Renewable Energy Aggregators; Notice of Preliminary Permit Application Accepted for Filing and Soliciting Comments, Motions To Intervene, and Competing Applications, 21769 [2019-10050]

Download as PDF Federal Register / Vol. 84, No. 94 / Wednesday, May 15, 2019 / Notices requirements of 18 CFR 4.34(b). All comments, motions to intervene, or protests should relate to project works which are the subject of the license amendment. Agencies may obtain copies of the application directly from the applicant. A copy of any protest or motion to intervene must be served upon each representative of the applicant specified in the particular application. If an intervener files comments or documents with the Commission relating to the merits of an issue that may affect the responsibilities of a particular resource agency, they must also serve a copy of the document on that resource agency. A copy of all other filings in reference to this application must be accompanied by proof of service on all persons listed in the service list prepared by the Commission in this proceeding, in accordance with 18 CFR 4.34(b) and 385.2010. Dated: May 9, 2019. Kimberly D. Bose, Secretary. [FR Doc. 2019–10049 Filed 5–14–19; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 14967–000] jbell on DSK3GLQ082PROD with NOTICES Renewable Energy Aggregators; Notice of Preliminary Permit Application Accepted for Filing and Soliciting Comments, Motions To Intervene, and Competing Applications On February 25, 2019, Renewable Energy Aggregators, filed an application for a preliminary permit, pursuant to section 4(f) of the Federal Power Act (FPA), proposing to study the feasibility of the Freestone Pumped Storage Hydro Project (Freestone Project or project) to be located at Nickajack Lake, near the town of Trenton, in Dade County, Georgia. The sole purpose of a preliminary permit, if issued, is to grant the permit holder priority to file a license application during the permit term. A preliminary permit does not authorize the permit holder to perform any land-disturbing activities or otherwise enter upon lands or waters owned by others without the owners’ express permission. The proposed project would consist of the following: (1) A roller compacted concrete or earth and rock upper dam; (2) an upper reservoir with a surface area of 84 acres and a storage capacity of 1,258.92 acre-feet; (3) a 48-inch- VerDate Sep<11>2014 22:43 May 14, 2019 Jkt 247001 diameter, 3,158-foot-long penstock; (4) a 25-foot-high, 150-foot-long, and 50-footwide powerhouse containing one unit with a capacity of 80 megawatts; (5) a lower reservoir (Nickajack Lake) with a surface area of 31.4 acres, and a storage capacity of 1,883.87 acre-feet; (6) a substation; and (7) a 1-mile-long transmission line from the substation to the point of interconnection. The proposed project would have an estimated average annual generation of 351,483 megawatt-hours. Applicant Contact: Adam Rousselle, Renewable Energy Aggregators, 5710 Oak Crest Drive, Doylestown Pennsylvania 18902; phone: (215) 485– 1708. FERC Contact: Michael Spencer, (202) 502–6093, michael.spencer@ferc.gov. Deadline for filing comments, motions to intervene, competing applications (without notices of intent), or notices of intent to file competing applications: 60 days from the issuance of this notice. Competing applications and notices of intent must meet the requirements of 18 CFR 4.36. The Commission strongly encourages electronic filing. Please file comments, motions to intervene, notices of intent, and competing applications using the Commission’s eFiling system at https:// www.ferc.gov/docs-filing/efiling.asp. Commenters can submit brief comments up to 6,000 characters, without prior registration, using the eComment system at https://www.ferc.gov/docs-filing/ ecomment.asp. You must include your name and contact information at the end of your comments. For assistance, please contact FERC Online Support at FERCOnlineSupport@ferc.gov, (866) 208–3676 (toll free), or (202) 502–8659 (TTY). In lieu of electronic filing, please send a paper copy to: Secretary, Federal Energy Regulatory Commission, 888 First Street, NE, Washington, DC 20426. The first page of any filing should include docket number P–14967–000. More information about this project, including a copy of the application, can be viewed or printed on the eLibrary’’ link of Commission’s website at https:// www.ferc.gov/docs-filing/elibrary.asp. Enter the docket number (P–14967) in the docket number field to access the document. For assistance, contact FERC Online Support. Dated: May 9, 2019. Kimberly D. Bose, Secretary. [FR Doc. 2019–10050 Filed 5–14–19; 8:45 am] BILLING CODE 6717–01–P PO 00000 Frm 00022 Fmt 4703 Sfmt 4703 21769 DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Combined Notice of Filings #1 Take notice that the Commission received the following exempt wholesale generator filings: Docket Numbers: EG19–96–000. Applicants: Wildhorse Wind Energy, LLC. Description: Notice of SelfCertification of Exempt Wholesale Generator Status of Wildhorse Wind Energy, LLC. Filed Date: 5/8/19. Accession Number: 20190508–5128. Comments Due: 5 p.m. ET 5/29/19. Take notice that the Commission received the following electric rate filings: Docket Numbers: ER10–2042–030; ER10–1942–022; ER17–696–010; ER10– 1938–025; ER10–1934–024; ER10–1893– 024; ER10–3051–029; ER10–2985–028; ER10–3049–029; ER11–4369–009; ER16–2218–009; ER10–1862–024; ER10–1865–010. Applicants: Calpine Energy Services, L.P., Calpine Construction Finance Company, LP, Calpine Energy Solutions, LLC, Calpine Power America—CA, LLC, CES Marketing IX, LLC, CES Marketing X, LLC, Champion Energy, LLC, Champion Energy Marketing LLC, Champion Energy Services, LLC, North American Power and Gas, LLC, North American Power Business, LLC, Power Contract Financing, L.L.C., South Point Energy Center, LLC. Description: Notification of Change in Status of the Indicated Calpine MBR Sellers. Filed Date: 5/8/19. Accession Number: 20190508–5130. Comments Due: 5 p.m. ET 5/29/19. Docket Numbers: ER19–105–003. Applicants: PJM Interconnection, L.L.C. Description: Compliance filing: Compliance Filing Pursuant to Commission’s 4/15/19 Order to be effective 1/17/2019. Filed Date: 5/9/19. Accession Number: 20190509–5020. Comments Due: 5 p.m. ET 5/30/19. Docket Numbers: ER19–1498–001. Applicants: AEP Texas Inc. Description: Tariff Amendment: AEPTX-Pedernales EC IA First Amend & Restated Amendment to be effective 3/ 13/2019. Filed Date: 5/9/19. Accession Number: 20190509–5035. Comments Due: 5 p.m. ET 5/30/19. Docket Numbers: ER19–1806–000. E:\FR\FM\15MYN1.SGM 15MYN1

Agencies

[Federal Register Volume 84, Number 94 (Wednesday, May 15, 2019)]
[Notices]
[Page 21769]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2019-10050]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Project No. 14967-000]


Renewable Energy Aggregators; Notice of Preliminary Permit 
Application Accepted for Filing and Soliciting Comments, Motions To 
Intervene, and Competing Applications

    On February 25, 2019, Renewable Energy Aggregators, filed an 
application for a preliminary permit, pursuant to section 4(f) of the 
Federal Power Act (FPA), proposing to study the feasibility of the 
Freestone Pumped Storage Hydro Project (Freestone Project or project) 
to be located at Nickajack Lake, near the town of Trenton, in Dade 
County, Georgia. The sole purpose of a preliminary permit, if issued, 
is to grant the permit holder priority to file a license application 
during the permit term. A preliminary permit does not authorize the 
permit holder to perform any land-disturbing activities or otherwise 
enter upon lands or waters owned by others without the owners' express 
permission.
    The proposed project would consist of the following: (1) A roller 
compacted concrete or earth and rock upper dam; (2) an upper reservoir 
with a surface area of 84 acres and a storage capacity of 1,258.92 
acre-feet; (3) a 48-inch-diameter, 3,158-foot-long penstock; (4) a 25-
foot-high, 150-foot-long, and 50-foot-wide powerhouse containing one 
unit with a capacity of 80 megawatts; (5) a lower reservoir (Nickajack 
Lake) with a surface area of 31.4 acres, and a storage capacity of 
1,883.87 acre-feet; (6) a substation; and (7) a 1-mile-long 
transmission line from the substation to the point of interconnection.
    The proposed project would have an estimated average annual 
generation of 351,483 megawatt-hours.
    Applicant Contact: Adam Rousselle, Renewable Energy Aggregators, 
5710 Oak Crest Drive, Doylestown Pennsylvania 18902; phone: (215) 485-
1708.
    FERC Contact: Michael Spencer, (202) 502-6093, 
[email protected].
    Deadline for filing comments, motions to intervene, competing 
applications (without notices of intent), or notices of intent to file 
competing applications: 60 days from the issuance of this notice. 
Competing applications and notices of intent must meet the requirements 
of 18 CFR 4.36.
    The Commission strongly encourages electronic filing. Please file 
comments, motions to intervene, notices of intent, and competing 
applications using the Commission's eFiling system at https://www.ferc.gov/docs-filing/efiling.asp. Commenters can submit brief 
comments up to 6,000 characters, without prior registration, using the 
eComment system at https://www.ferc.gov/docs-filing/ecomment.asp. You 
must include your name and contact information at the end of your 
comments. For assistance, please contact FERC Online Support at 
[email protected], (866) 208-3676 (toll free), or (202) 502-
8659 (TTY). In lieu of electronic filing, please send a paper copy to: 
Secretary, Federal Energy Regulatory Commission, 888 First Street, NE, 
Washington, DC 20426. The first page of any filing should include 
docket number P-14967-000.
    More information about this project, including a copy of the 
application, can be viewed or printed on the eLibrary'' link of 
Commission's website at https://www.ferc.gov/docs-filing/elibrary.asp. 
Enter the docket number (P-14967) in the docket number field to access 
the document. For assistance, contact FERC Online Support.

    Dated: May 9, 2019.
Kimberly D. Bose,
Secretary.
[FR Doc. 2019-10050 Filed 5-14-19; 8:45 am]