Notice of Petition for Partial Waiver; Wabash Valley Power Association, Inc., 19920 [2019-09279]
Download as PDF
19920
Federal Register / Vol. 84, No. 88 / Tuesday, May 7, 2019 / Notices
Dated: April 29, 2019.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2019–09261 Filed 5–6–19; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket Nos. EL18–22–001; EL19–26–001]
Notice of Petition for Partial Waiver;
Wabash Valley Power Association, Inc.
Take notice that on April 30, 2019,
pursuant to section 292.402 of the
Federal Energy Regulatory
Commission’s (Commission) Rules and
Regulations,1 Wabash Valley Power
Association, Inc., on behalf of itself and
Participating Members,2 filed a notice of
change in Implementation Plan and
requests continued partial waivers
under sections 292.303(a) and
292.303(b) of the Commission’s
regulations 3 implementing section 210
of the Public Utility Regulatory Policies
Act of 1978, as amended,4 all as more
fully explained in the petition.
Any person desiring to intervene or to
protest this filing must file in
accordance with Rules 211 and 214 of
the Commission’s Rules of Practice and
Procedure (18 CFR 385.211, 385.214).
Protests will be considered by the
Commission in determining the
appropriate action to be taken, but will
not serve to make protestants parties to
the proceeding. Any person wishing to
become a party must file a notice of
intervention or motion to intervene, as
appropriate. Such notices, motions, or
protests must be filed on or before the
comment date. Anyone filing a motion
to intervene or protest must serve a copy
of that document on the Petitioner.
The Commission encourages
electronic submission of protests and
interventions in lieu of paper using the
‘‘eFiling’’ link at https://www.ferc.gov.
Persons unable to file electronically
should submit an original and 5 copies
of the protest or intervention to the
Federal Energy Regulatory Commission,
1 18
CFR 292.402.
Participating Members include: Boone
REMC, Carroll White County REMC, Citizens
Electric Corporation, Corn Belt Energy, EnerStar
Electric Cooperative, Fulton County REMC,
Heartland REMC, Jay County REMC, Kosciusko
REMC, LaGrange County REMC, Marshall County
REMC, Miami-Cass REMC, M.J.M. Electric
Cooperative, Newton County REMC, Noble REMC,
Parke County REMC, Steuben County REMC, and
Warren County REMC.
3 18 CFR 292.303(a) and (b).
4 16 U.S.C. 824a–3.
jbell on DSK3GLQ082PROD with NOTICES
2 The
VerDate Sep<11>2014
16:24 May 06, 2019
Jkt 247001
888 First Street NE, Washington, DC
20426.
This filing is accessible on-line at
https://www.ferc.gov, using the
‘‘eLibrary’’ link and is available for
review in the Commission’s Public
Reference Room in Washington, DC.
There is an ‘‘eSubscription’’ link on the
website that enables subscribers to
receive email notification when a
document is added to a subscribed
docket(s). For assistance with any FERC
Online service, please email
FERCOnlineSupport@ferc.gov, or call
(866) 208–3676 (toll free). For TTY, call
(202) 502–8659.
Comments: 5:00 p.m. Eastern Time on
May 21, 2019.
Dated: May 1, 2019.
Kimberly D. Bose,
Secretary.
[FR Doc. 2019–09279 Filed 5–6–19; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Combined Notice of Filings #1
Take notice that the Commission
received the following electric rate
filings:
Docket Numbers: ER19–1541–000.
Applicants: Midcontinent
Independent System Operator, Inc.
Description: Second Supplement to
April 9, 2019 Pre-Arranged/Pre-Agreed
(Stipulation and Offer of Settlement)
Filing, et al. of the Midcontinent
Independent System Operator, Inc., et
al.
Filed Date: 4/30/19.
Accession Number: 20190430–5489.
Comments Due: 5 p.m. ET 5/6/19.
Docket Numbers: ER19–1656–001.
Applicants: Wilkinson Solar LLC.
Description: Tariff Amendment:
Supplement to Application for MarketBased Rate Authorization to be effective
6/24/2019.
Filed Date: 4/24/19.
Accession Number: 20190424–5077.
Comments Due: 5 p.m. ET 5/15/19.
Docket Numbers: ER19–1695–000.
Applicants: California Transmission
Project Corp.
Description: Request for One-Time
Limited Waiver, et al. of California
Transmission Project Corp.
Filed Date: 4/29/19.
Accession Number: 20190429–5056.
Comments Due: 5 p.m. ET 5/20/19.
Docket Numbers: ER19–1733–000.
Applicants: Sierra Pacific Power
Company.
PO 00000
Frm 00022
Fmt 4703
Sfmt 4703
Description: § 205(d) Rate Filing:
Service Agreement No. 18–00023 SPPC/
Patua to be effective 4/1/2019.
Filed Date: 4/30/19.
Accession Number: 20190430–5402.
Comments Due: 5 p.m. ET 5/21/19.
Docket Numbers: ER19–1734–000.
Applicants: The Potomac Edison
Company, PJM Interconnection, L.L.C.
Description: § 205(d) Rate Filing:
Potomac submits a CA, Service
Agreement No. 5275 with Town of
Williamsport to be effective 6/29/2019.
Filed Date: 4/30/19.
Accession Number: 20190430–5416.
Comments Due: 5 p.m. ET 5/21/19.
Docket Numbers: ER19–1735–000.
Applicants: Sierra Pacific Power
Company.
Description: § 205(d) Rate Filing:
Service Agreement No. 16–00063 SPPC/
Patua to be effective 4/1/2019.
Filed Date: 4/30/19.
Accession Number: 20190430–5419.
Comments Due: 5 p.m. ET 5/21/19.
Docket Numbers: ER19–1736–000.
Applicants: Tampa Electric Company.
Description: § 205(d) Rate Filing:
Emergency Interchange Service
Schedule A&B–2019 (Bundled) to be
effective 5/1/2019.
Filed Date: 4/30/19.
Accession Number: 20190430–5440.
Comments Due: 5 p.m. ET 5/21/19.
Docket Numbers: ER19–1737–000.
Applicants: New England Power Pool
Participants Committee.
Description: § 205(d) Rate Filing:
Kuser Membership Filing to be effective
5/1/2019.
Filed Date: 4/30/19.
Accession Number: 20190430–5446.
Comments Due: 5 p.m. ET 5/21/19.
Docket Numbers: ER19–1738–000.
Applicants: PSEG Fossil Sewaren
Urban Renewal LLC.
Description: Baseline eTariff Filing:
Application for Market Based Rate to be
effective 6/30/2019.
Filed Date: 4/30/19.
Accession Number: 20190430–5447.
Comments Due: 5 p.m. ET 5/21/19.
Take notice that the Commission
received the following electric securities
filings:
Docket Numbers: ES19–27–000.
Applicants: Ameren Transmission
Company of Illinois.
Description: Application under
Section 204 of the Federal Power Act for
Authorization to Issue Securities of
Ameren Transmission Company of
Illinois.
Filed Date: 4/30/19.
Accession Number: 20190430–5490.
Comments Due: 5 p.m. ET 5/21/19.
The filings are accessible in the
Commission’s eLibrary system by
E:\FR\FM\07MYN1.SGM
07MYN1
Agencies
[Federal Register Volume 84, Number 88 (Tuesday, May 7, 2019)]
[Notices]
[Page 19920]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2019-09279]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Docket Nos. EL18-22-001; EL19-26-001]
Notice of Petition for Partial Waiver; Wabash Valley Power
Association, Inc.
Take notice that on April 30, 2019, pursuant to section 292.402 of
the Federal Energy Regulatory Commission's (Commission) Rules and
Regulations,\1\ Wabash Valley Power Association, Inc., on behalf of
itself and Participating Members,\2\ filed a notice of change in
Implementation Plan and requests continued partial waivers under
sections 292.303(a) and 292.303(b) of the Commission's regulations \3\
implementing section 210 of the Public Utility Regulatory Policies Act
of 1978, as amended,\4\ all as more fully explained in the petition.
---------------------------------------------------------------------------
\1\ 18 CFR 292.402.
\2\ The Participating Members include: Boone REMC, Carroll White
County REMC, Citizens Electric Corporation, Corn Belt Energy,
EnerStar Electric Cooperative, Fulton County REMC, Heartland REMC,
Jay County REMC, Kosciusko REMC, LaGrange County REMC, Marshall
County REMC, Miami-Cass REMC, M.J.M. Electric Cooperative, Newton
County REMC, Noble REMC, Parke County REMC, Steuben County REMC, and
Warren County REMC.
\3\ 18 CFR 292.303(a) and (b).
\4\ 16 U.S.C. 824a-3.
---------------------------------------------------------------------------
Any person desiring to intervene or to protest this filing must
file in accordance with Rules 211 and 214 of the Commission's Rules of
Practice and Procedure (18 CFR 385.211, 385.214). Protests will be
considered by the Commission in determining the appropriate action to
be taken, but will not serve to make protestants parties to the
proceeding. Any person wishing to become a party must file a notice of
intervention or motion to intervene, as appropriate. Such notices,
motions, or protests must be filed on or before the comment date.
Anyone filing a motion to intervene or protest must serve a copy of
that document on the Petitioner.
The Commission encourages electronic submission of protests and
interventions in lieu of paper using the ``eFiling'' link at https://www.ferc.gov. Persons unable to file electronically should submit an
original and 5 copies of the protest or intervention to the Federal
Energy Regulatory Commission, 888 First Street NE, Washington, DC
20426.
This filing is accessible on-line at https://www.ferc.gov, using the
``eLibrary'' link and is available for review in the Commission's
Public Reference Room in Washington, DC. There is an ``eSubscription''
link on the website that enables subscribers to receive email
notification when a document is added to a subscribed docket(s). For
assistance with any FERC Online service, please email
[email protected], or call (866) 208-3676 (toll free). For
TTY, call (202) 502-8659.
Comments: 5:00 p.m. Eastern Time on May 21, 2019.
Dated: May 1, 2019.
Kimberly D. Bose,
Secretary.
[FR Doc. 2019-09279 Filed 5-6-19; 8:45 am]
BILLING CODE 6717-01-P