Combined Notice of Filings #1, 25796-25797 [2019-11593]
Download as PDF
25796
Federal Register / Vol. 84, No. 107 / Tuesday, June 4, 2019 / Notices
DEPARTMENT OF ENERGY
Environmental Management SiteSpecific Advisory Board, Northern New
Mexico
Office of Environmental
Management, Department of Energy
(DOE).
ACTION: Notice of open meeting.
AGENCY:
This notice announces a
combined meeting of the Environmental
Monitoring and Remediation Committee
and Waste Management Committee of
the Environmental Management SiteSpecific Advisory Board (EM SSAB),
Northern New Mexico (known locally as
the Northern New Mexico Citizens’
Advisory Board [NNMCAB]). The
Federal Advisory Committee Act
requires that public notice of this
meeting be announced in the Federal
Register.
SUMMARY:
Wednesday, June 19, 2019, 1:00
p.m.–4:00 p.m.
ADDRESSES: NNMCAB Office, 94 Cities
of Gold Road, Pojoaque, NM 87506.
FOR FURTHER INFORMATION CONTACT:
Menice Santistevan, Northern New
Mexico Citizens’ Advisory Board, 94
Cities of Gold Road, Santa Fe, NM
87506. Phone (505) 995–0393; Fax (505)
989–1752 or Email:
menice.santistevan@em.doe.gov.
SUPPLEMENTARY INFORMATION:
Purpose of the Board: The purpose of
the Board is to make recommendations
to DOE–EM and site management in the
areas of environmental restoration,
waste management, and related
activities.
Purpose of the Environmental
Monitoring and Remediation Committee
(EM&R): The EM&R Committee provides
a citizens’ perspective to NNMCAB on
current and future environmental
remediation activities resulting from
historical Los Alamos National
Laboratory (LANL) operations and, in
particular, issues pertaining to
groundwater, surface water and work
required under the New Mexico
Environment Department Order on
Consent. The EM&R Committee will
keep abreast of DOE–EM and site
programs and plans. The committee will
work with the NNMCAB to provide
assistance in determining priorities and
the best use of limited funds and time.
Formal recommendations will be
proposed when needed and, after
consideration and approval by the full
NNMCAB, may be sent to DOE–EM for
action.
Purpose of the Waste Management
(WM) Committee: The WM Committee
reviews policies, practices and
khammond on DSKBBV9HB2PROD with NOTICES
DATES:
VerDate Sep<11>2014
17:16 Jun 03, 2019
Jkt 247001
procedures, existing and proposed, so as
to provide recommendations, advice,
suggestions and opinions to the
NNMCAB regarding waste management
operations at the Los Alamos site.
Signed in Washington, DC, on May 30,
2019.
Antionette M. Watkins,
Acting Deputy Committee Management
Officer.
Tentative Agenda
[FR Doc. 2019–11581 Filed 6–3–19; 8:45 am]
• Call to Order
• Welcome and Introductions
• Approval of Agenda and Meeting
Minutes of April 10, 2019
• Old Business
Æ Report from Chair
Æ Consideration and Action on Draft
Recommendation 2019–02,
Improving the Utility of the Consent
Order
Æ Other Items
• New Business
Æ Discussion on NNMCAB
Committee and Work Plans
Æ Election of Committee Officers
Æ Other Items
• Break
• Presentation on N3B Education and
Apprenticeship Programs/N3B
Staffing Numbers
• Update from Deputy Designated
Federal Officer
• Public Comment Period
• Adjourn
Public Participation: The meeting is
open to the public. The NNMCAB’s
Committees welcome the attendance of
the public at their combined committee
meeting and will make every effort to
accommodate persons with physical
disabilities or special needs. If you
require special accommodations due to
a disability, please contact Menice
Santistevan at least seven days in
advance of the meeting at the telephone
number listed above. Written statements
may be filed with the Committees either
before or after the meeting. Individuals
who wish to make oral statements
pertaining to agenda items should
contact Menice Santistevan at the
address or telephone number listed
above. Requests must be received five
days prior to the meeting and reasonable
provision will be made to include the
presentation in the agenda. The Deputy
Designated Federal Officer is
empowered to conduct the meeting in a
fashion that will facilitate the orderly
conduct of business. Individuals
wishing to make public comments will
be provided a maximum of five minutes
to present their comments.
Minutes: Minutes will be available by
writing or calling Menice Santistevan at
the address or phone number listed
above. Minutes and other Board
documents are on the internet at: https://
energy.gov/em/nnmcab/meetingmaterials.
PO 00000
Frm 00067
Fmt 4703
Sfmt 4703
BILLING CODE 6450–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Combined Notice of Filings #1
Take notice that the Commission
received the following electric corporate
filings:
Docket Numbers: EC19–94–000.
Applicants: Oasis Power Partners,
LLC, Sagebrush, a California
partnership, Oasis Wind Holdings, LLC.
Description: Application for
Authorization Under Section 203 of the
Federal Power Act, et al. of Oasis Power
Partners, LLC, et al.
Filed Date: 5/24/19.
Accession Number: 20190524–5257.
Comments Due: 5 p.m. ET 6/14/19.
Docket Numbers: EC19–95–000.
Applicants: Craven County Wood
Energy Limited Partnership, Grayling
Generating Station Limited Partnership.
Description: Application for
Authorization Under Section 203 of the
Federal Power Act, et al. of Craven
County Wood Energy Limited
Partnership, et al.
Filed Date: 5/24/19.
Accession Number: 20190524–5266.
Comments Due: 5 p.m. ET 6/14/19.
Take notice that the Commission
received the following electric rate
filings:
Docket Numbers: ER16–372–006.
Applicants: PJM Interconnection,
L.L.C.
Description: Compliance filing:
Compliance Filing Pursuant to
4/29/2019 Order to be effective 4/29/
2019.
Filed Date: 5/28/19.
Accession Number: 20190528–5033.
Comments Due: 5 p.m. ET 6/18/19.
Docket Numbers: ER19–1979–000.
Applicants: Hecate Energy Highland
LLC.
Description: Request for Limited
Waiver, et al. of Hecate Energy Highland
LLC.
Filed Date: 5/23/19.
Accession Number: 20190523–5234.
Comments Due: 5 p.m. ET 6/3/19.
Docket Numbers: ER19–1987–000.
Applicants: Sierra Pacific Power
Company.
Description: § 205(d) Rate Filing:
Service Agreement No. 18–00088 to be
effective 5/24/2019.
E:\FR\FM\04JNN1.SGM
04JNN1
khammond on DSKBBV9HB2PROD with NOTICES
Federal Register / Vol. 84, No. 107 / Tuesday, June 4, 2019 / Notices
Filed Date: 5/24/19.
Accession Number: 20190524–5210.
Comments Due: 5 p.m. ET 6/14/19.
Docket Numbers: ER19–1988–000.
Applicants: Nevada Power Company.
Description: § 205(d) Rate Filing:
Service Agreement No. 15–00055 NPC
and NPC Dry Lake 4th Amendment
05.24.19 to be effective 5/24/2019.
Filed Date: 5/24/19.
Accession Number: 20190524–5212.
Comments Due: 5 p.m. ET 6/14/19.
Docket Numbers: ER19–1989–000.
Applicants: Southwest Power Pool,
Inc.
Description: § 205(d) Rate Filing: 3490
AEP Energy Partners, Inc. NITSA and
NOA to be effective 6/1/2019.
Filed Date: 5/28/19.
Accession Number: 20190528–5009.
Comments Due: 5 p.m. ET 6/18/19.
Docket Numbers: ER19–1991–000.
Applicants: Tampa Electric Company.
Description: § 205(d) Rate Filing: Rate
Schedule No. 21 w_City of Lakeland—
Amendment to Exhibit A to be effective
6/1/2019.
Filed Date: 5/28/19.
Accession Number: 20190528–5060.
Comments Due: 5 p.m. ET 6/18/19.
Docket Numbers: ER19–1992–000.
Applicants: RE Gaskell West 2 LLC.
Description: Baseline eTariff Filing:
Application for Market Based Rate to be
effective
5/29/2019.
Filed Date: 5/28/19.
Accession Number: 20190528–5097.
Comments Due: 5 p.m. ET 6/18/19.
Docket Numbers: ER19–1993–000.
Applicants: Oklahoma Gas and
Electric Company.
Description: Tariff Cancellation:
Cancellation of Cost Based Power Sales
Tariff to be effective 5/29/2019.
Filed Date: 5/28/19.
Accession Number: 20190528–5099.
Comments Due: 5 p.m. ET 6/18/19.
Docket Numbers: ER19–1994–000.
Applicants: The Connecticut Light
and Power Company.
Description: Initial rate filing: NTE
Connecticut, LLC ? Engineering Design
and Procurement Agreement to be
effective 5/28/2019.
Filed Date: 5/28/19.
Accession Number: 20190528–5102.
Comments Due: 5 p.m. ET 6/18/19.
Docket Numbers: ER19–1995–000.
Applicants: RE Gaskell West 2 LLC.
Description: § 205(d) Rate Filing:
Certificate of Concurrence to LGIA CoTenancy Agreement to be effective 5/29/
2019.
Filed Date: 5/28/19.
Accession Number: 20190528–5110.
Comments Due: 5 p.m. ET 6/18/19.
VerDate Sep<11>2014
17:16 Jun 03, 2019
Jkt 247001
The filings are accessible in the
Commission’s eLibrary system by
clicking on the links or querying the
docket number.
Any person desiring to intervene or
protest in any of the above proceedings
must file in accordance with Rules 211
and 214 of the Commission’s
Regulations (18 CFR 385.211 and
385.214) on or before 5:00 p.m. Eastern
time on the specified comment date.
Protests may be considered, but
intervention is necessary to become a
party to the proceeding.
eFiling is encouraged. More detailed
information relating to filing
requirements, interventions, protests,
service, and qualifying facilities filings
can be found at: https://www.ferc.gov/
docs-filing/efiling/filing-req.pdf. For
other information, call (866) 208–3676
(toll free). For TTY, call (202) 502–8659.
Dated: May 28, 2019.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2019–11593 Filed 6–3–19; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 2934–029]
New York State Electric & Gas
Corporation; Notice of Application
Accepted for Filing and Soliciting
Motions To Intervene and Protests
Take notice that the following
hydroelectric application has been filed
with the Commission and is available
for public inspection.
a. Type of Application: New Major
License.
b. Project No.: 2934–029.
c. Date filed: April 1, 2019.
d. Applicant: New York State Electric
& Gas Corporation (NYSEG).
e. Name of Project: Upper
Mechanicville Hydroelectric Project.
f. Location: The existing project is
located on the Hudson River, in
Saratoga and Rensselaer Counties, New
York. The project does not occupy any
federal lands.
g. Filed Pursuant to: Federal Power
Act, 16 U.S.C. 791(a)–825(r).
h. Applicant Contact: Hugh J. Ives,
Manager, NYSEG Hydro Operations, 89
East Avenue, Rochester, NY 14649;
(585) 724–8209; hugh.ives@
avangrid.com.
i. FERC Contact: Jody Callihan, (202)
502–8278 or jody.callihan@ferc.gov.
j. Deadline for filing motions to
intervene and protests: 60 days from the
issuance date of this notice.
PO 00000
Frm 00068
Fmt 4703
Sfmt 4703
25797
The Commission strongly encourages
electronic filing. Please file motions to
intervene and protests using the
Commission’s eFiling system at https://
www.ferc.gov/docs-filing/efiling.asp. For
assistance, please contact FERC Online
Support at FERCOnlineSupport@
ferc.gov, (866) 208–3676 (toll free), or
(202) 502–8659 (TTY). In lieu of
electronic filing, please send a paper
copy to: Secretary, Federal Energy
Regulatory Commission, 888 First Street
NE, Washington, DC 20426. The first
page of any filing should include docket
number P–2934–029.
The Commission’s Rules of Practice
require all intervenors filing documents
with the Commission to serve a copy of
that document on each person on the
official service list for the project.
Further, if an intervenor files comments
or documents with the Commission
relating to the merits of an issue that
may affect the responsibilities of a
particular resource agency, they must
also serve a copy of the document on
that resource agency.
k. This application has been accepted
for filing, but is not ready for
environmental analysis at this time.
l. The existing Upper Mechanicville
Hydroelectric Project consists of: (1) A
700-foot-long concrete gravity dam with
a crest elevation of 66.6 feet National
Geodetic Vertical Datum of 1929
(NGVD29); (2) 3 spillway bays each
extending 222 feet across the length of
the dam and separated by a 7.5-foot to
10.5-foot-wide concrete pier, with each
spillway bay containing 12 pneumatic
Obermeyer crest gates that are 6 feet
high; (3) a 1.8-mile-long impoundment
with a 380-acre surface area and gross
storage capacity of 10,735 acre-feet at a
normal pool elevation of 72.6 feet
NGVD29; (4) an intake channel with two
reinforced guide walls and three 35foot-diameter cofferdam walls
constructed of sheet piling; (5) a 20-footwide and 7.5-foot-high intake bypass
sluice gate; (6) a 105.5-foot-long by 122foot-wide powerhouse containing two
12,780 horsepower Kaplan turbines and
two Siemens-Allis generators each
having a rated capacity of 8,265
kilowatts; (7) a tailrace approximately
1,200 feet long and 120 feet wide with
a bi-level bottom designed to minimize
cross-currents; (8) one 1.10-mile-long,
34.5-kilovolt transmission line; and (9)
appurtenant facilities.
During the non-navigation season
(typically from December 1 through
April 30), NYSEG operates the project in
a run-of-river (ROR) mode and
maintains the impoundment at an
elevation of 72.6 feet NGVD29. During
the navigation season (typically May 1
through November 30), NYSEG
E:\FR\FM\04JNN1.SGM
04JNN1
Agencies
[Federal Register Volume 84, Number 107 (Tuesday, June 4, 2019)]
[Notices]
[Pages 25796-25797]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2019-11593]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
Combined Notice of Filings #1
Take notice that the Commission received the following electric
corporate filings:
Docket Numbers: EC19-94-000.
Applicants: Oasis Power Partners, LLC, Sagebrush, a California
partnership, Oasis Wind Holdings, LLC.
Description: Application for Authorization Under Section 203 of the
Federal Power Act, et al. of Oasis Power Partners, LLC, et al.
Filed Date: 5/24/19.
Accession Number: 20190524-5257.
Comments Due: 5 p.m. ET 6/14/19.
Docket Numbers: EC19-95-000.
Applicants: Craven County Wood Energy Limited Partnership, Grayling
Generating Station Limited Partnership.
Description: Application for Authorization Under Section 203 of the
Federal Power Act, et al. of Craven County Wood Energy Limited
Partnership, et al.
Filed Date: 5/24/19.
Accession Number: 20190524-5266.
Comments Due: 5 p.m. ET 6/14/19.
Take notice that the Commission received the following electric
rate filings:
Docket Numbers: ER16-372-006.
Applicants: PJM Interconnection, L.L.C.
Description: Compliance filing: Compliance Filing Pursuant to 4/29/
2019 Order to be effective 4/29/2019.
Filed Date: 5/28/19.
Accession Number: 20190528-5033.
Comments Due: 5 p.m. ET 6/18/19.
Docket Numbers: ER19-1979-000.
Applicants: Hecate Energy Highland LLC.
Description: Request for Limited Waiver, et al. of Hecate Energy
Highland LLC.
Filed Date: 5/23/19.
Accession Number: 20190523-5234.
Comments Due: 5 p.m. ET 6/3/19.
Docket Numbers: ER19-1987-000.
Applicants: Sierra Pacific Power Company.
Description: Sec. 205(d) Rate Filing: Service Agreement No. 18-
00088 to be effective 5/24/2019.
[[Page 25797]]
Filed Date: 5/24/19.
Accession Number: 20190524-5210.
Comments Due: 5 p.m. ET 6/14/19.
Docket Numbers: ER19-1988-000.
Applicants: Nevada Power Company.
Description: Sec. 205(d) Rate Filing: Service Agreement No. 15-
00055 NPC and NPC Dry Lake 4th Amendment 05.24.19 to be effective 5/24/
2019.
Filed Date: 5/24/19.
Accession Number: 20190524-5212.
Comments Due: 5 p.m. ET 6/14/19.
Docket Numbers: ER19-1989-000.
Applicants: Southwest Power Pool, Inc.
Description: Sec. 205(d) Rate Filing: 3490 AEP Energy Partners,
Inc. NITSA and NOA to be effective 6/1/2019.
Filed Date: 5/28/19.
Accession Number: 20190528-5009.
Comments Due: 5 p.m. ET 6/18/19.
Docket Numbers: ER19-1991-000.
Applicants: Tampa Electric Company.
Description: Sec. 205(d) Rate Filing: Rate Schedule No. 21 w_City
of Lakeland--Amendment to Exhibit A to be effective 6/1/2019.
Filed Date: 5/28/19.
Accession Number: 20190528-5060.
Comments Due: 5 p.m. ET 6/18/19.
Docket Numbers: ER19-1992-000.
Applicants: RE Gaskell West 2 LLC.
Description: Baseline eTariff Filing: Application for Market Based
Rate to be effective 5/29/2019.
Filed Date: 5/28/19.
Accession Number: 20190528-5097.
Comments Due: 5 p.m. ET 6/18/19.
Docket Numbers: ER19-1993-000.
Applicants: Oklahoma Gas and Electric Company.
Description: Tariff Cancellation: Cancellation of Cost Based Power
Sales Tariff to be effective 5/29/2019.
Filed Date: 5/28/19.
Accession Number: 20190528-5099.
Comments Due: 5 p.m. ET 6/18/19.
Docket Numbers: ER19-1994-000.
Applicants: The Connecticut Light and Power Company.
Description: Initial rate filing: NTE Connecticut, LLC ?
Engineering Design and Procurement Agreement to be effective 5/28/2019.
Filed Date: 5/28/19.
Accession Number: 20190528-5102.
Comments Due: 5 p.m. ET 6/18/19.
Docket Numbers: ER19-1995-000.
Applicants: RE Gaskell West 2 LLC.
Description: Sec. 205(d) Rate Filing: Certificate of Concurrence
to LGIA Co-Tenancy Agreement to be effective 5/29/2019.
Filed Date: 5/28/19.
Accession Number: 20190528-5110.
Comments Due: 5 p.m. ET 6/18/19.
The filings are accessible in the Commission's eLibrary system by
clicking on the links or querying the docket number.
Any person desiring to intervene or protest in any of the above
proceedings must file in accordance with Rules 211 and 214 of the
Commission's Regulations (18 CFR 385.211 and 385.214) on or before 5:00
p.m. Eastern time on the specified comment date. Protests may be
considered, but intervention is necessary to become a party to the
proceeding.
eFiling is encouraged. More detailed information relating to filing
requirements, interventions, protests, service, and qualifying
facilities filings can be found at: https://www.ferc.gov/docs-filing/efiling/filing-req.pdf. For other information, call (866) 208-3676
(toll free). For TTY, call (202) 502-8659.
Dated: May 28, 2019.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2019-11593 Filed 6-3-19; 8:45 am]
BILLING CODE 6717-01-P