Glen Ullin Energy Center, LLC.; Supplemental Notice That Initial Market-Based Rate Filing Includes Request for Blanket Section 204 Authorization, 20875-20876 [2019-09705]
Download as PDF
Federal Register / Vol. 84, No. 92 / Monday, May 13, 2019 / Notices
must file in accordance with Rules 211
and 214 of the Commission’s
Regulations (18 CFR 385.211 and
385.214) on or before 5:00 p.m. Eastern
time on the specified comment date.
Protests may be considered, but
intervention is necessary to become a
party to the proceeding.
eFiling is encouraged. More detailed
information relating to filing
requirements, interventions, protests,
service, and qualifying facilities filings
can be found at: https://www.ferc.gov/
docs-filing/efiling/filing-req.pdf. For
other information, call (866) 208–3676
(toll free). For TTY, call (202) 502–8659.
Dated: May 3, 2019.
Kimberly D. Bose,
Secretary.
[FR Doc. 2019–09718 Filed 5–10–19; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. CP19–218–000]
jbell on DSK3GLQ082PROD with NOTICES
Equitrans, L.P.; Notice of Request
Under Blanket Authorization
Take notice that on April 24, 2019,
Equitrans, L.P., 2200 Energy Drive
Canonsburg, PA 15317, filed a prior
notice application pursuant to sections
157.205, 157.208(c), and 157.216(b) of
the Federal Energy Regulatory
Commission’s (Commission) regulations
under the Natural Gas Act (NGA), and
Equitrans blanket certificate issued in
Docket No. CP96–532–000. Equitrans
requests authorization to abandon and
replace two segments of its TP–4555
pipeline (Bare Pipe Replacement
Project), one of the pipelines which
comprises Equitrans’ Allegheny Valley
Connector System. The replacement
segments, which are located in
Westmoreland County, Pennsylvania,
total approximately 3.92 miles, all as
more fully set forth in the application,
which is open to the public for
inspection. The filing may also be
viewed on the web at https://
www.ferc.gov using the ‘‘eLibrary’’ link.
Enter the docket number excluding the
last three digits in the docket number
field to access the document. For
assistance, contact FERC at
FERCOnlineSupport@ferc.gov or call
toll-free, (866) 208–3676 or TTY, (202)
502–8659.
Specifically, Equitrans is proposing to
abandon approximately 3.85 miles of
20-inch diameter pipeline on the TP–
4555 pipeline and replace it with
approximately 3.92 miles of 20-inch
VerDate Sep<11>2014
16:29 May 10, 2019
Jkt 247001
diameter pipeline. The TP–4555
pipeline is part of Equitrans’ Allegheny
Valley Connector System.
Any questions regarding this
application should be directed to
Matthew Eggerding Assistant General
Counsel, 2200 Energy Drive,
Canonsburg, PA 15317, or call (412)
553–5786, or by email: meggerding@
equitransmidstream.com.
Any person or the Commission’s staff
may, within 60 days after issuance of
the instant notice by the Commission,
file pursuant to Rule 214 of the
Commission’s Procedural Rules (18 CFR
385.214) a motion to intervene or notice
of intervention and pursuant to Section
157.205 of the regulations under the
NGA (18 CFR 157.205), a protest to the
request. If no protest is filed within the
time allowed therefore, the proposed
activity shall be deemed to be
authorized effective the day after the
time allowed for filing a protest. If a
protest is filed and not withdrawn
within 30 days after the allowed time
for filing a protest, the instant request
shall be treated as an application for
authorization pursuant to section 7 of
the NGA.
Pursuant to section 157.9 of the
Commission’s rules, 18 CFR 157.9,
within 90 days of this Notice the
Commission staff will either: Complete
its environmental assessment (EA) and
place it into the Commission’s public
record (eLibrary) for this proceeding, or
issue a Notice of Schedule for
Environmental Review. If a Notice of
Schedule for Environmental Review is
issued, it will indicate, among other
milestones, the anticipated date for the
Commission staff’s issuance of the final
environmental impact statement (FEIS)
or EA for this proposal. The filing of the
EA in the Commission’s public record
for this proceeding or the issuance of a
Notice of Schedule for Environmental
Review will serve to notify federal and
state agencies of the timing for the
completion of all necessary reviews, and
the subsequent need to complete all
federal authorizations within 90 days of
the date of issuance of the Commission
staff’s FEIS or EA.
Persons who wish to comment only
on the environmental review of this
project should submit an original and
two copies of their comments to the
Secretary of the Commission.
Environmental commenters will be
placed on the Commission’s
environmental mailing list, and will be
notified of any meetings associated with
the Commission’s environmental review
process. Environmental commenters
will not be required to serve copies of
filed documents on all other parties.
However, the non-party commenter will
PO 00000
Frm 00030
Fmt 4703
Sfmt 4703
20875
not receive copies of all documents filed
by other parties or issued by the
Commission and will not have the right
to seek court review of the
Commission’s final order.
The Commission strongly encourages
electronic filings of comments, protests
and interventions in lieu of paper using
the ‘‘eFiling’’ link at https://
www.ferc.gov. Persons unable to file
electronically should submit an original
and 3 copies of the protest or
intervention to the Federal Energy
Regulatory Commission, 888 First Street
NE, Washington, DC 20426.
Dated: May 3, 2019.
Kimberly D. Bose,
Secretary.
[FR Doc. 2019–09707 Filed 5–10–19; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. ER19–1778–000]
Glen Ullin Energy Center, LLC.;
Supplemental Notice That Initial
Market-Based Rate Filing Includes
Request for Blanket Section 204
Authorization
This is a supplemental notice in the
above-referenced proceeding of Glen
Ullin Energy Center, LLC’s application
for market-based rate authority, with an
accompanying rate tariff, noting that
such application includes a request for
blanket authorization, under 18 CFR
part 34, of future issuances of securities
and assumptions of liability.
Any person desiring to intervene or to
protest should file with the Federal
Energy Regulatory Commission, 888
First Street NE, Washington, DC 20426,
in accordance with Rules 211 and 214
of the Commission’s Rules of Practice
and Procedure (18 CFR 385.211 and
385.214). Anyone filing a motion to
intervene or protest must serve a copy
of that document on the Applicant.
Notice is hereby given that the
deadline for filing protests with regard
to the applicant’s request for blanket
authorization, under 18 CFR part 34, of
future issuances of securities and
assumptions of liability, is May 28,
2019.
The Commission encourages
electronic submission of protests and
interventions in lieu of paper, using the
FERC Online links at https://
www.ferc.gov. To facilitate electronic
service, persons with internet access
who will eFile a document and/or be
listed as a contact for an intervenor
E:\FR\FM\13MYN1.SGM
13MYN1
20876
Federal Register / Vol. 84, No. 92 / Monday, May 13, 2019 / Notices
must create and validate an
eRegistration account using the
eRegistration link. Select the eFiling
link to log on and submit the
intervention or protests.
Persons unable to file electronically
should submit an original and 5 copies
of the intervention or protest to the
Federal Energy Regulatory Commission,
888 First Street NE, Washington, DC
20426.
The filings in the above-referenced
proceeding are accessible in the
Commission’s eLibrary system by
clicking on the appropriate link in the
above list. They are also available for
electronic review in the Commission’s
Public Reference Room in Washington,
DC. There is an eSubscription link on
the website that enables subscribers to
receive email notification when a
document is added to a subscribed
docket(s). For assistance with any FERC
Online service, please email
FERCOnlineSupport@ferc.gov. or call
(866) 208–3676 (toll free). For TTY, call
(202) 502–8659.
Dated: May 6, 2019.
Kimberly D. Bose,
Secretary.
[FR Doc. 2019–09705 Filed 5–10–19; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
jbell on DSK3GLQ082PROD with NOTICES
Combined Notice of Filings #1
Take notice that the Commission
received the following electric corporate
filings:
Docket Numbers: EC19–85–000.
Applicants: Convergent Energy and
Power LP, Hazle Spindle, LLC,
Stephentown Spindle, LLC, ECP
ControlCo, LLC.
Description: Joint Application for
Authorization Under Section 203 of the
Federal Power Act, et al. of Convergent
Energy and Power LP, et al.
Filed Date: 5/3/19.
Accession Number: 20190503–5160.
Comments Due: 5 p.m. ET 5/24/19.
Take notice that the Commission
received the following electric rate
filings:
Docket Numbers: ER19–1066–001.
Applicants: Nevada Power Company.
Description: Tariff Amendment:
OATT Revision To Tariffs 05.03.19 to be
effective 12/31/9998.
Filed Date: 5/6/19.
Accession Number: 20190506–5000.
Comments Due: 5 p.m. ET 5/28/19.
Docket Numbers: ER19–1379–001.
VerDate Sep<11>2014
16:29 May 10, 2019
Jkt 247001
Applicants: Midcontinent
Independent System Operator, Inc.
Description: Tariff Amendment:
2019–05–06_SA 3275 J438 POI Add 25
Mvar Cap Bank Sub MPFCA to be
effective 3/20/2019.
Filed Date: 5/6/19.
Accession Number: 20190506–5097.
Comments Due: 5 p.m. ET 5/16/19.
Docket Numbers: ER19–1405–001.
Applicants: Precept Power LLC.
Description: Tariff Amendment:
ADMENDMENT TO INITIAL TARIFF,
WAIVERS AND BLANKET
AUTHORITY to be effective 6/1/2019.
Filed Date: 5/6/19.
Accession Number: 20190506–5001.
Comments Due: 5 p.m. ET 5/28/19.
Docket Numbers: ER19–1535–000.
Applicants: Lower Mount Bethel
Energy, LLC.
Description: Supplement to April 8,
2019 Lower Mount Bethel Energy, LLC
tariff filing.
Filed Date: 5/2/19.
Accession Number: 20190502–5152.
Comments Due: 5 p.m. ET 5/23/19.
Docket Numbers: ER19–1695–000.
Applicants: California Transmission
Project Corp.
Description: Amended Request for
One-Time Limited Waiver, et al. of
California Transmission Project Corp.
Filed Date: 5/3/19.
Accession Number: 20190503–5174.
Comments Due: 5 p.m. ET 5/24/19.
Docket Numbers: ER19–1781–000.
Applicants: MeterGenius, Inc.
Description: Baseline eTariff Filing:
MeterGenius Market Base Rate Inital
Tariff Filing to be effective 6/2/2019.
Filed Date: 5/3/19.
Accession Number: 20190503–5140.
Comments Due: 5 p.m. ET 5/24/19.
Docket Numbers: ER19–1782–000.
Applicants: Pacific Gas and Electric
Company.
Description: § 205(d) Rate Filing:
Amendment to the IA for the Stockton
Port District (TO SA 117) to be effective
7/3/2019.
Filed Date: 5/3/19.
Accession Number: 20190503–5142.
Comments Due: 5 p.m. ET 5/24/19.
Docket Numbers: ER19–1783–000.
Applicants: Southern California
Edison Company.
Description: § 205(d) Rate Filing: SCE
Recollation of WDAT Filing 7 of 9 to be
effective 5/1/2019.
Filed Date: 5/6/19.
Accession Number: 20190506–5002.
Comments Due: 5 p.m. ET 5/28/19.
Docket Numbers: ER19–1784–000.
Applicants: Public Service Company
of Colorado.
Description: § 205(d) Rate Filing:
PSCo-BLDR–T–2018–1–FASA&EDA–
522–0.0.0 to be effective 5/7/2019.
PO 00000
Frm 00031
Fmt 4703
Sfmt 4703
Filed Date: 5/6/19.
Accession Number: 20190506–5056.
Comments Due: 5 p.m. ET 5/28/19.
Docket Numbers: ER19–1785–000.
Applicants: PJM Interconnection,
L.L.C.
Description: § 205(d) Rate Filing:
Original Upgrade CSA, SA No. 5357;
Queue No. NQ–J468 to be effective
4/4/2019.
Filed Date: 5/6/19.
Accession Number: 20190506–5060.
Comments Due: 5 p.m. ET 5/28/19.
Docket Numbers: ER19–1786–000.
Applicants: Duke Energy Progress,
LLC.
Description: § 205(d) Rate Filing: DEPRevised Rate Schedule No. 180
(Haywood EMC) to be effective
11/1/2018.
Filed Date: 5/6/19.
Accession Number: 20190506–5087.
Comments Due: 5 p.m. ET 5/28/19.
Docket Numbers: ER19–1787–000.
Applicants: Riverhead Solar Farm,
LLC.
Description: Baseline eTariff Filing:
Riverhead Shared Facilities Agreement
to be effective 5/7/2019.
Filed Date: 5/6/19.
Accession Number: 20190506–5089.
Comments Due: 5 p.m. ET 5/28/19.
Docket Numbers: ER19–1788–000.
Applicants: Duke Energy Progress,
LLC.
Description: § 205(d) Rate Filing: DEPRevised Rate Schedule No. 172
(Piedmont EMC) to be effective
11/1/2018.
Filed Date: 5/6/19.
Accession Number: 20190506–5090.
Comments Due: 5 p.m. ET 5/28/19.
Docket Numbers: ER19–1789–000.
Applicants: Duke Energy Carolinas,
LLC.
Description: § 205(d) Rate Filing: DECAmended Rate Schedule Nos. 315, 316,
317, and 335) to be effective 1/1/2018.
Filed Date: 5/6/19.
Accession Number: 20190506–5094.
Comments Due: 5 p.m. ET 5/28/19.
The filings are accessible in the
Commission’s eLibrary system by
clicking on the links or querying the
docket number.
Any person desiring to intervene or
protest in any of the above proceedings
must file in accordance with Rules 211
and 214 of the Commission’s
Regulations (18 CFR 385.211 and
385.214) on or before 5:00 p.m. Eastern
time on the specified comment date.
Protests may be considered, but
intervention is necessary to become a
party to the proceeding.
eFiling is encouraged. More detailed
information relating to filing
E:\FR\FM\13MYN1.SGM
13MYN1
Agencies
[Federal Register Volume 84, Number 92 (Monday, May 13, 2019)]
[Notices]
[Pages 20875-20876]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2019-09705]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Docket No. ER19-1778-000]
Glen Ullin Energy Center, LLC.; Supplemental Notice That Initial
Market-Based Rate Filing Includes Request for Blanket Section 204
Authorization
This is a supplemental notice in the above-referenced proceeding of
Glen Ullin Energy Center, LLC's application for market-based rate
authority, with an accompanying rate tariff, noting that such
application includes a request for blanket authorization, under 18 CFR
part 34, of future issuances of securities and assumptions of
liability.
Any person desiring to intervene or to protest should file with the
Federal Energy Regulatory Commission, 888 First Street NE, Washington,
DC 20426, in accordance with Rules 211 and 214 of the Commission's
Rules of Practice and Procedure (18 CFR 385.211 and 385.214). Anyone
filing a motion to intervene or protest must serve a copy of that
document on the Applicant.
Notice is hereby given that the deadline for filing protests with
regard to the applicant's request for blanket authorization, under 18
CFR part 34, of future issuances of securities and assumptions of
liability, is May 28, 2019.
The Commission encourages electronic submission of protests and
interventions in lieu of paper, using the FERC Online links at https://www.ferc.gov. To facilitate electronic service, persons with internet
access who will eFile a document and/or be listed as a contact for an
intervenor
[[Page 20876]]
must create and validate an eRegistration account using the
eRegistration link. Select the eFiling link to log on and submit the
intervention or protests.
Persons unable to file electronically should submit an original and
5 copies of the intervention or protest to the Federal Energy
Regulatory Commission, 888 First Street NE, Washington, DC 20426.
The filings in the above-referenced proceeding are accessible in
the Commission's eLibrary system by clicking on the appropriate link in
the above list. They are also available for electronic review in the
Commission's Public Reference Room in Washington, DC. There is an
eSubscription link on the website that enables subscribers to receive
email notification when a document is added to a subscribed docket(s).
For assistance with any FERC Online service, please email
[email protected]. or call (866) 208-3676 (toll free). For
TTY, call (202) 502-8659.
Dated: May 6, 2019.
Kimberly D. Bose,
Secretary.
[FR Doc. 2019-09705 Filed 5-10-19; 8:45 am]
BILLING CODE 6717-01-P