Combined Notice of Filings #1, 19920-19921 [2019-09291]

Download as PDF 19920 Federal Register / Vol. 84, No. 88 / Tuesday, May 7, 2019 / Notices Dated: April 29, 2019. Nathaniel J. Davis, Sr., Deputy Secretary. [FR Doc. 2019–09261 Filed 5–6–19; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket Nos. EL18–22–001; EL19–26–001] Notice of Petition for Partial Waiver; Wabash Valley Power Association, Inc. Take notice that on April 30, 2019, pursuant to section 292.402 of the Federal Energy Regulatory Commission’s (Commission) Rules and Regulations,1 Wabash Valley Power Association, Inc., on behalf of itself and Participating Members,2 filed a notice of change in Implementation Plan and requests continued partial waivers under sections 292.303(a) and 292.303(b) of the Commission’s regulations 3 implementing section 210 of the Public Utility Regulatory Policies Act of 1978, as amended,4 all as more fully explained in the petition. Any person desiring to intervene or to protest this filing must file in accordance with Rules 211 and 214 of the Commission’s Rules of Practice and Procedure (18 CFR 385.211, 385.214). Protests will be considered by the Commission in determining the appropriate action to be taken, but will not serve to make protestants parties to the proceeding. Any person wishing to become a party must file a notice of intervention or motion to intervene, as appropriate. Such notices, motions, or protests must be filed on or before the comment date. Anyone filing a motion to intervene or protest must serve a copy of that document on the Petitioner. The Commission encourages electronic submission of protests and interventions in lieu of paper using the ‘‘eFiling’’ link at https://www.ferc.gov. Persons unable to file electronically should submit an original and 5 copies of the protest or intervention to the Federal Energy Regulatory Commission, 1 18 CFR 292.402. Participating Members include: Boone REMC, Carroll White County REMC, Citizens Electric Corporation, Corn Belt Energy, EnerStar Electric Cooperative, Fulton County REMC, Heartland REMC, Jay County REMC, Kosciusko REMC, LaGrange County REMC, Marshall County REMC, Miami-Cass REMC, M.J.M. Electric Cooperative, Newton County REMC, Noble REMC, Parke County REMC, Steuben County REMC, and Warren County REMC. 3 18 CFR 292.303(a) and (b). 4 16 U.S.C. 824a–3. jbell on DSK3GLQ082PROD with NOTICES 2 The VerDate Sep<11>2014 16:24 May 06, 2019 Jkt 247001 888 First Street NE, Washington, DC 20426. This filing is accessible on-line at https://www.ferc.gov, using the ‘‘eLibrary’’ link and is available for review in the Commission’s Public Reference Room in Washington, DC. There is an ‘‘eSubscription’’ link on the website that enables subscribers to receive email notification when a document is added to a subscribed docket(s). For assistance with any FERC Online service, please email FERCOnlineSupport@ferc.gov, or call (866) 208–3676 (toll free). For TTY, call (202) 502–8659. Comments: 5:00 p.m. Eastern Time on May 21, 2019. Dated: May 1, 2019. Kimberly D. Bose, Secretary. [FR Doc. 2019–09279 Filed 5–6–19; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Combined Notice of Filings #1 Take notice that the Commission received the following electric rate filings: Docket Numbers: ER19–1541–000. Applicants: Midcontinent Independent System Operator, Inc. Description: Second Supplement to April 9, 2019 Pre-Arranged/Pre-Agreed (Stipulation and Offer of Settlement) Filing, et al. of the Midcontinent Independent System Operator, Inc., et al. Filed Date: 4/30/19. Accession Number: 20190430–5489. Comments Due: 5 p.m. ET 5/6/19. Docket Numbers: ER19–1656–001. Applicants: Wilkinson Solar LLC. Description: Tariff Amendment: Supplement to Application for MarketBased Rate Authorization to be effective 6/24/2019. Filed Date: 4/24/19. Accession Number: 20190424–5077. Comments Due: 5 p.m. ET 5/15/19. Docket Numbers: ER19–1695–000. Applicants: California Transmission Project Corp. Description: Request for One-Time Limited Waiver, et al. of California Transmission Project Corp. Filed Date: 4/29/19. Accession Number: 20190429–5056. Comments Due: 5 p.m. ET 5/20/19. Docket Numbers: ER19–1733–000. Applicants: Sierra Pacific Power Company. PO 00000 Frm 00022 Fmt 4703 Sfmt 4703 Description: § 205(d) Rate Filing: Service Agreement No. 18–00023 SPPC/ Patua to be effective 4/1/2019. Filed Date: 4/30/19. Accession Number: 20190430–5402. Comments Due: 5 p.m. ET 5/21/19. Docket Numbers: ER19–1734–000. Applicants: The Potomac Edison Company, PJM Interconnection, L.L.C. Description: § 205(d) Rate Filing: Potomac submits a CA, Service Agreement No. 5275 with Town of Williamsport to be effective 6/29/2019. Filed Date: 4/30/19. Accession Number: 20190430–5416. Comments Due: 5 p.m. ET 5/21/19. Docket Numbers: ER19–1735–000. Applicants: Sierra Pacific Power Company. Description: § 205(d) Rate Filing: Service Agreement No. 16–00063 SPPC/ Patua to be effective 4/1/2019. Filed Date: 4/30/19. Accession Number: 20190430–5419. Comments Due: 5 p.m. ET 5/21/19. Docket Numbers: ER19–1736–000. Applicants: Tampa Electric Company. Description: § 205(d) Rate Filing: Emergency Interchange Service Schedule A&B–2019 (Bundled) to be effective 5/1/2019. Filed Date: 4/30/19. Accession Number: 20190430–5440. Comments Due: 5 p.m. ET 5/21/19. Docket Numbers: ER19–1737–000. Applicants: New England Power Pool Participants Committee. Description: § 205(d) Rate Filing: Kuser Membership Filing to be effective 5/1/2019. Filed Date: 4/30/19. Accession Number: 20190430–5446. Comments Due: 5 p.m. ET 5/21/19. Docket Numbers: ER19–1738–000. Applicants: PSEG Fossil Sewaren Urban Renewal LLC. Description: Baseline eTariff Filing: Application for Market Based Rate to be effective 6/30/2019. Filed Date: 4/30/19. Accession Number: 20190430–5447. Comments Due: 5 p.m. ET 5/21/19. Take notice that the Commission received the following electric securities filings: Docket Numbers: ES19–27–000. Applicants: Ameren Transmission Company of Illinois. Description: Application under Section 204 of the Federal Power Act for Authorization to Issue Securities of Ameren Transmission Company of Illinois. Filed Date: 4/30/19. Accession Number: 20190430–5490. Comments Due: 5 p.m. ET 5/21/19. The filings are accessible in the Commission’s eLibrary system by E:\FR\FM\07MYN1.SGM 07MYN1 Federal Register / Vol. 84, No. 88 / Tuesday, May 7, 2019 / Notices clicking on the links or querying the docket number. Any person desiring to intervene or protest in any of the above proceedings must file in accordance with Rules 211 and 214 of the Commission’s Regulations (18 CFR 385.211 and 385.214) on or before 5:00 p.m. Eastern time on the specified comment date. Protests may be considered, but intervention is necessary to become a party to the proceeding. eFiling is encouraged. More detailed information relating to filing requirements, interventions, protests, service, and qualifying facilities filings can be found at: https://www.ferc.gov/ docs-filing/efiling/filing-req.pdf. For other information, call (866) 208–3676 (toll free). For TTY, call (202) 502–8659. Dated: May 1, 2019. Kimberly D. Bose, Secretary. [FR Doc. 2019–09291 Filed 5–6–19; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 14966–000] jbell on DSK3GLQ082PROD with NOTICES Notice of Preliminary Permit Application Accepted for Filing and Soliciting Comments, Motions To Intervene, and Competing Applications; Grid Balance Hydropower, LLC On February 25, 2019, Grid Balance Hydropower, LLC, filed an application for a preliminary permit, pursuant to section 4(f) of the Federal Power Act (FPA), proposing to study the feasibility of the Packer-Banks Pumped Storage Project to be located in Carbon County, Pennsylvania. The sole purpose of a preliminary permit, if issued, is to grant the permit holder priority to file a license application during the permit term. A preliminary permit does not authorize the permit holder to perform any land-disturbing activities or otherwise enter upon lands or waters owned by others without the owners’ express permission. The proposed project would consist of the following: (1) A new 9,500-foot-long, 80- to 120-foot-high roller-compacted concrete and/or rock-filled dam or dike forming an upper reservoir having a surface area of 120 acres and a total storage capacity of approximately 9,300 acre-feet at a normal maximum water surface elevation between approximately 1,960 and 1,860 feet above mean sea level (msl); (2) a lower VerDate Sep<11>2014 16:24 May 06, 2019 Jkt 247001 reservoir with three different options: Option A (site 1) or B (site 2) would include a new 9,500-foot-long, 85- to 95foot-high roller-compacted concrete and/or rock-filled dam or dike forming a lower reservoir having a surface area of 120 acres and a total storage capacity of approximately 9,300 acre-feet at a normal maximum water surface elevation between approximately 1,250 and 1,350 feet msl. Option C (site 3) would include a below grade mine pit with a surface area of 200 acres and a total storage capacity of approximately 10,000 acre-feet at a normal maximum water surface elevation between approximately 1,250 and 1,350 feet msl; (3) a 5,500-foot-long tunnel and/or penstock connecting the upper and lower reservoirs; (4) a powerhouse containing four turbine-generator units with a total rated capacity of 400 megawatts; (5) a transmission line connecting to an existing 230-kilovolt transmission line traversing the site; and (6) appurtenant facilities. Initial fill and make-up water for the project would come from a nearby abandoned mine drainage source. The proposed project would have an annual generation of 1,680,000 megawatt-hours. Applicant Contact: Paul A. DiRenzo, Jr., Grid Balance Hydropower, LLC, 214 Norwegian Woods Drive, Pottsville, PA 17901; phone: 570–617–7810. FERC Contact: Monir Chowdhury; phone: (202) 502–6736. Deadline for filing comments, motions to intervene, competing applications (without notices of intent), or notices of intent to file competing applications: 60 days from the issuance of this notice. Competing applications and notices of intent must meet the requirements of 18 CFR 4.36. The Commission strongly encourages electronic filing. Please file comments, motions to intervene, notices of intent, and competing applications using the Commission’s eFiling system at https:// www.ferc.gov/docs-filing/efiling.asp. Commenters can submit brief comments up to 6,000 characters, without prior registration, using the eComment system at https://www.ferc.gov/docs-filing/ ecomment.asp. You must include your name and contact information at the end of your comments. For assistance, please contact FERC Online Support at FERCOnlineSupport@ferc.gov, (866) 208–3676 (toll free), or (202) 502–8659 (TTY). In lieu of electronic filing, please send a paper copy to: Secretary, Federal Energy Regulatory Commission, 888 First Street NE, Washington, DC 20426. The first page of any filing should include docket number P–14966–000. More information about this project, including a copy of the application, can PO 00000 Frm 00023 Fmt 4703 Sfmt 4703 19921 be viewed or printed on the ‘‘eLibrary’’ link of the Commission’s website at https://www.ferc.gov/docs-filing/ elibrary.asp. Enter the docket number (P–14966) in the docket number field to access the document. For assistance, contact FERC Online Support. Dated: May 1, 2019. Kimberly D. Bose, Secretary. [FR Doc. 2019–09294 Filed 5–6–19; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. IC19–22–000] Commission Information Collection Activities; (FERC Form Nos. 1, 1–F, and 3–Q); Comment Request; Extensions Federal Energy Regulatory Commission, DOE. ACTION: Notice of information collections and request for comments. AGENCY: In compliance with the requirements of the Paperwork Reduction Act of 1995 (PRA), the Federal Energy Regulatory Commission (Commission or FERC) is soliciting public comment on the currently approved information collections, FERC Form Nos. 1 (Annual Report of Major Electric Utilities, Licensees, and Others), 1–F (Annual Report for Nonmajor Public Utilities and Licensees), and 3–Q (Quarterly Financial Report of Electric Utilities, Licensees, and Natural Gas Companies). DATES: Comments on the collections of information are due July 8, 2019. ADDRESSES: You may submit comments (identified by Docket No. IC19–22–000) by either of the following methods: • eFiling at Commission’s Website: https://www.ferc.gov/docs-filing/ efiling.asp. • Mail/Hand Delivery/Courier: Federal Energy Regulatory Commission, Secretary of the Commission, 888 First Street NE, Washington, DC 20426. Instructions: All submissions must be formatted and filed in accordance with submission guidelines at: https:// www.ferc.gov/help/submissionguide.asp. For user assistance, contact FERC Online Support by email at ferconlinesupport@ferc.gov, or by phone at: (866) 208–3676 (toll-free), or (202) 502–8659 for TTY. Docket: Users interested in receiving automatic notification of activity in this docket or in viewing/downloading SUMMARY: E:\FR\FM\07MYN1.SGM 07MYN1

Agencies

[Federal Register Volume 84, Number 88 (Tuesday, May 7, 2019)]
[Notices]
[Pages 19920-19921]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2019-09291]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission


Combined Notice of Filings #1

    Take notice that the Commission received the following electric 
rate filings:

    Docket Numbers: ER19-1541-000.
    Applicants: Midcontinent Independent System Operator, Inc.
    Description: Second Supplement to April 9, 2019 Pre-Arranged/Pre-
Agreed (Stipulation and Offer of Settlement) Filing, et al. of the 
Midcontinent Independent System Operator, Inc., et al.
    Filed Date: 4/30/19.
    Accession Number: 20190430-5489.
    Comments Due: 5 p.m. ET 5/6/19.

    Docket Numbers: ER19-1656-001.
    Applicants: Wilkinson Solar LLC.
    Description: Tariff Amendment: Supplement to Application for 
Market-Based Rate Authorization to be effective 6/24/2019.
    Filed Date: 4/24/19.
    Accession Number: 20190424-5077.
    Comments Due: 5 p.m. ET 5/15/19.

    Docket Numbers: ER19-1695-000.
    Applicants: California Transmission Project Corp.
    Description: Request for One-Time Limited Waiver, et al. of 
California Transmission Project Corp.
    Filed Date: 4/29/19.
    Accession Number: 20190429-5056.
    Comments Due: 5 p.m. ET 5/20/19.

    Docket Numbers: ER19-1733-000.
    Applicants: Sierra Pacific Power Company.
    Description: Sec.  205(d) Rate Filing: Service Agreement No. 18-
00023 SPPC/Patua to be effective 4/1/2019.
    Filed Date: 4/30/19.
    Accession Number: 20190430-5402.
    Comments Due: 5 p.m. ET 5/21/19.

    Docket Numbers: ER19-1734-000.
    Applicants: The Potomac Edison Company, PJM Interconnection, L.L.C.
    Description: Sec.  205(d) Rate Filing: Potomac submits a CA, 
Service Agreement No. 5275 with Town of Williamsport to be effective 6/
29/2019.
    Filed Date: 4/30/19.
    Accession Number: 20190430-5416.
    Comments Due: 5 p.m. ET 5/21/19.

    Docket Numbers: ER19-1735-000.
    Applicants: Sierra Pacific Power Company.
    Description: Sec.  205(d) Rate Filing: Service Agreement No. 16-
00063 SPPC/Patua to be effective 4/1/2019.
    Filed Date: 4/30/19.
    Accession Number: 20190430-5419.
    Comments Due: 5 p.m. ET 5/21/19.

    Docket Numbers: ER19-1736-000.
    Applicants: Tampa Electric Company.
    Description: Sec.  205(d) Rate Filing: Emergency Interchange 
Service Schedule A&B-2019 (Bundled) to be effective 5/1/2019.
    Filed Date: 4/30/19.
    Accession Number: 20190430-5440.
    Comments Due: 5 p.m. ET 5/21/19.

    Docket Numbers: ER19-1737-000.
    Applicants: New England Power Pool Participants Committee.
    Description: Sec.  205(d) Rate Filing: Kuser Membership Filing to 
be effective 5/1/2019.
    Filed Date: 4/30/19.
    Accession Number: 20190430-5446.
    Comments Due: 5 p.m. ET 5/21/19.

    Docket Numbers: ER19-1738-000.
    Applicants: PSEG Fossil Sewaren Urban Renewal LLC.
    Description: Baseline eTariff Filing: Application for Market Based 
Rate to be effective 6/30/2019.
    Filed Date: 4/30/19.
    Accession Number: 20190430-5447.
    Comments Due: 5 p.m. ET 5/21/19.
    Take notice that the Commission received the following electric 
securities filings:

    Docket Numbers: ES19-27-000.
    Applicants: Ameren Transmission Company of Illinois.
    Description: Application under Section 204 of the Federal Power Act 
for Authorization to Issue Securities of Ameren Transmission Company of 
Illinois.
    Filed Date: 4/30/19.
    Accession Number: 20190430-5490.
    Comments Due: 5 p.m. ET 5/21/19.
    The filings are accessible in the Commission's eLibrary system by

[[Page 19921]]

clicking on the links or querying the docket number.
    Any person desiring to intervene or protest in any of the above 
proceedings must file in accordance with Rules 211 and 214 of the 
Commission's Regulations (18 CFR 385.211 and 385.214) on or before 5:00 
p.m. Eastern time on the specified comment date. Protests may be 
considered, but intervention is necessary to become a party to the 
proceeding.
    eFiling is encouraged. More detailed information relating to filing 
requirements, interventions, protests, service, and qualifying 
facilities filings can be found at: https://www.ferc.gov/docs-filing/efiling/filing-req.pdf. For other information, call (866) 208-3676 
(toll free). For TTY, call (202) 502-8659.

    Dated: May 1, 2019.
Kimberly D. Bose,
Secretary.
[FR Doc. 2019-09291 Filed 5-6-19; 8:45 am]
BILLING CODE 6717-01-P
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.