Combined Notice of Filings #1, 24770-24772 [2019-11160]
Download as PDF
24770
Federal Register / Vol. 84, No. 103 / Wednesday, May 29, 2019 / Notices
Boardman. The Boardman-to-Ione
transmission line removal timing, the
design of the transmission line to
replace the Boardman-to-Ione line, and
other supporting infrastructure needed
to meet service requirements will
depend on the construction of other
transmission infrastructure on the east
side of Bombing Range Road, across the
roadway from NWSTF Boardman.
Ultimately, if all Bonneville service and
reliability conditions are met and the
B2H Project is constructed, under the
amended land use agreement, the entire
Boardman-to-Ione transmission line will
be removed from NWSTF Boardman
within 10 years of the B2H Project being
placed in service.
If the B2H Project is not constructed
on NWSTF Boardman or the Navy does
not grant an easement to the B2H
project, all terms of the existing land use
agreement, including all previous
amendments, between Bonneville and
the Navy for the Boardman-to-Ione
transmission line right-of-way will
remain in place and unchanged.
The B2H Project Final EIS also
included a No Action Alternative.
Under the No Action Alternative,
Bonneville would not amend the
Boardman-to-Ione transmission line’s
land use agreement. The B2H Project
would not be constructed within the
existing Boardman-to-Ione transmission
line right-of-way. There would be no
changes to the location, operation,
maintenance, or Bonneville access for
the Boardman-to-Ione transmission line
on NWSTF Boardman. Because there
would be no ground disturbance or
other new environmental impacts
related to this portion of the existing
Boardman-to-Ione transmission line, the
No Action Alternative would be
considered the environmentally
preferable alternative for Bonneville’s
action that is the subject of this ROD.
khammond on DSKBBV9HB2PROD with NOTICES
Bonneville’s Rationale for Decision
In making its decision to amend the
land use agreement with the Navy for
the Boardman-to-Ione transmission line,
Bonneville has considered and balanced
a variety of relevant factors. Bonneville
considered the environmental impacts
described in the Final EIS, as well as
public comments received throughout
the NEPA process and on the Draft and
Final EISs. Bonneville also considered
the following Bonneville purposes (i.e.,
objectives) identified in the Final EIS:
• Maintain Bonneville’s transmission
system reliability and performance
• Meet Bonneville’s contractual and
statutory obligations
• Minimize impacts on the
environment
VerDate Sep<11>2014
17:45 May 28, 2019
Jkt 247001
• Minimize costs while meeting
Bonneville’s power and transmission
service needs
Finally, Bonneville considered the
decisions by the BLM, U.S. Bureau of
Reclamation, and U.S. Forest Service to
grant respective approvals, in part,
based on the analysis contained in the
Final EIS for the B2H Project, for rightsof-way over the lands they manage for
the Agency Preferred Alternative. After
considering and balancing all of these
factors, Bonneville has decided to
amend the land use agreement with the
Navy that authorizes the on-going
operation and maintenance of the 69-kV
Boardman-to-Ione transmission line on
NWSTF Boardman in Morrow County,
Oregon.
Amending the land use agreement
will not interfere with or otherwise
affect Bonneville’s ability to maintain
the stability and reliability of its
transmission system or for Bonneville to
meet contractual or statutory
obligations. The implementation of the
removal actions based on the reliability
and customer conditions identified in
the amended land use agreement will
ensure that any change in transmission
infrastructure will continue to meet
Bonneville’s system stability and
reliability needs and to provide service
to its customer(s).
The removal of the Boardman-to-Ione
transmission line from NWSTF
Boardman and any supporting
infrastructure construction, such as a
stepdown substation or access roads,
will likely result in impacts to soils,
land uses, vegetation, wildlife habitat,
and, potentially, some sensitive
resources. The impacts associated with
these activities were analyzed in the
B2H Project Final EIS, which also
identifies numerous mitigation
measures and required design features
to reduce, avoid, or compensate for B2H
Project impacts. IPC has committed to
implement these design features and
mitigation measures as part of the
development of the B2H Project.
Specific to removing the line, methods
would be used to minimize ground
disturbance and restrict vehicle access
in order to minimize potential
environmental impacts. In addition,
final removal plans would be
coordinated with NWSTF Boardman
personnel as well as Morrow County
Public Works, Oregon Department of
Transportation, adjacent landowners,
and other relevant agencies. As
additional site-specific information to
refine the location and nature of the
Boardman-to-Ione transmission line’s
removal activities are further known,
Bonneville may identify additional
PO 00000
Frm 00029
Fmt 4703
Sfmt 4703
necessary minimization and/or
mitigation actions.
Should the Boardman-to-Ione
transmission line be removed to
accommodate the B2H Project, the
estimated cost of the removal and
replacement activities will be about $16
million dollars, which will be paid for
by the B2H Project. Should the B2H
Project not be built, the Boardman-toIone transmission line will remain in
place and there will be no costs
associated with removal and
replacement activities. Either way, costs
to Bonneville would be minimal to nonexistent.
Mitigation
A complete list of required
environmental protection measures
designed to avoid and/or minimize
environmental harm from B2H Project
construction, operation, and
maintenance activities, is available in
Chapter 2 (Table 2–7) of the Final EIS
and in Appendix D of BLM’s ROD. All
the mitigation measures that apply to
removal of the Boardman-to-Ione
transmission line from NWSTF
Boardman are adopted. IPC will be
responsible for implementing mitigation
measures for their actions identified in
the EIS. As additional site-specific
information to refine the location and
nature of the Boardman-to-Ione
transmission line’s removal activities
are further known, Bonneville may
identify additional necessary
minimization and/or mitigation actions.
Before Bonneville takes any action to
begin removal of the Boardman-to-Ione
transmission line, Bonneville will
prepare a Mitigation Action Plan for all
mitigation it intends to implement.
Signed on the 13th day of May 2019.
Elliot E. Mainzer,
Administrator and Chief Executive Officer.
[FR Doc. 2019–11140 Filed 5–28–19; 8:45 am]
BILLING CODE 6450–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Combined Notice of Filings #1
Take notice that the Commission
received the following electric rate
filings:
Docket Numbers: ER18–855–000.
Applicants: Panoche Valley Solar,
LLC.
Description: Report Filing: Refund
Report of Panoche Valley Solar, LLC to
be effective N/A.
Filed Date: 5/21/19.
Accession Number: 20190521–5109.
E:\FR\FM\29MYN1.SGM
29MYN1
khammond on DSKBBV9HB2PROD with NOTICES
Federal Register / Vol. 84, No. 103 / Wednesday, May 29, 2019 / Notices
Comments Due: 5 p.m. ET 6/11/19.
Docket Numbers: ER19–709–003.
Applicants: Entergy Louisiana, LLC.
Description: Tariff Amendment:
Entergy OpCos Reactive Power Update
to be effective 1/1/2019.
Filed Date: 5/22/19.
Accession Number: 20190522–5117.
Comments Due: 5 p.m. ET 6/12/19.
Docket Numbers: ER19–1455–001.
Applicants: Wisconsin Public Service
Corporation.
Description: Tariff Amendment: TCJA
Supplemental Filing to be effective 1/1/
2018.
Filed Date: 5/22/19.
Accession Number: 20190522–5098.
Comments Due: 5 p.m. ET 6/12/19.
Docket Numbers: ER19–1823–001.
Applicants: Midcontinent
Independent System Operator, Inc.
Description: Compliance filing: 2019–
05–21_Amendment RM17–8
Compliance regarding Surplus
Interconnection Service to be effective
12/31/9998.
Filed Date: 5/21/19.
Accession Number: 20190521–5128.
Comments Due: 5 p.m. ET 6/11/19.
Docket Numbers: ER19–1921–000.
Applicants: The United Illuminating
Company.
Description: Tariff Cancellation:
Termination of Localized Costs Sharing
Agreement No. 17 to be effective 4/1/
2019.
Filed Date: 5/21/19.
Accession Number: 20190521–5136.
Comments Due: 5 p.m. ET 6/11/19.
Docket Numbers: ER19–1922–000.
Applicants: PJM Interconnection,
L.L.C.
Description: Compliance filing:
Compliance Filing re: Option to Build
Provisions in EL19–18–000 to be
effective 7/22/2019.
Filed Date: 5/21/19.
Accession Number: 20190521–5137.
Comments Due: 5 p.m. ET 6/11/19.
Docket Numbers: ER19–1923–000.
Applicants: Kansas City Power &
Light Company.
Description: § 205(d) Rate Filing:
KCP&L Certificate of Concurrence for
Amended & Restated Interchange
Agreement to be effective 5/16/2019.
Filed Date: 5/22/19.
Accession Number: 20190522–5000.
Comments Due: 5 p.m. ET 6/12/19.
Docket Numbers: ER19–1924–000.
Applicants: Cheyenne Light, Fuel and
Power Company.
Description: Compliance filing: Order
No. 845 Compliance FilingAmendments to OATT to be effective 5/
22/2019.
Filed Date: 5/22/19.
VerDate Sep<11>2014
17:45 May 28, 2019
Jkt 247001
Accession Number: 20190522–5001.
Comments Due: 5 p.m. ET 6/12/19.
Docket Numbers: ER19–1925–000.
Applicants: Black Hills Colorado
Electric, LLC.
Description: Compliance filing: Order
No. 845 Compliance FilingAmendments to OATT to be effective 5/
22/2019.
Filed Date: 5/22/19.
Accession Number: 20190522–5002.
Comments Due: 5 p.m. ET 6/12/19.
Docket Numbers: ER19–1926–000.
Applicants: Black Hills Power, Inc.
Description: Compliance filing: Order
No. 845 Compliance FilingAmendments to OATT to be effective 5/
22/2019.
Filed Date: 5/22/19.
Accession Number: 20190522–5003.
Comments Due: 5 p.m. ET 6/12/19.
Docket Numbers: ER19–1927–000.
Applicants: Portland General Electric
Company.
Description: Compliance filing: Order
845 Compliance Filing to be effective 5/
22/2019.
Filed Date: 5/22/19.
Accession Number: 20190522–5004.
Comments Due: 5 p.m. ET 6/12/19.
Docket Numbers: ER19–1928–000.
Applicants: Southwest Power Pool,
Inc.
Description: § 205(d) Rate Filing:
3290R2 Sholes Wind GIA to be effective
4/25/2019.
Filed Date: 5/22/19.
Accession Number: 20190522–5016.
Comments Due: 5 p.m. ET 6/12/19.
Docket Numbers: ER19–1929–000.
Applicants: Arizona Public Service
Company.
Description: Notice of Cancellation of
Rate Schedule No. 125 of Arizona
Public Service Company.
Filed Date: 5/21/19.
Accession Number: 20190521–5157.
Comments Due: 5 p.m. ET 6/11/19.
Docket Numbers: ER19–1930–000.
Applicants: Dominion Energy South
Carolina, Inc.
Description: Tariff Cancellation:
Notice of Termination of WR Tariff
(sections) (Amended) to be effective 4/
8/2019.
Filed Date: 5/22/19.
Accession Number: 20190522–5035.
Comments Due: 5 p.m. ET 6/12/19.
Docket Numbers: ER19–1931–000.
Applicants: Electric Energy, Inc.
Description: Compliance filing:
compliance 2019 Attachment M 2 to be
effective 5/22/2019.
Filed Date: 5/22/19.
Accession Number: 20190522–5056.
Comments Due: 5 p.m. ET 6/12/19.
Docket Numbers: ER19–1932–000.
PO 00000
Frm 00030
Fmt 4703
Sfmt 4703
24771
Applicants: Duke Energy Progress,
LLC.
Description: § 205(d) Rate Filing:
DEP–PJM Amended JOA Certificate of
Concurrence to be effective 7/22/2019.
Filed Date: 5/22/19.
Accession Number: 20190522–5059.
Comments Due: 5 p.m. ET 6/12/19.
Docket Numbers: ER19–1933–000.
Applicants: Southwest Power Pool,
Inc.
Description: § 205(d) Rate Filing:
3101R3 Heartland Consumers Power
District NITSA and NOA to be effective
5/1/2019.
Filed Date: 5/22/19.
Accession Number: 20190522–5069.
Comments Due: 5 p.m. ET 6/12/19.
Docket Numbers: ER19–1934–000.
Applicants: Tucson Electric Power
Company.
Description: Compliance filing: Order
No. 845 Compliance Filing to be
effective 5/22/2019.
Filed Date: 5/22/19.
Accession Number: 20190522–5070.
Comments Due: 5 p.m. ET 6/12/19.
Docket Numbers: ER19–1935–000.
Applicants: UNS Electric, Inc.
Description: Compliance filing: Order
No. 845 Compliance Filing to be
effective 5/22/2019.
Filed Date: 5/22/19.
Accession Number: 20190522–5071.
Comments Due: 5 p.m. ET 6/12/19.
Docket Numbers: ER19–1936–000.
Applicants: Idaho Power Company.
Description: Compliance filing: Order
Nos. 845 and 845–A Compliance
Filing—LGIP and LGIA Revisions to be
effective 5/22/2019.
Filed Date: 5/22/19.
Accession Number: 20190522–5072.
Comments Due: 5 p.m. ET 6/12/19.
Docket Numbers: ER19–1937–000.
Applicants: Mid-Atlantic Interstate
Transmission, LLC, PJM
Interconnection, L.L.C.
Description: Tariff Cancellation:
MAIT submits Notice of Cancellation of
Generation Facility Transmission IA 599
to be effective 4/30/2019.
Filed Date: 5/22/19.
Accession Number: 20190522–5073.
Comments Due: 5 p.m. ET 6/12/19.
Docket Numbers: ER19–1938–000.
Applicants: Florida Power & Light
Company.
Description: Compliance filing: FPL
Order No. 845 Compliance Filing-LGIP
& LGIA Revisions to be effective 5/22/
2019.
Filed Date: 5/22/19.
Accession Number: 20190522–5074.
Comments Due: 5 p.m. ET 6/12/19.
Docket Numbers: ER19–1939–000.
Applicants: Arizona Public Service
Company.
E:\FR\FM\29MYN1.SGM
29MYN1
khammond on DSKBBV9HB2PROD with NOTICES
24772
Federal Register / Vol. 84, No. 103 / Wednesday, May 29, 2019 / Notices
Description: Compliance filing: APS
Order No. 845 Filing to be effective
5/22/2019.
Filed Date: 5/22/19.
Accession Number: 20190522–5075.
Comments Due: 5 p.m. ET 6/12/19.
Docket Numbers: ER19–1940–000.
Applicants: Florida Power & Light
Company.
Description: Compliance filing: Order
845 Compliance Filing to be effective
5/22/2019.
Filed Date: 5/22/19.
Accession Number: 20190522–5099.
Comments Due: 5 p.m. ET 6/12/19.
Docket Numbers: ER19–1941–000.
Applicants: Flat Ridge 2 Wind Energy
LLC.
Description: § 205(d) Rate Filing:
Revised Market-Based Rate Tariff Filing
to be effective 4/22/2019.
Filed Date: 5/22/19.
Accession Number: 20190522–5100.
Comments Due: 5 p.m. ET 6/12/19.
Docket Numbers: ER19–1942–000.
Applicants: Fowler Ridge II Wind
Farm LLC.
Description: § 205(d) Rate Filing:
Revised Market-Based Rate Tariff Filing
to be effective 4/22/2019.
Filed Date: 5/22/19.
Accession Number: 20190522–5102.
Comments Due: 5 p.m. ET 6/12/19.
Docket Numbers: ER19–1943–000.
Applicants: NorthWestern
Corporation.
Description: Compliance filing: Order
No. 845 & 845–A Compliance Filing
(Montana) to be effective 5/22/2019.
Filed Date: 5/22/19.
Accession Number: 20190522–5107.
Comments Due: 5 p.m. ET 6/12/19.
Docket Numbers: ER19–1944–000.
Applicants: The Potomac Edison
Company, PJM Interconnection, L.L.C.
Description: § 205(d) Rate Filing: The
Potomac Edison Company submits
Interconnection Agreement No. 4313 to
be effective 7/21/2019.
Filed Date: 5/22/19.
Accession Number: 20190522–5108.
Comments Due: 5 p.m. ET 6/12/19.
Docket Numbers: ER19–1945–000.
Applicants: Pacific Gas and Electric
Company, Southern California Edison
Company, San Diego Gas & Electric
Company.
Description: Pre-Arranged/Pre-Agreed
(Amending 2017 Settlement Agreement)
Filing of Pacific Gas and Electric
Company, et al.
Filed Date: 5/22/19.
Accession Number: 20190522–5114.
Comments Due: 5 p.m. ET 6/12/19.
Docket Numbers: ER19–1946–000.
Applicants: Dominion Energy South
Carolina, Inc.
VerDate Sep<11>2014
18:42 May 28, 2019
Jkt 247001
Description: Compliance filing: Order
Nos. 845 and 845–A—Attachment M to
be effective 5/22/2019.
Filed Date: 5/22/19.
Accession Number: 20190522–5123.
Comments Due: 5 p.m. ET 6/12/19.
Docket Numbers: ER19–1947–000.
Applicants: Puget Sound Energy, Inc.
Description: Compliance filing: Order
No. 845 Compliance Filing to be
effective 5/22/2019.
Filed Date: 5/22/19.
Accession Number: 20190522–5134.
Comments Due: 5 p.m. ET 6/12/19.
Docket Numbers: ER19–1948–000.
Applicants: PacifiCorp.
Description: Compliance filing: OATT
Order 845 Changes to be effective 5/22/
2019.
Filed Date: 5/22/19.
Accession Number: 20190522–5135.
Comments Due: 5 p.m. ET 6/12/19.
Docket Numbers: ER19–1949–000.
Applicants: New York Independent
System Operator, Inc.
Description: Compliance filing:
Compliance filing re: Order No. 845 and
845–A revisions to LFIP and LGIA to be
effective 12/31/9998.
Filed Date: 5/22/19.
Accession Number: 20190522–5137.
Comments Due: 5 p.m. ET 6/12/19.
Docket Numbers: ER19–1950–000.
Applicants: California Independent
System Operator Corporation.
Description: Compliance filing: 2019–
05–22 Order No. 845 Compliance to be
effective 12/31/9998.
Filed Date: 5/22/19.
Accession Number: 20190522–5138.
Comments Due: 5 p.m. ET 6/12/19.
Docket Numbers: ER19–1951–000.
Applicants: ISO New England Inc.,
Eversource Energy Service Company (as
agent).
Description: Compliance filing: Rev.
to Schedule 22 of ISO Tariff in
Compliance with Order Nos. 845 &
845–A to be effective 12/31/9998.
Filed Date: 5/22/19.
Accession Number: 20190522–5140.
Comments Due: 5 p.m. ET 6/12/19.
Docket Numbers: ER19–1952–000.
Applicants: ISO New England Inc.,
New England Power Pool Participants
Committee.
Description: § 205(d) Rate Filing:
Revisions to ISO Tariff to Modify
Timelines and Scope of Interconnection
Studies to be effective 12/31/9998.
Filed Date: 5/22/19.
Accession Number: 20190522–5147.
Comments Due: 5 p.m. ET 6/12/19.
Docket Numbers: ER19–1953–000.
Applicants: El Paso Electric Company.
Description: Compliance filing: OATT
Order Nos. 845 and 845–A Compliance
PO 00000
Frm 00031
Fmt 4703
Sfmt 4703
Filing Attachment M to be effective
5/22/2019.
Filed Date: 5/22/19.
Accession Number: 20190522–5155.
Comments Due: 5 p.m. ET 6/12/19.
Take notice that the Commission
received the following electric
reliability filings.
Docket Numbers: RD19–5–000.
Applicants: North American Electric
Reliability Corporation.
Description: Petition of the North
American Electric Reliability
Corporation for Approval of Proposed
Reliability Standard CIP–003–8.
Filed Date: 5/21/19.
Accession Number: 20190521–5169.
Comments Due: 5 p.m. ET 6/12/19.
The filings are accessible in the
Commission’s eLibrary system by
clicking on the links or querying the
docket number.
Any person desiring to intervene or
protest in any of the above proceedings
must file in accordance with Rules 211
and 214 of the Commission’s
Regulations (18 CFR 385.211 and
385.214) on or before 5:00 p.m. Eastern
time on the specified comment date.
Protests may be considered, but
intervention is necessary to become a
party to the proceeding.
eFiling is encouraged. More detailed
information relating to filing
requirements, interventions, protests,
service, and qualifying facilities filings
can be found at: https://www.ferc.gov/
docs-filing/efiling/filing-req.pdf. For
other information, call (866) 208–3676
(toll free). For TTY, call (202) 502–8659.
Dated: May 22, 2019.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2019–11160 Filed 5–28–19; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. CP19–469–000]
Tennessee Gas Pipeline Company,
L.L.C.; Notice of Request Under
Blanket Authorization
Take notice that on May 15, 2019,
Tennessee Gas Pipeline Company,
L.L.C. (Tennessee), 1001 Louisiana
Street, Houston, Texas 77002, filed in
the above referenced docket, a prior
notice request pursuant to sections
157.205, 157.208 and 157.210 of the
Commission’s regulations under the
Natural Gas Act (NGA) and Tennessee’s
blanket certificate issued in Docket No.
CP82–413–000, for authorization to
E:\FR\FM\29MYN1.SGM
29MYN1
Agencies
[Federal Register Volume 84, Number 103 (Wednesday, May 29, 2019)]
[Notices]
[Pages 24770-24772]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2019-11160]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
Combined Notice of Filings #1
Take notice that the Commission received the following electric
rate filings:
Docket Numbers: ER18-855-000.
Applicants: Panoche Valley Solar, LLC.
Description: Report Filing: Refund Report of Panoche Valley Solar,
LLC to be effective N/A.
Filed Date: 5/21/19.
Accession Number: 20190521-5109.
[[Page 24771]]
Comments Due: 5 p.m. ET 6/11/19.
Docket Numbers: ER19-709-003.
Applicants: Entergy Louisiana, LLC.
Description: Tariff Amendment: Entergy OpCos Reactive Power Update
to be effective 1/1/2019.
Filed Date: 5/22/19.
Accession Number: 20190522-5117.
Comments Due: 5 p.m. ET 6/12/19.
Docket Numbers: ER19-1455-001.
Applicants: Wisconsin Public Service Corporation.
Description: Tariff Amendment: TCJA Supplemental Filing to be
effective 1/1/2018.
Filed Date: 5/22/19.
Accession Number: 20190522-5098.
Comments Due: 5 p.m. ET 6/12/19.
Docket Numbers: ER19-1823-001.
Applicants: Midcontinent Independent System Operator, Inc.
Description: Compliance filing: 2019-05-21_Amendment RM17-8
Compliance regarding Surplus Interconnection Service to be effective
12/31/9998.
Filed Date: 5/21/19.
Accession Number: 20190521-5128.
Comments Due: 5 p.m. ET 6/11/19.
Docket Numbers: ER19-1921-000.
Applicants: The United Illuminating Company.
Description: Tariff Cancellation: Termination of Localized Costs
Sharing Agreement No. 17 to be effective 4/1/2019.
Filed Date: 5/21/19.
Accession Number: 20190521-5136.
Comments Due: 5 p.m. ET 6/11/19.
Docket Numbers: ER19-1922-000.
Applicants: PJM Interconnection, L.L.C.
Description: Compliance filing: Compliance Filing re: Option to
Build Provisions in EL19-18-000 to be effective 7/22/2019.
Filed Date: 5/21/19.
Accession Number: 20190521-5137.
Comments Due: 5 p.m. ET 6/11/19.
Docket Numbers: ER19-1923-000.
Applicants: Kansas City Power & Light Company.
Description: Sec. 205(d) Rate Filing: KCP&L Certificate of
Concurrence for Amended & Restated Interchange Agreement to be
effective 5/16/2019.
Filed Date: 5/22/19.
Accession Number: 20190522-5000.
Comments Due: 5 p.m. ET 6/12/19.
Docket Numbers: ER19-1924-000.
Applicants: Cheyenne Light, Fuel and Power Company.
Description: Compliance filing: Order No. 845 Compliance Filing-
Amendments to OATT to be effective 5/22/2019.
Filed Date: 5/22/19.
Accession Number: 20190522-5001.
Comments Due: 5 p.m. ET 6/12/19.
Docket Numbers: ER19-1925-000.
Applicants: Black Hills Colorado Electric, LLC.
Description: Compliance filing: Order No. 845 Compliance Filing-
Amendments to OATT to be effective 5/22/2019.
Filed Date: 5/22/19.
Accession Number: 20190522-5002.
Comments Due: 5 p.m. ET 6/12/19.
Docket Numbers: ER19-1926-000.
Applicants: Black Hills Power, Inc.
Description: Compliance filing: Order No. 845 Compliance Filing-
Amendments to OATT to be effective 5/22/2019.
Filed Date: 5/22/19.
Accession Number: 20190522-5003.
Comments Due: 5 p.m. ET 6/12/19.
Docket Numbers: ER19-1927-000.
Applicants: Portland General Electric Company.
Description: Compliance filing: Order 845 Compliance Filing to be
effective 5/22/2019.
Filed Date: 5/22/19.
Accession Number: 20190522-5004.
Comments Due: 5 p.m. ET 6/12/19.
Docket Numbers: ER19-1928-000.
Applicants: Southwest Power Pool, Inc.
Description: Sec. 205(d) Rate Filing: 3290R2 Sholes Wind GIA to be
effective 4/25/2019.
Filed Date: 5/22/19.
Accession Number: 20190522-5016.
Comments Due: 5 p.m. ET 6/12/19.
Docket Numbers: ER19-1929-000.
Applicants: Arizona Public Service Company.
Description: Notice of Cancellation of Rate Schedule No. 125 of
Arizona Public Service Company.
Filed Date: 5/21/19.
Accession Number: 20190521-5157.
Comments Due: 5 p.m. ET 6/11/19.
Docket Numbers: ER19-1930-000.
Applicants: Dominion Energy South Carolina, Inc.
Description: Tariff Cancellation: Notice of Termination of WR
Tariff (sections) (Amended) to be effective 4/8/2019.
Filed Date: 5/22/19.
Accession Number: 20190522-5035.
Comments Due: 5 p.m. ET 6/12/19.
Docket Numbers: ER19-1931-000.
Applicants: Electric Energy, Inc.
Description: Compliance filing: compliance 2019 Attachment M 2 to
be effective 5/22/2019.
Filed Date: 5/22/19.
Accession Number: 20190522-5056.
Comments Due: 5 p.m. ET 6/12/19.
Docket Numbers: ER19-1932-000.
Applicants: Duke Energy Progress, LLC.
Description: Sec. 205(d) Rate Filing: DEP-PJM Amended JOA
Certificate of Concurrence to be effective 7/22/2019.
Filed Date: 5/22/19.
Accession Number: 20190522-5059.
Comments Due: 5 p.m. ET 6/12/19.
Docket Numbers: ER19-1933-000.
Applicants: Southwest Power Pool, Inc.
Description: Sec. 205(d) Rate Filing: 3101R3 Heartland Consumers
Power District NITSA and NOA to be effective 5/1/2019.
Filed Date: 5/22/19.
Accession Number: 20190522-5069.
Comments Due: 5 p.m. ET 6/12/19.
Docket Numbers: ER19-1934-000.
Applicants: Tucson Electric Power Company.
Description: Compliance filing: Order No. 845 Compliance Filing to
be effective 5/22/2019.
Filed Date: 5/22/19.
Accession Number: 20190522-5070.
Comments Due: 5 p.m. ET 6/12/19.
Docket Numbers: ER19-1935-000.
Applicants: UNS Electric, Inc.
Description: Compliance filing: Order No. 845 Compliance Filing to
be effective 5/22/2019.
Filed Date: 5/22/19.
Accession Number: 20190522-5071.
Comments Due: 5 p.m. ET 6/12/19.
Docket Numbers: ER19-1936-000.
Applicants: Idaho Power Company.
Description: Compliance filing: Order Nos. 845 and 845-A Compliance
Filing--LGIP and LGIA Revisions to be effective 5/22/2019.
Filed Date: 5/22/19.
Accession Number: 20190522-5072.
Comments Due: 5 p.m. ET 6/12/19.
Docket Numbers: ER19-1937-000.
Applicants: Mid-Atlantic Interstate Transmission, LLC, PJM
Interconnection, L.L.C.
Description: Tariff Cancellation: MAIT submits Notice of
Cancellation of Generation Facility Transmission IA 599 to be effective
4/30/2019.
Filed Date: 5/22/19.
Accession Number: 20190522-5073.
Comments Due: 5 p.m. ET 6/12/19.
Docket Numbers: ER19-1938-000.
Applicants: Florida Power & Light Company.
Description: Compliance filing: FPL Order No. 845 Compliance
Filing-LGIP & LGIA Revisions to be effective 5/22/2019.
Filed Date: 5/22/19.
Accession Number: 20190522-5074.
Comments Due: 5 p.m. ET 6/12/19.
Docket Numbers: ER19-1939-000.
Applicants: Arizona Public Service Company.
[[Page 24772]]
Description: Compliance filing: APS Order No. 845 Filing to be
effective 5/22/2019.
Filed Date: 5/22/19.
Accession Number: 20190522-5075.
Comments Due: 5 p.m. ET 6/12/19.
Docket Numbers: ER19-1940-000.
Applicants: Florida Power & Light Company.
Description: Compliance filing: Order 845 Compliance Filing to be
effective 5/22/2019.
Filed Date: 5/22/19.
Accession Number: 20190522-5099.
Comments Due: 5 p.m. ET 6/12/19.
Docket Numbers: ER19-1941-000.
Applicants: Flat Ridge 2 Wind Energy LLC.
Description: Sec. 205(d) Rate Filing: Revised Market-Based Rate
Tariff Filing to be effective 4/22/2019.
Filed Date: 5/22/19.
Accession Number: 20190522-5100.
Comments Due: 5 p.m. ET 6/12/19.
Docket Numbers: ER19-1942-000.
Applicants: Fowler Ridge II Wind Farm LLC.
Description: Sec. 205(d) Rate Filing: Revised Market-Based Rate
Tariff Filing to be effective 4/22/2019.
Filed Date: 5/22/19.
Accession Number: 20190522-5102.
Comments Due: 5 p.m. ET 6/12/19.
Docket Numbers: ER19-1943-000.
Applicants: NorthWestern Corporation.
Description: Compliance filing: Order No. 845 & 845-A Compliance
Filing (Montana) to be effective 5/22/2019.
Filed Date: 5/22/19.
Accession Number: 20190522-5107.
Comments Due: 5 p.m. ET 6/12/19.
Docket Numbers: ER19-1944-000.
Applicants: The Potomac Edison Company, PJM Interconnection, L.L.C.
Description: Sec. 205(d) Rate Filing: The Potomac Edison Company
submits Interconnection Agreement No. 4313 to be effective 7/21/2019.
Filed Date: 5/22/19.
Accession Number: 20190522-5108.
Comments Due: 5 p.m. ET 6/12/19.
Docket Numbers: ER19-1945-000.
Applicants: Pacific Gas and Electric Company, Southern California
Edison Company, San Diego Gas & Electric Company.
Description: Pre-Arranged/Pre-Agreed (Amending 2017 Settlement
Agreement) Filing of Pacific Gas and Electric Company, et al.
Filed Date: 5/22/19.
Accession Number: 20190522-5114.
Comments Due: 5 p.m. ET 6/12/19.
Docket Numbers: ER19-1946-000.
Applicants: Dominion Energy South Carolina, Inc.
Description: Compliance filing: Order Nos. 845 and 845-A--
Attachment M to be effective 5/22/2019.
Filed Date: 5/22/19.
Accession Number: 20190522-5123.
Comments Due: 5 p.m. ET 6/12/19.
Docket Numbers: ER19-1947-000.
Applicants: Puget Sound Energy, Inc.
Description: Compliance filing: Order No. 845 Compliance Filing to
be effective 5/22/2019.
Filed Date: 5/22/19.
Accession Number: 20190522-5134.
Comments Due: 5 p.m. ET 6/12/19.
Docket Numbers: ER19-1948-000.
Applicants: PacifiCorp.
Description: Compliance filing: OATT Order 845 Changes to be
effective 5/22/2019.
Filed Date: 5/22/19.
Accession Number: 20190522-5135.
Comments Due: 5 p.m. ET 6/12/19.
Docket Numbers: ER19-1949-000.
Applicants: New York Independent System Operator, Inc.
Description: Compliance filing: Compliance filing re: Order No. 845
and 845-A revisions to LFIP and LGIA to be effective 12/31/9998.
Filed Date: 5/22/19.
Accession Number: 20190522-5137.
Comments Due: 5 p.m. ET 6/12/19.
Docket Numbers: ER19-1950-000.
Applicants: California Independent System Operator Corporation.
Description: Compliance filing: 2019-05-22 Order No. 845 Compliance
to be effective 12/31/9998.
Filed Date: 5/22/19.
Accession Number: 20190522-5138.
Comments Due: 5 p.m. ET 6/12/19.
Docket Numbers: ER19-1951-000.
Applicants: ISO New England Inc., Eversource Energy Service Company
(as agent).
Description: Compliance filing: Rev. to Schedule 22 of ISO Tariff
in Compliance with Order Nos. 845 & 845-A to be effective 12/31/9998.
Filed Date: 5/22/19.
Accession Number: 20190522-5140.
Comments Due: 5 p.m. ET 6/12/19.
Docket Numbers: ER19-1952-000.
Applicants: ISO New England Inc., New England Power Pool
Participants Committee.
Description: Sec. 205(d) Rate Filing: Revisions to ISO Tariff to
Modify Timelines and Scope of Interconnection Studies to be effective
12/31/9998.
Filed Date: 5/22/19.
Accession Number: 20190522-5147.
Comments Due: 5 p.m. ET 6/12/19.
Docket Numbers: ER19-1953-000.
Applicants: El Paso Electric Company.
Description: Compliance filing: OATT Order Nos. 845 and 845-A
Compliance Filing Attachment M to be effective 5/22/2019.
Filed Date: 5/22/19.
Accession Number: 20190522-5155.
Comments Due: 5 p.m. ET 6/12/19.
Take notice that the Commission received the following electric
reliability filings.
Docket Numbers: RD19-5-000.
Applicants: North American Electric Reliability Corporation.
Description: Petition of the North American Electric Reliability
Corporation for Approval of Proposed Reliability Standard CIP-003-8.
Filed Date: 5/21/19.
Accession Number: 20190521-5169.
Comments Due: 5 p.m. ET 6/12/19.
The filings are accessible in the Commission's eLibrary system by
clicking on the links or querying the docket number.
Any person desiring to intervene or protest in any of the above
proceedings must file in accordance with Rules 211 and 214 of the
Commission's Regulations (18 CFR 385.211 and 385.214) on or before 5:00
p.m. Eastern time on the specified comment date. Protests may be
considered, but intervention is necessary to become a party to the
proceeding.
eFiling is encouraged. More detailed information relating to filing
requirements, interventions, protests, service, and qualifying
facilities filings can be found at: https://www.ferc.gov/docs-filing/efiling/filing-req.pdf. For other information, call (866) 208-3676
(toll free). For TTY, call (202) 502-8659.
Dated: May 22, 2019.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2019-11160 Filed 5-28-19; 8:45 am]
BILLING CODE 6717-01-P