PacifiCorp; Notice of Intent To File License Application, Filing of Pre-Application Document (Pad), Commencement of Pre-Filing Process, and Scoping; Request for Comments on the Pad and Scoping Document, and Identification of Issues and Associated Study Requests, 25801-25802 [2019-11594]
Download as PDF
Federal Register / Vol. 84, No. 107 / Tuesday, June 4, 2019 / Notices
appropriate action to be taken, but will
not serve to make protestants parties to
the proceeding. Any person wishing to
become a party must file a notice of
intervention or motion to intervene, as
appropriate. The Respondent’s answer
and all interventions, or protests must
be filed on or before the comment date.
The Respondent’s answer, motions to
intervene, and protests must be served
on the Complainants.
The Commission encourages
electronic submission of protests and
interventions in lieu of paper using the
‘‘eFiling’’ link at https://www.ferc.gov.
Persons unable to file electronically
should submit an original and 5 copies
of the protest or intervention to the
Federal Energy Regulatory Commission,
888 First Street NE, Washington, DC
20426.
This filing is accessible on-line at
https://www.ferc.gov, using the
‘‘eLibrary’’ link and is available for
electronic review in the Commission’s
Public Reference Room in Washington,
DC. There is an ‘‘eSubscription’’ link on
the website that enables subscribers to
receive email notification when a
document is added to a subscribed
docket(s). For assistance with any FERC
Online service, please email
FERCOnlineSupport@ferc.gov, or call
(866) 208–3676 (toll free). For TTY, call
(202) 502–8659.
Comment Date: 5 p.m. Eastern Time
on June 13, 2019.
Dated: May 28, 2019.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2019–11591 Filed 6–3–19; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 2420–054]
khammond on DSKBBV9HB2PROD with NOTICES
PacifiCorp; Notice of Intent To File
License Application, Filing of PreApplication Document (Pad),
Commencement of Pre-Filing Process,
and Scoping; Request for Comments
on the Pad and Scoping Document,
and Identification of Issues and
Associated Study Requests
a. Type of Filing: Notice of Intent to
File License Application for a New
License and Commencing Pre-filing
Process.
b. Project No.: 2420–054.
c. Dated Filed: March 29, 2019.
d. Submitted By: PacifiCorp.
e. Name of Project: Cutler
Hydroelectric Project.
VerDate Sep<11>2014
17:16 Jun 03, 2019
Jkt 247001
f. Location: On the Bear River near the
city of Logan in Box Elder and Cache
counties in Utah. The project does not
occupy any federal lands.
g. Filed Pursuant to: 18 CFR part 5 of
the Commission’s Regulations.
h. Potential Applicant Contact: Eva
Davies, Cutler Licensing Project
Manager, PacifiCorp, 1407 West North
Temple, Room 210, Salt Lake City, Utah
84115.
i. FERC Contact: Khatoon Melick at
(202) 502–8433 or email at:
Khatoon.melick@ferc.gov.
j. Cooperating agencies: Federal, state,
local, and tribal agencies with
jurisdiction and/or special expertise
with respect to environmental issues
that wish to cooperate in the
preparation of the environmental
document should follow the
instructions for filing such requests
described in item o below. Cooperating
agencies should note the Commission’s
policy that agencies that cooperate in
the preparation of the environmental
document cannot also intervene. See 94
FERC ¶ 61,076 (2001).
k. With this notice, we are initiating
informal consultation with: (a) The U.S.
Fish and Wildlife Service and/or NOAA
Fisheries under section 7 of the
Endangered Species Act and the joint
agency regulations thereunder at 50
CFR, Part 402 and (b) the State Historic
Preservation Officer, as required by
section 106, National Historic
Preservation Act, and the implementing
regulations of the Advisory Council on
Historic Preservation at 36 CFR 800.2.
l. With this notice, we are designating
PacifiCorp as the Commission’s nonfederal representative for carrying out
informal consultation, pursuant to
section 7 of the Endangered Species Act
and section 106 of the National Historic
Preservation Act.
m. PacifiCorp filed with the
Commission a Pre-Application
Document (PAD; including a proposed
process plan and schedule), pursuant to
18 CFR 5.6 of the Commission’s
regulations.
n. A copy of the PAD is available for
review at the Commission in the Public
Reference Room or may be viewed on
the Commission’s website (https://
www.ferc.gov), using the ‘‘eLibrary’’
link. Enter the docket number,
excluding the last three digits in the
docket number field to access the
document. For assistance, contact FERC
Online Support at
FERCONlineSupport@ferc.gov, (866)
208–3676 (toll free), or (202) 502–8659
(TTY). A copy is also available for
download on PacifiCorp’s project
relicensing website at: https://
PO 00000
Frm 00072
Fmt 4703
Sfmt 4703
25801
www.pacificorp.com/es/hydro/hl/cutler/
index.html.
o. Register online at https://
www.ferc.gov/docs-filing/
esubscription.asp to be notified via
email of new filing and issuances
related to this or other pending projects.
For assistance, contact FERC Online
Support.
p. With this notice, we are soliciting
comments on the PAD and
Commission’s staff Scoping Document 1
(SD1), as well as study requests. All
comments on the PAD and SD1, and
study requests should be sent to the
address above in paragraph h. In
addition, all comments on the PAD and
SD1, study requests, requests for
cooperating agency status, and all
communications to and from
Commission staff related to the merits of
the potential application must be filed
with the Commission.
The Commission strongly encourages
electronic filing. Please file all
documents using the Commission’s
eFiling system at https://www.ferc.gov/
docs-filing/efiling.asp. Commenters can
submit brief comments up to 6,000
characters, without prior registration,
using the eComment system at https://
www.ferc.gov/docs-filing/
ecomment.asp. You must include your
name and contact information at the end
of your comments. For assistance,
please contact FERC Online Support at
FERCOnlineSupport@ferc.gov. In lieu of
electronic filing, you may send a paper
copy to: Secretary, Federal Energy
Regulatory Commission, 888 First Street
NE, Washington, DC 20426. The first
page of any filing should include docket
number P–2420–054.
All filings with the Commission must
bear the appropriate heading:
‘‘Comments on Pre-Application
Document,’’ ‘‘Study Requests,’’
‘‘Comments on Scoping Document 1,’’
‘‘Request for Cooperating Agency
Status,’’ or ‘‘Communications to and
from Commission Staff.’’ Any
individual or entity interested in
submitting study requests, commenting
on the PAD or SD1, and any agency
requesting cooperating status must do so
by July 29, 2019.
q. Although our current intent is to
prepare an environmental assessment
(EA), there is the possibility that an
Environmental Impact Statement (EIS)
will be required. Nevertheless, this
notice, associated scoping meeting, and
our scoping process will satisfy the
NEPA scoping requirements,
irrespective of whether an EA or EIS is
issued by the Commission.
E:\FR\FM\04JNN1.SGM
04JNN1
25802
Federal Register / Vol. 84, No. 107 / Tuesday, June 4, 2019 / Notices
Scoping Meetings
Commission staff will hold two
scoping meetings in the vicinity of the
project at the times and places noted
below. The daytime meeting will focus
on resource agency, Indian tribes, and
non-governmental organization
concerns, while the evening meeting is
primarily for receiving input from the
public. We invite all interested
individuals, organizations, and agencies
to attend one or both of the meetings,
and to assist staff in identifying
particular study needs, as well as the
scope of environmental issues to be
addressed in the environmental
document. The times and locations of
these meetings are as follows:
Daytime Scoping Meeting
Date and Time: Thursday, June 27,
2019 at 9:00 a.m.
Location: Riverwoods Conference
Center, 615 S Riverwoods Parkway,
Logan, UT 84321.
Phone Number: (435) 750–5151.
khammond on DSKBBV9HB2PROD with NOTICES
Evening Scoping Meeting
Date and Time: Thursday, June 27,
2019 at 7:00 p.m.
Location: Riverwoods Conference
Center, 615 S Riverwoods Parkway,
Logan, UT 84321.
Phone Number: (435) 750–5151.
SD1, which outlines the subject areas
to be addressed in the environmental
document, was mailed to the
individuals and entities on the
Commission’s mailing list. Copies of
SD1 will be available at the scoping
meetings, or may be viewed on the web
at https://www.ferc.gov, using the
‘‘eLibrary’’ link. Follow the directions
for accessing information in paragraph
n. Based on all oral and written
comments, a Scoping Document 2 (SD2)
may be issued. SD2 may include a
revised process plan and schedule, as
well as a list of issues, identified
through the scoping process.
Environmental Site Review
The potential applicant and
Commission staff will conduct an
Environmental Site Review of the
project on Wednesday, June 26, 2019,
starting at 9:00 a.m. All participants
should meet at Cutler Marsh Marina
recreation site—also known as Valley
View Marina—located on the west side
of Cutler Reservoir on Highway 30, just
west of the Highway 30 bridge over the
reservoir. Driving directions: Starting at
L.W.’s Truck Stop in Logan, Utah
(southwest corner of 1000 W and 200
N), drive west on Highway 30 (also 200
N) approximately 5 miles. After crossing
Cutler Reservoir, the Cutler Marsh
Marina Recreation Site will be on the
VerDate Sep<11>2014
17:16 Jun 03, 2019
Jkt 247001
south side of the highway; turn left from
the highway into the gravel parking lot.
All participants are responsible for their
own transportation. Recommended gear:
Closed toe shoes, good for walking 1–2
miles in, hat, sunscreen, water bottle,
binoculars (optional, for wildlife
viewing). Anyone with questions about
the site visit should contact Ms. Miriam
Hugentobler with PacifiCorp at: (801)
652–8983. Lunch and extra water will
be provided by PacifiCorp. For lunch
RSVPs please contact Ms. Miriam
Hugentobler at (801) 652–8983 or email
her at: cutlerlicense@gmail.com.
Meeting Objectives
At the scoping meetings, staff will: (1)
Initiate scoping of the issues; (2) review
and discuss existing conditions and
resource management objectives; (3)
review and discuss existing information
and identify preliminary information
and study needs; (4) review and discuss
the process plan and schedule for prefiling activity that incorporates the time
frames provided for in Part 5 of the
Commission’s regulations and, to the
extent possible, maximizes coordination
of federal, state, and tribal permitting
and certification processes; and (5)
discuss the appropriateness of any
federal or state agency or Indian tribe
acting as a cooperating agency for
development of an environmental
document.
Meeting participants should come
prepared to discuss their issues and/or
concerns. Please review the PAD in
preparation for the scoping meetings.
Directions on how to obtain a copy of
the PAD and SD1 are included in item
n. of this document.
Meeting Procedures
The meetings will be recorded by a
stenographer and will be placed in the
public records of the project.
Dated: May 28, 2019.
Kimberly D. Bose,
Secretary.
[FR Doc. 2019–11594 Filed 6–3–19; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. ER19–1992–000]
RE Gaskell West 2 LLC; Supplemental
Notice That Initial Market-Based Rate
Filing Includes Request for Blanket
Section 204 Authorization
This is a supplemental notice in the
above-referenced proceeding of RE
Gaskell West 2 LLC’s application for
PO 00000
Frm 00073
Fmt 4703
Sfmt 4703
market-based rate authority, with an
accompanying rate tariff, noting that
such application includes a request for
blanket authorization, under 18 CFR
part 34, of future issuances of securities
and assumptions of liability.
Any person desiring to intervene or to
protest should file with the Federal
Energy Regulatory Commission, 888
First Street NE, Washington, DC 20426,
in accordance with Rules 211 and 214
of the Commission’s Rules of Practice
and Procedure (18 CFR 385.211 and
385.214). Anyone filing a motion to
intervene or protest must serve a copy
of that document on the Applicant.
Notice is hereby given that the
deadline for filing protests with regard
to the applicant’s request for blanket
authorization, under 18 CFR part 34, of
future issuances of securities and
assumptions of liability, is June 17,
2019.
The Commission encourages
electronic submission of protests and
interventions in lieu of paper, using the
FERC Online links at https://
www.ferc.gov. To facilitate electronic
service, persons with internet access
who will eFile a document and/or be
listed as a contact for an intervenor
must create and validate an
eRegistration account using the
eRegistration link. Select the eFiling
link to log on and submit the
intervention or protests.
Persons unable to file electronically
should submit an original and 5 copies
of the intervention or protest to the
Federal Energy Regulatory Commission,
888 First Street NE, Washington, DC
20426.
The filings in the above-referenced
proceeding are accessible in the
Commission’s eLibrary system by
clicking on the appropriate link in the
above list. They are also available for
electronic review in the Commission’s
Public Reference Room in Washington,
DC. There is an eSubscription link on
the website that enables subscribers to
receive email notification when a
document is added to a subscribed
docket(s). For assistance with any FERC
Online service, please email
FERCOnlineSupport@ferc.gov. or call
(866) 208–3676 (toll free). For TTY, call
(202) 502–8659.
Dated: May 28, 2019.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2019–11590 Filed 6–3–19; 8:45 am]
BILLING CODE 6717–01–P
E:\FR\FM\04JNN1.SGM
04JNN1
Agencies
[Federal Register Volume 84, Number 107 (Tuesday, June 4, 2019)]
[Notices]
[Pages 25801-25802]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2019-11594]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Project No. 2420-054]
PacifiCorp; Notice of Intent To File License Application, Filing
of Pre-Application Document (Pad), Commencement of Pre-Filing Process,
and Scoping; Request for Comments on the Pad and Scoping Document, and
Identification of Issues and Associated Study Requests
a. Type of Filing: Notice of Intent to File License Application for
a New License and Commencing Pre-filing Process.
b. Project No.: 2420-054.
c. Dated Filed: March 29, 2019.
d. Submitted By: PacifiCorp.
e. Name of Project: Cutler Hydroelectric Project.
f. Location: On the Bear River near the city of Logan in Box Elder
and Cache counties in Utah. The project does not occupy any federal
lands.
g. Filed Pursuant to: 18 CFR part 5 of the Commission's
Regulations.
h. Potential Applicant Contact: Eva Davies, Cutler Licensing
Project Manager, PacifiCorp, 1407 West North Temple, Room 210, Salt
Lake City, Utah 84115.
i. FERC Contact: Khatoon Melick at (202) 502-8433 or email at:
[email protected].
j. Cooperating agencies: Federal, state, local, and tribal agencies
with jurisdiction and/or special expertise with respect to
environmental issues that wish to cooperate in the preparation of the
environmental document should follow the instructions for filing such
requests described in item o below. Cooperating agencies should note
the Commission's policy that agencies that cooperate in the preparation
of the environmental document cannot also intervene. See 94 FERC ]
61,076 (2001).
k. With this notice, we are initiating informal consultation with:
(a) The U.S. Fish and Wildlife Service and/or NOAA Fisheries under
section 7 of the Endangered Species Act and the joint agency
regulations thereunder at 50 CFR, Part 402 and (b) the State Historic
Preservation Officer, as required by section 106, National Historic
Preservation Act, and the implementing regulations of the Advisory
Council on Historic Preservation at 36 CFR 800.2.
l. With this notice, we are designating PacifiCorp as the
Commission's non-federal representative for carrying out informal
consultation, pursuant to section 7 of the Endangered Species Act and
section 106 of the National Historic Preservation Act.
m. PacifiCorp filed with the Commission a Pre-Application Document
(PAD; including a proposed process plan and schedule), pursuant to 18
CFR 5.6 of the Commission's regulations.
n. A copy of the PAD is available for review at the Commission in
the Public Reference Room or may be viewed on the Commission's website
(https://www.ferc.gov), using the ``eLibrary'' link. Enter the docket
number, excluding the last three digits in the docket number field to
access the document. For assistance, contact FERC Online Support at
[email protected], (866) 208-3676 (toll free), or (202) 502-
8659 (TTY). A copy is also available for download on PacifiCorp's
project relicensing website at: https://www.pacificorp.com/es/hydro/hl/cutler/.
o. Register online at https://www.ferc.gov/docs-filing/esubscription.asp to be notified via email of new filing and issuances
related to this or other pending projects. For assistance, contact FERC
Online Support.
p. With this notice, we are soliciting comments on the PAD and
Commission's staff Scoping Document 1 (SD1), as well as study requests.
All comments on the PAD and SD1, and study requests should be sent to
the address above in paragraph h. In addition, all comments on the PAD
and SD1, study requests, requests for cooperating agency status, and
all communications to and from Commission staff related to the merits
of the potential application must be filed with the Commission.
The Commission strongly encourages electronic filing. Please file
all documents using the Commission's eFiling system at https://www.ferc.gov/docs-filing/efiling.asp. Commenters can submit brief
comments up to 6,000 characters, without prior registration, using the
eComment system at https://www.ferc.gov/docs-filing/ecomment.asp. You
must include your name and contact information at the end of your
comments. For assistance, please contact FERC Online Support at
[email protected] In lieu of electronic filing, you may send
a paper copy to: Secretary, Federal Energy Regulatory Commission, 888
First Street NE, Washington, DC 20426. The first page of any filing
should include docket number P-2420-054.
All filings with the Commission must bear the appropriate heading:
``Comments on Pre-Application Document,'' ``Study Requests,''
``Comments on Scoping Document 1,'' ``Request for Cooperating Agency
Status,'' or ``Communications to and from Commission Staff.'' Any
individual or entity interested in submitting study requests,
commenting on the PAD or SD1, and any agency requesting cooperating
status must do so by July 29, 2019.
q. Although our current intent is to prepare an environmental
assessment (EA), there is the possibility that an Environmental Impact
Statement (EIS) will be required. Nevertheless, this notice, associated
scoping meeting, and our scoping process will satisfy the NEPA scoping
requirements, irrespective of whether an EA or EIS is issued by the
Commission.
[[Page 25802]]
Scoping Meetings
Commission staff will hold two scoping meetings in the vicinity of
the project at the times and places noted below. The daytime meeting
will focus on resource agency, Indian tribes, and non-governmental
organization concerns, while the evening meeting is primarily for
receiving input from the public. We invite all interested individuals,
organizations, and agencies to attend one or both of the meetings, and
to assist staff in identifying particular study needs, as well as the
scope of environmental issues to be addressed in the environmental
document. The times and locations of these meetings are as follows:
Daytime Scoping Meeting
Date and Time: Thursday, June 27, 2019 at 9:00 a.m.
Location: Riverwoods Conference Center, 615 S Riverwoods Parkway,
Logan, UT 84321.
Phone Number: (435) 750-5151.
Evening Scoping Meeting
Date and Time: Thursday, June 27, 2019 at 7:00 p.m.
Location: Riverwoods Conference Center, 615 S Riverwoods Parkway,
Logan, UT 84321.
Phone Number: (435) 750-5151.
SD1, which outlines the subject areas to be addressed in the
environmental document, was mailed to the individuals and entities on
the Commission's mailing list. Copies of SD1 will be available at the
scoping meetings, or may be viewed on the web at https://www.ferc.gov,
using the ``eLibrary'' link. Follow the directions for accessing
information in paragraph n. Based on all oral and written comments, a
Scoping Document 2 (SD2) may be issued. SD2 may include a revised
process plan and schedule, as well as a list of issues, identified
through the scoping process.
Environmental Site Review
The potential applicant and Commission staff will conduct an
Environmental Site Review of the project on Wednesday, June 26, 2019,
starting at 9:00 a.m. All participants should meet at Cutler Marsh
Marina recreation site--also known as Valley View Marina--located on
the west side of Cutler Reservoir on Highway 30, just west of the
Highway 30 bridge over the reservoir. Driving directions: Starting at
L.W.'s Truck Stop in Logan, Utah (southwest corner of 1000 W and 200
N), drive west on Highway 30 (also 200 N) approximately 5 miles. After
crossing Cutler Reservoir, the Cutler Marsh Marina Recreation Site will
be on the south side of the highway; turn left from the highway into
the gravel parking lot. All participants are responsible for their own
transportation. Recommended gear: Closed toe shoes, good for walking 1-
2 miles in, hat, sunscreen, water bottle, binoculars (optional, for
wildlife viewing). Anyone with questions about the site visit should
contact Ms. Miriam Hugentobler with PacifiCorp at: (801) 652-8983.
Lunch and extra water will be provided by PacifiCorp. For lunch RSVPs
please contact Ms. Miriam Hugentobler at (801) 652-8983 or email her
at: [email protected].
Meeting Objectives
At the scoping meetings, staff will: (1) Initiate scoping of the
issues; (2) review and discuss existing conditions and resource
management objectives; (3) review and discuss existing information and
identify preliminary information and study needs; (4) review and
discuss the process plan and schedule for pre-filing activity that
incorporates the time frames provided for in Part 5 of the Commission's
regulations and, to the extent possible, maximizes coordination of
federal, state, and tribal permitting and certification processes; and
(5) discuss the appropriateness of any federal or state agency or
Indian tribe acting as a cooperating agency for development of an
environmental document.
Meeting participants should come prepared to discuss their issues
and/or concerns. Please review the PAD in preparation for the scoping
meetings. Directions on how to obtain a copy of the PAD and SD1 are
included in item n. of this document.
Meeting Procedures
The meetings will be recorded by a stenographer and will be placed
in the public records of the project.
Dated: May 28, 2019.
Kimberly D. Bose,
Secretary.
[FR Doc. 2019-11594 Filed 6-3-19; 8:45 am]
BILLING CODE 6717-01-P