Information Collection Request Submitted to OMB for Review and Approval; Comment Request; NSPS for Grain Elevators (Renewal), 24133 [2019-10892]

Download as PDF Federal Register / Vol. 84, No. 101 / Friday, May 24, 2019 / Notices Filed Date: 5/17/19. Accession Number: 20190517–5148. Comments Due: 5 p.m. ET 6/7/19. Docket Numbers: ER19–1893–000. Applicants: Dominion Energy South Carolina, Inc. Description: § 205(d) Rate Filing: VCS Transmission Agr Between SCE&G and SCPSA to be effective 7/17/2019. Filed Date: 5/17/19. Accession Number: 20190517–5155. Comments Due: 5 p.m. ET 6/7/19. Docket Numbers: ER19–1894–000. Applicants: Pacific Gas and Electric Company. Description: Tariff Cancellation: Notice of Termination of Capetown Wind Farm E&P Agreement to be effective 5/15/2019. Filed Date: 5/17/19. Accession Number: 20190517–5157. Comments Due: 5 p.m. ET 6/7/19. The filings are accessible in the Commission’s eLibrary system by clicking on the links or querying the docket number. Any person desiring to intervene or protest in any of the above proceedings must file in accordance with Rules 211 and 214 of the Commission’s Regulations (18 CFR 385.211 and 385.214) on or before 5:00 p.m. Eastern time on the specified comment date. Protests may be considered, but intervention is necessary to become a party to the proceeding. eFiling is encouraged. More detailed information relating to filing requirements, interventions, protests, service, and qualifying facilities filings can be found at: https://www.ferc.gov/ docs-filing/efiling/filing-req.pdf. For other information, call (866) 208–3676 (toll free). For TTY, call (202) 502–8659. Dated: May 17, 2019. Nathaniel J. Davis, Sr., Deputy Secretary. [FR Doc. 2019–10879 Filed 5–23–19; 8:45 am] BILLING CODE 6717–01–P ENVIRONMENTAL PROTECTION AGENCY khammond on DSKBBV9HB2PROD with NOTICES [EPA–HQ–OECA–2011–0239; FRL–9994– 30–OMS] Information Collection Request Submitted to OMB for Review and Approval; Comment Request; NSPS for Grain Elevators (Renewal) Environmental Protection Agency (EPA). ACTION: Notice. AGENCY: VerDate Sep<11>2014 18:10 May 23, 2019 Jkt 247001 The Environmental Protection Agency (EPA) has submitted an information collection request (ICR), NSPS for Grain Elevators (EPA ICR Number 1130.12, OMB Control Number 2060–0082), to the Office of Management and Budget (OMB) for review and approval in accordance with the Paperwork Reduction Act. This is a proposed extension of the ICR, which is currently approved through May 30, 2019. Public comments were previously requested, via the Federal Register, on May 30, 2018 during a 60-day comment period. This notice allows for an additional 30 days for public comments. A fuller description of the ICR is given below, including its estimated burden and cost to the public. An agency may neither conduct nor sponsor, and a person is not required to respond to, a collection of information unless it displays a currently valid OMB control number. DATES: Additional comments may be submitted on or before June 24, 2019. ADDRESSES: Submit your comments, referencing Docket ID Number EPA– HQ–OECA–2011–0239, to: (1) EPA online using www.regulations.gov (our preferred method), or by email to docket.oeca@epa.gov, or by mail to: EPA Docket Center, Environmental Protection Agency, Mail Code 28221T, 1200 Pennsylvania Ave. NW, Washington, DC 20460; and (2) OMB via email to oira_submission@omb.eop.gov. Address comments to OMB Desk Officer for EPA. EPA’s policy is that all comments received will be included in the public docket without change, including any personal information provided, unless the comment includes profanity, threats, information claimed to be Confidential Business Information (CBI), or other information whose disclosure is restricted by statute. FOR FURTHER INFORMATION CONTACT: Patrick Yellin, Monitoring, Assistance, and Media Programs Division, Office of Compliance, Mail Code 2227A, Environmental Protection Agency, 1200 Pennsylvania Ave. NW, Washington, DC 20460; telephone number: (202) 564– 2970; fax number: (202) 564–0050; email address: yellin.patrick@epa.gov. SUPPLEMENTARY INFORMATION: Supporting documents, which explain in detail the information that the EPA will be collecting, are available in the public docket for this ICR. The docket can be viewed online at www.regulations.gov, or in person at the EPA Docket Center, EPA West, Room 3334, 1301 Constitution Ave. NW, Washington, DC. The telephone number SUMMARY: PO 00000 Frm 00059 Fmt 4703 Sfmt 4703 24133 for the Docket Center is 202–566–1744. For additional information about EPA’s public docket, visit: https:// www.epa.gov/dockets. Abstract: The New Source Performance Standards (NSPS) for Grain Elevators (40 CFR part 60, subpart DD) apply to each affected facility at any grain terminal elevator or any grain storage elevator. The facilities are each truck unloading station, truck loading station, barge and ship loading station, railcar loading station, railcar unloading station, grain dryer and all grain handling operations that commenced construction, modification or reconstruction after August 3, 1978. Owners or operators of the affected facilities must make a one-time-only report of the date of construction or reconstruction; notification of the actual date of startup; notification of any physical or operational change to existing facility that may increase the rate of emission of the regulated pollutant; notification of initial performance test; and results of initial performance test. Owners or operators are also required to maintain records of the occurrence and duration of any startup, shutdown, or malfunction, or any period during which the monitoring system is inoperative. This information is being collected to assure compliance with 40 CFR part 60, subpart DD Form Numbers: None. Respondents/affected entities: Grain elevator operations. Respondent’s obligation to respond: Mandatory (40 CFR part 60 Subpart DD). Estimated number of respondents: 200 (total). Frequency of response: Initially. Total estimated burden: 460 hours (per year). Burden is defined at 5 CFR 1320.3(b). Total estimated cost: $52,000 (per year), which includes no annualized capital/startup and/or operation & maintenance costs. Changes in the Estimates: There is no change in the total estimated respondent burden compared with the ICR currently approved by OMB. The regulations have not changed over the past three years and are not anticipated to change over the next three years, and the growth rate for the industry is very low or nonexistent. This ICR reflects the on-going burden and costs for existing facilities. Courtney Kerwin, Director, Regulatory Support Division. [FR Doc. 2019–10892 Filed 5–23–19; 8:45 am] BILLING CODE 6560–50–P E:\FR\FM\24MYN1.SGM 24MYN1

Agencies

[Federal Register Volume 84, Number 101 (Friday, May 24, 2019)]
[Notices]
[Page 24133]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2019-10892]


=======================================================================
-----------------------------------------------------------------------

ENVIRONMENTAL PROTECTION AGENCY

[EPA-HQ-OECA-2011-0239; FRL-9994-30-OMS]


Information Collection Request Submitted to OMB for Review and 
Approval; Comment Request; NSPS for Grain Elevators (Renewal)

AGENCY: Environmental Protection Agency (EPA).

ACTION: Notice.

-----------------------------------------------------------------------

SUMMARY: The Environmental Protection Agency (EPA) has submitted an 
information collection request (ICR), NSPS for Grain Elevators (EPA ICR 
Number 1130.12, OMB Control Number 2060-0082), to the Office of 
Management and Budget (OMB) for review and approval in accordance with 
the Paperwork Reduction Act. This is a proposed extension of the ICR, 
which is currently approved through May 30, 2019. Public comments were 
previously requested, via the Federal Register, on May 30, 2018 during 
a 60-day comment period. This notice allows for an additional 30 days 
for public comments. A fuller description of the ICR is given below, 
including its estimated burden and cost to the public. An agency may 
neither conduct nor sponsor, and a person is not required to respond 
to, a collection of information unless it displays a currently valid 
OMB control number.

DATES: Additional comments may be submitted on or before June 24, 2019.

ADDRESSES: Submit your comments, referencing Docket ID Number EPA-HQ-
OECA-2011-0239, to: (1) EPA online using www.regulations.gov (our 
preferred method), or by email to [email protected], or by mail to: 
EPA Docket Center, Environmental Protection Agency, Mail Code 28221T, 
1200 Pennsylvania Ave. NW, Washington, DC 20460; and (2) OMB via email 
to [email protected]. Address comments to OMB Desk Officer 
for EPA.
    EPA's policy is that all comments received will be included in the 
public docket without change, including any personal information 
provided, unless the comment includes profanity, threats, information 
claimed to be Confidential Business Information (CBI), or other 
information whose disclosure is restricted by statute.

FOR FURTHER INFORMATION CONTACT: Patrick Yellin, Monitoring, 
Assistance, and Media Programs Division, Office of Compliance, Mail 
Code 2227A, Environmental Protection Agency, 1200 Pennsylvania Ave. NW, 
Washington, DC 20460; telephone number: (202) 564-2970; fax number: 
(202) 564-0050; email address: [email protected].

SUPPLEMENTARY INFORMATION: Supporting documents, which explain in 
detail the information that the EPA will be collecting, are available 
in the public docket for this ICR. The docket can be viewed online at 
www.regulations.gov, or in person at the EPA Docket Center, EPA West, 
Room 3334, 1301 Constitution Ave. NW, Washington, DC. The telephone 
number for the Docket Center is 202-566-1744. For additional 
information about EPA's public docket, visit: https://www.epa.gov/dockets.
    Abstract: The New Source Performance Standards (NSPS) for Grain 
Elevators (40 CFR part 60, subpart DD) apply to each affected facility 
at any grain terminal elevator or any grain storage elevator. The 
facilities are each truck unloading station, truck loading station, 
barge and ship loading station, railcar loading station, railcar 
unloading station, grain dryer and all grain handling operations that 
commenced construction, modification or reconstruction after August 3, 
1978. Owners or operators of the affected facilities must make a one-
time-only report of the date of construction or reconstruction; 
notification of the actual date of startup; notification of any 
physical or operational change to existing facility that may increase 
the rate of emission of the regulated pollutant; notification of 
initial performance test; and results of initial performance test. 
Owners or operators are also required to maintain records of the 
occurrence and duration of any startup, shutdown, or malfunction, or 
any period during which the monitoring system is inoperative. This 
information is being collected to assure compliance with 40 CFR part 
60, subpart DD
    Form Numbers: None.
    Respondents/affected entities: Grain elevator operations.
    Respondent's obligation to respond: Mandatory (40 CFR part 60 
Subpart DD).
    Estimated number of respondents: 200 (total).
    Frequency of response: Initially.
    Total estimated burden: 460 hours (per year). Burden is defined at 
5 CFR 1320.3(b).
    Total estimated cost: $52,000 (per year), which includes no 
annualized capital/startup and/or operation & maintenance costs.
    Changes in the Estimates: There is no change in the total estimated 
respondent burden compared with the ICR currently approved by OMB. The 
regulations have not changed over the past three years and are not 
anticipated to change over the next three years, and the growth rate 
for the industry is very low or non-existent. This ICR reflects the on-
going burden and costs for existing facilities.

Courtney Kerwin,
Director, Regulatory Support Division.
[FR Doc. 2019-10892 Filed 5-23-19; 8:45 am]
 BILLING CODE 6560-50-P


This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.