19. Docket Numbers: RP19–1271–000. Applicants: Gulf South Pipeline Company, LP. Description: Gulf South Pipeline Company, LP submits tariff filing per 154.204: Remove internet website Agreement Pro Forma From Tariff to be effective 7/1/2019. Filed Date: 05/31/2019. Accession Number: 20190531–5208. Comment Date: 5:00 p.m. ET 6/12/19. Docket Numbers: RP19–1272–000. Applicants: Gulf South Pipeline Company, LP. Description: Gulf South Pipeline Company, LP submits tariff filing per 154.204: Cap Rel Neg Rate Agmts (Atlanta Gas 8438 releases eff 6–1–2019) to be effective 6/1/2019. Filed Date: 05/31/2019. Accession Number: 20190531–5210. Comment Date: 5:00 p.m. ET 6/12/19. Docket Numbers: RP19–1273–000. Applicants: Gulf South Pipeline Company, LP. Description: Gulf South Pipeline Company, LP submits tariff filing per 154.204: Amendment & Cap Rel Neg Rate Agmts (Aethon 37657, 50488 to Scona 51155, 51160) to be effective 6/1/2019. Filed Date: 05/31/2019. Accession Number: 20190531–5211. Comment Date: 5:00 p.m. ET 6/12/19. Docket Numbers: RP19–1274–000. Applicants: Gulf South Pipeline Company, LP. Description: Gulf South Pipeline Company, LP submits tariff filing per 154.203: Compliance Rate Filing in Docket No. CP17–476–000 (Westlake Project) to be effective 8/1/2019. Filed Date: 05/31/2019. Accession Number: 20190531–5220. Comment Date: 5:00 p.m. ET 6/12/19. Docket Numbers: RP19–1275–000. Applicants: Gulf South Pipeline Company, LP. Description: Gulf South Pipeline Company, LP submits tariff filing per E:\FR\FM\07JNN1.SGM 07JNN1 jbell on DSK3GLQ082PROD with NOTICES 26670 Federal Register / Vol. 84, No. 110 / Friday, June 7, 2019 / Notices 154.203: Compliance Tariff Filing in Docket No. CP17–476–000 (Westlake Project) to be effective 8/1/2019. Filed Date: 05/31/2019. Accession Number: 20190531–5227. Comment Date: 5:00 p.m. ET 6/12/19. Docket Numbers: RP19–1276–000. Applicants: Equitrans, L.P. Description: Equitrans, L.P. submits tariff filing per 154.204: Equitrans’ Clean Up Filing—May 2019 to be effective 7/1/2019. Filed Date: 05/31/2019. Accession Number: 20190531–5231. Comment Date: 5:00 p.m. ET 6/12/19. Docket Numbers: RP19–1277–000. Applicants: Dauphin Island Gathering Partners. Description: Dauphin Island Gathering Partners submits tariff filing per 154.204: Tariff Sections Update— Contracts Consolidation to be effective 7/1/2019. Filed Date: 05/31/2019. Accession Number: 20190531–5281. Comment Date: 5:00 p.m. ET 6/12/19. Docket Numbers: RP19–1278–000. Applicants: North Baja Pipeline, LLC. Description: North Baja Pipeline, LLC submits tariff filing per 154.601: June Sempra Negotiated Rate Agreement to be effective 6/1/2019. Filed Date: 05/31/2019. Accession Number: 20190531–5253. Comment Date: 5:00 p.m. ET 6/12/19. Docket Numbers: RP19–1279–000. Applicants: Wyoming Interstate Company, L.L.C. Description: Wyoming Interstate Company, L.L.C. submits tariff filing per 154.601: Non-Conforming Agreement Update (CLFP) to be effective 7/1/2019. Filed Date: 05/31/2019. Accession Number: 20190531–5260. Comment Date: 5:00 p.m. ET 6/12/19. Docket Numbers: RP19–1280–000. Applicants: Algonquin Gas Transmission, LLC. Description: Algonquin Gas Transmission, LLC submits tariff filing per 154.204: Negotiated Rate—NSTAR to BPE 799380 eff 6–1–19 to be effective 6/1/2019. Filed Date: 05/31/2019. Accession Number: 20190531–5267. Comment Date: 5:00 p.m. ET 6/12/19. Docket Numbers: RP19–1281–000. Applicants: Cheyenne Plains Gas Pipeline Company, L.L.C. Description: Cheyenne Plains Gas Pipeline Company, L.L.C. submits tariff filing per 154.204: Billing and Payment Update to be effective 7/1/2019. Filed Date: 05/31/2019. Accession Number: 20190531–5342. Comment Date: 5:00 p.m. ET 6/12/19. Docket Numbers: RP19–1282–000. VerDate Sep<11>2014 18:13 Jun 06, 2019 Jkt 247001 Applicants: Colorado Interstate Gas Company, L.L.C. Description: Colorado Interstate Gas Company, L.L.C. submits tariff filing per 154.204: Billing and Payment Update Filing to be effective 7/1/2019. Filed Date: 05/31/2019. Accession Number: 20190531–5343. Comment Date: 5:00 p.m. ET 6/12/19. Docket Numbers: RP19–1283–000. Applicants: Ruby Pipeline, L.L.C. Description: Ruby Pipeline, L.L.C. submits tariff filing per 154.204: Billing and Payment Update to be effective 7/1/2019. Filed Date: 05/31/2019. Accession Number: 20190531–5344. Comment Date: 5:00 p.m. ET 6/12/19. Docket Numbers: RP19–1284–000. Applicants: Sierrita Gas Pipeline LLC. Description: Sierrita Gas Pipeline LLC submits tariff filing per 154.204: Billing and Payment Update to be effective 7/1/2019. Filed Date: 05/31/2019. Accession Number: 20190531–5346. Comment Date: 5:00 p.m. ET 6/12/19. Docket Numbers: RP19–1285–000. Applicants: TransColorado Gas Transmission Company LLC. Description: TransColorado Gas Transmission Company LLC submits tariff filing per 154.204: Billing and Payment Update and Housekeeping Filing to be effective 7/1/2019. Filed Date: 05/31/2019. Accession Number: 20190531–5364. Comment Date: 5:00 p.m. ET 6/12/19. Docket Numbers: RP19–1286–000. Applicants: Wyoming Interstate Company, L.L.C. Description: Wyoming Interstate Company, L.L.C. submits tariff filing per 154.204: Billing and Payment Update to be effective 7/1/2019. Filed Date: 05/31/2019. Accession Number: 20190531–5373. Comment Date: 5:00 p.m. ET 6/12/19. Docket Numbers: RP19–1287–000. Applicants: Young Gas Storage Company, Ltd. Description: Young Gas Storage Company, Ltd. submits tariff filing per 154.204: Billing and Payment Update to be effective 7/1/2019. Filed Date: 05/31/2019. Accession Number: 20190531–5376. Comment Date: 5:00 p.m. ET 6/12/19. Docket Numbers: RP19–1288–000. Applicants: Equitrans, L.P. Description: Equitrans, L.P. submits tariff filing per 154.601: Negotiated Rate Agreement—Revised Triad Hunter FTS Agreement to be effective 6/1/2019. Filed Date: 05/31/2019. Accession Number: 20190531–5422. Comment Date: 5:00 p.m. ET 6/12/19. PO 00000 Frm 00030 Fmt 4703 Sfmt 4703 Docket Numbers: RP19–1289–000. Applicants: Columbia Gas Transmission, LLC. Description: Columbia Gas Transmission, LLC submits tariff filing per 154.601: TCO June Negotiated Rate Agreements to be effective 6/1/2019. Filed Date: 05/31/2019. Accession Number: 20190531–5475. Comment Date: 5:00 p.m. ET 6/12/19. Docket Numbers: RP19–1290–000. Applicants: Columbia Gulf Transmission, LLC. Description: Columbia Gulf Transmission, LLC submits tariff filing per 154.601: June Negotiated Rate Agreement Filing to be effective 6/1/ 2019. Filed Date: 05/31/2019. Accession Number: 20190531–5477. Comment Date: 5:00 p.m. ET 6/12/19. Docket Numbers: RP19–1291–000. Applicants: Paiute Pipeline Company. Description: Paiute Pipeline Company submits tariff filing per 154.204: 2019 Rate Case to be effective 7/1/2019. Filed Date: 05/31/2019. Accession Number: 20190531–5486. Comment Date: 5:00 p.m. ET 6/12/19. Docket Numbers: RP19–1292–000. Applicants: Northern Natural Gas Company. Description: Northern Natural Gas Company submits tariff filing per 154.204: 20190531 Negotiated Rates to be effective 6/1/2019. Filed Date: 05/31/2019. Accession Number: 20190531–5488. Comment Date: 5:00 p.m. ET 6/12/19. Docket Numbers: RP19–352–001. Applicants: Sea Robin Pipeline Company, LLC. Description: Sea Robin Pipeline Company, LLC submits tariff filing per 154.206: RP19–352 Motion Rates into Effect to be effective 6/1/2019. Filed Date: 05/31/2019. Accession Number: 20190531–5118. Comment Date: 5:00 p.m. ET 6/12/19. The filings are accessible in the Commission’s eLibrary system by clicking on the links or querying the docket number. Any person desiring to intervene or protest in any of the above proceedings must file in accordance with Rules 211 and 214 of the Commission’s Regulations (18 CFR 385.211 and 385.214) on or before 5:00 p.m. Eastern time on the specified date(s). Protests may be considered, but intervention is necessary to become a party to the proceeding. eFiling is encouraged. More detailed information relating to filing requirements, interventions, protests, service, and qualifying facilities filings can be found at: https://www.ferc.gov/ E:\FR\FM\07JNN1.SGM 07JNN1 Federal Register / Vol. 84, No. 110 / Friday, June 7, 2019 / Notices docs-filing/efiling/filing-req.pdf. For other information, call (866) 208–3676 (toll free). For TTY, call (202) 502–8659. Dated: June 3, 2019. Nathaniel J. Davis, Sr., Deputy Secretary. [FR Doc. 2019–12049 Filed 6–6–19; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 7189–014] jbell on DSK3GLQ082PROD with NOTICES Notice of Intent To File License Application, Filing of Pre-Application Document (PAD), Denying Use of the Traditional Licensing Process, Commencement of Pre-Filing Process and Scoping; Request for Comments on the PAD and Scoping Document, and Identification of Issues and Associated Study Requests: Green Lake Water Power Company a. Type of Filing: Notice of Intent to File License Application for a Subsequent Minor License and Request to Use the Traditional Licensing Process. b. Project No.: 7189–014. c. Dated Filed: April 1, 2019. d. Submitted By: Green Lake Water Power Company (Green Lake Power). e. Name of Project: Green Lake Project. f. Location: On Green Lake and Reeds Brook near the City of Ellsworth, Hancock County, Maine. The project occupies approximately two acres of United States lands administered by the U.S. Fish and Wildlife Service’s Green Lake National Fish Hatchery. g. Filed Pursuant to: 18 CFR part 5 of the Commission’s Regulations. h. Potential Applicant Contact: Caroline Kleinschmidt, Green Lake Water Power Company, 120 Hatchery Way, Ellsworth, ME 04605; phone at (425) 553–6718, or email at caroline@greenlakewaterpower.com. i. FERC Contact: Dr. Nicholas Palso at (202) 502–8854 or email at nicholas .palso@ferc.gov. j. Cooperating agencies: Federal, state, local, and tribal agencies with jurisdiction and/or special expertise with respect to environmental issues that wish to cooperate in the preparation of the environmental document should follow the instructions for filing such requests described in item o below. Cooperating agencies should note the Commission’s policy that agencies that cooperate in the preparation of the environmental VerDate Sep<11>2014 18:13 Jun 06, 2019 Jkt 247001 document cannot also intervene. See 94 FERC ¶ 61,076 (2001). k. With this notice, we are initiating informal consultation with: (a) The U.S. Fish and Wildlife Service and/or NOAA Fisheries under section 7 of the Endangered Species Act and the joint agency regulations thereunder at 50 CFR part 402; (b) NOAA Fisheries under section 305(b) of the Magnuson-Stevens Fishery Conservation and Management Act and implementing regulations at 50 CFR 600.920; and (c) the Maine State Historic Preservation Officer, as required by section 106 of the National Historic Preservation Act and the implementing regulations of the Advisory Council on Historic Preservation at 36 CFR 800.2. l. With this notice, we are designating Green Lake Power as the Commission’s non-federal representative for carrying out informal consultation pursuant to section 7 of the Endangered Species Act, section 305(b) of the Magnuson-Stevens Fishery Conservation and Management Act, and section 106 of the National Historic Preservation Act. m. Green Lake Power filed with the Commission a Pre-Application Document (PAD; including a proposed process plan and schedule) and request to use the Traditional Licensing Process (TLP) on April 1, 2019. Green Lake Power provided public notice of its TLP request on March 28, 2019. In a letter dated May 31, 2019, the Director of the Division of Hydropower Licensing denied Green Lake Power’s request to use the TLP. Green Lake Power must use the Integrated Licensing Process to prepare a license application for the project. n. A copy of the PAD is available for review at the Commission in the Public Reference Room or may be viewed on the Commission’s website (https:// www.ferc.gov), using the ‘‘eLibrary’’ link. Enter the docket number, excluding the last three digits in the docket number field to access the document. For assistance, contact FERC Online Support at FERCOnlineSupport @ferc.gov, (866) 208–3676 (toll free), or (202) 502–8659 (TTY). A copy is also available for inspection and reproduction at the address in paragraph h. Register online at https://www.ferc .gov/docs-filing/esubscription.asp to be notified via email of new filing and issuances related to this or other pending projects. For assistance, contact FERC Online Support. o. With this notice, we are soliciting comments on the PAD and Commission staff’s Scoping Document 1 (SD1), as well as study requests. All comments on the PAD and SD1, and study requests PO 00000 Frm 00031 Fmt 4703 Sfmt 4703 26671 should be sent to the address above in paragraph h. In addition, all comments on the PAD and SD1, study requests, requests for cooperating agency status, and all communications to and from Commission staff related to the merits of the potential application must be filed with the Commission. The Commission strongly encourages electronic filing. Please file all documents using the Commission’s eFiling system at https://www.ferc.gov/ docs-filing/efiling.asp. Commenters can submit brief comments up to 6,000 characters, without prior registration, using the eComment system at https:// www.ferc.gov/docs-filing/ ecomment.asp. You must include your name and contact information at the end of your comments. For assistance, please contact FERC Online Support at FERCOnlineSupport@ferc.gov. In lieu of electronic filing, please send a paper copy to: Secretary, Federal Energy Regulatory Commission, 888 First Street NE, Washington, DC 20426. The first page of any filing should include docket number P–7189–014. All filings with the Commission must bear the appropriate heading: ‘‘Comments on Pre-Application Document,’’ ‘‘Study Requests,’’ ‘‘Comments on Scoping Document 1,’’ ‘‘Request for Cooperating Agency Status,’’ or ‘‘Communications to and from Commission Staff.’’ Any individual or entity interested in submitting study requests, commenting on the PAD or SD1, and any agency requesting cooperating status must do so within 60 days of the date of this notice. p. Although our current intent is to prepare an environmental assessment (EA), there is the possibility that an Environmental Impact Statement (EIS) will be required. The scoping process will satisfy the NEPA scoping requirements, irrespective of whether an EA or EIS is issued by the Commission. Scoping Meetings Commission staff will hold two scoping meetings in the vicinity of the project at the time and place noted below. The daytime meeting will focus on resource agency, Indian tribe, and non-governmental organization concerns, while the evening meeting is primarily for receiving input from the public. We invite all interested individuals, organizations, and agencies to attend one or both of the meetings, and to assist staff in identifying particular study needs, as well as the scope of environmental issues to be addressed in the environmental document. The times and locations of these meetings are as follows: E:\FR\FM\07JNN1.SGM 07JNN1

Agencies

[Federal Register Volume 84, Number 110 (Friday, June 7, 2019)]
[Notices]
[Pages 26668-26671]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2019-12049]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission


Combined Notice of Filings

    Take notice that the Commission has received the following Natural 
Gas Pipeline Rate and Refund Report filings:

Filings Instituting Proceedings

    Docket Number: PR19-61-000.
    Applicants: Louisville Gas and Electric Company.
    Description: Tariff filing per 284.123(b),(e)/: Revised Statement 
of Operating Conditions to be effective 5/1/2019.
    Filed Date: 5/23/19.
    Accession Number: 201905235129.
    Comments/Protests Due: 5 p.m. ET 6/13/19.

    Docket Number: PR19-62-000.
    Applicants: Columbia Gas of Maryland, Inc.
    Description: Tariff filing per 284.123(b),(e)/: CMD Rates effective 
May 8 2019.
    Filed Date: 5/28/19.
    Accession Number: 201905285101.
    Comments/Protests Due: 5 p.m. ET 6/18/19.

    Docket Number: PR19-63-000.
    Applicants: Centana Intrastate Pipeline, LLC.
    Description: Tariff filing per 284.123(b),(e)/: CIPCO SOC 
Nomination Time Change Filing to be effective 4/1/2016.
    Filed Date: 5/30/19.
    Accession Number: 201905305221.
    Comments/Protests Due: 5 p.m. ET 6/13/19.

    Docket Number: PR19-64-000.
    Applicants: Southern California Gas Company.
    Description: Tariff filing per 284.123(b),(e)+(g): 
Offshore_Delivery_Service_Rate_Revision_May_2019 to be effective 5/1/
2019.
    Filed Date: 5/30/19.
    Accession Number: 201905305300.
    Comments Due: 5 p.m. ET 6/20/19.
    284.123(g) Protests Due: 5 p.m. ET 7/29/19.

    Docket Numbers: RP19-1195-001.
    Applicants: Texas Gas Transmission, LLC.
    Description: Texas Gas Transmission, LLC submits tariff filing per 
154.205(b): Amendment to RP19-1195 to be effective 5/1/2019 under RP19-
1195.
    Filed Date: 05/30/2019.
    Accession Number: 20190530-5166.
    Comment Date: 5:00 p.m. ET 6/11/19.

    Docket Numbers: RP19-1248-000.
    Applicants: NEXUS Gas Transmission, LLC.
    Description: NEXUS Gas Transmission, LLC submits tariff filing per 
154.204: Negotiated Rates--Columbia Gas 860005 June 1 Releases to be 
effective 6/1/2019.
    Filed Date: 05/30/2019.
    Accession Number: 20190530-5005.
    Comment Date: 5:00 p.m. ET 6/11/19.

    Docket Numbers: RP19-1249-000.
    Applicants: Texas Eastern Transmission, LP.
    Description: Texas Eastern Transmission, LP submits tariff filing 
per 154.204: Negotiated Rates--MC Global 6-1-2019 Releases to be 
effective 6/1/2019.
    Filed Date: 05/30/2019.
    Accession Number: 20190530-5020.
    Comment Date: 5:00 p.m. ET 6/11/19.

    Docket Numbers: RP19-1250-000.
    Applicants: Texas Eastern Transmission, LP.
    Description: Texas Eastern Transmission, LP submits tariff filing 
per 154.204: Negotiated rate--Center point to Range 8957691 eff 6-1-19 
to be effective 6/1/2019.
    Filed Date: 05/30/2019.
    Accession Number: 20190530-5021.
    Comment Date: 5:00 p.m. ET 6/11/19.

    Docket Numbers: RP19-1251-000.
    Applicants: Algonquin Gas Transmission, LLC.
    Description: Algonquin Gas Transmission, LLC submits tariff filing 
per 154.204: Negotitated Rate--NSTAR release to SFE Energy 799340 eff 
6-1-19 to be effective 6/1/2019.
    Filed Date: 05/30/2019.
    Accession Number: 20190530-5086.
    Comment Date: 5:00 p.m. ET 6/11/19.

    Docket Numbers: RP19-1252-000.
    Applicants: Transcontinental Gas Pipe Line Company, LLC.
    Description: Transcontinental Gas Pipe Line Company, LLC submits 
tariff filing per 154.204: Negotiated Rates--Cherokee AGL--Replacement 
Shippers--Jun 2019 to be effective 6/1/2019.
    Filed Date: 05/30/2019.
    Accession Number: 20190530-5122.
    Comment Date: 5:00 p.m. ET 6/11/19.

    Docket Numbers: RP19-1253-000.
    Applicants: Algonquin Gas Transmission, LLC.
    Description: Algonquin Gas Transmission, LLC submits tariff filing 
per 154.204: Negotiated Rate--Bay releases to BBPC eff 6-1-19 to be 
effective 6/1/2019.
    Filed Date: 05/30/2019.
    Accession Number: 20190530-5144.
    Comment Date: 5:00 p.m. ET 6/11/19.

    Docket Numbers: RP19-1254-000.
    Applicants: Northwest Pipeline LLC.
    Description: Northwest Pipeline LLC submits tariff filing per 
154.204: Housekeeping 2019 Mid-Year to be effective 7/1/2019.
    Filed Date: 05/30/2019.
    Accession Number: 20190530-5167.
    Comment Date: 5:00 p.m. ET 6/11/19.

    Docket Numbers: RP19-1255-000.
    Applicants: TransColorado Gas Transmission Company LLC.
    Description: TransColorado Gas Transmission Company LLC submits 
tariff filing per 154.403(d)(2): Qrtly FLU Update to be effective 7/1/
2019.
    Filed Date: 05/30/2019.
    Accession Number: 20190530-5178.
    Comment Date: 5:00 p.m. ET 6/11/19.

    Docket Numbers: RP19-1256-000.
    Applicants: Colorado Interstate Gas Company, L.L.C.
    Description: Colorado Interstate Gas Company, L.L.C. submits tariff 
filing per 154.403(d)(2): Quarterly LUF Update FIling to be effective 
7/1/2019.
    Filed Date: 05/30/2019.
    Accession Number: 20190530-5196.
    Comment Date: 5:00 p.m. ET 6/11/19.

    Docket Numbers: RP19-1257-000.
    Applicants: Dauphin Island Gathering Partners.
    Description: Dauphin Island Gathering Partners submits tariff 
filing per 154.204: Negotiated Rate Filing WT 5-30-2019 to be effective 
6/1/2019.
    Filed Date: 05/30/2019.
    Accession Number: 20190530-5214.
    Comment Date: 5:00 p.m. ET 6/11/19.

    Docket Numbers: RP19-1258-000.

[[Page 26669]]

    Applicants: Colorado Interstate Gas Company, L.L.C.
    Description: Colorado Interstate Gas Company, L.L.C. submits tariff 
filing per 154.204: Non-Conforming Agreement Filing--Black Hills NW 
Wyoming Gas Utility Co #214677 to be effective 7/1/2019
    Filed Date: 05/30/2019.
    Accession Number: 20190530-5217.
    Comment Date: 5:00 p.m. ET 6/11/19.

    Docket Numbers: RP19-1259-000.
    Applicants: El Paso Natural Gas Company, L.L.C.
    Description: El Paso Natural Gas Company, L.L.C. submits tariff 
filing per 154.601: Negotiated Rate Agreement Update (APS June 2019) to 
be effective 6/1/2019.
    Filed Date: 05/30/2019.
    Accession Number: 20190530-5218.
    Comment Date: 5:00 p.m. ET 6/11/19.

    Docket Numbers: RP19-1260-000.
    Applicants: Eastern Shore Natural Gas Company.
    Description: Eastern Shore Natural Gas Company submits tariff 
filing per 154.204: Fuel Retention and Cash-Out Adjustment 2019 to be 
effective 7/1/2019.
    Filed Date: 05/30/2019.
    Accession Number: 20190530-5344.
    Comment Date: 5:00 p.m. ET 6/11/19.

    Docket Numbers: RP18-1167-003.
    Applicants: Equitrans, L.P.
    Description: Equitrans, L.P. submits tariff filing per 154.203: 
2019 Settlement--Compliance Filing to be effective 6/1/2019.
    Filed Date: 05/31/2019.
    Accession Number: 20190531-5207.
    Comment Date: 5:00 p.m. ET 6/12/19.

    Docket Numbers: RP18-940-006.
    Applicants: Empire Pipeline, Inc.
    Description: Empire Pipeline, Inc. submits tariff filing per 
154.203: Empire Rate Case Settlement Compliance Filing to be effective 
7/3/2019.
    Filed Date: 05/31/2019.
    Accession Number: 20190531-5255.
    Comment Date: 5:00 p.m. ET 6/12/19.

    Docket Numbers: RP19-1261-000.
    Applicants: Equitrans, L.P.
    Description: Equitrans, L.P. submits tariff filing per 154.601: 
Negotiated Retainage Agreement 6-1-2019 to be effective 6/1/2019.
    Filed Date: 05/31/2019.
    Accession Number: 20190531-5033.
    Comment Date: 5:00 p.m. ET 6/12/19.

    Docket Numbers: RP19-1262-000.
    Applicants: Texas Eastern Transmission, LP.
    Description: Texas Eastern Transmission, LP submits tariff filing 
per 154.204: Negotiated Rate--Range to Castleton 8957873 eff 6-1-19 to 
be effective 6/1/2019.
    Filed Date: 05/31/2019.
    Accession Number: 20190531-5048.
    Comment Date: 5:00 p.m. ET 6/12/19.

    Docket Numbers: RP19-1263-000.
    Applicants: Millennium Pipeline Company, LLC.
    Description: Millennium Pipeline Company, LLC submits tariff filing 
per 154.204: Negotiated Rate Amd--DTE to be effective 6/1/2019.
    Filed Date: 05/31/2019.
    Accession Number: 20190531-5073.
    Comment Date: 5:00 p.m. ET 6/12/19.

    Docket Numbers: RP19-1264-000.
    Applicants: Kinder Morgan Louisiana Pipeline LLC.
    Description: Kinder Morgan Louisiana Pipeline LLC submits tariff 
filing per 154.403(d)(2): Periodic Rate Adjustment--Fuel and 
Unaccounted for Gas Tracker to be effective 7/1/2019.
    Filed Date: 05/31/2019.
    Accession Number: 20190531-5074.
    Comment Date: 5:00 p.m. ET 6/12/19.

    Docket Numbers: RP19-1265-000.
    Applicants: MarkWest Pioneer, L.L.C.
    Description: MarkWest Pioneer, L.L.C. submits tariff filing per 
154.403(d)(2): Quarterly Fuel Adjustment Filing to be effective 7/1/
2019.
    Filed Date: 05/31/2019.
    Accession Number: 20190531-5098.
    Comment Date: 5:00 p.m. ET 6/12/19.

    Docket Numbers: RP19-1266-000.
    Applicants: NEXUS Gas Transmission, LLC.
    Description: NEXUS Gas Transmission, LLC submits tariff filing per 
154.204: Negotitated Rate--CNX 860004 releases eff 6-1-19 to be 
effective 6/1/2019.
    Filed Date: 05/31/2019.
    Accession Number: 20190531-5138.
    Comment Date: 5:00 p.m. ET 6/12/19.

    Docket Numbers: RP19-1267-000.
    Applicants: Equitrans, L.P.
    Description: Equitrans, L.P. submits tariff filing per 154.204: 
Negotiated Rate Service Agreements 6-1-2019 to be effective 6/1/2019.
    Filed Date: 05/31/2019.
    Accession Number: 20190531-5142.
    Comment Date: 5:00 p.m. ET 6/12/19.

    Docket Numbers: RP19-1268-000.
    Applicants: NEXUS Gas Transmission, LLC.
    Description: NEXUS Gas Transmission, LLC submits tariff filing per 
154.204: Negotiated Rate--BP Energy to BP Canada eff 6-1-19 to be 
effective 6/1/2019.
    Filed Date: 05/31/2019.
    Accession Number: 20190531-5162.
    Comment Date: 5:00 p.m. ET 6/12/19.

    Docket Numbers: RP19-1269-000.
    Applicants: Crossroads Pipeline Company.
    Description: Crossroads Pipeline Company submits tariff filing per 
154.204: PAL Housekeeping to be effective 7/1/2019.
    Filed Date: 05/31/2019.
    Accession Number: 20190531-5200.
    Comment Date: 5:00 p.m. ET 6/12/19.

    Docket Numbers: RP19-1270-000.
    Applicants: Cheniere Corpus Christi Pipeline, LP.
    Description: Cheniere Corpus Christi Pipeline, LP submits tariff 
filing per 154.204: EPC--Usage Clarification to be effective 7/1/2019.
    Filed Date: 05/31/2019.
    Accession Number: 20190531-5201.
    Comment Date: 5:00 p.m. ET 6/12/19.

    Docket Numbers: RP19-1271-000.
    Applicants: Gulf South Pipeline Company, LP.
    Description: Gulf South Pipeline Company, LP submits tariff filing 
per 154.204: Remove internet website Agreement Pro Forma From Tariff to 
be effective 7/1/2019.
    Filed Date: 05/31/2019.
    Accession Number: 20190531-5208.
    Comment Date: 5:00 p.m. ET 6/12/19.

    Docket Numbers: RP19-1272-000.
    Applicants: Gulf South Pipeline Company, LP.
    Description: Gulf South Pipeline Company, LP submits tariff filing 
per 154.204: Cap Rel Neg Rate Agmts (Atlanta Gas 8438 releases eff 6-1-
2019) to be effective 6/1/2019.
    Filed Date: 05/31/2019.
    Accession Number: 20190531-5210.
    Comment Date: 5:00 p.m. ET 6/12/19.

    Docket Numbers: RP19-1273-000.
    Applicants: Gulf South Pipeline Company, LP.
    Description: Gulf South Pipeline Company, LP submits tariff filing 
per 154.204: Amendment & Cap Rel Neg Rate Agmts (Aethon 37657, 50488 to 
Scona 51155, 51160) to be effective 6/1/2019.
    Filed Date: 05/31/2019.
    Accession Number: 20190531-5211.
    Comment Date: 5:00 p.m. ET 6/12/19.

    Docket Numbers: RP19-1274-000.
    Applicants: Gulf South Pipeline Company, LP.
    Description: Gulf South Pipeline Company, LP submits tariff filing 
per 154.203: Compliance Rate Filing in Docket No. CP17-476-000 
(Westlake Project) to be effective 8/1/2019.
    Filed Date: 05/31/2019.
    Accession Number: 20190531-5220.
    Comment Date: 5:00 p.m. ET 6/12/19.

    Docket Numbers: RP19-1275-000.
    Applicants: Gulf South Pipeline Company, LP.
    Description: Gulf South Pipeline Company, LP submits tariff filing 
per

[[Page 26670]]

154.203: Compliance Tariff Filing in Docket No. CP17-476-000 (Westlake 
Project) to be effective 8/1/2019.
    Filed Date: 05/31/2019.
    Accession Number: 20190531-5227.
    Comment Date: 5:00 p.m. ET 6/12/19.

    Docket Numbers: RP19-1276-000.
    Applicants: Equitrans, L.P.
    Description: Equitrans, L.P. submits tariff filing per 154.204: 
Equitrans' Clean Up Filing--May 2019 to be effective 7/1/2019.
    Filed Date: 05/31/2019.
    Accession Number: 20190531-5231.
    Comment Date: 5:00 p.m. ET 6/12/19.

    Docket Numbers: RP19-1277-000.
    Applicants: Dauphin Island Gathering Partners.
    Description: Dauphin Island Gathering Partners submits tariff 
filing per 154.204: Tariff Sections Update--Contracts Consolidation to 
be effective 7/1/2019.
    Filed Date: 05/31/2019.
    Accession Number: 20190531-5281.
    Comment Date: 5:00 p.m. ET 6/12/19.

    Docket Numbers: RP19-1278-000.
    Applicants: North Baja Pipeline, LLC.
    Description: North Baja Pipeline, LLC submits tariff filing per 
154.601: June Sempra Negotiated Rate Agreement to be effective 6/1/
2019.
    Filed Date: 05/31/2019.
    Accession Number: 20190531-5253.
    Comment Date: 5:00 p.m. ET 6/12/19.

    Docket Numbers: RP19-1279-000.
    Applicants: Wyoming Interstate Company, L.L.C.
    Description: Wyoming Interstate Company, L.L.C. submits tariff 
filing per 154.601: Non-Conforming Agreement Update (CLFP) to be 
effective 7/1/2019.
    Filed Date: 05/31/2019.
    Accession Number: 20190531-5260.
    Comment Date: 5:00 p.m. ET 6/12/19.

    Docket Numbers: RP19-1280-000.
    Applicants: Algonquin Gas Transmission, LLC.
    Description: Algonquin Gas Transmission, LLC submits tariff filing 
per 154.204: Negotiated Rate--NSTAR to BPE 799380 eff 6-1-19 to be 
effective 6/1/2019.
    Filed Date: 05/31/2019.
    Accession Number: 20190531-5267.
    Comment Date: 5:00 p.m. ET 6/12/19.

    Docket Numbers: RP19-1281-000.
    Applicants: Cheyenne Plains Gas Pipeline Company, L.L.C.
    Description: Cheyenne Plains Gas Pipeline Company, L.L.C. submits 
tariff filing per 154.204: Billing and Payment Update to be effective 
7/1/2019.
    Filed Date: 05/31/2019.
    Accession Number: 20190531-5342.
    Comment Date: 5:00 p.m. ET 6/12/19.

    Docket Numbers: RP19-1282-000.
    Applicants: Colorado Interstate Gas Company, L.L.C.
    Description: Colorado Interstate Gas Company, L.L.C. submits tariff 
filing per 154.204: Billing and Payment Update Filing to be effective 
7/1/2019.
    Filed Date: 05/31/2019.
    Accession Number: 20190531-5343.
    Comment Date: 5:00 p.m. ET 6/12/19.

    Docket Numbers: RP19-1283-000.
    Applicants: Ruby Pipeline, L.L.C.
    Description: Ruby Pipeline, L.L.C. submits tariff filing per 
154.204: Billing and Payment Update to be effective 7/1/2019.
    Filed Date: 05/31/2019.
    Accession Number: 20190531-5344.
    Comment Date: 5:00 p.m. ET 6/12/19.

    Docket Numbers: RP19-1284-000.
    Applicants: Sierrita Gas Pipeline LLC.
    Description: Sierrita Gas Pipeline LLC submits tariff filing per 
154.204: Billing and Payment Update to be effective 7/1/2019.
    Filed Date: 05/31/2019.
    Accession Number: 20190531-5346.
    Comment Date: 5:00 p.m. ET 6/12/19.

    Docket Numbers: RP19-1285-000.
    Applicants: TransColorado Gas Transmission Company LLC.
    Description: TransColorado Gas Transmission Company LLC submits 
tariff filing per 154.204: Billing and Payment Update and Housekeeping 
Filing to be effective 7/1/2019.
    Filed Date: 05/31/2019.
    Accession Number: 20190531-5364.
    Comment Date: 5:00 p.m. ET 6/12/19.

    Docket Numbers: RP19-1286-000.
    Applicants: Wyoming Interstate Company, L.L.C.
    Description: Wyoming Interstate Company, L.L.C. submits tariff 
filing per 154.204: Billing and Payment Update to be effective 7/1/
2019.
    Filed Date: 05/31/2019.
    Accession Number: 20190531-5373.
    Comment Date: 5:00 p.m. ET 6/12/19.

    Docket Numbers: RP19-1287-000.
    Applicants: Young Gas Storage Company, Ltd.
    Description: Young Gas Storage Company, Ltd. submits tariff filing 
per 154.204: Billing and Payment Update to be effective 7/1/2019.
    Filed Date: 05/31/2019.
    Accession Number: 20190531-5376.
    Comment Date: 5:00 p.m. ET 6/12/19.

    Docket Numbers: RP19-1288-000.
    Applicants: Equitrans, L.P.
    Description: Equitrans, L.P. submits tariff filing per 154.601: 
Negotiated Rate Agreement--Revised Triad Hunter FTS Agreement to be 
effective 6/1/2019.
    Filed Date: 05/31/2019.
    Accession Number: 20190531-5422.
    Comment Date: 5:00 p.m. ET 6/12/19.

    Docket Numbers: RP19-1289-000.
    Applicants: Columbia Gas Transmission, LLC.
    Description: Columbia Gas Transmission, LLC submits tariff filing 
per 154.601: TCO June Negotiated Rate Agreements to be effective 6/1/
2019.
    Filed Date: 05/31/2019.
    Accession Number: 20190531-5475.
    Comment Date: 5:00 p.m. ET 6/12/19.

    Docket Numbers: RP19-1290-000.
    Applicants: Columbia Gulf Transmission, LLC.
    Description: Columbia Gulf Transmission, LLC submits tariff filing 
per 154.601: June Negotiated Rate Agreement Filing to be effective 6/1/
2019.
    Filed Date: 05/31/2019.
    Accession Number: 20190531-5477.
    Comment Date: 5:00 p.m. ET 6/12/19.

    Docket Numbers: RP19-1291-000.
    Applicants: Paiute Pipeline Company.
    Description: Paiute Pipeline Company submits tariff filing per 
154.204: 2019 Rate Case to be effective 7/1/2019.
    Filed Date: 05/31/2019.
    Accession Number: 20190531-5486.
    Comment Date: 5:00 p.m. ET 6/12/19.

    Docket Numbers: RP19-1292-000.
    Applicants: Northern Natural Gas Company.
    Description: Northern Natural Gas Company submits tariff filing per 
154.204: 20190531 Negotiated Rates to be effective 6/1/2019.
    Filed Date: 05/31/2019.
    Accession Number: 20190531-5488.
    Comment Date: 5:00 p.m. ET 6/12/19.

    Docket Numbers: RP19-352-001.
    Applicants: Sea Robin Pipeline Company, LLC.
    Description: Sea Robin Pipeline Company, LLC submits tariff filing 
per 154.206: RP19-352 Motion Rates into Effect to be effective 6/1/
2019.
    Filed Date: 05/31/2019.
    Accession Number: 20190531-5118.
    Comment Date: 5:00 p.m. ET 6/12/19.

    The filings are accessible in the Commission's eLibrary system by 
clicking on the links or querying the docket number.
    Any person desiring to intervene or protest in any of the above 
proceedings must file in accordance with Rules 211 and 214 of the 
Commission's Regulations (18 CFR 385.211 and 385.214) on or before 5:00 
p.m. Eastern time on the specified date(s). Protests may be considered, 
but intervention is necessary to become a party to the proceeding.
    eFiling is encouraged. More detailed information relating to filing 
requirements, interventions, protests, service, and qualifying 
facilities filings can be found at: https://www.ferc.gov/

[[Page 26671]]

docs-filing/efiling/filing-req.pdf. For other information, call (866) 
208-3676 (toll free). For TTY, call (202) 502-8659.

    Dated: June 3, 2019.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2019-12049 Filed 6-6-19; 8:45 am]
 BILLING CODE 6717-01-P
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.