See the Item Specific Docket Numbers Provided in the Text; Proposed Information Collection Request; Comment Request; See Item Specific ICR Titles Provided in the Text, 19777-19782 [2019-09229]
Download as PDF
Federal Register / Vol. 84, No. 87 / Monday, May 6, 2019 / Notices
ENVIRONMENTAL PROTECTION
AGENCY
[FRL–9993–18–OECA]
See the Item Specific Docket Numbers
Provided in the Text; Proposed
Information Collection Request;
Comment Request; See Item Specific
ICR Titles Provided in the Text
Environmental Protection
Agency (EPA).
ACTION: Notice.
AGENCY:
The Environmental Protection
Agency (EPA) is planning to submit the
below listed information collection
requests (ICR) to the Office of
Management and Budget (OMB) for
review and approval in accordance with
the Paperwork Reduction Act (44 U.S.C.
3501 et seq.). Before doing so, EPA is
soliciting public comments on specific
aspects of the proposed information
collection as described below. These are
proposed extensions of 41 currently
approved ICRs. An Agency may not
conduct or sponsor and a person is not
required to respond to a collection of
information unless it displays a
currently valid OMB control number.
DATES: Comments must be submitted on
or before July 5, 2019.
ADDRESSES: Submit your comments,
referencing the Docket ID numbers
provided for each item in the text,
online using www.regulations.gov (our
preferred method), by email to
docket.oeca@epa.gov, or by mail to: EPA
Docket Center, Environmental
Protection Agency, Mail Code 28221T,
1200 Pennsylvania Ave. NW,
Washington, DC 20460.
EPA’s policy is that all comments
received will be included in the public
docket without change including any
personal information provided, unless
the comment includes profanity, threats,
information claimed to be Confidential
Business Information (CBI) or other
information whose disclosure is
restricted by statute.
FOR FURTHER INFORMATION CONTACT:
Patrick Yellin, Monitoring, Assistance,
and Media Programs Division, Office of
Compliance, (Mail Code 2227A),
Environmental Protection Agency, 1200
Pennsylvania Ave. NW, Washington, DC
20460; telephone number: (202) 564–
2970; fax number: (202) 564–0050;
email address: yellin.patrick@epa.gov.
SUPPLEMENTARY INFORMATION:
Supporting documents which explain in
detail the information that the EPA will
be collecting are available in the public
docket for this ICR. The docket can be
viewed online at www.regulations.gov
or in person at the EPA Docket Center,
jbell on DSK3GLQ082PROD with NOTICES
SUMMARY:
VerDate Sep<11>2014
19:35 May 03, 2019
Jkt 247001
WJC West, Room 3334, 1301
Constitution Ave. NW, Washington, DC.
The telephone number for the Docket
Center is 202–566–1744. For additional
information about EPA’s public docket,
visit https://www.epa.gov/dockets.
Pursuant to section 3506(c)(2)(A) of
the PRA, EPA is soliciting comments
and information to enable it to: (i)
Evaluate whether the proposed
collection of information is necessary
for the proper performance of the
functions of the Agency, including
whether the information will have
practical utility; (ii) evaluate the
accuracy of the Agency’s estimate of the
burden of the proposed collection of
information, including the validity of
the methodology and assumptions used;
(iii) enhance the quality, utility, and
clarity of the information to be
collected; and (iv) minimize the burden
of the collection of information on those
who are to respond, including through
the use of appropriate automated
electronic, mechanical, or other
technological collection techniques or
other forms of information technology,
e.g., permitting electronic submission of
responses. Burden is defined at 5 CFR
1320.03(b). EPA will consider the
comments received and amend the ICR
as appropriate. The final ICR package
will then be submitted to OMB for
review and approval. At that time, EPA
will issue another Federal Register
notice to announce the submission of
the ICR to OMB and the opportunity to
submit additional comments to OMB.
General Abstract: For all the listed
ICRs in this notice, owners and
operators of affected facilities are
required to comply with reporting and
record keeping requirements for the
general provisions of 40 CFR part 60,
subpart A or part 63, subpart A, as well
as the applicable specific standards.
This includes submitting initial
notifications, performance tests and
periodic reports and results, and
maintaining records of maintain records
of the occurrence and duration of any
startup, shutdown, or malfunction in
the operation of an affected facility, or
any period during which the monitoring
system is inoperative. These reports are
used by EPA to determine compliance
with the standards.
(1) Docket ID Number: EPA–HQ–
OECA–2012–0646; NSPS for
Incinerators (40 CFR part 60, subpart E)
(Renewal); EPA ICR Number 1058.13;
OMB Control Number 2060–0040;
Expiration date November 30, 2019.
Respondents: Incinerators that charge
more than 45 metric tons per day (50
tons per day) of solid waste.
Respondent’s obligation to respond:
Mandatory (40 CFR part 60, subpart E).
PO 00000
Frm 00025
Fmt 4703
Sfmt 4703
19777
Estimated number of respondents: 82.
Frequency of response: Initially.
Estimated annual burden: 8,490
hours.
Estimated annual cost: $717,000,
includes $205,000 annualized capital or
operations & maintenance (O&M) costs.
Changes in estimates: There is no
change in burden hours from the
previous ICR.
(2) Docket ID Number: EPA–HQ–
OECA–2012–0499; NSPS for IndustrialCommercial-Institutional Steam
Generating Units (40 CFR part 60,
subpart Db) (Renewal); EPA ICR
Number 1088.15; OMB Control Number
2060–0072; Expiration date November
30, 2019.
Respondents: Industrial/commercial/
institutional steam generating units
(boilers).
Respondent’s obligation to respond:
Mandatory (40 CFR part 60, subpart Db).
Estimated number of respondents:
1846.
Frequency of response: Initially,
quarterly, and semiannually.
Estimated annual burden: 1,690,000
hours.
Estimated annual cost: $210,000,000,
includes $35,100,000 annualized capital
or O&M costs.
Changes in estimates: There is a
projected increase in burden due to an
increase in the number of sources
subject to the regulation.
(3) Docket ID Number: EPA–HQ–
OECA–2012–0662; NESHAP for
Gasoline Distribution Facilities (40 CFR
part 63, subpart R) (Renewal); EPA ICR
Number 1659.10; OMB Control Number
2060–0325; Expiration date November
30, 2019.
Respondents: Bulk gasoline terminals
with throughputs greater than 75,700
liters/day.
Respondent’s obligation to respond:
Mandatory (40 CFR part 63, subpart R).
Estimated number of respondents:
492.
Frequency of response: Initially and
semiannually.
Estimated annual burden: 15,900
hours.
Estimated annual cost: $2,000,000,
includes $357,000 annualized capital or
O&M costs.
Changes in estimates: There is no
change in burden hours from the
previous ICR.
(4) Docket ID Number: EPA–HQ–
OECA–2012–0664; NESHAP for
Commercial Ethylene Oxide
Sterilization and Fumigation Operations
(40 CFR part 63, subpart O) (Renewal);
EPA ICR Number 1666.11; OMB Control
Number 2060–0283; Expiration date
November 30, 2019.
E:\FR\FM\06MYN1.SGM
06MYN1
jbell on DSK3GLQ082PROD with NOTICES
19778
Federal Register / Vol. 84, No. 87 / Monday, May 6, 2019 / Notices
Respondents: Commercial ethylene
oxide sterilization and fumigation
operations.
Respondent’s obligation to respond:
Mandatory (40 CFR part 63, subpart O).
Estimated number of respondents:
125.
Frequency of response: Initially,
occasionally, and semiannually.
Estimated annual burden: 9,200
hours.
Estimated annual cost: $1,630,000,
includes $681,000 annualized capital or
O&M costs.
Changes in estimates: There is a
projected increase in burden due to an
increase in the number of sources
subject to the regulation.
(5) Docket ID Number: EPA–HQ–
OECA–2012–0681; NSPS for
Commercial and Industrial Solid Waste
Incineration Units (40 CFR part 60,
subpart CCC) (Renewal); EPA ICR
Number 1926.08; OMB Control Number
2060–0450; Expiration date November
30, 2019.
Respondents: Commercial and
industrial solid waste incineration
units.
Respondent’s obligation to respond:
Mandatory (40 CFR part 60, subpart
CCC).
Estimated number of respondents: 30.
Frequency of response: Initially,
occasionally, semiannually and
annually.
Estimated annual burden: 6,520
hours.
Estimated annual cost: $1,080,000,
includes $406,000 annualized capital or
O&M costs.
Changes in estimates: There is no
change in burden hours from the
previous ICR.
(6) Docket ID Number: EPA–HQ–
OECA–2012–0685; Emission Guidelines
for Existing Commerce and Industrial
Solid Waste Incineration Units (40 CFR
part 60, subpart DDDD) (Renewal); EPA
ICR Number 1927.08; OMB Control
Number 2060–0451; Expiration date
November 30, 2019.
Respondents: Commercial and
industrial solid waste incineration
units.
Respondent’s obligation to respond:
Mandatory (40 CFR part 60, subpart
DDDD).
Estimated number of respondents: 90.
Frequency of response: Initially,
occasionally, semiannually, and
annually.
Estimated annual burden: 19,700
hours.
Estimated annual cost: $3,250,000,
includes $1,220,000 annualized capital
or O&M costs.
Changes in estimates: There is no
change in burden hours from the
previous ICR.
VerDate Sep<11>2014
19:35 May 03, 2019
Jkt 247001
(7) Docket ID Number: EPA–HQ–
OECA–2012–0686; NESHAP for Organic
Liquids Distribution (Non-Gasoline)
Facilities (40 CFR part 63, subpart
EEEE) (Renewal); EPA ICR Number
1963.07; OMB Control Number 2060–
0539; Expiration date November 30,
2019.
Respondents: Organic liquids (nongasoline) distribution facilities.
Respondent’s obligation to respond:
Mandatory (40 CFR part 63, subpart
EEEE).
Estimated number of respondents:
381.
Frequency of response: Initially and
semiannually.
Estimated annual burden: 115,000
hours.
Estimated annual cost: $20,500,000,
includes $8,560,000 annualized capital
or O&M costs.
Changes in estimates: There is no
change in burden hours from the
previous ICR.
(8) Docket ID Number: EPA–HQ–
OECA–2012–0687; NESHAP for
Stationary Combustion Turbines (40
CFR part 63, subpart YYYY) (Renewal);
EPA ICR Number 1967.07; OMB Control
Number 2060–0540; Expiration date
November 30, 2019.
Respondents: Stationary combustion
turbines.
Respondent’s obligation to respond:
Mandatory (40 CFR part 63, subpart
YYYY).
Estimated number of respondents:
131.
Frequency of response: Initially,
semiannually, and annually.
Estimated annual burden: 2,220
hours.
Estimated annual cost: $239,000,
includes $9,700 annualized capital or
O&M costs.
Changes in estimates: There is a
projected increase in burden due to an
increase in the number of sources
subject to the regulation.
(9) Docket ID Number: EPA–HQ–
OECA–2012–0690; NESHAP for
Automobile and Light-duty Truck
Surface Coating (40 CFR part 63, subpart
IIII) (Renewal); EPA ICR Number
2045.07; OMB Control Number 2060–
0550; Expiration date November 30,
2019.
Respondents: Facilities that perform
surface coating on automobiles and
light-duty trucks.
Respondent’s obligation to respond:
Mandatory (40 CFR part 63, subpart IIII).
Estimated number of respondents: 65.
Frequency of response: Initially,
occasionally, and semiannually.
Estimated annual burden: 26,700
hours.
PO 00000
Frm 00026
Fmt 4703
Sfmt 4703
Estimated annual cost: $2,830,000,
includes $78,000 annualized capital or
O&M costs.
Changes in estimates: There is a
projected decrease in burden due to
anticipated shutdown of existing
sources.
(10) Docket ID Number: EPA–HQ–
OECA–2012–0695; NESHAP for Site
Remediation (40 CFR part 63, subpart
GGGGG) (Renewal); EPA ICR Number
2062.07; OMB Control Number 2060–
0534; Expiration date November 30,
2019.
Respondents: Facilities with site
remediation activities.
Respondent’s obligation to respond:
Mandatory (40 CFR part 63, subpart
GGGGG).
Estimated number of respondents:
286.
Frequency of response: Initially and
semiannually.
Estimated annual burden: 140,000
hours.
Estimated annual cost: $13,900,000,
includes $582,000 annualized capital or
O&M costs.
Changes in estimates: There is no
change in burden hours from the
previous ICR.
(11) Docket ID Number: EPA–HQ–
OECA–2012–0697; NESHAP for Iron
and Steel Foundries (40 CFR part 63,
subpart EEEEE) (Renewal); EPA ICR
Number 2096.07; OMB Control Number
2060–0543; Expiration date November
30, 2019.
Respondents: Iron and steel foundries.
Respondent’s obligation to respond:
Mandatory (40 CFR part 63, subpart
EEEEE).
Estimated number of respondents: 98.
Frequency of response: Initially,
occasionally, and semiannually.
Estimated annual burden: 30,000
hours.
Estimated annual cost: $3,490,000,
includes $400,000 annualized capital or
O&M costs.
Changes in estimates: There is no
change in burden hours from the
previous ICR.
(12) Docket ID Number: EPA–HQ–
OECA–2012–0701; NESHAP for
Miscellaneous Coating Manufacturing
(40 CFR part 63, subpart HHHHH)
(Renewal); EPA ICR Number 2115.06;
OMB Control Number 2060–0535;
Expiration date November 30, 2019.
Respondents: Facilities that
manufacture a miscellaneous coating,
including inks, paints, or adhesives.
Respondent’s obligation to respond:
Mandatory (40 CFR part 63, subpart
HHHHH).
Estimated number of respondents: 44.
Frequency of response: Initially,
occasionally, and semiannually.
E:\FR\FM\06MYN1.SGM
06MYN1
jbell on DSK3GLQ082PROD with NOTICES
Federal Register / Vol. 84, No. 87 / Monday, May 6, 2019 / Notices
Estimated annual burden: 55,800
hours.
Estimated annual cost: $6,690,000,
includes $928,000 annualized capital or
O&M costs.
Changes in estimates: There is no
change in burden hours from the
previous ICR.
(13) Docket ID Number: EPA–HQ–
OECA–2013–0318; NSPS for Magnetic
Tape Coating Facilities (40 CFR part 60,
subpart SSS) (Renewal); EPA ICR
Number 1135.13; OMB Control Number
2060–0171; Expiration date January 31,
2020.
Respondents: Magnetic tape coating
facilities constructed or modified after
January 22, 1986.
Respondent’s obligation to respond:
Mandatory (40 CFR part 60, subpart
SSS).
Estimated number of respondents: 6.
Frequency of response: Initially,
quarterly, and semiannually.
Estimated annual burden: 2,030
hours.
Estimated annual cost: $295,000,
includes $86,400 annualized capital or
O&M costs.
Changes in estimates: There is no
change in burden hours from the
previous ICR.
(14) Docket ID Number: EPA–HQ–
OECA–2013–0334; NSPS for Secondary
Brass and Bronze Production, Primary
Copper Smelters, Primary Zinc
Smelters, Primary Lead Smelters,
Primary Aluminum Reduction Plants,
and Ferroalloy Production Facilities (40
CFR part 60, subparts M, P, Q, R, S, Z)
(Renewal); EPA ICR Number 1604.12;
OMB Control Number 2060–0110;
Expiration date January 31, 2020.
Respondents: Secondary brass and
bronze production, primary copper
smelters, primary zinc smelters, primary
lead smelters, primary aluminum
reduction plants, and ferroalloy
production facilities.
Respondent’s obligation to respond:
Mandatory (40 CFR part 60, subparts M,
P, Q, R, S, and Z).
Estimated number of respondents: 18.
Frequency of response: Initially,
monthly, semiannually, and annually.
Estimated annual burden: 3,880
hours.
Estimated annual cost: $527,000,
includes $127,000 annualized capital or
O&M costs.
Changes in estimates: There is no
change in burden hours from the
previous ICR.
(15) Docket ID Number: EPA–HQ–
OECA–2013–0336; NESHAP for Off-Site
Waste and Recovery Operations (40 CFR
part 63, subpart DD) (Renewal); EPA ICR
Number 1717.12; OMB Control Number
2060–0313; Expiration date January 31,
2020.
VerDate Sep<11>2014
19:35 May 03, 2019
Jkt 247001
Respondents: Off-Site waste
management and recovery operations.
Respondent’s obligation to respond:
Mandatory (40 CFR part 63, subpart
DD).
Estimated number of respondents: 45.
Frequency of response: Initially,
occasionally, and semiannually.
Estimated annual burden: 40,600
hours.
Estimated annual cost: $5,060,000,
includes $874,000 annualized capital or
O&M costs.
Changes in estimates: There is no
change in burden hours from the
previous ICR.
(16) Docket ID Number: EPA–HQ–
OECA–2012–0676; NESHAP for
Phosphoric Acid Manufacturing and
Phosphate Fertilizers Production (40
CFR part 63, subparts AA and BB)
(Renewal); EPA ICR Number 1790.09;
OMB Control Number 2060–0361;
Expiration date January 31, 2020.
Respondents: Phosphoric acid
manufacturing and phosphate fertilizer
production facilities.
Respondent’s obligation to respond:
Mandatory (40 CFR part 63, subparts
AA and BB).
Estimated number of respondents: 13.
Frequency of response: Initially,
quarterly, annually, and semiannually.
Estimated annual burden: 2,200
hours.
Estimated annual cost: $413,000,
includes $186,000 annualized capital or
O&M costs.
Changes in estimates: There is no
change in burden hours from the
previous ICR.
(17) Docket ID Number: EPA–HQ–
OECA–2012–0679; NESHAP for
Petroleum Refineries: Catalytic Cracking
Units, Reforming and Sulfur Units (40
CFR part 63, subpart UUU) (Renewal);
EPA ICR Number 1844.09; OMB Control
Number 2060–0554; Expiration date
January 31, 2020.
Respondents: Fluid catalytic cracking
units, catalytic reforming units, and
sulfur recovery units at petroleum
refineries.
Respondent’s obligation to respond:
Mandatory (40 CFR part 63, subpart
UUU).
Estimated number of respondents:
142.
Frequency of response: Initially,
occasionally and semiannually.
Estimated annual burden: 20,200
hours.
Estimated annual cost: $10,900,000,
includes $8,820,000 annualized capital
or O&M costs.
Changes in estimates: There is no
change in burden hours from the
previous ICR.
(18) Docket ID Number: EPA–HQ–
OECA–2013–0338; NESHAP for the
PO 00000
Frm 00027
Fmt 4703
Sfmt 4703
19779
Manufacture of Amino/Phenolic Resins
(40 CFR part 63, subpart OOO)
(Renewal); EPA ICR Number 1869.11;
OMB Control Number 2060–0434;
Expiration date January 31, 2020.
Respondents: Manufacturers of
amino/phenolic resins.
Respondent’s obligation to respond:
Mandatory (40 CFR part 63, subpart
OOO).
Estimated number of respondents: 19.
Frequency of response: Initially,
occasionally, and semiannually.
Estimated annual burden: 23,300
hours.
Estimated annual cost: $3,360,000,
includes $958,000 annualized capital or
O&M costs.
Changes in estimates: There is no
change in burden hours from the
previous ICR.
(19) Docket ID Number: EPA–HQ–
OECA–2013–0339; NESHAP for Boat
Manufacturing (40 CFR part 63, subpart
VVVV) (Renewal); EPA ICR Number
1966.07; OMB Control Number 2060–
0546; Expiration date January 31, 2020.
Respondents: Boat manufacturing
facilities.
Respondent’s obligation to respond:
Mandatory (40 CFR part 63, subpart
VVVV).
Estimated number of respondents:
144.
Frequency of response: Initially,
occasionally, quarterly, and
semiannually.
Estimated annual burden: 23,500
hours.
Estimated annual cost: $2,430,000,
includes $800 annualized capital or
O&M costs.
Changes in estimates: There is a
projected decrease in burden due to
anticipated shutdown of existing
sources.
(20) Docket ID Number: EPA–HQ–
OECA–2013–0341; NESHAP for
Plywood and Composite Wood Products
(40 CFR part 63, subpart DDDD)
(Renewal); EPA ICR Number 1984.07;
OMB Control Number 2060–0552;
Expiration date January 31, 2020.
Respondents: Plywood and composite
wood products (PCWP) facilities.
Respondent’s obligation to respond:
Mandatory (40 CFR part 63, subpart
DDDD).
Estimated number of respondents:
228.
Frequency of response: Initially,
occasionally, and semiannually.
Estimated annual burden: 11,900
hours.
Estimated annual cost: $1,250,000,
includes $16,000 annualized capital or
O&M costs.
Changes in estimates: There is no
change in burden hours from the
previous ICR.
E:\FR\FM\06MYN1.SGM
06MYN1
jbell on DSK3GLQ082PROD with NOTICES
19780
Federal Register / Vol. 84, No. 87 / Monday, May 6, 2019 / Notices
(21) Docket ID Number: EPA–HQ–
OECA–2013–0345; NESHAP for Metal
Can Manufacturing Surface Coating (40
CFR part 63, subpart KKKK) (Renewal);
EPA ICR Number 2079.07; OMB Control
Number 2060–0541; Expiration date
January 31, 2020.
Respondents: Metal can
manufacturing facilities that use 5,700
liters (1,500 gallons) per year or more of
surface coatings.
Respondent’s obligation to respond:
Mandatory (40 CFR part 63, subpart
KKKK).
Estimated number of respondents: 5.
Frequency of response: Initially,
occasionally, and semiannually.
Estimated annual burden: 1,940
hours.
Estimated annual cost: $206,000,
includes $6,000 annualized capital or
O&M costs.
Changes in estimates: There is no
change in burden hours from the
previous ICR.
(22) Docket ID Number: EPA–HQ–
OECA–2013–0310; NSPS for Sewage
Sludge Treatment Plants (40 CFR part
60, subpart O) (Renewal); EPA ICR
Number 1063.14; OMB Control Number
2060–0035; Expiration date March 31,
2020.
Respondents: Incinerators at sewage
sludge treatment plants.
Respondent’s obligation to respond:
Mandatory (40 CFR part 60, subpart O).
Estimated number of respondents: 86.
Frequency of response: Initially and
semiannually.
Estimated annual burden: 9,690
hours.
Estimated annual cost: $4,050,000,
includes $3,050,000 annualized capital
or O&M costs.
Changes in estimates: There is a
projected decrease in burden due to
anticipated shutdown of existing
sources.
(23) Docket ID Number: EPA–HQ–
OECA–2013–0314; NSPS for Phosphate
Rock Plants (40 CFR part 60, subpart
NN) (Renewal); EPA ICR Number
1078.12; OMB Control Number 2060–
0111; Expiration date March 31, 2020.
Respondents: Phosphate rock plants.
Respondent’s obligation to respond:
Mandatory (40 CFR part 60, subpart
NN).
Estimated number of respondents: 15.
Frequency of response: Initially and
semiannually.
Estimated annual burden: 1,860
hours.
Estimated annual cost: $333,000,
includes $141,000 annualized capital or
O&M costs.
Changes in estimates: There is a
projected increase in burden due to an
increase in the number of sources
subject to the regulation.
VerDate Sep<11>2014
19:35 May 03, 2019
Jkt 247001
(24) Docket ID Number: EPA–HQ–
OECA–2013–0329; NSPS for Rubber
Tire Manufacturing (40 CFR part 60,
subpart BBB) (Renewal); EPA ICR
Number 1158.13; OMB Control Number
2060–0156; Expiration date March 31,
2020.
Respondents: Rubber tire
manufacturers.
Respondent’s obligation to respond:
Mandatory (40 CFR part 60, subpart
BBB).
Estimated number of respondents: 41.
Frequency of response: Initially,
occasionally, semiannually, and
annually.
Estimated annual burden: 17,700
hours.
Estimated annual cost: $1,850,000,
includes $16,400 annualized capital or
O&M costs.
Changes in estimates: There is no
change in burden hours from the
previous ICR.
(25) Docket ID Number: EPA–HQ–
OECA–2013–0335; NESHAP for
Aerospace Manufacturing and Rework
Facilities (40 CFR part 63, subpart GG)
(Renewal); EPA ICR Number 1687.12;
OMB Control Number 2060–0314;
Expiration date March 31, 2020.
Respondents: Aerospace
manufacturing and rework facilities.
Respondent’s obligation to respond:
Mandatory (40 CFR part 63, subpart
GG).
Estimated number of respondents:
144.
Frequency of response: Initially,
occasionally, and semiannually.
Estimated annual burden: 115,000
hours.
Estimated annual cost: $12,000,000,
includes $108,000 annualized capital or
O&M costs.
Changes in estimates: There is no
change in burden hours from the
previous ICR.
(26) Docket ID Number: EPA–HQ–
OECA–2013–0342; NESHAP for Lime
Manufacturing (40 CFR part 63, subpart
AAAAA) (Renewal); EPA ICR Number
2072.07; OMB Control Number 2060–
0544; Expiration date March 31, 2020.
Respondents: Lime manufacturing
plants.
Respondent’s obligation to respond:
Mandatory (40 CFR part 63, subpart
AAAAA).
Estimated number of respondents: 68.
Frequency of response: Initially,
occasionally, and semiannually.
Estimated annual burden: 16,300
hours.
Estimated annual cost: $2,010,000,
includes $325,000 annualized capital or
O&M costs.
Changes in estimates: There is a
projected increase in burden due to an
PO 00000
Frm 00028
Fmt 4703
Sfmt 4703
increase in the number of sources
subject to the regulation.
(27) Docket ID Number: EPA–HQ–
OECA–2013–0301; NESHAP for
Beryllium (40 CFR part 61, subpart C)
(Renewal); EPA ICR Number 0193.13;
OMB Control Number 2060–0092;
Expiration date March 31, 2020.
Respondents: Facilities processing
beryllium ore, beryllium, beryllium
oxides, beryllium alloys, or berylliumcontaining waste.
Respondent’s obligation to respond:
Mandatory (40 CFR part 61, subpart C).
Estimated number of respondents: 33.
Frequency of response: Initially,
occasionally, and monthly.
Estimated annual burden: 2,670
hours.
Estimated annual cost: $310,000,
includes $35,000 annualized capital or
O&M costs.
Changes in estimates: There is no
change in burden hours from the
previous ICR.
(28) Docket ID Number: EPA–HQ–
OECA–2013–0340; NESHAP for
Stationary Reciprocating Internal
Combustion Engines (40 CFR part 63,
subpart ZZZZ) (Renewal); EPA ICR
Number 1975.11; OMB Control Number
2060–0548; Expiration date April 30,
2020.
Respondents: Stationary reciprocating
internal combustion engines (RICE).
Respondent’s obligation to respond:
Mandatory (40 CFR part 63, subpart
ZZZZ).
Estimated number of respondents:
906,640.
Frequency of response: Initially,
quarterly, semiannually, and annually.
Estimated annual burden: 3,610,000
hours.
Estimated annual cost: $407,000,000,
includes $35,100,000 annualized capital
or O&M costs.
Changes in estimates: There is a
projected increase in burden due to an
increase in the number of sources
subject to the regulation.
(29) Docket ID Number: EPA–HQ–
OECA–2013–0313; NSPS for Stationary
Gas Turbines (40 CFR part 60, subpart
GG) (Renewal); EPA ICR Number
1071.13; OMB Control Number 2060–
0028; Expiration date May 31, 2020.
Respondents: Stationary gas turbines.
Respondent’s obligation to respond:
Mandatory (40 CFR part 60, subpart
GG).
Estimated number of respondents:
535.
Frequency of response: Initially and
semiannually.
Estimated annual burden: 69,100
hours.
Estimated annual cost: $7,130,000,
includes $0 annualized capital or O&M
costs.
E:\FR\FM\06MYN1.SGM
06MYN1
jbell on DSK3GLQ082PROD with NOTICES
Federal Register / Vol. 84, No. 87 / Monday, May 6, 2019 / Notices
Changes in estimates: There is no
change in burden hours from the
previous ICR.
(30) Docket ID Number: EPA–HQ–
OECA–2013–0302; NSPS for the
Graphic Arts Industry (40 CFR part 60,
subpart QQ) (Renewal); EPA ICR
Number 0657.13; OMB Control Number
2060–0105; Expiration date May 31,
2020.
Respondents: Facilities with
publication rotogravure printing
presses.
Respondent’s obligation to respond:
Mandatory (40 CFR part 60, subpart
QQ).
Estimated number of respondents: 21.
Frequency of response: Initially and
semiannually.
Estimated annual burden: 1,920
hours.
Estimated annual cost: $198,000,
includes $0 annualized capital or O&M
costs.
Changes in estimates: There is a
projected increase in burden due to an
increase in the number of new or
modified sources subject to the
regulation.
(31) Docket ID Number: EPA–HQ–
OECA–2013–0319; NSPS for VOC
Emissions from Petroleum Refinery
Wastewater Systems (40 CFR part 60,
subpart QQQ) (Renewal); EPA ICR
Number 1136.13; OMB Control Number
2060–0172; Expiration date June 30,
2020.
Respondents: Petroleum refinery
wastewater systems.
Respondent’s obligation to respond:
Mandatory (40 CFR part 60, subpart
QQQ).
Estimated number of respondents:
149.
Frequency of response: Initially,
occasionally, and semiannually.
Estimated annual burden: 10,200
hours.
Estimated annual cost: $1,070,000,
includes $19,400 annualized capital or
O&M costs.
Changes in estimates: There is no
change in burden hours from the
previous ICR.
(32) Docket ID Number: EPA–HQ–
OECA–2013–0321; NSPS for Sewage
Sludge Incinerators (40 CFR part 60,
subpart LLLL) (Renewal); EPA ICR
Number 2369.05; OMB Control Number
2060–0658; Expiration date June 30,
2020.
Respondents: Sewage sludge
incineration units.
Respondent’s obligation to respond:
Mandatory (40 CFR part 60, subpart
LLLL).
Estimated number of respondents: 5.
Frequency of response: Initially,
occasionally, semiannually, and
annually.
VerDate Sep<11>2014
19:35 May 03, 2019
Jkt 247001
Estimated annual burden: 1,270
hours.
Estimated annual cost: $825,000,
includes $694,000 annualized capital or
O&M costs.
Changes in estimates: There is a
projected increase in burden due to an
increase in the number of sources
subject to the regulation.
(33) Docket ID Number: EPA–HQ–
OECA–2013–0317; NESHAP for Gold
Mine Ore Processing (40 CFR part 63,
subpart EEEEEEE) (Renewal); EPA ICR
Number 2383.05; OMB Control Number
2060–0659; Expiration date June 30,
2020.
Respondents: Gold mine ore
processing and production facilities.
Respondent’s obligation to respond:
Mandatory (40 CFR part 63, subpart
EEEEEEE).
Estimated number of respondents: 21.
Frequency of response: Initially,
occasionally, semiannually, and
annually.
Estimated annual burden: 2,840
hours.
Estimated annual cost: $521,000,
includes $227,000 annualized capital or
O&M costs.
Changes in estimates: There is no
change in burden hours from the
previous ICR.
(34) Docket ID Number: EPA–HQ–
OECA–2013–0325; NESHAP for
Benzene Emission from Benzene Storage
Vessels and Coke Oven By-Product
Recovery Plants (40 CFR part 61,
subparts L and Y) (Renewal); EPA ICR
Number 1080.16; OMB Control Number
2060–0185; Expiration date August 31,
2020.
Respondents: Owners and operators
of benzene storage vessels and coke
oven by-product recovery plants.
Respondent’s obligation to respond:
Mandatory (40 CFR part 61, subparts L
and Y).
Estimated number of respondents: 21.
Frequency of response: Initially,
occasionally, semiannually, and
annually.
Estimated annual burden: 3,220
hours.
Estimated annual cost: $332,000,
includes $0 annualized capital or O&M
costs.
Changes in estimates: There is no
change in burden hours from the
previous ICR.
(35) Docket ID Number: EPA–HQ–
OECA–2013–0315; NSPS for
Commercial and Industrial Solid Waste
Incineration (CISWI) units (40 CFR part
60, subpart CCCC) (Renewal); EPA ICR
Number 2384.05; OMB Control Number
2060–0662; Expiration date August 31,
2020.
PO 00000
Frm 00029
Fmt 4703
Sfmt 4703
19781
Respondents: Commercial and
industrial solid waste incineration
units.
Respondent’s obligation to respond:
Mandatory (40 CFR part 60, subpart
CCCC).
Estimated number of respondents: 8.
Frequency of response: Initially,
occasionally, semiannually, and
annually.
Estimated annual burden: 1,450
hours.
Estimated annual cost: $779,000,
includes $630,000 annualized capital or
O&M costs.
Changes in estimates: There is a
projected increase in burden due to an
increase in the number of sources
subject to the regulation.
(36) Docket ID Number: EPA–HQ–
OECA–2014–0063; NESHAP for
Polyether Polyols Production (40 CFR
part 63, subpart PPP) (Renewal); EPA
ICR Number 1811.11; OMB Control
Number 2060–0415; Expiration date
September 30, 2020.
Respondents: Polyether polyols
production facilities.
Respondent’s obligation to respond:
Mandatory (40 CFR part 63, subpart
PPP).
Estimated number of respondents: 23.
Frequency of response: Initially,
occasionally, and semiannually.
Estimated annual burden: 3,710
hours.
Estimated annual cost: $383,000,
includes $0 annualized capital or O&M
costs.
Changes in estimates: There is no
change in burden hours from the
previous ICR.
(37) Docket ID Number: EPA–HQ–
OECA–2013–0350; The Consolidated
Air Rule (CAR) for the Synthetic
Organic Chemical Manufacturing
Industry (SOCMI) (Renewal); EPA ICR
Number 1854.11; OMB Control Number
2060–0443; Expiration date September
30, 2020.
Respondents: Synthetic organic
chemical manufacturing facilities.
Respondent’s obligation to respond:
Mandatory (40 CFR part 65).
Estimated number of respondents:
5,198.
Frequency of response: Initially,
occasionally, semiannually and
annually.
Estimated annual burden: 2,210,000
hours.
Estimated annual cost: $337,000,000,
includes $105,000,000 annualized
capital or O&M costs.
Changes in estimates: There is a
projected increase in burden due to an
increase in the number of sources
subject to the regulation.
(38) Docket ID Number: EPA–HQ–
OECA–2013–0353; NSPS for Stationary
E:\FR\FM\06MYN1.SGM
06MYN1
jbell on DSK3GLQ082PROD with NOTICES
19782
Federal Register / Vol. 84, No. 87 / Monday, May 6, 2019 / Notices
Spark Ignition Internal Combustion
Engines (40 CFR part 60, subpart JJJJ)
(Renewal); EPA ICR Number 2227.06;
OMB Control Number 2060–0610;
Expiration date September 30, 2020.
Respondents: Stationary spark
ignition internal combustion engines.
Respondent’s obligation to respond:
Mandatory (40 CFR part 60, subpart JJJJ).
Estimated number of respondents:
18,570.
Frequency of response: Initially and
annually.
Estimated annual burden: 35,100
hours.
Estimated annual cost: $6,140,000,
includes $2,480,000 annualized capital
or O&M costs.
Changes in estimates: There is a
projected increase in burden due to an
increase in the number of sources
subject to the regulation.
(39) Docket ID Number: EPA–HQ–
OECA–2016–0009; NESHAP for Group
IV Polymers and Resins (40 CFR part 63,
subpart JJJ) (Renewal); EPA ICR Number
2457.04; OMB Control Number 2060–
0682; Expiration date September 30,
2020.
Respondents: Thermoplastic resin
production facilities.
Respondent’s obligation to respond:
Mandatory (40 CFR part 63, subpart JJJ).
Estimated number of respondents: 31.
Frequency of response: Initially,
occasionally, quarterly, and
semiannually.
Estimated annual burden: 177,000
hours.
Estimated annual cost: $28,000,000,
includes $9,350,000 annualized capital
or O&M costs.
Changes in estimates: There is no
change in burden hours from the
previous ICR.
(40) Docket ID Number: EPA–HQ–
OECA–2014–0034; NSPS for Kraft Pulp
Mills (40 CFR part 60, subpart BB)
(Renewal); EPA ICR Number 2485.04;
OMB Control Number 2060–0690;
Expiration date September 30, 2020.
Respondents: Kraft pulp mills.
Respondent’s obligation to respond:
Mandatory (40 CFR part 60, subpart BB).
Estimated number of respondents: 10.
Frequency of response: Initially,
occasionally, and semiannually.
Estimated annual burden: 3,950
hours.
Estimated annual cost: $1,230,000,
includes $821,000 annualized capital or
O&M costs.
Changes in estimates: There is a
projected increase in burden due to an
increase in the number of sources
subject to the regulation.
(41) Docket ID Number: EPA–HQ–
OECA–2013–0303; NSPS for Equipment
Leaks of VOC in Petroleum Refineries
VerDate Sep<11>2014
19:35 May 03, 2019
Jkt 247001
(40 CFR part 60, subparts GGG and
GGGa) (Renewal); EPA ICR Number
0983.16; OMB Control Number 2060–
0067; Expiration date September 30,
2020.
Respondents: Petroleum refineries.
Respondent’s obligation to respond:
Mandatory (40 CFR part 60, subparts
GGG and GGGa).
Estimated number of respondents:
116.
Frequency of response: Initially and
semiannually.
Estimated annual burden: 183,400
hours.
Estimated annual cost: $18,940,000,
includes $0 annualized capital or O&M
costs.
Changes in estimates: There is no
change in burden hours from the
previous ICR.
Dated: April 17, 2019.
Martha Segall,
Acting Director, Monitoring, Assistance and
Media Programs Division, Office of
Compliance.
[FR Doc. 2019–09229 Filed 5–3–19; 8:45 am]
BILLING CODE 6560–50–P
ENVIRONMENTAL PROTECTION
AGENCY
[EPA–HQ–OPP–2009–0361; FRL–9992–96]
Glyphosate Proposed Interim
Registration Review Decision; Notice
of Availability
Environmental Protection
Agency (EPA).
ACTION: Notice.
AGENCY:
This document announces the
availability of EPA’s Proposed Interim
Registration Review Decision for
glyphosate and opens a 60-day public
comment period on the proposed
decision.
DATES: Comments must be received on
or before July 5, 2019.
ADDRESSES: Submit your comments,
identified by the docket identification
(ID) number for the specific pesticide of
interest provided in the Table in Unit
IV, by one of the following methods:
• Federal eRulemaking Portal: https://
www.regulations.gov. Follow the online
instructions for submitting comments.
Do not submit electronically any
information you consider to be
Confidential Business Information (CBI)
or other information whose disclosure is
restricted by statute.
• Mail: OPP Docket, Environmental
Protection Agency Docket Center (EPA/
DC), (28221T), 1200 Pennsylvania Ave.
NW, Washington, DC 20460–0001.
• Hand Delivery: To make special
arrangements for hand delivery or
SUMMARY:
PO 00000
Frm 00030
Fmt 4703
Sfmt 4703
delivery of boxed information, please
follow the instructions at https://
www.epa.gov/dockets/contacts.html.
Additional instructions on commenting
or visiting the docket, along with more
information about dockets generally, is
available at https://www.epa.gov/
dockets.
FOR FURTHER INFORMATION CONTACT: For
pesticide specific information, contact:
The glyphosate registration review
email address identified in the Table in
Unit IV.
For general information on the
registration review program, contact:
Dana Friedman, Pesticide Re-Evaluation
Division (7508P), Office of Pesticide
Programs, Environmental Protection
Agency, 1200 Pennsylvania Ave. NW,
Washington, DC 20460–0001; telephone
number: (703) 347–8827; email address:
friedman.dana@epa.gov.
SUPPLEMENTARY INFORMATION:
I. General Information
A. Does this action apply to me?
This action is directed to the public
in general and may be of interest to a
wide range of stakeholders including
environmental, human health, farm
worker, and agricultural advocates; the
chemical industry; pesticide users; and
members of the public interested in the
sale, distribution, or use of pesticides.
Since others also may be interested, the
Agency has not attempted to describe all
the specific entities that may be affected
by this action. If you have any questions
regarding the applicability of this action
to a particular entity, contact the
glyphosate registration review email
address and phone number identified in
the Table in Unit IV.
B. What should I consider as I prepare
my comments for EPA?
1. Submitting CBI. Do not submit this
information to EPA through
regulations.gov or email. Clearly mark
the part or all of the information that
you claim to be CBI. For CBI
information on a disk or CD–ROM that
you mail to EPA, mark the outside of the
disk or CD–ROM as CBI and then
identify electronically within the disk or
CD–ROM the specific information that
is claimed as CBI. In addition to one
complete version of the comment that
includes information claimed as CBI, a
copy of the comment that does not
contain the information claimed as CBI
must be submitted for inclusion in the
public docket. Information so marked
will not be disclosed except in
accordance with procedures set forth in
40 CFR part 2.
2. Tips for preparing your comments.
When preparing and submitting your
E:\FR\FM\06MYN1.SGM
06MYN1
Agencies
[Federal Register Volume 84, Number 87 (Monday, May 6, 2019)]
[Notices]
[Pages 19777-19782]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2019-09229]
[[Page 19777]]
=======================================================================
-----------------------------------------------------------------------
ENVIRONMENTAL PROTECTION AGENCY
[FRL-9993-18-OECA]
See the Item Specific Docket Numbers Provided in the Text;
Proposed Information Collection Request; Comment Request; See Item
Specific ICR Titles Provided in the Text
AGENCY: Environmental Protection Agency (EPA).
ACTION: Notice.
-----------------------------------------------------------------------
SUMMARY: The Environmental Protection Agency (EPA) is planning to
submit the below listed information collection requests (ICR) to the
Office of Management and Budget (OMB) for review and approval in
accordance with the Paperwork Reduction Act (44 U.S.C. 3501 et seq.).
Before doing so, EPA is soliciting public comments on specific aspects
of the proposed information collection as described below. These are
proposed extensions of 41 currently approved ICRs. An Agency may not
conduct or sponsor and a person is not required to respond to a
collection of information unless it displays a currently valid OMB
control number.
DATES: Comments must be submitted on or before July 5, 2019.
ADDRESSES: Submit your comments, referencing the Docket ID numbers
provided for each item in the text, online using www.regulations.gov
(our preferred method), by email to [email protected], or by mail to:
EPA Docket Center, Environmental Protection Agency, Mail Code 28221T,
1200 Pennsylvania Ave. NW, Washington, DC 20460.
EPA's policy is that all comments received will be included in the
public docket without change including any personal information
provided, unless the comment includes profanity, threats, information
claimed to be Confidential Business Information (CBI) or other
information whose disclosure is restricted by statute.
FOR FURTHER INFORMATION CONTACT: Patrick Yellin, Monitoring,
Assistance, and Media Programs Division, Office of Compliance, (Mail
Code 2227A), Environmental Protection Agency, 1200 Pennsylvania Ave.
NW, Washington, DC 20460; telephone number: (202) 564-2970; fax number:
(202) 564-0050; email address: [email protected].
SUPPLEMENTARY INFORMATION: Supporting documents which explain in detail
the information that the EPA will be collecting are available in the
public docket for this ICR. The docket can be viewed online at
www.regulations.gov or in person at the EPA Docket Center, WJC West,
Room 3334, 1301 Constitution Ave. NW, Washington, DC. The telephone
number for the Docket Center is 202-566-1744. For additional
information about EPA's public docket, visit https://www.epa.gov/dockets.
Pursuant to section 3506(c)(2)(A) of the PRA, EPA is soliciting
comments and information to enable it to: (i) Evaluate whether the
proposed collection of information is necessary for the proper
performance of the functions of the Agency, including whether the
information will have practical utility; (ii) evaluate the accuracy of
the Agency's estimate of the burden of the proposed collection of
information, including the validity of the methodology and assumptions
used; (iii) enhance the quality, utility, and clarity of the
information to be collected; and (iv) minimize the burden of the
collection of information on those who are to respond, including
through the use of appropriate automated electronic, mechanical, or
other technological collection techniques or other forms of information
technology, e.g., permitting electronic submission of responses. Burden
is defined at 5 CFR 1320.03(b). EPA will consider the comments received
and amend the ICR as appropriate. The final ICR package will then be
submitted to OMB for review and approval. At that time, EPA will issue
another Federal Register notice to announce the submission of the ICR
to OMB and the opportunity to submit additional comments to OMB.
General Abstract: For all the listed ICRs in this notice, owners
and operators of affected facilities are required to comply with
reporting and record keeping requirements for the general provisions of
40 CFR part 60, subpart A or part 63, subpart A, as well as the
applicable specific standards. This includes submitting initial
notifications, performance tests and periodic reports and results, and
maintaining records of maintain records of the occurrence and duration
of any startup, shutdown, or malfunction in the operation of an
affected facility, or any period during which the monitoring system is
inoperative. These reports are used by EPA to determine compliance with
the standards.
(1) Docket ID Number: EPA-HQ-OECA-2012-0646; NSPS for Incinerators
(40 CFR part 60, subpart E) (Renewal); EPA ICR Number 1058.13; OMB
Control Number 2060-0040; Expiration date November 30, 2019.
Respondents: Incinerators that charge more than 45 metric tons per
day (50 tons per day) of solid waste.
Respondent's obligation to respond: Mandatory (40 CFR part 60,
subpart E).
Estimated number of respondents: 82.
Frequency of response: Initially.
Estimated annual burden: 8,490 hours.
Estimated annual cost: $717,000, includes $205,000 annualized
capital or operations & maintenance (O&M) costs.
Changes in estimates: There is no change in burden hours from the
previous ICR.
(2) Docket ID Number: EPA-HQ-OECA-2012-0499; NSPS for Industrial-
Commercial-Institutional Steam Generating Units (40 CFR part 60,
subpart Db) (Renewal); EPA ICR Number 1088.15; OMB Control Number 2060-
0072; Expiration date November 30, 2019.
Respondents: Industrial/commercial/institutional steam generating
units (boilers).
Respondent's obligation to respond: Mandatory (40 CFR part 60,
subpart Db).
Estimated number of respondents: 1846.
Frequency of response: Initially, quarterly, and semiannually.
Estimated annual burden: 1,690,000 hours.
Estimated annual cost: $210,000,000, includes $35,100,000
annualized capital or O&M costs.
Changes in estimates: There is a projected increase in burden due
to an increase in the number of sources subject to the regulation.
(3) Docket ID Number: EPA-HQ-OECA-2012-0662; NESHAP for Gasoline
Distribution Facilities (40 CFR part 63, subpart R) (Renewal); EPA ICR
Number 1659.10; OMB Control Number 2060-0325; Expiration date November
30, 2019.
Respondents: Bulk gasoline terminals with throughputs greater than
75,700 liters/day.
Respondent's obligation to respond: Mandatory (40 CFR part 63,
subpart R).
Estimated number of respondents: 492.
Frequency of response: Initially and semiannually.
Estimated annual burden: 15,900 hours.
Estimated annual cost: $2,000,000, includes $357,000 annualized
capital or O&M costs.
Changes in estimates: There is no change in burden hours from the
previous ICR.
(4) Docket ID Number: EPA-HQ-OECA-2012-0664; NESHAP for Commercial
Ethylene Oxide Sterilization and Fumigation Operations (40 CFR part 63,
subpart O) (Renewal); EPA ICR Number 1666.11; OMB Control Number 2060-
0283; Expiration date November 30, 2019.
[[Page 19778]]
Respondents: Commercial ethylene oxide sterilization and fumigation
operations.
Respondent's obligation to respond: Mandatory (40 CFR part 63,
subpart O).
Estimated number of respondents: 125.
Frequency of response: Initially, occasionally, and semiannually.
Estimated annual burden: 9,200 hours.
Estimated annual cost: $1,630,000, includes $681,000 annualized
capital or O&M costs.
Changes in estimates: There is a projected increase in burden due
to an increase in the number of sources subject to the regulation.
(5) Docket ID Number: EPA-HQ-OECA-2012-0681; NSPS for Commercial
and Industrial Solid Waste Incineration Units (40 CFR part 60, subpart
CCC) (Renewal); EPA ICR Number 1926.08; OMB Control Number 2060-0450;
Expiration date November 30, 2019.
Respondents: Commercial and industrial solid waste incineration
units.
Respondent's obligation to respond: Mandatory (40 CFR part 60,
subpart CCC).
Estimated number of respondents: 30.
Frequency of response: Initially, occasionally, semiannually and
annually.
Estimated annual burden: 6,520 hours.
Estimated annual cost: $1,080,000, includes $406,000 annualized
capital or O&M costs.
Changes in estimates: There is no change in burden hours from the
previous ICR.
(6) Docket ID Number: EPA-HQ-OECA-2012-0685; Emission Guidelines
for Existing Commerce and Industrial Solid Waste Incineration Units (40
CFR part 60, subpart DDDD) (Renewal); EPA ICR Number 1927.08; OMB
Control Number 2060-0451; Expiration date November 30, 2019.
Respondents: Commercial and industrial solid waste incineration
units.
Respondent's obligation to respond: Mandatory (40 CFR part 60,
subpart DDDD).
Estimated number of respondents: 90.
Frequency of response: Initially, occasionally, semiannually, and
annually.
Estimated annual burden: 19,700 hours.
Estimated annual cost: $3,250,000, includes $1,220,000 annualized
capital or O&M costs.
Changes in estimates: There is no change in burden hours from the
previous ICR.
(7) Docket ID Number: EPA-HQ-OECA-2012-0686; NESHAP for Organic
Liquids Distribution (Non-Gasoline) Facilities (40 CFR part 63, subpart
EEEE) (Renewal); EPA ICR Number 1963.07; OMB Control Number 2060-0539;
Expiration date November 30, 2019.
Respondents: Organic liquids (non-gasoline) distribution
facilities.
Respondent's obligation to respond: Mandatory (40 CFR part 63,
subpart EEEE).
Estimated number of respondents: 381.
Frequency of response: Initially and semiannually.
Estimated annual burden: 115,000 hours.
Estimated annual cost: $20,500,000, includes $8,560,000 annualized
capital or O&M costs.
Changes in estimates: There is no change in burden hours from the
previous ICR.
(8) Docket ID Number: EPA-HQ-OECA-2012-0687; NESHAP for Stationary
Combustion Turbines (40 CFR part 63, subpart YYYY) (Renewal); EPA ICR
Number 1967.07; OMB Control Number 2060-0540; Expiration date November
30, 2019.
Respondents: Stationary combustion turbines.
Respondent's obligation to respond: Mandatory (40 CFR part 63,
subpart YYYY).
Estimated number of respondents: 131.
Frequency of response: Initially, semiannually, and annually.
Estimated annual burden: 2,220 hours.
Estimated annual cost: $239,000, includes $9,700 annualized capital
or O&M costs.
Changes in estimates: There is a projected increase in burden due
to an increase in the number of sources subject to the regulation.
(9) Docket ID Number: EPA-HQ-OECA-2012-0690; NESHAP for Automobile
and Light-duty Truck Surface Coating (40 CFR part 63, subpart IIII)
(Renewal); EPA ICR Number 2045.07; OMB Control Number 2060-0550;
Expiration date November 30, 2019.
Respondents: Facilities that perform surface coating on automobiles
and light-duty trucks.
Respondent's obligation to respond: Mandatory (40 CFR part 63,
subpart IIII).
Estimated number of respondents: 65.
Frequency of response: Initially, occasionally, and semiannually.
Estimated annual burden: 26,700 hours.
Estimated annual cost: $2,830,000, includes $78,000 annualized
capital or O&M costs.
Changes in estimates: There is a projected decrease in burden due
to anticipated shutdown of existing sources.
(10) Docket ID Number: EPA-HQ-OECA-2012-0695; NESHAP for Site
Remediation (40 CFR part 63, subpart GGGGG) (Renewal); EPA ICR Number
2062.07; OMB Control Number 2060-0534; Expiration date November 30,
2019.
Respondents: Facilities with site remediation activities.
Respondent's obligation to respond: Mandatory (40 CFR part 63,
subpart GGGGG).
Estimated number of respondents: 286.
Frequency of response: Initially and semiannually.
Estimated annual burden: 140,000 hours.
Estimated annual cost: $13,900,000, includes $582,000 annualized
capital or O&M costs.
Changes in estimates: There is no change in burden hours from the
previous ICR.
(11) Docket ID Number: EPA-HQ-OECA-2012-0697; NESHAP for Iron and
Steel Foundries (40 CFR part 63, subpart EEEEE) (Renewal); EPA ICR
Number 2096.07; OMB Control Number 2060-0543; Expiration date November
30, 2019.
Respondents: Iron and steel foundries.
Respondent's obligation to respond: Mandatory (40 CFR part 63,
subpart EEEEE).
Estimated number of respondents: 98.
Frequency of response: Initially, occasionally, and semiannually.
Estimated annual burden: 30,000 hours.
Estimated annual cost: $3,490,000, includes $400,000 annualized
capital or O&M costs.
Changes in estimates: There is no change in burden hours from the
previous ICR.
(12) Docket ID Number: EPA-HQ-OECA-2012-0701; NESHAP for
Miscellaneous Coating Manufacturing (40 CFR part 63, subpart HHHHH)
(Renewal); EPA ICR Number 2115.06; OMB Control Number 2060-0535;
Expiration date November 30, 2019.
Respondents: Facilities that manufacture a miscellaneous coating,
including inks, paints, or adhesives.
Respondent's obligation to respond: Mandatory (40 CFR part 63,
subpart HHHHH).
Estimated number of respondents: 44.
Frequency of response: Initially, occasionally, and semiannually.
[[Page 19779]]
Estimated annual burden: 55,800 hours.
Estimated annual cost: $6,690,000, includes $928,000 annualized
capital or O&M costs.
Changes in estimates: There is no change in burden hours from the
previous ICR.
(13) Docket ID Number: EPA-HQ-OECA-2013-0318; NSPS for Magnetic
Tape Coating Facilities (40 CFR part 60, subpart SSS) (Renewal); EPA
ICR Number 1135.13; OMB Control Number 2060-0171; Expiration date
January 31, 2020.
Respondents: Magnetic tape coating facilities constructed or
modified after January 22, 1986.
Respondent's obligation to respond: Mandatory (40 CFR part 60,
subpart SSS).
Estimated number of respondents: 6.
Frequency of response: Initially, quarterly, and semiannually.
Estimated annual burden: 2,030 hours.
Estimated annual cost: $295,000, includes $86,400 annualized
capital or O&M costs.
Changes in estimates: There is no change in burden hours from the
previous ICR.
(14) Docket ID Number: EPA-HQ-OECA-2013-0334; NSPS for Secondary
Brass and Bronze Production, Primary Copper Smelters, Primary Zinc
Smelters, Primary Lead Smelters, Primary Aluminum Reduction Plants, and
Ferroalloy Production Facilities (40 CFR part 60, subparts M, P, Q, R,
S, Z) (Renewal); EPA ICR Number 1604.12; OMB Control Number 2060-0110;
Expiration date January 31, 2020.
Respondents: Secondary brass and bronze production, primary copper
smelters, primary zinc smelters, primary lead smelters, primary
aluminum reduction plants, and ferroalloy production facilities.
Respondent's obligation to respond: Mandatory (40 CFR part 60,
subparts M, P, Q, R, S, and Z).
Estimated number of respondents: 18.
Frequency of response: Initially, monthly, semiannually, and
annually.
Estimated annual burden: 3,880 hours.
Estimated annual cost: $527,000, includes $127,000 annualized
capital or O&M costs.
Changes in estimates: There is no change in burden hours from the
previous ICR.
(15) Docket ID Number: EPA-HQ-OECA-2013-0336; NESHAP for Off-Site
Waste and Recovery Operations (40 CFR part 63, subpart DD) (Renewal);
EPA ICR Number 1717.12; OMB Control Number 2060-0313; Expiration date
January 31, 2020.
Respondents: Off-Site waste management and recovery operations.
Respondent's obligation to respond: Mandatory (40 CFR part 63,
subpart DD).
Estimated number of respondents: 45.
Frequency of response: Initially, occasionally, and semiannually.
Estimated annual burden: 40,600 hours.
Estimated annual cost: $5,060,000, includes $874,000 annualized
capital or O&M costs.
Changes in estimates: There is no change in burden hours from the
previous ICR.
(16) Docket ID Number: EPA-HQ-OECA-2012-0676; NESHAP for Phosphoric
Acid Manufacturing and Phosphate Fertilizers Production (40 CFR part
63, subparts AA and BB) (Renewal); EPA ICR Number 1790.09; OMB Control
Number 2060-0361; Expiration date January 31, 2020.
Respondents: Phosphoric acid manufacturing and phosphate fertilizer
production facilities.
Respondent's obligation to respond: Mandatory (40 CFR part 63,
subparts AA and BB).
Estimated number of respondents: 13.
Frequency of response: Initially, quarterly, annually, and
semiannually.
Estimated annual burden: 2,200 hours.
Estimated annual cost: $413,000, includes $186,000 annualized
capital or O&M costs.
Changes in estimates: There is no change in burden hours from the
previous ICR.
(17) Docket ID Number: EPA-HQ-OECA-2012-0679; NESHAP for Petroleum
Refineries: Catalytic Cracking Units, Reforming and Sulfur Units (40
CFR part 63, subpart UUU) (Renewal); EPA ICR Number 1844.09; OMB
Control Number 2060-0554; Expiration date January 31, 2020.
Respondents: Fluid catalytic cracking units, catalytic reforming
units, and sulfur recovery units at petroleum refineries.
Respondent's obligation to respond: Mandatory (40 CFR part 63,
subpart UUU).
Estimated number of respondents: 142.
Frequency of response: Initially, occasionally and semiannually.
Estimated annual burden: 20,200 hours.
Estimated annual cost: $10,900,000, includes $8,820,000 annualized
capital or O&M costs.
Changes in estimates: There is no change in burden hours from the
previous ICR.
(18) Docket ID Number: EPA-HQ-OECA-2013-0338; NESHAP for the
Manufacture of Amino/Phenolic Resins (40 CFR part 63, subpart OOO)
(Renewal); EPA ICR Number 1869.11; OMB Control Number 2060-0434;
Expiration date January 31, 2020.
Respondents: Manufacturers of amino/phenolic resins.
Respondent's obligation to respond: Mandatory (40 CFR part 63,
subpart OOO).
Estimated number of respondents: 19.
Frequency of response: Initially, occasionally, and semiannually.
Estimated annual burden: 23,300 hours.
Estimated annual cost: $3,360,000, includes $958,000 annualized
capital or O&M costs.
Changes in estimates: There is no change in burden hours from the
previous ICR.
(19) Docket ID Number: EPA-HQ-OECA-2013-0339; NESHAP for Boat
Manufacturing (40 CFR part 63, subpart VVVV) (Renewal); EPA ICR Number
1966.07; OMB Control Number 2060-0546; Expiration date January 31,
2020.
Respondents: Boat manufacturing facilities.
Respondent's obligation to respond: Mandatory (40 CFR part 63,
subpart VVVV).
Estimated number of respondents: 144.
Frequency of response: Initially, occasionally, quarterly, and
semiannually.
Estimated annual burden: 23,500 hours.
Estimated annual cost: $2,430,000, includes $800 annualized capital
or O&M costs.
Changes in estimates: There is a projected decrease in burden due
to anticipated shutdown of existing sources.
(20) Docket ID Number: EPA-HQ-OECA-2013-0341; NESHAP for Plywood
and Composite Wood Products (40 CFR part 63, subpart DDDD) (Renewal);
EPA ICR Number 1984.07; OMB Control Number 2060-0552; Expiration date
January 31, 2020.
Respondents: Plywood and composite wood products (PCWP) facilities.
Respondent's obligation to respond: Mandatory (40 CFR part 63,
subpart DDDD).
Estimated number of respondents: 228.
Frequency of response: Initially, occasionally, and semiannually.
Estimated annual burden: 11,900 hours.
Estimated annual cost: $1,250,000, includes $16,000 annualized
capital or O&M costs.
Changes in estimates: There is no change in burden hours from the
previous ICR.
[[Page 19780]]
(21) Docket ID Number: EPA-HQ-OECA-2013-0345; NESHAP for Metal Can
Manufacturing Surface Coating (40 CFR part 63, subpart KKKK) (Renewal);
EPA ICR Number 2079.07; OMB Control Number 2060-0541; Expiration date
January 31, 2020.
Respondents: Metal can manufacturing facilities that use 5,700
liters (1,500 gallons) per year or more of surface coatings.
Respondent's obligation to respond: Mandatory (40 CFR part 63,
subpart KKKK).
Estimated number of respondents: 5.
Frequency of response: Initially, occasionally, and semiannually.
Estimated annual burden: 1,940 hours.
Estimated annual cost: $206,000, includes $6,000 annualized capital
or O&M costs.
Changes in estimates: There is no change in burden hours from the
previous ICR.
(22) Docket ID Number: EPA-HQ-OECA-2013-0310; NSPS for Sewage
Sludge Treatment Plants (40 CFR part 60, subpart O) (Renewal); EPA ICR
Number 1063.14; OMB Control Number 2060-0035; Expiration date March 31,
2020.
Respondents: Incinerators at sewage sludge treatment plants.
Respondent's obligation to respond: Mandatory (40 CFR part 60,
subpart O).
Estimated number of respondents: 86.
Frequency of response: Initially and semiannually.
Estimated annual burden: 9,690 hours.
Estimated annual cost: $4,050,000, includes $3,050,000 annualized
capital or O&M costs.
Changes in estimates: There is a projected decrease in burden due
to anticipated shutdown of existing sources.
(23) Docket ID Number: EPA-HQ-OECA-2013-0314; NSPS for Phosphate
Rock Plants (40 CFR part 60, subpart NN) (Renewal); EPA ICR Number
1078.12; OMB Control Number 2060-0111; Expiration date March 31, 2020.
Respondents: Phosphate rock plants.
Respondent's obligation to respond: Mandatory (40 CFR part 60,
subpart NN).
Estimated number of respondents: 15.
Frequency of response: Initially and semiannually.
Estimated annual burden: 1,860 hours.
Estimated annual cost: $333,000, includes $141,000 annualized
capital or O&M costs.
Changes in estimates: There is a projected increase in burden due
to an increase in the number of sources subject to the regulation.
(24) Docket ID Number: EPA-HQ-OECA-2013-0329; NSPS for Rubber Tire
Manufacturing (40 CFR part 60, subpart BBB) (Renewal); EPA ICR Number
1158.13; OMB Control Number 2060-0156; Expiration date March 31, 2020.
Respondents: Rubber tire manufacturers.
Respondent's obligation to respond: Mandatory (40 CFR part 60,
subpart BBB).
Estimated number of respondents: 41.
Frequency of response: Initially, occasionally, semiannually, and
annually.
Estimated annual burden: 17,700 hours.
Estimated annual cost: $1,850,000, includes $16,400 annualized
capital or O&M costs.
Changes in estimates: There is no change in burden hours from the
previous ICR.
(25) Docket ID Number: EPA-HQ-OECA-2013-0335; NESHAP for Aerospace
Manufacturing and Rework Facilities (40 CFR part 63, subpart GG)
(Renewal); EPA ICR Number 1687.12; OMB Control Number 2060-0314;
Expiration date March 31, 2020.
Respondents: Aerospace manufacturing and rework facilities.
Respondent's obligation to respond: Mandatory (40 CFR part 63,
subpart GG).
Estimated number of respondents: 144.
Frequency of response: Initially, occasionally, and semiannually.
Estimated annual burden: 115,000 hours.
Estimated annual cost: $12,000,000, includes $108,000 annualized
capital or O&M costs.
Changes in estimates: There is no change in burden hours from the
previous ICR.
(26) Docket ID Number: EPA-HQ-OECA-2013-0342; NESHAP for Lime
Manufacturing (40 CFR part 63, subpart AAAAA) (Renewal); EPA ICR Number
2072.07; OMB Control Number 2060-0544; Expiration date March 31, 2020.
Respondents: Lime manufacturing plants.
Respondent's obligation to respond: Mandatory (40 CFR part 63,
subpart AAAAA).
Estimated number of respondents: 68.
Frequency of response: Initially, occasionally, and semiannually.
Estimated annual burden: 16,300 hours.
Estimated annual cost: $2,010,000, includes $325,000 annualized
capital or O&M costs.
Changes in estimates: There is a projected increase in burden due
to an increase in the number of sources subject to the regulation.
(27) Docket ID Number: EPA-HQ-OECA-2013-0301; NESHAP for Beryllium
(40 CFR part 61, subpart C) (Renewal); EPA ICR Number 0193.13; OMB
Control Number 2060-0092; Expiration date March 31, 2020.
Respondents: Facilities processing beryllium ore, beryllium,
beryllium oxides, beryllium alloys, or beryllium-containing waste.
Respondent's obligation to respond: Mandatory (40 CFR part 61,
subpart C).
Estimated number of respondents: 33.
Frequency of response: Initially, occasionally, and monthly.
Estimated annual burden: 2,670 hours.
Estimated annual cost: $310,000, includes $35,000 annualized
capital or O&M costs.
Changes in estimates: There is no change in burden hours from the
previous ICR.
(28) Docket ID Number: EPA-HQ-OECA-2013-0340; NESHAP for Stationary
Reciprocating Internal Combustion Engines (40 CFR part 63, subpart
ZZZZ) (Renewal); EPA ICR Number 1975.11; OMB Control Number 2060-0548;
Expiration date April 30, 2020.
Respondents: Stationary reciprocating internal combustion engines
(RICE).
Respondent's obligation to respond: Mandatory (40 CFR part 63,
subpart ZZZZ).
Estimated number of respondents: 906,640.
Frequency of response: Initially, quarterly, semiannually, and
annually.
Estimated annual burden: 3,610,000 hours.
Estimated annual cost: $407,000,000, includes $35,100,000
annualized capital or O&M costs.
Changes in estimates: There is a projected increase in burden due
to an increase in the number of sources subject to the regulation.
(29) Docket ID Number: EPA-HQ-OECA-2013-0313; NSPS for Stationary
Gas Turbines (40 CFR part 60, subpart GG) (Renewal); EPA ICR Number
1071.13; OMB Control Number 2060-0028; Expiration date May 31, 2020.
Respondents: Stationary gas turbines.
Respondent's obligation to respond: Mandatory (40 CFR part 60,
subpart GG).
Estimated number of respondents: 535.
Frequency of response: Initially and semiannually.
Estimated annual burden: 69,100 hours.
Estimated annual cost: $7,130,000, includes $0 annualized capital
or O&M costs.
[[Page 19781]]
Changes in estimates: There is no change in burden hours from the
previous ICR.
(30) Docket ID Number: EPA-HQ-OECA-2013-0302; NSPS for the Graphic
Arts Industry (40 CFR part 60, subpart QQ) (Renewal); EPA ICR Number
0657.13; OMB Control Number 2060-0105; Expiration date May 31, 2020.
Respondents: Facilities with publication rotogravure printing
presses.
Respondent's obligation to respond: Mandatory (40 CFR part 60,
subpart QQ).
Estimated number of respondents: 21.
Frequency of response: Initially and semiannually.
Estimated annual burden: 1,920 hours.
Estimated annual cost: $198,000, includes $0 annualized capital or
O&M costs.
Changes in estimates: There is a projected increase in burden due
to an increase in the number of new or modified sources subject to the
regulation.
(31) Docket ID Number: EPA-HQ-OECA-2013-0319; NSPS for VOC
Emissions from Petroleum Refinery Wastewater Systems (40 CFR part 60,
subpart QQQ) (Renewal); EPA ICR Number 1136.13; OMB Control Number
2060-0172; Expiration date June 30, 2020.
Respondents: Petroleum refinery wastewater systems.
Respondent's obligation to respond: Mandatory (40 CFR part 60,
subpart QQQ).
Estimated number of respondents: 149.
Frequency of response: Initially, occasionally, and semiannually.
Estimated annual burden: 10,200 hours.
Estimated annual cost: $1,070,000, includes $19,400 annualized
capital or O&M costs.
Changes in estimates: There is no change in burden hours from the
previous ICR.
(32) Docket ID Number: EPA-HQ-OECA-2013-0321; NSPS for Sewage
Sludge Incinerators (40 CFR part 60, subpart LLLL) (Renewal); EPA ICR
Number 2369.05; OMB Control Number 2060-0658; Expiration date June 30,
2020.
Respondents: Sewage sludge incineration units.
Respondent's obligation to respond: Mandatory (40 CFR part 60,
subpart LLLL).
Estimated number of respondents: 5.
Frequency of response: Initially, occasionally, semiannually, and
annually.
Estimated annual burden: 1,270 hours.
Estimated annual cost: $825,000, includes $694,000 annualized
capital or O&M costs.
Changes in estimates: There is a projected increase in burden due
to an increase in the number of sources subject to the regulation.
(33) Docket ID Number: EPA-HQ-OECA-2013-0317; NESHAP for Gold Mine
Ore Processing (40 CFR part 63, subpart EEEEEEE) (Renewal); EPA ICR
Number 2383.05; OMB Control Number 2060-0659; Expiration date June 30,
2020.
Respondents: Gold mine ore processing and production facilities.
Respondent's obligation to respond: Mandatory (40 CFR part 63,
subpart EEEEEEE).
Estimated number of respondents: 21.
Frequency of response: Initially, occasionally, semiannually, and
annually.
Estimated annual burden: 2,840 hours.
Estimated annual cost: $521,000, includes $227,000 annualized
capital or O&M costs.
Changes in estimates: There is no change in burden hours from the
previous ICR.
(34) Docket ID Number: EPA-HQ-OECA-2013-0325; NESHAP for Benzene
Emission from Benzene Storage Vessels and Coke Oven By-Product Recovery
Plants (40 CFR part 61, subparts L and Y) (Renewal); EPA ICR Number
1080.16; OMB Control Number 2060-0185; Expiration date August 31, 2020.
Respondents: Owners and operators of benzene storage vessels and
coke oven by-product recovery plants.
Respondent's obligation to respond: Mandatory (40 CFR part 61,
subparts L and Y).
Estimated number of respondents: 21.
Frequency of response: Initially, occasionally, semiannually, and
annually.
Estimated annual burden: 3,220 hours.
Estimated annual cost: $332,000, includes $0 annualized capital or
O&M costs.
Changes in estimates: There is no change in burden hours from the
previous ICR.
(35) Docket ID Number: EPA-HQ-OECA-2013-0315; NSPS for Commercial
and Industrial Solid Waste Incineration (CISWI) units (40 CFR part 60,
subpart CCCC) (Renewal); EPA ICR Number 2384.05; OMB Control Number
2060-0662; Expiration date August 31, 2020.
Respondents: Commercial and industrial solid waste incineration
units.
Respondent's obligation to respond: Mandatory (40 CFR part 60,
subpart CCCC).
Estimated number of respondents: 8.
Frequency of response: Initially, occasionally, semiannually, and
annually.
Estimated annual burden: 1,450 hours.
Estimated annual cost: $779,000, includes $630,000 annualized
capital or O&M costs.
Changes in estimates: There is a projected increase in burden due
to an increase in the number of sources subject to the regulation.
(36) Docket ID Number: EPA-HQ-OECA-2014-0063; NESHAP for Polyether
Polyols Production (40 CFR part 63, subpart PPP) (Renewal); EPA ICR
Number 1811.11; OMB Control Number 2060-0415; Expiration date September
30, 2020.
Respondents: Polyether polyols production facilities.
Respondent's obligation to respond: Mandatory (40 CFR part 63,
subpart PPP).
Estimated number of respondents: 23.
Frequency of response: Initially, occasionally, and semiannually.
Estimated annual burden: 3,710 hours.
Estimated annual cost: $383,000, includes $0 annualized capital or
O&M costs.
Changes in estimates: There is no change in burden hours from the
previous ICR.
(37) Docket ID Number: EPA-HQ-OECA-2013-0350; The Consolidated Air
Rule (CAR) for the Synthetic Organic Chemical Manufacturing Industry
(SOCMI) (Renewal); EPA ICR Number 1854.11; OMB Control Number 2060-
0443; Expiration date September 30, 2020.
Respondents: Synthetic organic chemical manufacturing facilities.
Respondent's obligation to respond: Mandatory (40 CFR part 65).
Estimated number of respondents: 5,198.
Frequency of response: Initially, occasionally, semiannually and
annually.
Estimated annual burden: 2,210,000 hours.
Estimated annual cost: $337,000,000, includes $105,000,000
annualized capital or O&M costs.
Changes in estimates: There is a projected increase in burden due
to an increase in the number of sources subject to the regulation.
(38) Docket ID Number: EPA-HQ-OECA-2013-0353; NSPS for Stationary
[[Page 19782]]
Spark Ignition Internal Combustion Engines (40 CFR part 60, subpart
JJJJ) (Renewal); EPA ICR Number 2227.06; OMB Control Number 2060-0610;
Expiration date September 30, 2020.
Respondents: Stationary spark ignition internal combustion engines.
Respondent's obligation to respond: Mandatory (40 CFR part 60,
subpart JJJJ).
Estimated number of respondents: 18,570.
Frequency of response: Initially and annually.
Estimated annual burden: 35,100 hours.
Estimated annual cost: $6,140,000, includes $2,480,000 annualized
capital or O&M costs.
Changes in estimates: There is a projected increase in burden due
to an increase in the number of sources subject to the regulation.
(39) Docket ID Number: EPA-HQ-OECA-2016-0009; NESHAP for Group IV
Polymers and Resins (40 CFR part 63, subpart JJJ) (Renewal); EPA ICR
Number 2457.04; OMB Control Number 2060-0682; Expiration date September
30, 2020.
Respondents: Thermoplastic resin production facilities.
Respondent's obligation to respond: Mandatory (40 CFR part 63,
subpart JJJ).
Estimated number of respondents: 31.
Frequency of response: Initially, occasionally, quarterly, and
semiannually.
Estimated annual burden: 177,000 hours.
Estimated annual cost: $28,000,000, includes $9,350,000 annualized
capital or O&M costs.
Changes in estimates: There is no change in burden hours from the
previous ICR.
(40) Docket ID Number: EPA-HQ-OECA-2014-0034; NSPS for Kraft Pulp
Mills (40 CFR part 60, subpart BB) (Renewal); EPA ICR Number 2485.04;
OMB Control Number 2060-0690; Expiration date September 30, 2020.
Respondents: Kraft pulp mills.
Respondent's obligation to respond: Mandatory (40 CFR part 60,
subpart BB).
Estimated number of respondents: 10.
Frequency of response: Initially, occasionally, and semiannually.
Estimated annual burden: 3,950 hours.
Estimated annual cost: $1,230,000, includes $821,000 annualized
capital or O&M costs.
Changes in estimates: There is a projected increase in burden due
to an increase in the number of sources subject to the regulation.
(41) Docket ID Number: EPA-HQ-OECA-2013-0303; NSPS for Equipment
Leaks of VOC in Petroleum Refineries (40 CFR part 60, subparts GGG and
GGGa) (Renewal); EPA ICR Number 0983.16; OMB Control Number 2060-0067;
Expiration date September 30, 2020.
Respondents: Petroleum refineries.
Respondent's obligation to respond: Mandatory (40 CFR part 60,
subparts GGG and GGGa).
Estimated number of respondents: 116.
Frequency of response: Initially and semiannually.
Estimated annual burden: 183,400 hours.
Estimated annual cost: $18,940,000, includes $0 annualized capital
or O&M costs.
Changes in estimates: There is no change in burden hours from the
previous ICR.
Dated: April 17, 2019.
Martha Segall,
Acting Director, Monitoring, Assistance and Media Programs Division,
Office of Compliance.
[FR Doc. 2019-09229 Filed 5-3-19; 8:45 am]
BILLING CODE 6560-50-P