DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. CP19–99–000]
Notice of Schedule for Environmental
Review of the Natural Gas Pipeline
Company of America Gulf Coast
Southbound Project
On February 28, 2019, Natural Gas
Pipeline Company of America (Natural)
filed an application in Docket No.
CP19–99–000 requesting a Certificate of
Public Convenience and Necessity and
Abandonment Authority pursuant to
Sections 7(c) and 7(b) of the Natural Gas
Act to construct, operate, and abandon
certain natural gas pipeline facilities.
The proposed project, known as the
Gulf Coast Southbound Project (Project),
would expand the southbound
transportation capacity of Natural’s Gulf
Coast Mainline System by 300,000
dekatherms per day through
modifications at five existing natural gas
compressor stations in the state of
Texas.
On March 6, 2019, the Federal Energy
Regulatory Commission (Commission or
FERC) issued its Notice of Application
for the Project. Among other things, that
notice alerted agencies issuing federal
authorizations of the requirement to
complete all necessary reviews and to
reach a final decision on a request for
a federal authorization within 90 days of
the date of issuance of the Commission
staff’s Environmental Assessment (EA)
for the Project. This instant notice
identifies the FERC staff’s planned
schedule for the completion of the EA
for the Project.
jbell on DSK3GLQ082PROD with NOTICES
Schedule for Environmental Review
Issuance of EA—October 23, 2019
90-day Federal Authorization Decision
Deadline—January 21, 2020
If a schedule change becomes
necessary, additional notice will be
provided so that the relevant agencies
are kept informed of the Project’s
progress.
Project Description
As part of the Project, Natural would
conduct the following activities (all
locations are in the state of Texas):
VerDate Sep<11>2014
19:35 May 03, 2019
Jkt 247001
• Install one new electric motor
driven compressor unit with a rating of
10,000 horsepower, abandon two
existing compressor units, and add
cooling equipment and a new filter
separator at existing Compressor Station
300 in Victoria County.
• Install one Solar Mars 100 turbine
with a rating of 15,900 horsepower, add
cooling equipment, and replace two
filter separators at existing Compressor
Station 301 in Wharton County.
• Install two Solar Titan 130 turbines
with a rating of 23,470 horsepower each,
abandon in place 10 existing
compressor units, and add cooling
equipment and filter separators at
existing Compressor Station 304 in
Harrison County.
• Install gas coolers and filter
separators at existing Compressor
Stations 303 and 394 in Angelina and
Cass Counties, respectively.
Background
On April 9, 2019, the Commission
issued a Notice of Intent to Prepare an
Environmental Assessment for the
Proposed Gulf Southbound Project and
Request for Comments on
Environmental Issues (NOI). The NOI
was sent to affected landowners; federal,
state, and local government agencies;
elected officials; Native American tribes;
other interested parties; and local
libraries and newspapers. All
substantive comments received will be
addressed in the EA. As of the date of
issuance of this notice, no comments
have been received.
Additional Information
In order to receive notification of the
issuance of the EA and to keep track of
all formal issuances and submittals in
specific dockets, the Commission offers
a free service called eSubscription. This
can reduce the amount of time you
spend researching proceedings by
automatically providing you with
notification of these filings, document
summaries, and direct links to the
documents. Go to www.ferc.gov/docsfiling/esubscription.asp.
Additional information about the
Project is available from the
Commission’s Office of External Affairs
at (866) 208–FERC or on the FERC
website (www.ferc.gov). Using the
‘‘eLibrary’’ link, select ‘‘General Search’’
from the eLibrary menu, enter the
selected date range and ‘‘Docket
Number’’ excluding the last three digits
(i.e., CP19–99), and follow the
instructions. For assistance with access
to eLibrary, the helpline can be reached
at (866) 208–3676, TTY (202) 502–8659,
or at FERCOnlineSupport@ferc.gov. The
eLibrary link on the FERC website also
PO 00000
Frm 00021
Fmt 4703
Sfmt 4703
19773
provides access to the texts of formal
documents issued by the Commission,
such as orders, notices, and rule
makings.
Dated: April 29, 2019.
Kimberly D. Bose,
Secretary.
[FR Doc. 2019–09198 Filed 5–3–19; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Combined Notice of Filings
Take notice that the Commission has
received the following Natural Gas
Pipeline Rate and Refund Report filings:
Filings Instituting Proceedings
Docket Number: PR18–81–001.
Applicants: Agua Blanca, LLC.
Description: Tariff filing per
284.123(b),(e)/: Amendment to 2 to be
effective 7/1/2018.
Filed Date: 4/25/19.
Accession Number: 201904255104.
Comments/Protests Due: 5 p.m. ET
5/16/19.
Docket Numbers: RP19–1149–000.
Applicants: Algonquin Gas
Transmission, LLC.
Description: § 4(d) Rate Filing:
Negotiated Rates—Various Releases to
BBPC eff 5–1–2019 to be effective
5/1/2019.
Filed Date: 4/25/19.
Accession Number: 20190425–5004.
Comments Due: 5 p.m. ET 5/7/19.
Docket Numbers: RP19–1150–000.
Applicants: Alliance Pipeline L.P.
Description: § 4(d) Rate Filing: April
2019 Negotiated Rate Cleanup Filing to
be effective 5/28/2019.
Filed Date: 4/25/19.
Accession Number: 20190425–5020.
Comments Due: 5 p.m. ET 5/7/19.
Docket Numbers: RP19–1152–000.
Applicants: El Paso Natural Gas
Company, L.L.C.
Description: § 4(d) Rate Filing: NonConforming Negotiated Rate Agreement
Update (SoCal June 19) to be effective
6/1/2019.
Filed Date: 4/25/19.
Accession Number: 20190425–5087.
Comments Due: 5 p.m. ET 5/7/19.
Docket Numbers: RP19–1153–000.
Applicants: Texas Eastern
Transmission, LP.
Description: § 4(d) Rate Filing:
Negotiated Rate—Chevron 911109 5–1–
19 Release to be effective 5/1/2019.
Filed Date: 4/25/19.
Accession Number: 20190425–5105.
E:\FR\FM\06MYN1.SGM
06MYN1
Agencies
[Federal Register Volume 84, Number 87 (Monday, May 6, 2019)]
[Notices]
[Page 19773]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2019-09198]
=======================================================================
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Docket No. CP19-99-000]
Notice of Schedule for Environmental Review of the Natural Gas
Pipeline Company of America Gulf Coast Southbound Project
On February 28, 2019, Natural Gas Pipeline Company of America
(Natural) filed an application in Docket No. CP19-99-000 requesting a
Certificate of Public Convenience and Necessity and Abandonment
Authority pursuant to Sections 7(c) and 7(b) of the Natural Gas Act to
construct, operate, and abandon certain natural gas pipeline
facilities. The proposed project, known as the Gulf Coast Southbound
Project (Project), would expand the southbound transportation capacity
of Natural's Gulf Coast Mainline System by 300,000 dekatherms per day
through modifications at five existing natural gas compressor stations
in the state of Texas.
On March 6, 2019, the Federal Energy Regulatory Commission
(Commission or FERC) issued its Notice of Application for the Project.
Among other things, that notice alerted agencies issuing federal
authorizations of the requirement to complete all necessary reviews and
to reach a final decision on a request for a federal authorization
within 90 days of the date of issuance of the Commission staff's
Environmental Assessment (EA) for the Project. This instant notice
identifies the FERC staff's planned schedule for the completion of the
EA for the Project.
Schedule for Environmental Review
Issuance of EA--October 23, 2019
90-day Federal Authorization Decision Deadline--January 21, 2020
If a schedule change becomes necessary, additional notice will be
provided so that the relevant agencies are kept informed of the
Project's progress.
Project Description
As part of the Project, Natural would conduct the following
activities (all locations are in the state of Texas):
Install one new electric motor driven compressor unit with
a rating of 10,000 horsepower, abandon two existing compressor units,
and add cooling equipment and a new filter separator at existing
Compressor Station 300 in Victoria County.
Install one Solar Mars 100 turbine with a rating of 15,900
horsepower, add cooling equipment, and replace two filter separators at
existing Compressor Station 301 in Wharton County.
Install two Solar Titan 130 turbines with a rating of
23,470 horsepower each, abandon in place 10 existing compressor units,
and add cooling equipment and filter separators at existing Compressor
Station 304 in Harrison County.
Install gas coolers and filter separators at existing
Compressor Stations 303 and 394 in Angelina and Cass Counties,
respectively.
Background
On April 9, 2019, the Commission issued a Notice of Intent to
Prepare an Environmental Assessment for the Proposed Gulf Southbound
Project and Request for Comments on Environmental Issues (NOI). The NOI
was sent to affected landowners; federal, state, and local government
agencies; elected officials; Native American tribes; other interested
parties; and local libraries and newspapers. All substantive comments
received will be addressed in the EA. As of the date of issuance of
this notice, no comments have been received.
Additional Information
In order to receive notification of the issuance of the EA and to
keep track of all formal issuances and submittals in specific dockets,
the Commission offers a free service called eSubscription. This can
reduce the amount of time you spend researching proceedings by
automatically providing you with notification of these filings,
document summaries, and direct links to the documents. Go to
www.ferc.gov/docs-filing/esubscription.asp.
Additional information about the Project is available from the
Commission's Office of External Affairs at (866) 208-FERC or on the
FERC website (www.ferc.gov). Using the ``eLibrary'' link, select
``General Search'' from the eLibrary menu, enter the selected date
range and ``Docket Number'' excluding the last three digits (i.e.,
CP19-99), and follow the instructions. For assistance with access to
eLibrary, the helpline can be reached at (866) 208-3676, TTY (202) 502-
8659, or at [email protected]. The eLibrary link on the FERC
website also provides access to the texts of formal documents issued by
the Commission, such as orders, notices, and rule makings.
Dated: April 29, 2019.
Kimberly D. Bose,
Secretary.
[FR Doc. 2019-09198 Filed 5-3-19; 8:45 am]
BILLING CODE 6717-01-P