Combined Notice of Filings #2, 24500 [2019-11159]
Download as PDF
24500
Federal Register / Vol. 84, No. 102 / Tuesday, May 28, 2019 / Notices
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
jbell on DSK3GLQ082PROD with NOTICES
Combined Notice of Filings #2
Take notice that the Commission
received the following electric rate
filings:
Docket Numbers: ER19–1137–003.
Applicants: Southwest Power Pool,
Inc.
Description: Compliance filing:
Request for Deferral of Effective Date—
East Texas Cooperatives Stated Rate to
be effective N/A.
Filed Date: 5/21/19.
Accession Number: 20190521–5091.
Comments Due: 5 p.m. ET 6/11/19.
Docket Numbers: ER19–1912–000.
Applicants: Southwest Power Pool,
Inc.
Description: § 205(d) Rate Filing: 3551
Rainbow Energy Marketing & Sunflower
Meter Agent Agr to be effective 5/1/
2019.
Filed Date: 5/21/19.
Accession Number: 20190521–5087.
Comments Due: 5 p.m. ET 6/11/19.
Docket Numbers: ER19–1913–000.
Applicants: PJM Interconnection,
L.L.C.
Description: Tariff Cancellation:
Notice of Cancellation of ISA, SA No.
5258; Queue No. AC1–085 to be
effective 5/7/2019.
Filed Date: 5/21/19.
Accession Number: 20190521–5098.
Comments Due: 5 p.m. ET 6/11/19.
Docket Numbers: ER19–1914–000.
Applicants: Arizona Public Service
Company.
Description: § 205(d) Rate Filing: Rate
Schedule No. 292, Cochise County Joint
Participation to be effective 7/21/2019.
Filed Date: 5/21/19.
Accession Number: 20190521–5104.
Comments Due: 5 p.m. ET 6/11/19.
Docket Numbers: ER19–1915–000.
Applicants: Arizona Public Service
Company.
Description: § 205(d) Rate Filing:
Service Agreement No. 372, Cochise
County Mutual Standby Agreement to
be effective 7/21/2019.
Filed Date: 5/21/19.
Accession Number: 20190521–5105.
Comments Due: 5 p.m. ET 6/11/19.
Docket Numbers: ER19–1916–000.
Applicants: Louisville Gas and
Electric Company.
Description: Compliance filing: Order
No. 845 Compliance Filing to be
effective 5/22/2019.
Filed Date: 5/21/19.
Accession Number: 20190521–5106.
Comments Due: 5 p.m. ET 6/11/19.
VerDate Sep<11>2014
20:49 May 24, 2019
Jkt 247001
Docket Numbers: ER19–1917–000.
Applicants: Liberty Utilities (Granite
State Electric) Corp.
Description: § 205(d) Rate Filing:
Borderline Sales Rate Sheet Update
2019 to be effective 5/22/2019.
Filed Date: 5/21/19.
Accession Number: 20190521–5107.
Comments Due: 5 p.m. ET 6/11/19.
DEPARTMENT OF ENERGY
Docket Numbers: ER19–1918–000.
Applicants: Duke Energy Florida,
LLC.
Description: § 205(d) Rate Filing: DEFSeminole Electric Cooperative, Inc.
Revised Rate Sch. No. 194 to be effective
6/1/2019.
Filed Date: 5/21/19.
Accession Number: 20190521–5108.
Comments Due: 5 p.m. ET 6/11/19.
This is a supplemental notice in the
above-referenced proceeding of Antrim
Wind Energy LLC’s application for
market-based rate authority, with an
accompanying rate tariff, noting that
such application includes a request for
blanket authorization, under 18 CFR
part 34, of future issuances of securities
and assumptions of liability.
Any person desiring to intervene or to
protest should file with the Federal
Energy Regulatory Commission, 888
First Street NE, Washington, DC 20426,
in accordance with Rules 211 and 214
of the Commission’s Rules of Practice
and Procedure (18 CFR 385.211 and
385.214). Anyone filing a motion to
intervene or protest must serve a copy
of that document on the Applicant.
Notice is hereby given that the
deadline for filing protests with regard
to the applicant’s request for blanket
authorization, under 18 CFR part 34, of
future issuances of securities and
assumptions of liability, is June 10,
2019.
The Commission encourages
electronic submission of protests and
interventions in lieu of paper, using the
FERC Online links at https://
www.ferc.gov. To facilitate electronic
service, persons with internet access
who will eFile a document and/or be
listed as a contact for an intervenor
must create and validate an
eRegistration account using the
eRegistration link. Select the eFiling
link to log on and submit the
intervention or protests.
Persons unable to file electronically
should submit an original and 5 copies
of the intervention or protest to the
Federal Energy Regulatory Commission,
888 First Street NE, Washington, DC
20426.
The filings in the above-referenced
proceeding are accessible in the
Commission’s eLibrary system by
clicking on the appropriate link in the
above list. They are also available for
electronic review in the Commission’s
Public Reference Room in Washington,
DC. There is an eSubscription link on
the website that enables subscribers to
receive email notification when a
document is added to a subscribed
docket(s). For assistance with any FERC
Docket Numbers: ER19–1920–000.
Applicants: Tampa Electric Company.
Description: Compliance filing: LGIP
and LGIA Revisions per Order No. 845
to be effective 5/22/2019.
Filed Date: 5/21/19.
Accession Number: 20190521–5114.
Comments Due: 5 p.m. ET 6/11/19.
The filings are accessible in the
Commission’s eLibrary system by
clicking on the links or querying the
docket number.
Any person desiring to intervene or
protest in any of the above proceedings
must file in accordance with Rules 211
and 214 of the Commission’s
Regulations (18 CFR 385.211 and
385.214) on or before 5:00 p.m. Eastern
time on the specified comment date.
Protests may be considered, but
intervention is necessary to become a
party to the proceeding.
eFiling is encouraged. More detailed
information relating to filing
requirements, interventions, protests,
service, and qualifying facilities filings
can be found at: https://www.ferc.gov/
docs-filing/efiling/filing-req.pdf. For
other information, call (866) 208–3676
(toll free). For TTY, call (202) 502–8659.
Dated: May 21, 2019.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2019–11159 Filed 5–24–19; 8:45 am]
BILLING CODE 6717–01–P
PO 00000
Frm 00039
Fmt 4703
Sfmt 4703
Federal Energy Regulatory
Commission
[Docket No. ER19–1889–000]
Antrim Wind Energy LLC;
Supplemental Notice That Initial
Market-Based Rate Filing Includes
Request for Blanket Section 204
Authorization
E:\FR\FM\28MYN1.SGM
28MYN1
Agencies
[Federal Register Volume 84, Number 102 (Tuesday, May 28, 2019)]
[Notices]
[Page 24500]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2019-11159]
[[Page 24500]]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
Combined Notice of Filings #2
Take notice that the Commission received the following electric
rate filings:
Docket Numbers: ER19-1137-003.
Applicants: Southwest Power Pool, Inc.
Description: Compliance filing: Request for Deferral of Effective
Date--East Texas Cooperatives Stated Rate to be effective N/A.
Filed Date: 5/21/19.
Accession Number: 20190521-5091.
Comments Due: 5 p.m. ET 6/11/19.
Docket Numbers: ER19-1912-000.
Applicants: Southwest Power Pool, Inc.
Description: Sec. 205(d) Rate Filing: 3551 Rainbow Energy
Marketing & Sunflower Meter Agent Agr to be effective 5/1/2019.
Filed Date: 5/21/19.
Accession Number: 20190521-5087.
Comments Due: 5 p.m. ET 6/11/19.
Docket Numbers: ER19-1913-000.
Applicants: PJM Interconnection, L.L.C.
Description: Tariff Cancellation: Notice of Cancellation of ISA, SA
No. 5258; Queue No. AC1-085 to be effective 5/7/2019.
Filed Date: 5/21/19.
Accession Number: 20190521-5098.
Comments Due: 5 p.m. ET 6/11/19.
Docket Numbers: ER19-1914-000.
Applicants: Arizona Public Service Company.
Description: Sec. 205(d) Rate Filing: Rate Schedule No. 292,
Cochise County Joint Participation to be effective 7/21/2019.
Filed Date: 5/21/19.
Accession Number: 20190521-5104.
Comments Due: 5 p.m. ET 6/11/19.
Docket Numbers: ER19-1915-000.
Applicants: Arizona Public Service Company.
Description: Sec. 205(d) Rate Filing: Service Agreement No. 372,
Cochise County Mutual Standby Agreement to be effective 7/21/2019.
Filed Date: 5/21/19.
Accession Number: 20190521-5105.
Comments Due: 5 p.m. ET 6/11/19.
Docket Numbers: ER19-1916-000.
Applicants: Louisville Gas and Electric Company.
Description: Compliance filing: Order No. 845 Compliance Filing to
be effective 5/22/2019.
Filed Date: 5/21/19.
Accession Number: 20190521-5106.
Comments Due: 5 p.m. ET 6/11/19.
Docket Numbers: ER19-1917-000.
Applicants: Liberty Utilities (Granite State Electric) Corp.
Description: Sec. 205(d) Rate Filing: Borderline Sales Rate Sheet
Update 2019 to be effective 5/22/2019.
Filed Date: 5/21/19.
Accession Number: 20190521-5107.
Comments Due: 5 p.m. ET 6/11/19.
Docket Numbers: ER19-1918-000.
Applicants: Duke Energy Florida, LLC.
Description: Sec. 205(d) Rate Filing: DEF-Seminole Electric
Cooperative, Inc. Revised Rate Sch. No. 194 to be effective 6/1/2019.
Filed Date: 5/21/19.
Accession Number: 20190521-5108.
Comments Due: 5 p.m. ET 6/11/19.
Docket Numbers: ER19-1920-000.
Applicants: Tampa Electric Company.
Description: Compliance filing: LGIP and LGIA Revisions per Order
No. 845 to be effective 5/22/2019.
Filed Date: 5/21/19.
Accession Number: 20190521-5114.
Comments Due: 5 p.m. ET 6/11/19.
The filings are accessible in the Commission's eLibrary system by
clicking on the links or querying the docket number.
Any person desiring to intervene or protest in any of the above
proceedings must file in accordance with Rules 211 and 214 of the
Commission's Regulations (18 CFR 385.211 and 385.214) on or before 5:00
p.m. Eastern time on the specified comment date. Protests may be
considered, but intervention is necessary to become a party to the
proceeding.
eFiling is encouraged. More detailed information relating to filing
requirements, interventions, protests, service, and qualifying
facilities filings can be found at: https://www.ferc.gov/docs-filing/efiling/filing-req.pdf. For other information, call (866) 208-3676
(toll free). For TTY, call (202) 502-8659.
Dated: May 21, 2019.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2019-11159 Filed 5-24-19; 8:45 am]
BILLING CODE 6717-01-P