Combined Notice of Filings #1, 20351-20352 [2019-09482]
Download as PDF
Federal Register / Vol. 84, No. 90 / Thursday, May 9, 2019 / Notices
Dated: May 2, 2019.
Kimberly D. Bose,
Secretary.
[FR Doc. 2019–09487 Filed 5–8–19; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
jbell on DSK3GLQ082PROD with NOTICES
Combined Notice of Filings #1
Take notice that the Commission
received the following electric rate
filings:
Docket Numbers: ER19–465–001.
Applicants: Midcontinent
Independent System Operator, Inc.
Description: Compliance filing: 2019–
05–01_Response Letter to Order 841
Compliance to be effective 5/1/2019.
Filed Date: 5/1/19.
Accession Number: 20190501–5401.
Comments Due: 5 p.m. ET 5/22/19.
Docket Numbers: ER19–467–001.
Applicants: New York Independent
System Operator, Inc.
Description: Compliance filing:
Response to FERC questions on ESRs
(Order No. 841) to be effective N/A.
Filed Date: 5/1/19.
Accession Number: 20190501–5404.
Comments Due: 5 p.m. ET 5/22/19.
Docket Numbers: ER19–468–001.
Applicants: California Independent
System Operator Corporation.
Description: Compliance filing: 2019–
05–01 Response to Deficiency Letter—
Compliance with Order No. 841 to be
effective N/A.
Filed Date: 5/1/19.
Accession Number: 20190501–5395.
Comments Due: 5 p.m. ET 5/22/19.
Docket Numbers: ER19–469–001.
Applicants: PJM Interconnection,
L.L.C.
Description: Compliance filing:
Response to 4/1/2019 Letter Req
Additional Information re Order No. 841
to be effective 12/3/2019.
Filed Date: 5/1/19.
Accession Number: 20190501–5390.
Comments Due: 5 p.m. ET 5/22/19.
Docket Numbers: ER19–470–001.
Applicants: ISO New England Inc.,
Eversource Energy Service Company (as
agent).
Description: Compliance filing:
Response to April 1, 2019 Letter Re:
Compliance Filing for Order No. 841 to
be effective 12/3/2019.
Filed Date: 5/1/19.
Accession Number: 20190501–5403.
Comments Due: 5 p.m. ET 5/22/19.
Docket Numbers: ER19–1467–001.
Applicants: Arizona Public Service
Company.
VerDate Sep<11>2014
19:39 May 08, 2019
Jkt 247001
Description: Tariff Amendment:
Supplemental Filng to Cancellation of
Service Agreement No. 352 to be
effective 5/28/2019.
Filed Date: 5/1/19.
Accession Number: 20190501–5391.
Comments Due: 5 p.m. ET 5/22/19.
Docket Numbers: ER19–1755–000.
Applicants: Arizona Public Service
Company.
Description: § 205(d) Rate Filing: Rate
Schedule No. 33—WAPA Triangle
Agreement_Exhibit A Revision No. 53 to
be effective 7/1/2019.
Filed Date: 5/1/19.
Accession Number: 20190501–5384.
Comments Due: 5 p.m. ET 5/22/19.
Docket Numbers: ER19–1756–000.
Applicants: NorthWestern
Corporation.
Description: § 205(d) Rate Filing:
Montana OATT Formula Rate (Part 1) to
be effective 7/1/2019.
Filed Date: 5/1/19.
Accession Number: 20190501–5392.
Comments Due: 5 p.m. ET 5/22/19.
Docket Numbers: ER19–1757–000.
Applicants: Southern California
Edison Company.
Description: § 205(d) Rate Filing: SCE
Recollation of WDAT Filing 8 of 9 to be
effective 5/1/2019.
Filed Date: 5/1/19.
Accession Number: 20190501–5394.
Comments Due: 5 p.m. ET 5/22/19.
Docket Numbers: ER19–1758–000.
Applicants: Southern California
Edison Company.
Description: § 205(d) Rate Filing: SCE
Recollation of WDAT Filing 9 of 9 to be
effective 5/1/2019.
Filed Date: 5/1/19.
Accession Number: 20190501–5399.
Comments Due: 5 p.m. ET 5/22/19.
Docket Numbers: ER19–1759–000.
Applicants: PJM Interconnection,
L.L.C.
Description: § 205(d) Rate Filing:
Original ICSA, SA No. 5189; Queue No.
AB2–040 to be effective 9/10/2018.
Filed Date: 5/1/19.
Accession Number: 20190501–5400.
Comments Due: 5 p.m. ET 5/22/19.
Docket Numbers: ER19–1760–000.
Applicants: Southern California
Edison Company.
Description: § 205(d) Rate Filing: SCE
Recollation of Rate Schedules to be
effective 5/1/2019.
Filed Date: 5/1/19.
Accession Number: 20190501–5402.
Comments Due: 5 p.m. ET 5/22/19.
Docket Numbers: ER19–1761–000.
Applicants: Southern California
Edison Company.
Description: § 205(d) Rate Filing: SCE
Recollation of WDAT Filing 5 of 9 to be
effective 5/1/2019.
PO 00000
Frm 00030
Fmt 4703
Sfmt 4703
20351
Filed Date: 5/2/19.
Accession Number: 20190502–5003.
Comments Due: 5 p.m. ET 5/23/19.
Docket Numbers: ER19–1762–000.
Applicants: Electric Energy, Inc.
Description: Compliance filing:
compliance 2019 Attachment M to be
effective 5/2/2019.
Filed Date: 5/2/19.
Accession Number: 20190502–5005.
Comments Due: 5 p.m. ET 5/23/19.
Docket Numbers: ER19–1763–000.
Applicants: Southwest Power Pool,
Inc.
Description: § 205(d) Rate Filing:
3446R1 Group NIRE/SPS Facilities
Construction Agreement to be effective
7/1/2019.
Filed Date: 5/2/19.
Accession Number: 20190502–5015.
Comments Due: 5 p.m. ET 5/23/19.
Docket Numbers: ER19–1764–000.
Applicants: Applied Energy LLC
Description: Tariff Cancellation: MBR
Tariff Cancellation to be effective 5/3/
2019.
Filed Date: 5/2/19.
Accession Number: 20190502–5057.
Comments Due: 5 p.m. ET 5/23/19.
Docket Numbers: ER19–1765–000.
Applicants: CSOLAR IV South, LLC.
Description: § 205(d) Rate Filing: Cost
True-Up Amendment to Co-Tenancy
and Shared Use Agreement to be
effective 5/3/2019.
Filed Date: 5/2/19.
Accession Number: 20190502–5061.
Comments Due: 5 p.m. ET 5/23/19.
Docket Numbers: ER19–1766–000.
Applicants: CSOLAR IV South, LLC.
Description: § 205(d) Rate Filing: New
Substation Facilities Agreement to be
effective 5/3/2019.
Filed Date: 5/2/19.
Accession Number: 20190502–5062.
Comments Due: 5 p.m. ET 5/23/19.
Docket Numbers: ER19–1768–000.
Applicants: Duquesne Light
Company.
Description: Tariff Cancellation:
Notice of Cancellation of Elrama
Connection and Site Agreement to be
effective 12/31/2014.
Filed Date: 5/2/19.
Accession Number: 20190502–5074.
Comments Due: 5 p.m. ET 5/23/19.
Docket Numbers: ER19–1769–000.
Applicants: Southern California
Edison Company.
Description: § 205(d) Rate Filing: SCE
Recollation of TO Tariff Filing 2a of 3
to be effective 5/1/2019.
Filed Date: 5/2/19.
Accession Number: 20190502–5077.
Comments Due: 5 p.m. ET 5/23/19.
Docket Numbers: ER19–1770–000.
Applicants: Entergy Arkansas, LLC,
Entergy Louisiana, LLC, Entergy
E:\FR\FM\09MYN1.SGM
09MYN1
20352
Federal Register / Vol. 84, No. 90 / Thursday, May 9, 2019 / Notices
Mississippi, LLC, Entergy New Orleans,
LLC, Entergy Texas, Inc.
Description: Post-Retirement Benefits
Other than Pensions for 2018 Test Year
of Entergy Arkansas, Inc., et al.
Filed Date: 5/1/19.
Accession Number: 20190501–5447.
Comments Due: 5 p.m. ET 5/22/19.
The filings are accessible in the
Commission’s eLibrary system by
clicking on the links or querying the
docket number.
Any person desiring to intervene or
protest in any of the above proceedings
must file in accordance with Rules 211
and 214 of the Commission’s
Regulations (18 CFR 385.211 and
385.214) on or before 5:00 p.m. Eastern
time on the specified comment date.
Protests may be considered, but
intervention is necessary to become a
party to the proceeding.
eFiling is encouraged. More detailed
information relating to filing
requirements, interventions, protests,
service, and qualifying facilities filings
can be found at: https://www.ferc.gov/
docs-filing/efiling/filing-req.pdf. For
other information, call (866) 208–3676
(toll free). For TTY, call (202) 502–8659.
Dated: May 2, 2019.
Kimberly D. Bose,
Secretary.
[FR Doc. 2019–09482 Filed 5–8–19; 8:45 am]
BILLING CODE 6717–01–P
ENVIRONMENTAL PROTECTION
AGENCY
[EPA–HQ–ORD–2016–0010; FRL–9993–12–
ORD]
Proposed Information Collection
Request; Comment Request;
Recordkeeping for Institutional Dual
Use Research of Concern (iDURC)
Policy Compliance (Renewal)
Environmental Protection
Agency (EPA).
ACTION: Notice.
AGENCY:
The Environmental Protection
Agency is planning to submit an
information collection request (ICR),
‘‘Recordkeeping for Institutional Dual
Use Research of Concern (iDURC) Policy
Compliance’’ (EPA ICR No. 2530.03,
OMB Control No. 2080–0082) to the
Office of Management and Budget
(OMB) for review and approval in
accordance with the Paperwork
Reduction Act Before doing so, EPA is
soliciting public comments on specific
aspects of the proposed information
collection as described below. This is a
proposed extension of the ICR, which is
currently approved through January 1,
jbell on DSK3GLQ082PROD with NOTICES
SUMMARY:
VerDate Sep<11>2014
19:39 May 08, 2019
Jkt 247001
2020. An Agency may not conduct or
sponsor and a person is not required to
respond to a collection of information
unless it displays a currently valid OMB
control number.
DATES: Comments must be submitted on
or before July 8, 2019.
ADDRESSES: Submit your comments,
referencing Docket ID No. EPA–HQ–
ORD–2016–0010 online using
www.regulations.gov (our preferred
method), by email to ord.docket@
epa.gov, or by mail to: EPA Docket
Center, Environmental Protection
Agency, Mail Code 28221T, 1200
Pennsylvania Ave. NW, Washington, DC
20460.
EPA’s policy is that all comments
received will be included in the public
docket without change including any
personal information provided, unless
the comment includes profanity, threats,
information claimed to be Confidential
Business Information (CBI) or other
information whose disclosure is
restricted by statute.
FOR FURTHER INFORMATION CONTACT:
Viktoriya Plotkin, National Homeland
Security Research Center, Office of
Research and Development, (8101R), 27
Tarzwell Drive, Narragansett, Rhode
Island, 02882; telephone number: 401–
782–3178; fax number: 401–782–3030;
email address: plotkin.viktoriya@
epa.gov.
SUPPLEMENTARY INFORMATION:
Supporting documents which explain in
detail the information that the EPA will
be collecting are available in the public
docket for this ICR. The docket can be
viewed online at www.regulations.gov
or in person at the EPA Docket Center,
WJC West, Room 3334, 1301
Constitution Ave. NW, Washington, DC.
The telephone number for the Docket
Center is 202–566–1744. For additional
information about EPA’s public docket,
visit https://www.epa.gov/dockets.
Pursuant to section 3506(c)(2)(A) of
the PRA, EPA is soliciting comments
and information to enable it to: (i)
Evaluate whether the proposed
collection of information is necessary
for the proper performance of the
functions of the Agency, including
whether the information will have
practical utility; (ii) evaluate the
accuracy of the Agency’s estimate of the
burden of the proposed collection of
information, including the validity of
the methodology and assumptions used;
(iii) enhance the quality, utility, and
clarity of the information to be
collected; and (iv) minimize the burden
of the collection of information on those
who are to respond, including through
the use of appropriate automated
electronic, mechanical, or other
PO 00000
Frm 00031
Fmt 4703
Sfmt 9990
technological collection techniques or
other forms of information technology,
e.g., permitting electronic submission of
responses. EPA will consider the
comments received and amend the ICR
as appropriate. The final ICR package
will then be submitted to OMB for
review and approval. At that time, EPA
will issue another Federal Register
notice to announce the submission of
the ICR to OMB and the opportunity to
submit additional comments to OMB.
Abstract: To comply with the U.S.
Government Policy for Institutional
Oversight of Life Sciences Dual Use
Research of Concern (DURC Policy),
EPA must ensure that the institutions
subject to DURC Policy appropriately
train their laboratory personnel and
maintain records of their training. This
training is specific to ‘‘dual use research
of concern,’’ and should include
information on how to properly identify
DURC, appropriate methods for
ensuring research that is determined to
be DURC, and that it is conducted and
communicated responsibly.
Form numbers: None.
Respondents/affected entities: Private
sector and federal-owned/contractoroperated labs.
Respondent’s obligation to respond:
Mandatory (Per EPA Order 1000,19:
Policy and Procedures for Managing
Dual Use Research of Concern).
Estimated number of respondents:
Forty (total).
Frequency of response: Only once
and/or as necessary.
Total estimated burden: 52 hours (per
year). Burden is defined at 5 CFR
1320.03(b).
Total estimated cost: $1,590 (per
year), includes $0 annualized capital or
operation & maintenance costs.
Changes in estimates: There is
decrease of 52 burden hours in the total
estimated respondent burden compared
with the ICR currently approved by
OMB. This decrease is due to an
adjustment in estimates to account for
the number of hours required to perform
recordkeeping duties.
Dated: April 23, 2019.
Jennifer Orme-Zavaleta,
Principal Deputy Assistant Administrator for
Science.
[FR Doc. 2019–09589 Filed 5–8–19; 8:45 am]
BILLING CODE 6560–50–P
E:\FR\FM\09MYN1.SGM
09MYN1
Agencies
[Federal Register Volume 84, Number 90 (Thursday, May 9, 2019)]
[Notices]
[Pages 20351-20352]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2019-09482]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
Combined Notice of Filings #1
Take notice that the Commission received the following electric
rate filings:
Docket Numbers: ER19-465-001.
Applicants: Midcontinent Independent System Operator, Inc.
Description: Compliance filing: 2019-05-01_Response Letter to Order
841 Compliance to be effective 5/1/2019.
Filed Date: 5/1/19.
Accession Number: 20190501-5401.
Comments Due: 5 p.m. ET 5/22/19.
Docket Numbers: ER19-467-001.
Applicants: New York Independent System Operator, Inc.
Description: Compliance filing: Response to FERC questions on ESRs
(Order No. 841) to be effective N/A.
Filed Date: 5/1/19.
Accession Number: 20190501-5404.
Comments Due: 5 p.m. ET 5/22/19.
Docket Numbers: ER19-468-001.
Applicants: California Independent System Operator Corporation.
Description: Compliance filing: 2019-05-01 Response to Deficiency
Letter--Compliance with Order No. 841 to be effective N/A.
Filed Date: 5/1/19.
Accession Number: 20190501-5395.
Comments Due: 5 p.m. ET 5/22/19.
Docket Numbers: ER19-469-001.
Applicants: PJM Interconnection, L.L.C.
Description: Compliance filing: Response to 4/1/2019 Letter Req
Additional Information re Order No. 841 to be effective 12/3/2019.
Filed Date: 5/1/19.
Accession Number: 20190501-5390.
Comments Due: 5 p.m. ET 5/22/19.
Docket Numbers: ER19-470-001.
Applicants: ISO New England Inc., Eversource Energy Service Company
(as agent).
Description: Compliance filing: Response to April 1, 2019 Letter
Re: Compliance Filing for Order No. 841 to be effective 12/3/2019.
Filed Date: 5/1/19.
Accession Number: 20190501-5403.
Comments Due: 5 p.m. ET 5/22/19.
Docket Numbers: ER19-1467-001.
Applicants: Arizona Public Service Company.
Description: Tariff Amendment: Supplemental Filng to Cancellation
of Service Agreement No. 352 to be effective 5/28/2019.
Filed Date: 5/1/19.
Accession Number: 20190501-5391.
Comments Due: 5 p.m. ET 5/22/19.
Docket Numbers: ER19-1755-000.
Applicants: Arizona Public Service Company.
Description: Sec. 205(d) Rate Filing: Rate Schedule No. 33--WAPA
Triangle Agreement_Exhibit A Revision No. 53 to be effective 7/1/2019.
Filed Date: 5/1/19.
Accession Number: 20190501-5384.
Comments Due: 5 p.m. ET 5/22/19.
Docket Numbers: ER19-1756-000.
Applicants: NorthWestern Corporation.
Description: Sec. 205(d) Rate Filing: Montana OATT Formula Rate
(Part 1) to be effective 7/1/2019.
Filed Date: 5/1/19.
Accession Number: 20190501-5392.
Comments Due: 5 p.m. ET 5/22/19.
Docket Numbers: ER19-1757-000.
Applicants: Southern California Edison Company.
Description: Sec. 205(d) Rate Filing: SCE Recollation of WDAT
Filing 8 of 9 to be effective 5/1/2019.
Filed Date: 5/1/19.
Accession Number: 20190501-5394.
Comments Due: 5 p.m. ET 5/22/19.
Docket Numbers: ER19-1758-000.
Applicants: Southern California Edison Company.
Description: Sec. 205(d) Rate Filing: SCE Recollation of WDAT
Filing 9 of 9 to be effective 5/1/2019.
Filed Date: 5/1/19.
Accession Number: 20190501-5399.
Comments Due: 5 p.m. ET 5/22/19.
Docket Numbers: ER19-1759-000.
Applicants: PJM Interconnection, L.L.C.
Description: Sec. 205(d) Rate Filing: Original ICSA, SA No. 5189;
Queue No. AB2-040 to be effective 9/10/2018.
Filed Date: 5/1/19.
Accession Number: 20190501-5400.
Comments Due: 5 p.m. ET 5/22/19.
Docket Numbers: ER19-1760-000.
Applicants: Southern California Edison Company.
Description: Sec. 205(d) Rate Filing: SCE Recollation of Rate
Schedules to be effective 5/1/2019.
Filed Date: 5/1/19.
Accession Number: 20190501-5402.
Comments Due: 5 p.m. ET 5/22/19.
Docket Numbers: ER19-1761-000.
Applicants: Southern California Edison Company.
Description: Sec. 205(d) Rate Filing: SCE Recollation of WDAT
Filing 5 of 9 to be effective 5/1/2019.
Filed Date: 5/2/19.
Accession Number: 20190502-5003.
Comments Due: 5 p.m. ET 5/23/19.
Docket Numbers: ER19-1762-000.
Applicants: Electric Energy, Inc.
Description: Compliance filing: compliance 2019 Attachment M to be
effective 5/2/2019.
Filed Date: 5/2/19.
Accession Number: 20190502-5005.
Comments Due: 5 p.m. ET 5/23/19.
Docket Numbers: ER19-1763-000.
Applicants: Southwest Power Pool, Inc.
Description: Sec. 205(d) Rate Filing: 3446R1 Group NIRE/SPS
Facilities Construction Agreement to be effective 7/1/2019.
Filed Date: 5/2/19.
Accession Number: 20190502-5015.
Comments Due: 5 p.m. ET 5/23/19.
Docket Numbers: ER19-1764-000.
Applicants: Applied Energy LLC
Description: Tariff Cancellation: MBR Tariff Cancellation to be
effective 5/3/2019.
Filed Date: 5/2/19.
Accession Number: 20190502-5057.
Comments Due: 5 p.m. ET 5/23/19.
Docket Numbers: ER19-1765-000.
Applicants: CSOLAR IV South, LLC.
Description: Sec. 205(d) Rate Filing: Cost True-Up Amendment to
Co-Tenancy and Shared Use Agreement to be effective 5/3/2019.
Filed Date: 5/2/19.
Accession Number: 20190502-5061.
Comments Due: 5 p.m. ET 5/23/19.
Docket Numbers: ER19-1766-000.
Applicants: CSOLAR IV South, LLC.
Description: Sec. 205(d) Rate Filing: New Substation Facilities
Agreement to be effective 5/3/2019.
Filed Date: 5/2/19.
Accession Number: 20190502-5062.
Comments Due: 5 p.m. ET 5/23/19.
Docket Numbers: ER19-1768-000.
Applicants: Duquesne Light Company.
Description: Tariff Cancellation: Notice of Cancellation of Elrama
Connection and Site Agreement to be effective 12/31/2014.
Filed Date: 5/2/19.
Accession Number: 20190502-5074.
Comments Due: 5 p.m. ET 5/23/19.
Docket Numbers: ER19-1769-000.
Applicants: Southern California Edison Company.
Description: Sec. 205(d) Rate Filing: SCE Recollation of TO Tariff
Filing 2a of 3 to be effective 5/1/2019.
Filed Date: 5/2/19.
Accession Number: 20190502-5077.
Comments Due: 5 p.m. ET 5/23/19.
Docket Numbers: ER19-1770-000.
Applicants: Entergy Arkansas, LLC, Entergy Louisiana, LLC, Entergy
[[Page 20352]]
Mississippi, LLC, Entergy New Orleans, LLC, Entergy Texas, Inc.
Description: Post-Retirement Benefits Other than Pensions for 2018
Test Year of Entergy Arkansas, Inc., et al.
Filed Date: 5/1/19.
Accession Number: 20190501-5447.
Comments Due: 5 p.m. ET 5/22/19.
The filings are accessible in the Commission's eLibrary system by
clicking on the links or querying the docket number.
Any person desiring to intervene or protest in any of the above
proceedings must file in accordance with Rules 211 and 214 of the
Commission's Regulations (18 CFR 385.211 and 385.214) on or before 5:00
p.m. Eastern time on the specified comment date. Protests may be
considered, but intervention is necessary to become a party to the
proceeding.
eFiling is encouraged. More detailed information relating to filing
requirements, interventions, protests, service, and qualifying
facilities filings can be found at: https://www.ferc.gov/docs-filing/efiling/filing-req.pdf. For other information, call (866) 208-3676
(toll free). For TTY, call (202) 502-8659.
Dated: May 2, 2019.
Kimberly D. Bose,
Secretary.
[FR Doc. 2019-09482 Filed 5-8-19; 8:45 am]
BILLING CODE 6717-01-P