Sunshine Act Meeting Notice, 21336-21338 [2019-10044]
Download as PDF
21336
Federal Register / Vol. 84, No. 93 / Tuesday, May 14, 2019 / Notices
Riverdale Street, Northbridge, MA
01534.
n. Anyone may submit comments, a
protest, or a motion to intervene in
accordance with the requirements of the
Commission’s Rules of Practice and
Procedure, 18 CFR 385.210, .211, and
.214. In determining the appropriate
action to take, the Commission will
consider all protests or other comments
filed, but only those who file a motion
to intervene in accordance with the
Commission’s Rules may become a
party to the proceeding. Any comments,
protests, or motions to intervene must
be received on or before the specified
comment date for the particular
application.
All filings must (1) bear in all capital
letters the title ‘‘PROTEST’’, ‘‘MOTION
TO INTERVENE’’, ‘‘COMMENTS,’’
‘‘REPLY COMMENTS,’’
‘‘RECOMMENDATIONS,’’ ‘‘TERMS
AND CONDITIONS,’’ or
‘‘PRESCRIPTIONS;’’ (2) set forth in the
heading the name of the applicant and
the project number of the application to
which the filing responds; (3) furnish
the name, address, and telephone
number of the person protesting or
intervening; and (4) otherwise comply
with the requirements of 18 CFR
385.2001 through 385.2005. All
comments, recommendations, terms and
conditions or prescriptions must set
forth their evidentiary basis and
otherwise comply with the requirements
of 18 CFR 4.34(b). Agencies may obtain
copies of the application directly from
the applicant. A copy of any protest or
motion to intervene must be served
upon each representative of the
applicant specified in the particular
application. A copy of all other filings
in reference to this application must be
accompanied by proof of service on all
persons listed in the service list
prepared by the Commission in this
proceeding, in accordance with 18 CFR
4.34(b) and 385.2010.
You may also register online at https://
www.ferc.gov/docs-filing/
esubscription.asp to be notified via
email of new filings and issuances
related to this or other pending projects.
For assistance, contact FERC Online
Support.
o. Procedural Schedule: The
application will be processed according
to the following revised schedule.
Revisions to the schedule may be made
as appropriate.
Milestone
Target date
Filing of interventions, protests, comments, recommendations, preliminary terms and conditions, and preliminary fishway
prescriptions.
Commission issues Environmental Assessment ........................................................................................................................
Comments on Environmental Assessment .................................................................................................................................
Final amendments to the application
must be filed with the Commission no
later than 30 days from the issuance
date of this notice.
p. A license applicant must file no
later than 60 days following the date of
issuance of this notice: (1) A copy of the
water quality certification; (2) a copy of
the request for certification, including
proof of the date on which the certifying
agency received the request; or (3)
evidence of waiver of water quality
certification.
Dated: May 8, 2019.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
July 2019.
November 2019.
December 2019.
DEPARTMENT OF ENERGY
* NOTE—Items listed on the agenda
may be deleted without further notice.
Federal Energy Regulatory
Commission
CONTACT PERSON FOR MORE INFORMATION:
Sunshine Act Meeting Notice
The following notice of meeting is
published pursuant to section 3(a) of the
government in the Sunshine Act (Pub.
L. 94–409), 5 U.S.C. 552b:
AGENCY HOLDING MEETING: Federal
Energy Regulatory Commission.
May 16, 2019 10:00 a.m.
Room 2C, 888 First Street NE,
Washington, DC 20426.
TIME AND DATE:
PLACE:
OPEN.
[FR Doc. 2019–09883 Filed 5–13–19; 8:45 am]
STATUS:
BILLING CODE 6717–01–P
MATTERS TO BE CONSIDERED:
Agenda
Kimberly D. Bose, Secretary, Telephone
(202) 502–8400.
For a recorded message listing items
struck from or added to the meeting, call
(202) 502–8627.
This is a list of matters to be
considered by the Commission. It does
not include a listing of all documents
relevant to the items on the agenda. All
public documents, however, may be
viewed on line at the Commission’s
website at https://
ferc.capitolconnection.org/ using the
eLibrary link, or may be examined in
the Commission’s Public Reference
Room.
1056TH MEETING—OPEN MEETING
[May 16, 2019—10:00 a.m.]
Item No.
Docket No.
Company
Administrative
khammond on DSKBBV9HB2PROD with NOTICES
A–1 .........
A–2 .........
A–3 .........
AD19–1–000 ..........................................
AD19–2–000 ..........................................
AD19–14–000 ........................................
Agency Administrative Matters.
Customer Matters, Reliability, Security and Market Operations.
2019 Summer Energy Market and Reliability Assessment.
Electric
E–1 .........
RM16–23–001 ........................................
E–2 .........
AD16–20–001 ........................................
EL16–108–000 .......................................
EL17–29–000 .........................................
EL17–31–000 .........................................
VerDate Sep<11>2014
16:57 May 13, 2019
Jkt 247001
PO 00000
Electric Storage Participation in Markets Operated by Regional Transmission Organizations and Independent System Operators.
Electric Storage Participation in Regions with Organized Wholesale Electric Markets.
Tilton Energy LLC v. Midcontinent Independent System Operator, Inc.
American Municipal Power, Inc. v. Midcontinent
Independent System Operator, Inc.
Northern Illinois Municipal Power Agency v. PJM, Interconnection, L.L.C.
Frm 00023
Fmt 4703
Sfmt 4703
E:\FR\FM\14MYN1.SGM
14MYN1
Federal Register / Vol. 84, No. 93 / Tuesday, May 14, 2019 / Notices
21337
1056TH MEETING—OPEN MEETING—Continued
[May 16, 2019—10:00 a.m.]
Item No.
Docket No.
Company
EL17–37–000 .........................................
EL17–54–000 (consolidated) .................
E–3 .........
E–4 .........
EL17–29–000 .........................................
EL16–108–000 .......................................
EL17–31–000 .........................................
EL17–37–000 .........................................
EL17–54–000 (consolidated) .................
EL17–31–000 .........................................
EL17–37–000 .........................................
EL16–108–000 .......................................
EL17–29–000 .........................................
EL17–54–000 (consolidated) .................
E–5 .........
EL17–54–000 (consolidated) .................
E–6 .........
E–7 .........
EL16–108–000 .......................................
EL17–29–000 .........................................
EL17–31–000 .........................................
EL17–37–000 .........................................
RM05–5–027 ..........................................
EL18–138–000 .......................................
.......
.......
.......
.......
ER18–1793–001 ....................................
EL18–157–000 .......................................
ER19–838–000 ......................................
EL18–158–000 .......................................
ER17–706–006 ......................................
EL18–159–000 .......................................
EL18–160–000 .......................................
ER18–2323–002 ....................................
EL18–164–000 .......................................
ER19–845–000 ......................................
EL18–165–000 .......................................
ER15–1682–006 ....................................
EL18–167–000 .......................................
ER19–839–001 ......................................
EL19–16–000 .........................................
ER18–2323–001 ....................................
EL18–172–000 .......................................
EL18–174–000 .......................................
EL19–40–000 .........................................
EL19–30–000 .........................................
E–19 .......
EC19–68–000 ........................................
E–20 .......
ER19–366–000 ......................................
ER19–366–001
E–8 .........
E–9 .........
E–10 .......
E–11 .......
E–12 .......
E–13 .......
E–14 .......
E–15
E–16
E–17
E–18
American Municipal Power, Inc. v. PJM Interconnection, L.L.C.
Dynegy Marketing and Trade, LLC and Illinois Power, Marketing Company
Midcontinent Independent System Operator, Inc.
American Municipal Power, Inc. v. Midcontinent, Independent System Operator, Inc.
Tilton Energy LLC v. Midcontinent Independent System Operator, Inc.
Northern Illinois Municipal Power Agency v. PJM, Interconnection, L.L.C.
American Municipal Power, Inc. v. PJM Interconnection, L.L.C.
Dynegy Marketing and Trade, LLC and Illinois Power, Marketing Company
Midcontinent Independent System Operator, Inc.
Northern Illinois Municipal Power Agency v. PJM
Interconnection, L.L.C.
American Municipal Power, Inc. v. PJM Interconnection, L.L.C.
Tilton Energy LLC v. Midcontinent Independent System Operator, Inc.
American Municipal Power, Inc. v. Midcontinent, Independent System Operator, Inc.
Dynegy Marketing and Trade, LLC and Illinois Power, Marketing Company
Midcontinent Independent System Operator, Inc.
Dynegy Marketing and Trade, LLC and Illinois Power, Marketing Company
Midcontinent Independent System Operator, Inc.
Tilton Energy LLC v. Midcontinent Independent System Operator, Inc.
American Municipal Power, Inc. v. Midcontinent, Independent System Operator, Inc.
Northern Illinois Municipal Power Agency v. PJM, Interconnection, L.L.C.
American Municipal Power, Inc. v. PJM Interconnection, L.L.C.
Standards for Business Practices and Communication, Protocols for Public Utilities.
Midcontinent Independent System Operator, Inc.
ALLETE, Inc.
Montana-Dakota Utilities Co.
Northern Indiana Public Service Company
Otter Tail Power Company
Southern Indiana Gas & Electric Company.
Midcontinent Independent System Operator, Inc.
American Transmission Company LLC.
Midcontinent Independent System Operator, Inc.
GridLiance West LLC.
International Transmission Company.
ITC Midwest, LLC.
Midcontinent Independent System Operator, Inc.
Southern California Edison Company.
TransCanyon DCR, LLC.
Virginia Electric and Power Company.
PJM Interconnection, L.L.C.
Michigan Electric Transmission Company, LLC.
Midcontinent Independent System Operator, Inc.
American Municipal Power, Inc.
American Municipal Power, Inc.
Florida Municipal Power Agency v. Duke Energy Florida, LLC.
LS Power Grid New York, LLC.
LS Power Grid New York Corporation I.
Clearway Energy Group LLC.
Clearway Energy, Inc.
Public Service Company of Colorado.
Miscellaneous
M–1 ........
PL10–2–003 ...........................................
Enforcement of Statutes, Regulations, and Orders.
khammond on DSKBBV9HB2PROD with NOTICES
Gas
G–1 .........
G–2 .........
G–3 .........
VerDate Sep<11>2014
RP18–923–000 ......................................
RP18–923–002
RP18–923–003
RP18–923–005
RP19–996–000 ......................................
RP18–987–001 ......................................
RP18–990–001
16:57 May 13, 2019
Jkt 247001
PO 00000
Enable Mississippi River Transmission, LLC.
Apache Corporation
Red Wolf Acquisitions, LLC.
Transcontinental Gas Pipe Line Company, LLC.
Frm 00024
Fmt 4703
Sfmt 4703
E:\FR\FM\14MYN1.SGM
14MYN1
v.
v.
v.
v.
21338
Federal Register / Vol. 84, No. 93 / Tuesday, May 14, 2019 / Notices
1056TH MEETING—OPEN MEETING—Continued
[May 16, 2019—10:00 a.m.]
Item No.
Docket No.
Company
Hydro
H–1 .........
P–2242–078 ...........................................
Eugene Water & Electric Board.
Certificates
C–1 .........
C–2 .........
CP19–34–000 ........................................
CP17–470–000 ......................................
Issued: May 9, 2019.
Kimberly D. Bose,
Secretary.
A free webcast of this event is available
through https://ferc.capitolconnection.org/
.Anyone with internet access who desires to
view this event can do so by navigating to
www.ferc.gov’s Calendar of Events and
locating this event in the Calendar. The event
will contain a link to its webcast. The Capitol
Connection provides technical support for
the free webcasts. It also offers access to this
event via television in the DC area and via
phone bridge for a fee. If you have any
questions, visit https://
ferc.capitolconnection.org/ or contact Shirley
Al-Jarani at 703–993–3104.
Immediately following the conclusion of
the Commission Meeting, a press briefing
will be held in the Commission Meeting
Room. Members of the public may view this
briefing in the designated overflow room.
This statement is intended to notify the
public that the press briefings that follow
Commission meetings may now be viewed
remotely at Commission headquarters, but
will not be telecast through the Capitol
Connection service.
[FR Doc. 2019–10044 Filed 5–10–19; 4:15 pm]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
khammond on DSKBBV9HB2PROD with NOTICES
Combined Notice of Filings #1
Take notice that the Commission
received the following electric corporate
filings:
Docket Numbers: EC19–87–000.
Applicants: RWE Aktiengesellschaft,
E.ON SE, Munnsville Wind Farm, LLC,
Pioneer Trail Wind Farm, LLC,
Radford’s Run Wind Farm, LLC, Settlers
Trail Wind Farm, LLC, Stony Creek
Wind Farm, LLC, Wildcat Wind Farm I,
LLC, Iron Horse Battery Storage, LLC,
EC&R Energy Marketing, LLC, EC&R
O&M, LLC.
Description: Joint Application for
Authorization Under Section 203 of the
Federal Power Act, et al. of RWE
Aktiengesellschaft, et al.
VerDate Sep<11>2014
16:57 May 13, 2019
Jkt 247001
Alliance Pipeline L.P.
Freeport LNG Development, L.P.
FLNG Liquefaction 4, LLC.
Filed Date: 5/7/19.
Accession Number: 20190507–5160.
Comments Due: 5 p.m. ET 5/28/19.
Docket Numbers: EC19–88–000.
Applicants: Cinergy Corp., Duke
Energy Renewables, Inc., Caprock Solar
1 LLC, Cimarron Windpower II, LLC,
Frontier Windpower, LLC, Happy Jack
Windpower, LLC, Ironwood
Windpower, LLC, Kit Carson
Windpower, LLC, Laurel Hill Wind
Energy, LLC, North Allegheny Wind,
LLC, Pumpjack Solar I, LLC, Rio Bravo
Solar I, LLC, Rio Bravo Solar II, LLC,
Shoreham Solar Commons LLC, Seville
Solar One LLC, Seville Solar Two LLC,
Silver Sage Windpower, LLC, Three
Buttes Windpower, LLC, Top of the
World Wind Energy LLC, Tallbear
Seville LLC, Wildwood Solar I, LLC,
Wildwood Solar II, LLC, John Hancock
Life Insurance Company (U.S.A.), JH
Symphony Renewables, LLC.
Description: Joint Application for
Authorization Under Section 203 of the
Federal Power Act of Cinergy Corp., et
al.
Filed Date: 5/8/19.
Accession Number: 20190508–5097.
Comments Due: 5 p.m. ET 5/29/19.
Take notice that the Commission
received the following electric rate
filings:
Docket Numbers: ER15–572–007.
Applicants: New York Transco, LLC,
New York Independent System
Operator, Inc.
Description: Compliance filing: NY
Transco compliance re: formula rate
revisions AC transmission projects to be
effective 4/8/2019.
Filed Date: 5/8/19.
Accession Number: 20190508–5001.
Comments Due: 5 p.m. ET 5/29/19.
Docket Numbers: ER19–318–000.
Applicants: Midcontinent
Independent System Operator, Inc.
Description: Midcontinent
Independent System Operator, Inc.
submits tariff filing per 35.19a(b):
Refund Report_Cleco Power [ER17–
1368–000, ER17–1669–000, ER18–1237–
PO 00000
Frm 00025
Fmt 4703
Sfmt 4703
000 & ER19–318–000] to be effective N/
A.
Filed Date: 5/8/19.
Accession Number: 20190508–5058.
Comments Due: 5 p.m. ET 5/29/19.
Docket Numbers: ER19–1456–001.
Applicants: Midcontinent
Independent System Operator, Inc.
Description: Tariff Amendment:
2019–05–08_SA 3293 Big Stone Sub
Transformer Upgrade Sub MPFCA (J488
J493 J526) to be effective 3/29/2019.
Filed Date: 5/8/19.
Accession Number: 20190508–5099.
Comments Due: 5 p.m. ET 5/20/19.
Docket Numbers: ER19–1797–000.
Applicants: Valcour Clinton
Windpark, LLC.
Description: § 205(d) Rate Filing:
Notice of Succession & Clarification of
Category Seller Status to be effective 5/
8/2019.
Filed Date: 5/7/19.
Accession Number: 20190507–5108.
Comments Due: 5 p.m. ET 5/28/19.
Docket Numbers: ER19–1798–000.
Applicants: Valcour Ellenburg
Windpark, LLC.
Description: § 205(d) Rate Filing:
Notice of Succession & Clarification of
Category Seller Status to be effective 5/
8/2019.
Filed Date: 5/7/19.
Accession Number: 20190507–5124.
Comments Due: 5 p.m. ET 5/28/19.
Docket Numbers: ER19–1799–000.
Applicants: Valcour Wethersfield
Windpark, LLC.
Description: § 205(d) Rate Filing:
Notice of Succession & Clarification of
Category Seller Status to be effective 5/
8/2019.
Filed Date: 5/7/19.
Accession Number: 20190507–5128.
Comments Due: 5 p.m. ET 5/28/19.
Docket Numbers: ER19–1800–000.
Applicants: Midcontinent
Independent System Operator, Inc.
Description: § 205(d) Rate Filing:
2019–05–07_SA 6511 ETEC–MISO
Agreement for Pseudo-Ties Out of MISO
to be effective 6/1/2019.
E:\FR\FM\14MYN1.SGM
14MYN1
Agencies
[Federal Register Volume 84, Number 93 (Tuesday, May 14, 2019)]
[Notices]
[Pages 21336-21338]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2019-10044]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
Sunshine Act Meeting Notice
The following notice of meeting is published pursuant to section
3(a) of the government in the Sunshine Act (Pub. L. 94-409), 5 U.S.C.
552b:
AGENCY HOLDING MEETING: Federal Energy Regulatory Commission.
TIME AND DATE: May 16, 2019 10:00 a.m.
PLACE: Room 2C, 888 First Street NE, Washington, DC 20426.
STATUS: OPEN.
MATTERS TO BE CONSIDERED: Agenda
* NOTE--Items listed on the agenda may be deleted without further
notice.
CONTACT PERSON FOR MORE INFORMATION: Kimberly D. Bose, Secretary,
Telephone (202) 502-8400.
For a recorded message listing items struck from or added to the
meeting, call (202) 502-8627.
This is a list of matters to be considered by the Commission. It
does not include a listing of all documents relevant to the items on
the agenda. All public documents, however, may be viewed on line at the
Commission's website at https://ferc.capitolconnection.org/ using the
eLibrary link, or may be examined in the Commission's Public Reference
Room.
1056th Meeting--Open Meeting
[May 16, 2019--10:00 a.m.]
----------------------------------------------------------------------------------------------------------------
Item No. Docket No. Company
----------------------------------------------------------------------------------------------------------------
Administrative
----------------------------------------------------------------------------------------------------------------
A-1................... AD19-1-000............................................... Agency Administrative
Matters.
A-2................... AD19-2-000............................................... Customer Matters,
Reliability, Security and
Market Operations.
A-3................... AD19-14-000.............................................. 2019 Summer Energy Market and
Reliability Assessment.
----------------------------------------------------------------------------------------------------------------
Electric
----------------------------------------------------------------------------------------------------------------
E-1................... RM16-23-001.............................................. Electric Storage
Participation in Markets
Operated by Regional
Transmission Organizations
and Independent System
Operators.
AD16-20-001.............................................. Electric Storage
Participation in Regions
with Organized Wholesale
Electric Markets.
E-2................... EL16-108-000............................................. Tilton Energy LLC v.
Midcontinent Independent
System Operator, Inc.
EL17-29-000.............................................. American Municipal Power,
Inc. v. Midcontinent
Independent System Operator,
Inc.
EL17-31-000.............................................. Northern Illinois Municipal
Power Agency v. PJM,
Interconnection, L.L.C.
[[Page 21337]]
EL17-37-000.............................................. American Municipal Power,
Inc. v. PJM Interconnection,
L.L.C.
EL17-54-000 (consolidated)............................... Dynegy Marketing and Trade,
LLC and Illinois Power,
Marketing Company v.
Midcontinent Independent
System Operator, Inc.
E-3................... EL17-29-000.............................................. American Municipal Power,
Inc. v. Midcontinent,
Independent System Operator,
Inc.
EL16-108-000............................................. Tilton Energy LLC v.
Midcontinent Independent
System Operator, Inc.
EL17-31-000.............................................. Northern Illinois Municipal
Power Agency v. PJM,
Interconnection, L.L.C.
EL17-37-000.............................................. American Municipal Power,
Inc. v. PJM Interconnection,
L.L.C.
EL17-54-000 (consolidated)............................... Dynegy Marketing and Trade,
LLC and Illinois Power,
Marketing Company v.
Midcontinent Independent
System Operator, Inc.
E-4................... EL17-31-000.............................................. Northern Illinois Municipal
Power Agency v. PJM
Interconnection, L.L.C.
EL17-37-000.............................................. American Municipal Power,
Inc. v. PJM Interconnection,
L.L.C.
EL16-108-000............................................. Tilton Energy LLC v.
Midcontinent Independent
System Operator, Inc.
EL17-29-000.............................................. American Municipal Power,
Inc. v. Midcontinent,
Independent System Operator,
Inc.
EL17-54-000 (consolidated)............................... Dynegy Marketing and Trade,
LLC and Illinois Power,
Marketing Company v.
Midcontinent Independent
System Operator, Inc.
E-5................... EL17-54-000 (consolidated)............................... Dynegy Marketing and Trade,
LLC and Illinois Power,
Marketing Company v.
Midcontinent Independent
System Operator, Inc.
EL16-108-000............................................. Tilton Energy LLC v.
Midcontinent Independent
System Operator, Inc.
EL17-29-000.............................................. American Municipal Power,
Inc. v. Midcontinent,
Independent System Operator,
Inc.
EL17-31-000.............................................. Northern Illinois Municipal
Power Agency v. PJM,
Interconnection, L.L.C.
EL17-37-000.............................................. American Municipal Power,
Inc. v. PJM Interconnection,
L.L.C.
E-6................... RM05-5-027............................................... Standards for Business
Practices and Communication,
Protocols for Public
Utilities.
E-7................... EL18-138-000............................................. Midcontinent Independent
System Operator, Inc.
ALLETE, Inc.
Montana-Dakota Utilities Co.
Northern Indiana Public
Service Company
Otter Tail Power Company
Southern Indiana Gas &
Electric Company.
ER18-1793-001............................................ Midcontinent Independent
System Operator, Inc.
E-8................... EL18-157-000............................................. American Transmission Company
LLC.
ER19-838-000............................................. Midcontinent Independent
System Operator, Inc.
E-9................... EL18-158-000............................................. GridLiance West LLC.
ER17-706-006............................................. .............................
E-10.................. EL18-159-000............................................. International Transmission
Company.
EL18-160-000............................................. ITC Midwest, LLC.
ER18-2323-002............................................ Midcontinent Independent
System Operator, Inc.
E-11.................. EL18-164-000............................................. Southern California Edison
Company.
ER19-845-000............................................. .............................
E-12.................. EL18-165-000............................................. TransCanyon DCR, LLC.
ER15-1682-006............................................ .............................
E-13.................. EL18-167-000............................................. Virginia Electric and Power
Company.
ER19-839-001............................................. PJM Interconnection, L.L.C.
E-14.................. EL19-16-000.............................................. Michigan Electric
Transmission Company, LLC.
ER18-2323-001............................................ Midcontinent Independent
System Operator, Inc.
E-15.................. EL18-172-000............................................. American Municipal Power,
Inc.
E-16.................. EL18-174-000............................................. American Municipal Power,
Inc.
E-17.................. EL19-40-000.............................................. Florida Municipal Power
Agency v. Duke Energy
Florida, LLC.
E-18.................. EL19-30-000.............................................. LS Power Grid New York, LLC.
LS Power Grid New York
Corporation I.
E-19.................. EC19-68-000.............................................. Clearway Energy Group LLC.
Clearway Energy, Inc.
E-20.................. ER19-366-000............................................. Public Service Company of
ER19-366-001............................................. Colorado.
----------------------------------------------------------------------------------------------------------------
Miscellaneous
----------------------------------------------------------------------------------------------------------------
M-1................... PL10-2-003............................................... Enforcement of Statutes,
Regulations, and Orders.
----------------------------------------------------------------------------------------------------------------
Gas
----------------------------------------------------------------------------------------------------------------
G-1................... RP18-923-000............................................. Enable Mississippi River
RP18-923-002............................................. Transmission, LLC.
RP18-923-003.............................................
RP18-923-005.............................................
G-2................... RP19-996-000............................................. Apache Corporation
Red Wolf Acquisitions, LLC.
G-3................... RP18-987-001............................................. Transcontinental Gas Pipe
RP18-990-001............................................. Line Company, LLC.
----------------------------------------------------------------------------------------------------------------
[[Page 21338]]
Hydro
----------------------------------------------------------------------------------------------------------------
H-1................... P-2242-078............................................... Eugene Water & Electric
Board.
----------------------------------------------------------------------------------------------------------------
Certificates
----------------------------------------------------------------------------------------------------------------
C-1................... CP19-34-000.............................................. Alliance Pipeline L.P.
C-2................... CP17-470-000............................................. Freeport LNG Development,
L.P.
FLNG Liquefaction 4, LLC.
----------------------------------------------------------------------------------------------------------------
Issued: May 9, 2019.
Kimberly D. Bose,
Secretary.
A free webcast of this event is available through https://ferc.capitolconnection.org/.Anyone with internet access who desires
to view this event can do so by navigating to www.ferc.gov's
Calendar of Events and locating this event in the Calendar. The
event will contain a link to its webcast. The Capitol Connection
provides technical support for the free webcasts. It also offers
access to this event via television in the DC area and via phone
bridge for a fee. If you have any questions, visit https://ferc.capitolconnection.org/ or contact Shirley Al-Jarani at 703-993-
3104.
Immediately following the conclusion of the Commission Meeting,
a press briefing will be held in the Commission Meeting Room.
Members of the public may view this briefing in the designated
overflow room. This statement is intended to notify the public that
the press briefings that follow Commission meetings may now be
viewed remotely at Commission headquarters, but will not be telecast
through the Capitol Connection service.
[FR Doc. 2019-10044 Filed 5-10-19; 4:15 pm]
BILLING CODE 6717-01-P