Renewable Energy Aggregators; Notice of Preliminary Permit Application Accepted for Filing and Soliciting Comments, Motions To Intervene, and Competing Applications, 23559 [2019-10596]
Download as PDF
Federal Register / Vol. 84, No. 99 / Wednesday, May 22, 2019 / Notices
Dated: May 15, 2019.
Kimberly D. Bose,
Secretary.
[FR Doc. 2019–10599 Filed 5–21–19; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 14961–000]
jbell on DSK3GLQ082PROD with NOTICES
Renewable Energy Aggregators;
Notice of Preliminary Permit
Application Accepted for Filing and
Soliciting Comments, Motions To
Intervene, and Competing Applications
On January 10, 2019, Renewable
Energy Aggregators, filed an application
for a preliminary permit, pursuant to
section 4(f) of the Federal Power Act
(FPA), proposing to study the feasibility
of the Eastern Industries Pumped
Storage Hydroelectric Project to be
located in Dauphin County,
Pennsylvania. The sole purpose of a
preliminary permit, if issued, is to grant
the permit holder priority to file a
license application during the permit
term. A preliminary permit does not
authorize the permit holder to perform
any land-disturbing activities or
otherwise enter upon lands or waters
owned by others without the owners’
express permission.
The proposed project would consist of
the following: (1) A new upper reservoir
with a surface area of 62 acres and a
storage capacity of 929.9 acre-feet at a
surface elevation of approximately 1,343
feet above mean sea level (msl) created
through construction of a new rollercompacted concrete or rock-filled dam;
(2) a new lower reservoir with a surface
area of 22.3 acres and a total storage
capacity of 1,337.9 acre-feet at a surface
elevation of 1,057 feet msl; (3) a new
834-foot-long, 48-inch-diameter
penstock connecting the upper and
lower reservoirs; (4) a new 150-footlong, 50-foot-wide powerhouse
containing one turbine-generator unit
with a total rated capacity of 20
megawatts; (5) a new transmission line
connecting the powerhouse to a nearby
electric grid interconnection point with
options to evaluate multiple grid
interconnection locations; and (6)
appurtenant facilities. The proposed
project would have an annual
generation of 88,434 megawatt-hours.
Applicant Contact: Adam Rousselle II,
Renewable Energy Aggregators, 5710
Oak Crest Drive, Doylestown, PA 18902;
phone: 215–485–1708.
FERC Contact: Monir Chowdhury;
phone: (202) 502–6736.
VerDate Sep<11>2014
17:29 May 21, 2019
Jkt 247001
Deadline for filing comments, motions
to intervene, competing applications
(without notices of intent), or notices of
intent to file competing applications: 60
days from the issuance of this notice.1
Competing applications and notices of
intent must meet the requirements of 18
CFR 4.36.
The Commission strongly encourages
electronic filing. Please file comments,
motions to intervene, notices of intent,
and competing applications using the
Commission’s eFiling system at https://
www.ferc.gov/docs-filing/efiling.asp.
Commenters can submit brief comments
up to 6,000 characters, without prior
registration, using the eComment system
at https://www.ferc.gov/docs-filing/
ecomment.asp. You must include your
name and contact information at the end
of your comments. For assistance,
please contact FERC Online Support at
FERCOnlineSupport@ferc.gov, (866)
208–3676 (toll free), or (202) 502–8659
(TTY). In lieu of electronic filing, please
send a paper copy to: Secretary, Federal
Energy Regulatory Commission, 888
First Street NE, Washington, DC 20426.
The first page of any filing should
include docket number P–14961–000.
More information about this project,
including a copy of the application, can
be viewed or printed on the ‘‘eLibrary’’
link of the Commission’s website at
https://www.ferc.gov/docs-filing/
elibrary.asp. Enter the docket number
(P–14961) in the docket number field to
access the document. For assistance,
contact FERC Online Support.
Dated: May 15, 2019.
Kimberly D. Bose,
Secretary.
[FR Doc. 2019–10596 Filed 5–21–19; 8:45 am]
BILLING CODE 6717–01–P
23559
accordance with Rules 211 and 214 of
the Commission’s Rules of Practice and
Procedure (18 CFR 385.211, 385.214).
Protests will be considered by the
Commission in determining the
appropriate action to be taken, but will
not serve to make protestants parties to
the proceeding. Any person wishing to
become a party must file a notice of
intervention or motion to intervene, as
appropriate. Such notices, motions, or
protests must be filed on or before the
comment date. On or before the
comment date, it is not necessary to
serve motions to intervene or protests
on persons other than the Applicant.
The Commission encourages
electronic submission of protests and
interventions in lieu of paper using the
‘‘eFiling’’ link at https://www.ferc.gov.
Persons unable to file electronically
should submit an original and 5 copies
of the protest or intervention to the
Federal Energy Regulatory Commission,
888 First Street NE, Washington, DC
20426.
This filing is accessible on-line at
https://www.ferc.gov, using the
‘‘eLibrary’’ link and is available for
review in the Commission’s Public
Reference Room in Washington, DC.
There is an ‘‘eSubscription’’ link on the
website that enables subscribers to
receive email notification when a
document is added to a subscribed
docket(s). For assistance with any FERC
Online service, please email
FERCOnlineSupport@ferc.gov, or call
(866) 208–3676 (toll free). For TTY, call
(202) 502–8659.
Comment Date: 5:00 p.m. Eastern
Time on June 11, 2019.
Dated: May 16, 2019.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2019–10686 Filed 5–21–19; 8:45 am]
DEPARTMENT OF ENERGY
BILLING CODE 6717–01–P
Federal Energy Regulatory
Commission
DEPARTMENT OF ENERGY
[Docket No. EF19–3–000]
Western Area Power Administration;
Notice of Filing
Take notice that on May 10, 2019,
Western Area Power Administration
submitted tariff filing per: Extension of
the Falcon and Amistad Projects’ Firm
Power Formula Rate-Rate Order No.
WAPA–186 to be effective April 1, 2019.
Any person desiring to intervene or to
protest this filing must file in
1 The Commission is issuing a second notice for
this project because the first notice issued on March
8, 2019, did not correctly identify the county where
the project would be located and some
municipalities may not have been notified by the
first notice.
PO 00000
Frm 00038
Fmt 4703
Sfmt 4703
Federal Energy Regulatory
Commission
Combined Notice of Filings #1
Take notice that the Commission
received the following exempt
wholesale generator filings:
Docket Numbers: EG19–113–000.
Applicants: Sage Draw Wind, LLC.
Description: Notice of SelfCertification of EWG Status Sage Draw
Wind, LLC.
Filed Date: 5/16/19.
Accession Number: 20190516–5009.
Comments Due: 5 p.m. ET 6/6/19.
Docket Numbers: EG19–114–000.
Applicants: 231RC 8me LLC.
E:\FR\FM\22MYN1.SGM
22MYN1
Agencies
[Federal Register Volume 84, Number 99 (Wednesday, May 22, 2019)]
[Notices]
[Page 23559]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2019-10596]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Project No. 14961-000]
Renewable Energy Aggregators; Notice of Preliminary Permit
Application Accepted for Filing and Soliciting Comments, Motions To
Intervene, and Competing Applications
On January 10, 2019, Renewable Energy Aggregators, filed an
application for a preliminary permit, pursuant to section 4(f) of the
Federal Power Act (FPA), proposing to study the feasibility of the
Eastern Industries Pumped Storage Hydroelectric Project to be located
in Dauphin County, Pennsylvania. The sole purpose of a preliminary
permit, if issued, is to grant the permit holder priority to file a
license application during the permit term. A preliminary permit does
not authorize the permit holder to perform any land-disturbing
activities or otherwise enter upon lands or waters owned by others
without the owners' express permission.
The proposed project would consist of the following: (1) A new
upper reservoir with a surface area of 62 acres and a storage capacity
of 929.9 acre-feet at a surface elevation of approximately 1,343 feet
above mean sea level (msl) created through construction of a new
roller-compacted concrete or rock-filled dam; (2) a new lower reservoir
with a surface area of 22.3 acres and a total storage capacity of
1,337.9 acre-feet at a surface elevation of 1,057 feet msl; (3) a new
834-foot-long, 48-inch-diameter penstock connecting the upper and lower
reservoirs; (4) a new 150-foot-long, 50-foot-wide powerhouse containing
one turbine-generator unit with a total rated capacity of 20 megawatts;
(5) a new transmission line connecting the powerhouse to a nearby
electric grid interconnection point with options to evaluate multiple
grid interconnection locations; and (6) appurtenant facilities. The
proposed project would have an annual generation of 88,434 megawatt-
hours.
Applicant Contact: Adam Rousselle II, Renewable Energy Aggregators,
5710 Oak Crest Drive, Doylestown, PA 18902; phone: 215-485-1708.
FERC Contact: Monir Chowdhury; phone: (202) 502-6736.
Deadline for filing comments, motions to intervene, competing
applications (without notices of intent), or notices of intent to file
competing applications: 60 days from the issuance of this notice.\1\
Competing applications and notices of intent must meet the requirements
of 18 CFR 4.36.
---------------------------------------------------------------------------
\1\ The Commission is issuing a second notice for this project
because the first notice issued on March 8, 2019, did not correctly
identify the county where the project would be located and some
municipalities may not have been notified by the first notice.
---------------------------------------------------------------------------
The Commission strongly encourages electronic filing. Please file
comments, motions to intervene, notices of intent, and competing
applications using the Commission's eFiling system at https://www.ferc.gov/docs-filing/efiling.asp. Commenters can submit brief
comments up to 6,000 characters, without prior registration, using the
eComment system at https://www.ferc.gov/docs-filing/ecomment.asp. You
must include your name and contact information at the end of your
comments. For assistance, please contact FERC Online Support at
[email protected], (866) 208-3676 (toll free), or (202) 502-
8659 (TTY). In lieu of electronic filing, please send a paper copy to:
Secretary, Federal Energy Regulatory Commission, 888 First Street NE,
Washington, DC 20426. The first page of any filing should include
docket number P-14961-000.
More information about this project, including a copy of the
application, can be viewed or printed on the ``eLibrary'' link of the
Commission's website at https://www.ferc.gov/docs-filing/elibrary.asp.
Enter the docket number (P-14961) in the docket number field to access
the document. For assistance, contact FERC Online Support.
Dated: May 15, 2019.
Kimberly D. Bose,
Secretary.
[FR Doc. 2019-10596 Filed 5-21-19; 8:45 am]