Combined Notice of Filings #2, 24132-24133 [2019-10879]
Download as PDF
khammond on DSKBBV9HB2PROD with NOTICES
24132
Federal Register / Vol. 84, No. 101 / Friday, May 24, 2019 / Notices
environmental impacts. The more
specific your comments, the more useful
they will be. To ensure that the
Commission has the opportunity to
consider your comments prior to
making its decision on this project, it is
important that we receive your
comments in Washington, DC on or
before 5:00 p.m. Eastern Time on June
17, 2019.
For your convenience, there are three
methods you can use to file your
comments to the Commission. The
Commission encourages electronic filing
of comments and has staff available to
assist you at (866) 208–3676 or
FercOnlineSupport@ferc.gov. Please
carefully follow these instructions so
that your comments are properly
recorded.
(1) You can file your comments
electronically using the eComment
feature on the Commission’s website
(www.ferc.gov) under the link to
Documents and Filings. This is an easy
method for submitting brief, text-only
comments on a project;
(2) You can also file your comments
electronically using the eFiling feature
on the Commission’s website
(www.ferc.gov) under the link to
Documents and Filings. With eFiling,
you can provide comments in a variety
of formats by attaching them as a file
with your submission. New eFiling
users must first create an account by
clicking on ‘‘eRegister.’’ You must select
the type of filing you are making. If you
are filing a comment on a particular
project, please select ‘‘Comment on a
Filing’’; or
(3) You can file a paper copy of your
comments by mailing them to the
following address. Be sure to reference
the project docket number (CP19–7–
000) with your submission: Kimberly D.
Bose, Secretary, Federal Energy
Regulatory Commission, 888 First Street
NE, Room 1A, Washington, DC 20426
Any person seeking to become a party
to the proceeding must file a motion to
intervene pursuant to Rule 214 of the
Commission’s Rules of Practice and
Procedures (18 CFR 385.214). Motions
to intervene are more fully described at
https://www.ferc.gov/resources/guides/
how-to/intervene.asp. Only intervenors
have the right to seek rehearing or
judicial review of the Commission’s
decision. The Commission may grant
affected landowners and others with
environmental concerns intervenor
status upon showing good cause by
stating that they have a clear and direct
interest in this proceeding which no
other party can adequately represent.
Simply filing environmental comments
will not give you intervenor status, but
VerDate Sep<11>2014
19:48 May 23, 2019
Jkt 247001
you do not need intervenor status to
have your comments considered.
Additional information about the
project is available from the
Commission’s Office of External Affairs,
at (866) 208–FERC, or on the FERC
website (www.ferc.gov) using the
eLibrary link. The eLibrary link also
provides access to the texts of all formal
documents issued by the Commission,
such as orders, notices, and
rulemakings.
In addition, the Commission offers a
free service called eSubscription which
allows you to keep track of all formal
issuances and submittals in specific
dockets. This can reduce the amount of
time you spend researching proceedings
by automatically providing you with
notification of these filings, document
summaries, and direct links to the
documents. Go to www.ferc.gov/docsfiling/esubscription.asp.
Dated: May 17, 2019.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2019–10878 Filed 5–23–19; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Combined Notice of Filings #2
Take notice that the Commission
received the following exempt
wholesale generator filings:
Docket Numbers: EG19–115–000.
Applicants: Canadian Breaks LLC.
Description: Self-Certification of
Exempt Wholesale Generator Status of
Canadian Breaks LLC.
Filed Date: 5/17/19.
Accession Number: 20190517–5147.
Comments Due: 5 p.m. ET 6/7/19.
Take notice that the Commission
received the following electric rate
filings:
Docket Numbers: ER15–762–013.
Applicants: Sierra Solar Greenworks
LLC.
Description: Compliance filing: Sierra
Solar Greenworks MBR Tariff to be
effective 5/18/2019.
Filed Date: 5/17/19.
Accession Number: 20190517–5180.
Comments Due: 5 p.m. ET 6/7/19.
Docket Numbers: ER15–2680–009.
Applicants: Sandstone Solar LLC.
Description: Compliance filing:
Sandstone Solar LLC MBR Tariff to be
effective 5/18/2019.
Filed Date: 5/17/19.
Accession Number: 20190517–5129.
Comments Due: 5 p.m. ET 6/7/19.
PO 00000
Frm 00058
Fmt 4703
Sfmt 4703
Docket Numbers: ER16–890–008.
Applicants: Summer Solar LLC.
Description: Compliance filing:
Summer Solar MBR Tariff to be effective
5/18/2019.
Filed Date: 5/17/19.
Accession Number: 20190517–5134.
Comments Due: 5 p.m. ET 6/7/19.
Docket Numbers: ER16–1609–003.
Applicants: ID SOLAR 1, LLC.
Description: Compliance filing: ID
Solar 1 MBR Tariff to be effective
5/18/2019.
Filed Date: 5/17/19.
Accession Number: 20190517–5179.
Comments Due: 5 p.m. ET 6/7/19.
Docket Numbers: ER16–1956–007.
Applicants: Western Antelope Dry
Ranch LLC.
Description: Compliance filing:
Western Antelope Dry Ranch MBR
Tariff to be effective 5/18/2019.
Filed Date: 5/17/19.
Accession Number: 20190517–5138.
Comments Due: 5 p.m. ET 6/7/19.
Docket Numbers: ER16–2224–006.
Applicants: Solverde 1, LLC.
Description: Compliance filing:
Solverde 1, LLC MBR Tariff to be
effective 5/18/2019.
Filed Date: 5/17/19.
Accession Number: 20190517–5133.
Comments Due: 5 p.m. ET 6/7/19.
Docket Numbers: ER19–832–001.
Applicants: Duke Energy Florida,
LLC.
Description: Compliance filing: DEFNotice of Cancellation (ER19–832)
eTariff Metadata Compliance Filing to
be effective 11/1/2015.
Filed Date: 5/17/19.
Accession Number: 20190517–5156.
Comments Due: 5 p.m. ET 6/7/19.
Docket Numbers: ER19–847–001.
Applicants: San Pablo Raceway, LLC.
Description: Compliance filing: San
Pablo Raceway MBR Tariff to be
effective 5/18/2019.
Filed Date: 5/17/19.
Accession Number: 20190517–5125.
Comments Due: 5 p.m. ET 6/7/19.
Docket Numbers: ER19–1402–000.
Applicants: Coyote Ridge Wind, LLC.
Description: Report Filing:
Supplement to Application for MarketBased Rate Authority to be effective
N/A.
Filed Date: 5/17/19.
Accession Number: 20190517–5112.
Comments Due: 5 p.m. ET 5/28/19.
Docket Numbers: ER19–1892–000.
Applicants: Midcontinent
Independent System Operator, Inc.,
Ameren Illinois Company.
Description: § 205(d) Rate Filing:
2019–05–17_SA 3028 Ameren IL-Prairie
Power Project #14 Pleasant View to be
effective 4/18/2019.
E:\FR\FM\24MYN1.SGM
24MYN1
Federal Register / Vol. 84, No. 101 / Friday, May 24, 2019 / Notices
Filed Date: 5/17/19.
Accession Number: 20190517–5148.
Comments Due: 5 p.m. ET 6/7/19.
Docket Numbers: ER19–1893–000.
Applicants: Dominion Energy South
Carolina, Inc.
Description: § 205(d) Rate Filing: VCS
Transmission Agr Between SCE&G and
SCPSA to be effective 7/17/2019.
Filed Date: 5/17/19.
Accession Number: 20190517–5155.
Comments Due: 5 p.m. ET 6/7/19.
Docket Numbers: ER19–1894–000.
Applicants: Pacific Gas and Electric
Company.
Description: Tariff Cancellation:
Notice of Termination of Capetown
Wind Farm E&P Agreement to be
effective 5/15/2019.
Filed Date: 5/17/19.
Accession Number: 20190517–5157.
Comments Due: 5 p.m. ET 6/7/19.
The filings are accessible in the
Commission’s eLibrary system by
clicking on the links or querying the
docket number.
Any person desiring to intervene or
protest in any of the above proceedings
must file in accordance with Rules 211
and 214 of the Commission’s
Regulations (18 CFR 385.211 and
385.214) on or before 5:00 p.m. Eastern
time on the specified comment date.
Protests may be considered, but
intervention is necessary to become a
party to the proceeding.
eFiling is encouraged. More detailed
information relating to filing
requirements, interventions, protests,
service, and qualifying facilities filings
can be found at: https://www.ferc.gov/
docs-filing/efiling/filing-req.pdf. For
other information, call (866) 208–3676
(toll free). For TTY, call (202) 502–8659.
Dated: May 17, 2019.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2019–10879 Filed 5–23–19; 8:45 am]
BILLING CODE 6717–01–P
ENVIRONMENTAL PROTECTION
AGENCY
khammond on DSKBBV9HB2PROD with NOTICES
[EPA–HQ–OECA–2011–0239; FRL–9994–
30–OMS]
Information Collection Request
Submitted to OMB for Review and
Approval; Comment Request; NSPS
for Grain Elevators (Renewal)
Environmental Protection
Agency (EPA).
ACTION: Notice.
AGENCY:
VerDate Sep<11>2014
18:10 May 23, 2019
Jkt 247001
The Environmental Protection
Agency (EPA) has submitted an
information collection request (ICR),
NSPS for Grain Elevators (EPA ICR
Number 1130.12, OMB Control Number
2060–0082), to the Office of
Management and Budget (OMB) for
review and approval in accordance with
the Paperwork Reduction Act. This is a
proposed extension of the ICR, which is
currently approved through May 30,
2019. Public comments were previously
requested, via the Federal Register, on
May 30, 2018 during a 60-day comment
period. This notice allows for an
additional 30 days for public comments.
A fuller description of the ICR is given
below, including its estimated burden
and cost to the public. An agency may
neither conduct nor sponsor, and a
person is not required to respond to, a
collection of information unless it
displays a currently valid OMB control
number.
DATES: Additional comments may be
submitted on or before June 24, 2019.
ADDRESSES: Submit your comments,
referencing Docket ID Number EPA–
HQ–OECA–2011–0239, to: (1) EPA
online using www.regulations.gov (our
preferred method), or by email to
docket.oeca@epa.gov, or by mail to: EPA
Docket Center, Environmental
Protection Agency, Mail Code 28221T,
1200 Pennsylvania Ave. NW,
Washington, DC 20460; and (2) OMB via
email to oira_submission@omb.eop.gov.
Address comments to OMB Desk Officer
for EPA.
EPA’s policy is that all comments
received will be included in the public
docket without change, including any
personal information provided, unless
the comment includes profanity, threats,
information claimed to be Confidential
Business Information (CBI), or other
information whose disclosure is
restricted by statute.
FOR FURTHER INFORMATION CONTACT:
Patrick Yellin, Monitoring, Assistance,
and Media Programs Division, Office of
Compliance, Mail Code 2227A,
Environmental Protection Agency, 1200
Pennsylvania Ave. NW, Washington, DC
20460; telephone number: (202) 564–
2970; fax number: (202) 564–0050;
email address: yellin.patrick@epa.gov.
SUPPLEMENTARY INFORMATION:
Supporting documents, which explain
in detail the information that the EPA
will be collecting, are available in the
public docket for this ICR. The docket
can be viewed online at
www.regulations.gov, or in person at the
EPA Docket Center, EPA West, Room
3334, 1301 Constitution Ave. NW,
Washington, DC. The telephone number
SUMMARY:
PO 00000
Frm 00059
Fmt 4703
Sfmt 4703
24133
for the Docket Center is 202–566–1744.
For additional information about EPA’s
public docket, visit: https://
www.epa.gov/dockets.
Abstract: The New Source
Performance Standards (NSPS) for Grain
Elevators (40 CFR part 60, subpart DD)
apply to each affected facility at any
grain terminal elevator or any grain
storage elevator. The facilities are each
truck unloading station, truck loading
station, barge and ship loading station,
railcar loading station, railcar unloading
station, grain dryer and all grain
handling operations that commenced
construction, modification or
reconstruction after August 3, 1978.
Owners or operators of the affected
facilities must make a one-time-only
report of the date of construction or
reconstruction; notification of the actual
date of startup; notification of any
physical or operational change to
existing facility that may increase the
rate of emission of the regulated
pollutant; notification of initial
performance test; and results of initial
performance test. Owners or operators
are also required to maintain records of
the occurrence and duration of any
startup, shutdown, or malfunction, or
any period during which the monitoring
system is inoperative. This information
is being collected to assure compliance
with 40 CFR part 60, subpart DD
Form Numbers: None.
Respondents/affected entities: Grain
elevator operations.
Respondent’s obligation to respond:
Mandatory (40 CFR part 60 Subpart DD).
Estimated number of respondents:
200 (total).
Frequency of response: Initially.
Total estimated burden: 460 hours
(per year). Burden is defined at 5 CFR
1320.3(b).
Total estimated cost: $52,000 (per
year), which includes no annualized
capital/startup and/or operation &
maintenance costs.
Changes in the Estimates: There is no
change in the total estimated respondent
burden compared with the ICR currently
approved by OMB. The regulations have
not changed over the past three years
and are not anticipated to change over
the next three years, and the growth rate
for the industry is very low or nonexistent. This ICR reflects the on-going
burden and costs for existing facilities.
Courtney Kerwin,
Director, Regulatory Support Division.
[FR Doc. 2019–10892 Filed 5–23–19; 8:45 am]
BILLING CODE 6560–50–P
E:\FR\FM\24MYN1.SGM
24MYN1
Agencies
[Federal Register Volume 84, Number 101 (Friday, May 24, 2019)]
[Notices]
[Pages 24132-24133]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2019-10879]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
Combined Notice of Filings #2
Take notice that the Commission received the following exempt
wholesale generator filings:
Docket Numbers: EG19-115-000.
Applicants: Canadian Breaks LLC.
Description: Self-Certification of Exempt Wholesale Generator
Status of Canadian Breaks LLC.
Filed Date: 5/17/19.
Accession Number: 20190517-5147.
Comments Due: 5 p.m. ET 6/7/19.
Take notice that the Commission received the following electric
rate filings:
Docket Numbers: ER15-762-013.
Applicants: Sierra Solar Greenworks LLC.
Description: Compliance filing: Sierra Solar Greenworks MBR Tariff
to be effective 5/18/2019.
Filed Date: 5/17/19.
Accession Number: 20190517-5180.
Comments Due: 5 p.m. ET 6/7/19.
Docket Numbers: ER15-2680-009.
Applicants: Sandstone Solar LLC.
Description: Compliance filing: Sandstone Solar LLC MBR Tariff to
be effective 5/18/2019.
Filed Date: 5/17/19.
Accession Number: 20190517-5129.
Comments Due: 5 p.m. ET 6/7/19.
Docket Numbers: ER16-890-008.
Applicants: Summer Solar LLC.
Description: Compliance filing: Summer Solar MBR Tariff to be
effective 5/18/2019.
Filed Date: 5/17/19.
Accession Number: 20190517-5134.
Comments Due: 5 p.m. ET 6/7/19.
Docket Numbers: ER16-1609-003.
Applicants: ID SOLAR 1, LLC.
Description: Compliance filing: ID Solar 1 MBR Tariff to be
effective 5/18/2019.
Filed Date: 5/17/19.
Accession Number: 20190517-5179.
Comments Due: 5 p.m. ET 6/7/19.
Docket Numbers: ER16-1956-007.
Applicants: Western Antelope Dry Ranch LLC.
Description: Compliance filing: Western Antelope Dry Ranch MBR
Tariff to be effective 5/18/2019.
Filed Date: 5/17/19.
Accession Number: 20190517-5138.
Comments Due: 5 p.m. ET 6/7/19.
Docket Numbers: ER16-2224-006.
Applicants: Solverde 1, LLC.
Description: Compliance filing: Solverde 1, LLC MBR Tariff to be
effective 5/18/2019.
Filed Date: 5/17/19.
Accession Number: 20190517-5133.
Comments Due: 5 p.m. ET 6/7/19.
Docket Numbers: ER19-832-001.
Applicants: Duke Energy Florida, LLC.
Description: Compliance filing: DEF-Notice of Cancellation (ER19-
832) eTariff Metadata Compliance Filing to be effective 11/1/2015.
Filed Date: 5/17/19.
Accession Number: 20190517-5156.
Comments Due: 5 p.m. ET 6/7/19.
Docket Numbers: ER19-847-001.
Applicants: San Pablo Raceway, LLC.
Description: Compliance filing: San Pablo Raceway MBR Tariff to be
effective 5/18/2019.
Filed Date: 5/17/19.
Accession Number: 20190517-5125.
Comments Due: 5 p.m. ET 6/7/19.
Docket Numbers: ER19-1402-000.
Applicants: Coyote Ridge Wind, LLC.
Description: Report Filing: Supplement to Application for Market-
Based Rate Authority to be effective N/A.
Filed Date: 5/17/19.
Accession Number: 20190517-5112.
Comments Due: 5 p.m. ET 5/28/19.
Docket Numbers: ER19-1892-000.
Applicants: Midcontinent Independent System Operator, Inc., Ameren
Illinois Company.
Description: Sec. 205(d) Rate Filing: 2019-05-17_SA 3028 Ameren
IL-Prairie Power Project #14 Pleasant View to be effective 4/18/2019.
[[Page 24133]]
Filed Date: 5/17/19.
Accession Number: 20190517-5148.
Comments Due: 5 p.m. ET 6/7/19.
Docket Numbers: ER19-1893-000.
Applicants: Dominion Energy South Carolina, Inc.
Description: Sec. 205(d) Rate Filing: VCS Transmission Agr Between
SCE&G and SCPSA to be effective 7/17/2019.
Filed Date: 5/17/19.
Accession Number: 20190517-5155.
Comments Due: 5 p.m. ET 6/7/19.
Docket Numbers: ER19-1894-000.
Applicants: Pacific Gas and Electric Company.
Description: Tariff Cancellation: Notice of Termination of Capetown
Wind Farm E&P Agreement to be effective 5/15/2019.
Filed Date: 5/17/19.
Accession Number: 20190517-5157.
Comments Due: 5 p.m. ET 6/7/19.
The filings are accessible in the Commission's eLibrary system by
clicking on the links or querying the docket number.
Any person desiring to intervene or protest in any of the above
proceedings must file in accordance with Rules 211 and 214 of the
Commission's Regulations (18 CFR 385.211 and 385.214) on or before 5:00
p.m. Eastern time on the specified comment date. Protests may be
considered, but intervention is necessary to become a party to the
proceeding.
eFiling is encouraged. More detailed information relating to filing
requirements, interventions, protests, service, and qualifying
facilities filings can be found at: https://www.ferc.gov/docs-filing/efiling/filing-req.pdf. For other information, call (866) 208-3676
(toll free). For TTY, call (202) 502-8659.
Dated: May 17, 2019.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2019-10879 Filed 5-23-19; 8:45 am]
BILLING CODE 6717-01-P