InPipe Energy; Notice of Preliminary Determination of a Qualifying Conduit Hydropower Facility and Soliciting Comments and Motions To Intervene, 24774-24775 [2019-11173]
Download as PDF
24774
Federal Register / Vol. 84, No. 103 / Wednesday, May 29, 2019 / Notices
reproduction in the Commission’s
Public Reference Room located at 888
First Street NE, Room 2A, Washington,
DC 20426, or by calling (202) 502–8371.
n. Individuals desiring to be included
on the Commission’s mailing list should
so indicate by writing to the Secretary
of the Commission.
o. Comments, Protests, or Motions to
Intervene: Anyone may submit
comments, a protest, or a motion to
intervene in accordance with the
requirements of Rules of Practice and
Procedure, 18 CFR 385.210, .211, .212
and .214. In determining the appropriate
action to take, the Commission will
consider all protests or other comments
filed, but only those who file a motion
to intervene in accordance with the
Commission’s Rules may become a
party to the proceeding. Any comments,
protests, or motions to intervene must
be received on or before the specified
comment date for the particular
application.
p. Filing and Service of Responsive
Documents: Any filing must (1) bear in
all capital letters the title
‘‘COMMENTS’’, ‘‘PROTEST’’, or
‘‘MOTION TO INTERVENE’’ as
applicable; (2) set forth in the heading
the name of the applicant and the
project number of the application to
which the filing responds; (3) furnish
the name, address, and telephone
number of the person protesting or
intervening; and (4) otherwise comply
with the requirements of 18 CFR
385.2001 through 385.2005. All
comments, motions to intervene, or
protests must set forth their evidentiary
basis and otherwise comply with the
requirements of 18 CFR 4.34(b). All
comments, motions to intervene, or
protests should relate to the surrender
application that is the subject of this
notice. Agencies may obtain copies of
the application directly from the
applicant. A copy of any protest or
motion to intervene must be served
upon each representative of the
applicant specified in the particular
application. If an intervener files
comments or documents with the
Commission relating to the merits of an
issue that may affect the responsibilities
of a particular resource agency, they
must also serve a copy of the document
on that resource agency. A copy of all
other filings in reference to this
application must be accompanied by
proof of service on all persons listed in
the service list prepared by the
Commission in this proceeding, in
accordance with 18 CFR 4.34(b) and
385.2010.
q. Agency Comments—Federal, state,
and local agencies are invited to file
comments on the described proceeding.
If any agency does not file comments
within the time specified for filing
comments, it will be presumed to have
no comments.
Dated: May 22, 2019.
Kimberly D. Bose,
Secretary.
[FR Doc. 2019–11178 Filed 5–28–19; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. CD19–7–000]
InPipe Energy; Notice of Preliminary
Determination of a Qualifying Conduit
Hydropower Facility and Soliciting
Comments and Motions To Intervene
qualifying conduit hydropower facility,
pursuant to section 30 of the Federal
Power Act (FPA), as amended by section
4 of the Hydropower Regulatory
Efficiency Act of 2013 (HREA). The
proposed La Brea Regulation Station
Hydroelectric Project would have a total
installed capacity of up to 100 kilowatts
(kW), and would be located in the La
Brea Regulation Station, which is on the
City of Los Angeles’ water supply
system. The project would be located in
the City of Los Angeles in Los Angeles
County, California.
Applicant Contact: Gregg Semler,
InPipe Energy, 222 NW Eighth Avenue,
Portland, OR 97209, Phone No. (503)
341–0004, Email: gregg@
inpipeenergy.com.
FERC Contact: Robert Bell, Phone No.
(202) 502–6062; Email: robert.bell@
ferc.gov.
Qualifying Conduit Hydropower
Facility Description: The proposed
project would consist of: (1) A 100-kW
turbine-generator located in a 15-by-7
foot concrete vault, adjacent to an
existing pressure reducing valve vault in
the La Brea Regulation Station; (2) a 12inch pipeline transporting water from
the existing 60-inch mainline to the
generator, and returning it to the
mainline; and (3) appurtenant facilities.
The proposed project would have an
estimated annual generation of up to
875 megawatt-hours.
A qualifying conduit hydropower
facility is one that is determined or
deemed to meet all of the criteria shown
in the table below.
On May 14, 2019, InPipe Energy filed
a notice of intent to construct a
TABLE 1—CRITERIA FOR QUALIFYING CONDUIT HYDROPOWER FACILITY
Statutory provision
Description
Satisfies
(Y/N)
FPA 30(a)(3)(A), as amended by HREA ..
The conduit the facility uses is a tunnel, canal, pipeline, aqueduct, flume, ditch, or
similar manmade water conveyance that is operated for the distribution of water
for agricultural, municipal, or industrial consumption and not primarily for the generation of electricity.
The facility is constructed, operated, or maintained for the generation of electric
power and uses for such generation only the hydroelectric potential of a non-federally owned conduit.
The facility has an installed capacity that does not exceed 5 megawatts ..................
Y
khammond on DSKBBV9HB2PROD with NOTICES
FPA 30(a)(3)(C)(i), as amended by HREA
FPA 30(a)(3)(C)(ii), as amended
HREA.
FPA 30(a)(3)(C)(iii), as amended
HREA.
by
by
On or before August 9, 2013, the facility is not licensed, or exempted from the licensing requirements of Part I of the FPA.
Preliminary Determination: The
proposed La Brea Regulation Station
Hydroelectric Project will not interfere
with the primary purpose of the
VerDate Sep<11>2014
17:45 May 28, 2019
Jkt 247001
conduit, which is to transport water to
the City of Los Angeles’ municipal
water supply distribution system.
Therefore, based upon the above
PO 00000
Frm 00033
Fmt 4703
Sfmt 4703
Y
Y
Y
criteria, Commission staff preliminarily
determines that the proposal satisfies
the requirements for a qualifying
conduit hydropower facility, which is
E:\FR\FM\29MYN1.SGM
29MYN1
khammond on DSKBBV9HB2PROD with NOTICES
Federal Register / Vol. 84, No. 103 / Wednesday, May 29, 2019 / Notices
not required to be licensed or exempted
from licensing.
Comments and Motions to Intervene:
Deadline for filing comments contesting
whether the facility meets the qualifying
criteria is 30 days from the issuance
date of this notice.
Deadline for filing motions to
intervene is 30 days from the issuance
date of this notice.
Anyone may submit comments or a
motion to intervene in accordance with
the requirements of Rules of Practice
and Procedure, 18 CFR 385.210 and
385.214. Any motions to intervene must
be received on or before the specified
deadline date for the particular
proceeding.
Filing and Service of Responsive
Documents: All filings must (1) bear in
all capital letters the ‘‘COMMENTS
CONTESTING QUALIFICATION FOR A
CONDUIT HYDROPOWER FACILITY’’
or ‘‘MOTION TO INTERVENE,’’ as
applicable; (2) state in the heading the
name of the applicant and the project
number of the application to which the
filing responds; (3) state the name,
address, and telephone number of the
person filing; and (4) otherwise comply
with the requirements of sections
385.2001 through 385.2005 of the
Commission’s regulations.1 All
comments contesting Commission staff’s
preliminary determination that the
facility meets the qualifying criteria
must set forth their evidentiary basis.
The Commission strongly encourages
electronic filing. Please file motions to
intervene and comments using the
Commission’s eFiling system at https://
www.ferc.gov/docs-filing/efiling.asp.
Commenters can submit brief comments
up to 6,000 characters, without prior
registration, using the eComment system
at https://www.ferc.gov/docs-filing/
ecomment.asp. You must include your
name and contact information at the end
of your comments. For assistance,
please contact FERC Online Support at
FERCOnlineSupport@ferc.gov, (866)
208–3676 (toll free), or (202) 502–8659
(TTY). In lieu of electronic filing, please
send a paper copy to: Secretary, Federal
Energy Regulatory Commission, 888
First Street NE, Washington, DC 20426.
A copy of all other filings in reference
to this application must be accompanied
by proof of service on all persons listed
in the service list prepared by the
Commission in this proceeding, in
accordance with 18 CFR 4.34(b) and
385.2010.
Locations of Notice of Intent: Copies
of the notice of intent can be obtained
directly from the applicant or such
copies can be viewed and reproduced at
1 18
CFR 385.2001–2005 (2018).
VerDate Sep<11>2014
17:45 May 28, 2019
Jkt 247001
the Commission in its Public Reference
Room, Room 2A, 888 First Street NE,
Washington, DC 20426. The filing may
also be viewed on the web at https://
www.ferc.gov/docs-filing/elibrary.asp
using the ‘‘eLibrary’’ link. Enter the
docket number (i.e., CD19–7) in the
docket number field to access the
document. For assistance, call toll-free
1–866–208–3676 or email
FERCOnlineSupport@ferc.gov. For TTY,
call (202) 502–8659.
Dated: May 22, 2019.
Kimberly D. Bose,
Secretary.
[FR Doc. 2019–11173 Filed 5–28–19; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 2310–230]
Pacific Gas and Electric Company;
Notice of Application Accepted for
Filing, Soliciting Comments, Motions
To Intervene, and Protests
Take notice that the following
hydroelectric application has been filed
with the Federal Energy Regulatory
Commission and is available for public
inspection:
a. Type of Application: Non-project
use of project lands.
b. Project No: 2310–230.
c. Date Filed: April 4, 2019 and
supplemented May 7, 2019.
d. Applicant: Pacific Gas and Electric
Company (licensee).
e. Name of Project: Drum-Spaulding
Hydroelectric Project.
f. Location: South Canal in Placer
County, California.
g. Filed Pursuant to: Federal Power
Act, 16 U.S.C. 791a–825r.
h. Applicant Contact: Brian Madigan,
Senior Hydro License Coordinator,
Pacific Gas and Electric Company, Mail
Code N11D, P.O. Box 770000, San
Francisco, California 94177; phone (415)
973–3059.
i. FERC Contact: Ms. Joy Kurtz at 202–
502–6760, or joy.kurtz@ferc.gov.
j. Deadline for filing comments,
motions to intervene, and protests is 30
days from the issuance of this notice by
the Commission. The Commission
strongly encourages electronic filing.
Please file motions to intervene,
protests, and comments using the
Commission’s eFiling system at https://
www.ferc.gov/docs-filing/efiling.asp.
Commenters can submit brief comments
up to 6,000 characters, without prior
registration, using the eComment system
PO 00000
Frm 00034
Fmt 4703
Sfmt 4703
24775
at https://www.ferc.gov/docs-filing/
ecomment.asp. You must include your
name and contact information at the end
of your comments. For assistance,
please contact FERC Online Support at
FERCOnlineSupport@ferc.gov, (866)
208–3676 (toll free), or (202) 502–8659
(TTY). In lieu of electronic filing, please
send a paper copy to: Secretary, Federal
Energy Regulatory Commission, 888
First Street NE, Washington, DC 20426.
The first page of any filing should
include docket number P–2310–230.
k. Description of Request: The
licensee requests Commission approval
to grant Placer County Water Agency
(PCWA) permission to use project lands
within the project boundary to construct
and operate a raw water intake on South
Canal in order to meet PCWA’s water
supply demands for western Placer
County. The water withdrawn from the
project would be done in accordance
with an existing water supply agreement
between the licensee and PCWA, which
obligates the licensee to provide a
certain volume of water to PCWA for
purchase. The raw water intake on
South Canal would withdraw a
maximum of 62 million gallons of water
per day and serve as a redundant
withdrawal location to other withdrawal
points within the project that are
operated by PCWA. Because of this
redundancy, water withdrawn via the
intake would not increase the amount of
water currently withdrawn from the
project area. Construction activities
within the project boundary would
include installation of the intake
structure, which would be recessed into
the canal, and outfitted with an inclined
trash rack and three five- foot slide
gates. The velocity through the trash
rack on the intake structure would not
exceed 0.8 feet per second. The intake
structure would connect to three
existing 60-inch steel pipes.
Additionally, storm drain facilities
located near one of PCWA’s transfer
basins, located on the bank side of
South Canal, would be restored
following construction of the intake.
This work would entail repairs to the
concrete walls and restoration of an
existing drainage inlet and manhole.
l. Locations of the Application: A
copy of the application is available for
inspection and reproduction at the
Commission’s Public Reference Room,
located at 888 First Street NE, Room 2A,
Washington, DC 20426, or by calling
202–502–8371. This filing may also be
viewed on the Commission’s website at
https://www.ferc.gov using the
‘‘eLibrary’’ link. Enter the docket
number excluding the last three digits in
the docket number field to access the
document. You may also register online
E:\FR\FM\29MYN1.SGM
29MYN1
Agencies
[Federal Register Volume 84, Number 103 (Wednesday, May 29, 2019)]
[Notices]
[Pages 24774-24775]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2019-11173]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Docket No. CD19-7-000]
InPipe Energy; Notice of Preliminary Determination of a
Qualifying Conduit Hydropower Facility and Soliciting Comments and
Motions To Intervene
On May 14, 2019, InPipe Energy filed a notice of intent to
construct a qualifying conduit hydropower facility, pursuant to section
30 of the Federal Power Act (FPA), as amended by section 4 of the
Hydropower Regulatory Efficiency Act of 2013 (HREA). The proposed La
Brea Regulation Station Hydroelectric Project would have a total
installed capacity of up to 100 kilowatts (kW), and would be located in
the La Brea Regulation Station, which is on the City of Los Angeles'
water supply system. The project would be located in the City of Los
Angeles in Los Angeles County, California.
Applicant Contact: Gregg Semler, InPipe Energy, 222 NW Eighth
Avenue, Portland, OR 97209, Phone No. (503) 341-0004, Email:
[email protected].
FERC Contact: Robert Bell, Phone No. (202) 502-6062; Email:
[email protected].
Qualifying Conduit Hydropower Facility Description: The proposed
project would consist of: (1) A 100-kW turbine-generator located in a
15-by-7 foot concrete vault, adjacent to an existing pressure reducing
valve vault in the La Brea Regulation Station; (2) a 12-inch pipeline
transporting water from the existing 60-inch mainline to the generator,
and returning it to the mainline; and (3) appurtenant facilities. The
proposed project would have an estimated annual generation of up to 875
megawatt-hours.
A qualifying conduit hydropower facility is one that is determined
or deemed to meet all of the criteria shown in the table below.
Table 1--Criteria for Qualifying Conduit Hydropower Facility
------------------------------------------------------------------------
Statutory provision Description Satisfies (Y/N)
------------------------------------------------------------------------
FPA 30(a)(3)(A), as amended by The conduit the Y
HREA. facility uses is a
tunnel, canal,
pipeline, aqueduct,
flume, ditch, or
similar manmade water
conveyance that is
operated for the
distribution of water
for agricultural,
municipal, or
industrial
consumption and not
primarily for the
generation of
electricity.
FPA 30(a)(3)(C)(i), as amended The facility is Y
by HREA. constructed,
operated, or
maintained for the
generation of
electric power and
uses for such
generation only the
hydroelectric
potential of a non-
federally owned
conduit.
FPA 30(a)(3)(C)(ii), as amended The facility has an Y
by HREA. installed capacity
that does not exceed
5 megawatts.
FPA 30(a)(3)(C)(iii), as On or before August 9, Y
amended by HREA. 2013, the facility is
not licensed, or
exempted from the
licensing
requirements of Part
I of the FPA.
------------------------------------------------------------------------
Preliminary Determination: The proposed La Brea Regulation Station
Hydroelectric Project will not interfere with the primary purpose of
the conduit, which is to transport water to the City of Los Angeles'
municipal water supply distribution system. Therefore, based upon the
above criteria, Commission staff preliminarily determines that the
proposal satisfies the requirements for a qualifying conduit hydropower
facility, which is
[[Page 24775]]
not required to be licensed or exempted from licensing.
Comments and Motions to Intervene: Deadline for filing comments
contesting whether the facility meets the qualifying criteria is 30
days from the issuance date of this notice.
Deadline for filing motions to intervene is 30 days from the
issuance date of this notice.
Anyone may submit comments or a motion to intervene in accordance
with the requirements of Rules of Practice and Procedure, 18 CFR
385.210 and 385.214. Any motions to intervene must be received on or
before the specified deadline date for the particular proceeding.
Filing and Service of Responsive Documents: All filings must (1)
bear in all capital letters the ``COMMENTS CONTESTING QUALIFICATION FOR
A CONDUIT HYDROPOWER FACILITY'' or ``MOTION TO INTERVENE,'' as
applicable; (2) state in the heading the name of the applicant and the
project number of the application to which the filing responds; (3)
state the name, address, and telephone number of the person filing; and
(4) otherwise comply with the requirements of sections 385.2001 through
385.2005 of the Commission's regulations.\1\ All comments contesting
Commission staff's preliminary determination that the facility meets
the qualifying criteria must set forth their evidentiary basis.
---------------------------------------------------------------------------
\1\ 18 CFR 385.2001-2005 (2018).
---------------------------------------------------------------------------
The Commission strongly encourages electronic filing. Please file
motions to intervene and comments using the Commission's eFiling system
at https://www.ferc.gov/docs-filing/efiling.asp. Commenters can submit
brief comments up to 6,000 characters, without prior registration,
using the eComment system at https://www.ferc.gov/docs-filing/ecomment.asp. You must include your name and contact information at the
end of your comments. For assistance, please contact FERC Online
Support at [email protected], (866) 208-3676 (toll free), or
(202) 502-8659 (TTY). In lieu of electronic filing, please send a paper
copy to: Secretary, Federal Energy Regulatory Commission, 888 First
Street NE, Washington, DC 20426. A copy of all other filings in
reference to this application must be accompanied by proof of service
on all persons listed in the service list prepared by the Commission in
this proceeding, in accordance with 18 CFR 4.34(b) and 385.2010.
Locations of Notice of Intent: Copies of the notice of intent can
be obtained directly from the applicant or such copies can be viewed
and reproduced at the Commission in its Public Reference Room, Room 2A,
888 First Street NE, Washington, DC 20426. The filing may also be
viewed on the web at https://www.ferc.gov/docs-filing/elibrary.asp using
the ``eLibrary'' link. Enter the docket number (i.e., CD19-7) in the
docket number field to access the document. For assistance, call toll-
free 1-866-208-3676 or email [email protected]. For TTY, call
(202) 502-8659.
Dated: May 22, 2019.
Kimberly D. Bose,
Secretary.
[FR Doc. 2019-11173 Filed 5-28-19; 8:45 am]
BILLING CODE 6717-01-P